Ket Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Jun 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 29 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jul 2026 | 3936 21st St | interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated.Details
interior remodel converting on habitable 1st fl space into habitable spaces inlculding a bath, media, study, gym, and wine room. new window being installed on rear facade. the existing buildings gross floor area is not being modified. 836 sf of prev e occupied floor is being renovated. | $100,000 |
| Jun 24, 2026 | In progress issued Sep 2026 | 1683 21st Av | 2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741Details
2 story and 1 story lightwell infill on left south side.1 story lightwell infill north side. dryrot repair frnt stairs. gr fl:provide rms down consist of family rm,bedrm, bath, lndry rm. replce & relcate wtr hter & furnace in garage.2nd fl: relocate kitchen, remodel e bath. novs 202314806,202314741 | $85,000 |
| Aug 15, 2025 | In progress issued Nov 2025 | 1638 11th Av | 1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows.Details
1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows. | $95,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 1523 12th Av | remodel one kitchen in kind on 2nd fl. and one kitchen in kind on 3rd fl. rewire electrical on 2nd and 3rd floor. new subpanel for 2nd and 3rd fl. electrical work with select demo and fishing. replace sheet rock in kind with 5/8" type x. each kitchen approx. 95 sq ft.Details
remodel one kitchen in kind on 2nd fl. and one kitchen in kind on 3rd fl. rewire electrical on 2nd and 3rd floor. new subpanel for 2nd and 3rd fl. electrical work with select demo and fishing. replace sheet rock in kind with 5/8" type x. each kitchen approx. 95 sq ft. | $42,000 |
| Jul 7, 2025 | Completed final sign-off Aug 2026 | 390 Capp St | 1/f: (n) 795sf adu. convert (e) garage into (n) bedroom, convert (e) media room into (n) kitchen & (e) bedroom into (n) living room.Details
1/f: (n) 795sf adu. convert (e) garage into (n) bedroom, convert (e) media room into (n) kitchen & (e) bedroom into (n) living room. | $50,000 |
| May 29, 2025 | Completed final sign-off Feb 2026 | 828 Cortland Av | revision to pa 202502271216 window material change from wood cladding to vinyl windowsDetails
revision to pa 202502271216 window material change from wood cladding to vinyl windows | |
| May 16, 2025 | Completed final sign-off Apr 2026 | 3936 21st St | ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windowsDetails
ground fl: rebuild stair 2nd fl: remodel kitchen, relocate bath, infill light court, upgrade stairs to 1st fl, modify (e) rear roof deck. 3rd fl: remodel master bath & bath, infill light court. replace & upgrade windows | $220,000 |
| Feb 27, 2025 | Completed final sign-off Feb 2026 | 828 Cortland Av | residential ti to remodel (e) residential unit at 2nd floor. scope of work includes demo of non structrual interior partitions and remodel bedrooms, bathrooms, and kitchenDetails
residential ti to remodel (e) residential unit at 2nd floor. scope of work includes demo of non structrual interior partitions and remodel bedrooms, bathrooms, and kitchen | $120,000 |
| Mar 23, 2024 | In progress issued Dec 2025 | 2195 Quesada Av | legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition.Details
legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition. | $120,000 |
| Feb 7, 2024 | Completed final sign-off Oct 2024 | 190 Collins St | to remodel 4 units w/ 3 kitchens & 4 bathrooms. remodel at unit 190, 190a, 192, & 192a. (no kitchen remodel at unit 192a), no exterior work re-locate entrance door @ unit 192, adding and remodelling clossets all four units per plans.Details
to remodel 4 units w/ 3 kitchens & 4 bathrooms. remodel at unit 190, 190a, 192, & 192a. (no kitchen remodel at unit 192a), no exterior work re-locate entrance door @ unit 192, adding and remodelling clossets all four units per plans. | $100,000 |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 1261 45th Av | install kitchenette (1263 45th ave) on the g/f. install kitchenette (1261 45th ave) on 4/f.Details
install kitchenette (1263 45th ave) on the g/f. install kitchenette (1261 45th ave) on 4/f. | $30,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2024 | 837 26th Av | 1st floor: add family, bedroom, full bath and power room. new wet bar and relocate laundry. 2nd floor: reconfigure (e) kitchen and bathroom per layout. add 1 full bath. nrew roof deck. infill north side lightwell (not visible from street) and new skylights.Details
1st floor: add family, bedroom, full bath and power room. new wet bar and relocate laundry. 2nd floor: reconfigure (e) kitchen and bathroom per layout. add 1 full bath. nrew roof deck. infill north side lightwell (not visible from street) and new skylights. | $180,000 |
| Jul 11, 2023 | Completed final sign-off May 2024 | 2395 27th Av | repair wooden exterior stairway. less than 50%Details
repair wooden exterior stairway. less than 50% | $2,500 |
| Dec 13, 2022 | Completed final sign-off Dec 2022 | 1501 Waller St | revision to pa#202206136171 to provide as built dimensions of restroom, turning clearance and general clearances. provide product specs for installed ada compliance door pull.Details
revision to pa#202206136171 to provide as built dimensions of restroom, turning clearance and general clearances. provide product specs for installed ada compliance door pull. | |
| Aug 24, 2022 | Completed final sign-off Nov 2023 | 1646 34th Av | revision to bpa#202207128293. 2/f: new island sink, remove (1) tub, reconfigure (2) sky light sizesDetails
revision to bpa#202207128293. 2/f: new island sink, remove (1) tub, reconfigure (2) sky light sizes | |
| Jul 29, 2022 | Completed final sign-off Nov 2023 | 1646 34th Av | replace front (4) windows in kind with aluminum clad wood windows. casement and fixd windows. sliding window to be casementDetails
replace front (4) windows in kind with aluminum clad wood windows. casement and fixd windows. sliding window to be casement | $500 |
| Jul 12, 2022 | Completed final sign-off Nov 2023 | 1646 34th Av | 1st/fl: add 1 bedroom, family rm, & full bathroom. 2nd/fl: remodel kitchen, bathroom, add office and full bathroom. total remodel.Details
1st/fl: add 1 bedroom, family rm, & full bathroom. 2nd/fl: remodel kitchen, bathroom, add office and full bathroom. total remodel. | $110,000 |
| Jun 13, 2022 | Completed final sign-off Dec 2022 | 1501 Waller St | change of use & tenant improvement. conversion from yoga studio into nail salon includes remodel of (e) non-compliant restroom and upgrades to accessibility including entrance. no change in floor area.Details
change of use & tenant improvement. conversion from yoga studio into nail salon includes remodel of (e) non-compliant restroom and upgrades to accessibility including entrance. no change in floor area. | $85,000 |
| May 5, 2022 | Completed final sign-off May 2022 | 1631 26th Av | structural revision to pa# 202105240854. new foundation at rear wall of garage. reduce scope of founation replacement between lines b-e and 3-4.Details
structural revision to pa# 202105240854. new foundation at rear wall of garage. reduce scope of founation replacement between lines b-e and 3-4. | $800 |
| May 2, 2022 | Completed final sign-off May 2022 | 1631 26th Av | revision to app# 202105240854. revise mechanical report. new radiant heat. remove duct leakage inspection.Details
revision to app# 202105240854. revise mechanical report. new radiant heat. remove duct leakage inspection. | |
| Feb 10, 2022 | Completed final sign-off Jul 2022 | 2059 44th Av | remodel one kitchen and one bathroom. replacement in kind of kitchen cabinets, sink, countertop, tiles, toilet, bathtub, vanitities, switches, and recess light fixtures.Details
remodel one kitchen and one bathroom. replacement in kind of kitchen cabinets, sink, countertop, tiles, toilet, bathtub, vanitities, switches, and recess light fixtures. | $28,500 |
| Dec 24, 2021 | Completed final sign-off Mar 2022 | 2395 27th Av | unit 3: remodel kitchen and bathroom. replace cabinets, countertop and tiles. replace sink,toilet and vanity and bathtub. change subpanel to 60amp.Details
unit 3: remodel kitchen and bathroom. replace cabinets, countertop and tiles. replace sink,toilet and vanity and bathtub. change subpanel to 60amp. | $22,000 |
| Jul 27, 2021 | Completed final sign-off May 2022 | 1631 26th Av | revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairsDetails
revision to pa 2021-0524-0854 1st fl reconfigure layout, add 1 full bath. reconfigure interior stairs | $2,000 |
| May 24, 2021 | Completed final sign-off May 2022 | 1631 26th Av | remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room.Details
remodel (e) interior stair connecting basement to 2/f. remodel 1 bedroom, add a bathroom and laundry area, 1 family room. | $50,000 |
| Feb 24, 2021 | Never finaled issued Apr 2021, no final | 540 Page St | structural revision to app#202010287632 (reconfigure framing)Details
structural revision to app#202010287632 (reconfigure framing) | |
| Oct 28, 2020 | Completed final sign-off Sep 2021 | 540 Page St | 2/f: remodel kitchen, bathrooms. add 1 full bath. 3/f: remodel bathroom and add wetbar.Details
2/f: remodel kitchen, bathrooms. add 1 full bath. 3/f: remodel bathroom and add wetbar. | $90,000 |
| Nov 8, 2019 | Completed final sign-off Jul 2020 | 251 Oak St | window replacement - nine windows at front facade previously installed without permit - all wood with ogees within existing openings. no other work at front.Details
window replacement - nine windows at front facade previously installed without permit - all wood with ogees within existing openings. no other work at front. | $2,500 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 375 30th Av | revision to 201710030268 reconfigure layout per plansDetails
revision to 201710030268 reconfigure layout per plans | |
| Sep 17, 2018 | Completed final sign-off Jul 2019 | 215 Granada Av | lower level - add bathroom, 2 bedrooms and a family/media rm. replace (e) deck w/ 8 ft by 16 ft wood deck. 2nd level - remodel kitchen and 1 bathroom, add 1 bathroomDetails
lower level - add bathroom, 2 bedrooms and a family/media rm. replace (e) deck w/ 8 ft by 16 ft wood deck. 2nd level - remodel kitchen and 1 bathroom, add 1 bathroom | $50,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2020 | 715 Sargent St | convert portion of remaining garage space to 3rd bedroom. (ground floor unit legalized under separate permit #2018-0426-7500 s) extend entry landing to create entry porch.Details
convert portion of remaining garage space to 3rd bedroom. (ground floor unit legalized under separate permit #2018-0426-7500 s) extend entry landing to create entry porch. | $15,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2020 | 715 Sargent St | legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14.Details
legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14. | $15,000 |
| Oct 3, 2017 | Completed final sign-off May 2019 | 375 30th Av | 1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear.Details
1st floor: add 2 bedrooms, 2 full baths, and media room. new patio.2nd floor: remodel kitchen and bath. reconfigure stairs and new deck at rear. 3rd floor: remodel bath and add one full bath. new cantilever deck at rear. 3 new dormers and infill at rear. | $85,000 |
| Feb 23, 2017 | Completed final sign-off Nov 2017 | 806 39th Av | revision to app#201602018532. 1st floor: add 2 bedrooms, family room, and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. infill left and partial right lightwell. replace front 5 windows in kind with aluminum clad wood windows.Details
revision to app#201602018532. 1st floor: add 2 bedrooms, family room, and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. infill left and partial right lightwell. replace front 5 windows in kind with aluminum clad wood windows. | |
| Mar 1, 2016 | Completed final sign-off Feb 2019 | 982 Randolph St | to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019.Details
to comply with nov 201551992. gnd flr - legalize non warranted rooms: family room, bedroom and full bathroom. replace water heater per unit legalization ordinance 43-14. add 982 randolph st to 984 randolph st 7081a/019. | $40,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |