Bao Hengda Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to Sep 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 13 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1452 Clement St | new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom.Details
new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom. | $150,000 |
| May 21, 2026 | Completed final sign-off Oct 2026 | 1428 18th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $65,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 2259 27th Av | revision to permit 202510097131. revise rear window sizes. reconfigure kitchen layout, and barn doors in office on 2/f. new slab and foundations.Details
revision to permit 202510097131. revise rear window sizes. reconfigure kitchen layout, and barn doors in office on 2/f. new slab and foundations. | $3,000 |
| Jan 3, 2026 | In progress issued Sep 2026 | 2306 30th Av | 1/f: add 2 bedroom, 1 full bath, family, office & laundry. 2/f: remodel kitchen & bathroom. relocate 2 bedrooms. replace all windows in-kind w/ vinyl. rear addition.Details
1/f: add 2 bedroom, 1 full bath, family, office & laundry. 2/f: remodel kitchen & bathroom. relocate 2 bedrooms. replace all windows in-kind w/ vinyl. rear addition. | $280,000 |
| Oct 9, 2025 | In progress issued Dec 2025 | 2259 27th Av | 1st floor: relocate laundry, add family room with wet bar, mudroom, playroom, 1 bedroom and bathroom. 2nd floor: reconfigure kitchen and dining, remodel existing bedrooms & bathroom, add 1 office & bathroom. remove existing rear shed, infill light-well, & new patio at rear.Details
1st floor: relocate laundry, add family room with wet bar, mudroom, playroom, 1 bedroom and bathroom. 2nd floor: reconfigure kitchen and dining, remodel existing bedrooms & bathroom, add 1 office & bathroom. remove existing rear shed, infill light-well, & new patio at rear. | $220,000 |
| Sep 3, 2025 | Completed final sign-off Feb 2026 | 531 Bowdoin St | rev to pa# 2025-0318-2500: remove one skylight in the roof, add beam in the 2nd fl. and remove footing in the first fl. add two burner stove on first flr.Details
rev to pa# 2025-0318-2500: remove one skylight in the roof, add beam in the 2nd fl. and remove footing in the first fl. add two burner stove on first flr. | |
| Jun 4, 2025 | Completed final sign-off Oct 2025 | 726 Junipero Serra Bl | interior bath remodel within (e) building. no changes to building footprint or exterior. associated plumbing and electrical workDetails
interior bath remodel within (e) building. no changes to building footprint or exterior. associated plumbing and electrical work | $20,552 |
| Mar 18, 2025 | Completed final sign-off Feb 2026 | 531 Bowdoin St | 2nd fl. remodel -relocated kitchen, family room and one bath 1st fl. legalizing one full bath, one office and one media room, remove illegal sun roomDetails
2nd fl. remodel -relocated kitchen, family room and one bath 1st fl. legalizing one full bath, one office and one media room, remove illegal sun room | $60,000 |
| May 24, 2024 | Completed final sign-off Nov 2024 | 184 Locksley Av | unit #5: remodel a kitchen. remodel a bathroom. add 20 lights.Details
unit #5: remodel a kitchen. remodel a bathroom. add 20 lights. | $50,000 |
| May 8, 2024 | In progress issued May 2024 | 150 Anzavista Av | reconnecting extg room gas heaters instead of mini split in original permit drawings. have new title 24. modification in location of gas meters. (pg&e moved them). revision to pa#202107214868Details
reconnecting extg room gas heaters instead of mini split in original permit drawings. have new title 24. modification in location of gas meters. (pg&e moved them). revision to pa#202107214868 | |
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 5173 Diamond Heights Bl | remodel (1) bathroom in kindDetails
remodel (1) bathroom in kind | $12,000 |
| Oct 26, 2022 | Completed final sign-off Oct 2023 | 68 Morningside Dr | remodel the bathroom: change tub to standing shower, replace tiles, replace sink, replace, cabinets, and add one light. no moving wallls. no changing layout.Details
remodel the bathroom: change tub to standing shower, replace tiles, replace sink, replace, cabinets, and add one light. no moving wallls. no changing layout. | $11,000 |
| Oct 13, 2022 | Completed final sign-off May 2023 | 18 Gardenside Dr | remove 12 street facing existing windows and replace with whole aluminum frame window in existing units.Details
remove 12 street facing existing windows and replace with whole aluminum frame window in existing units. | $5,000 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 2134 36th Av | remodel one kitchen and two bathrooms.Details
remodel one kitchen and two bathrooms. | $25,000 |
| Aug 2, 2021 | Completed final sign-off Jun 2022 | 2731 Golden Gate Av | remodel two existing bathroom in kind without any changes to square footage or structural work. lights per cec 150.0 (k)Details
remodel two existing bathroom in kind without any changes to square footage or structural work. lights per cec 150.0 (k) | $20,000 |
| Jul 21, 2021 | Never finaled issued Mar 2022, no final | 150 Anzavista Av | the scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit.Details
the scope of work is to convert an existing recreation room into an adu per the multi-family ministerial state adu law. no waivers required. sprinkler under separate permit. | $90,000 |
| Jan 29, 2021 | Completed final sign-off Apr 2022 | 471 40th Av | rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front.Details
rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front. | $100,000 |
| Oct 23, 2020 | Completed final sign-off Dec 2020 | 1554 29th Av | repair the siding wall on the backside of the house.Details
repair the siding wall on the backside of the house. | $2,800 |
| Dec 18, 2019 | Completed final sign-off Apr 2022 | 471 40th Av | rear ground fl horizontal infilled under 2nd fl projection. remove (e) deck and stair filled in (e) openings, create (n) opening in officeDetails
rear ground fl horizontal infilled under 2nd fl projection. remove (e) deck and stair filled in (e) openings, create (n) opening in office | $100,000 |