Winder Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Aug 2026
- Last 24 months
- 19 permits filed
67 permits since 2000: 51 completed, 11 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 534 Laidley St | exploratory demo in garage/basement and kitchen. patch & repair as neededDetails
exploratory demo in garage/basement and kitchen. patch & repair as needed | $10,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 640 Panorama Dr | rev 202606183520: add 2 new skylights. replace front, side and rear windows per plan.Details
rev 202606183520: add 2 new skylights. replace front, side and rear windows per plan. | $10,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 2207 12th Av | 2/f: remodel (e) kitchen & (e) bathroom. 1/f: new bedroom, media room, bathroom, wetbar, relocate laundry and mech.Details
2/f: remodel (e) kitchen & (e) bathroom. 1/f: new bedroom, media room, bathroom, wetbar, relocate laundry and mech. | $140,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 640 Panorama Dr | 1/f: new media room, wetbar, bedroom, office, bathroom and half-bathroom. relocate laundry and mech. 2/f: 2 new bedrooms, bathroom, kitchen, relocate furnace.Details
1/f: new media room, wetbar, bedroom, office, bathroom and half-bathroom. relocate laundry and mech. 2/f: 2 new bedrooms, bathroom, kitchen, relocate furnace. | $180,000 |
| Mar 26, 2026 | Completed final sign-off Apr 2026 | 596 Bella Vista Wy | reroofing overlay bitumen s/a. no torch down. amend to 202510278244 & 202511149675.Details
reroofing overlay bitumen s/a. no torch down. amend to 202510278244 & 202511149675. | $5,000 |
| Jan 8, 2026 | Completed final sign-off May 2026 | 2171 12th Av | reev 202512262822: replace 2 front openings with new fiberglass dbl casement. replace front garage door with steel and replace stucco at front in-kind. rpelce rear siding in-kind.Details
reev 202512262822: replace 2 front openings with new fiberglass dbl casement. replace front garage door with steel and replace stucco at front in-kind. rpelce rear siding in-kind. | $25,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 596 Bella Vista Wy | rev 202511149675: infill stairwell per plans. new window. no other work preformed.Details
rev 202511149675: infill stairwell per plans. new window. no other work preformed. | $4,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 5545 Diamond Heights Bl | 1st flr: add 1 bedroom. 1.5 baths and family. 2nd flr: remodel kitchen and bathrooms add home office. infill lightwell. replace front windows (vinyl).Details
1st flr: add 1 bedroom. 1.5 baths and family. 2nd flr: remodel kitchen and bathrooms add home office. infill lightwell. replace front windows (vinyl). | $120,000 |
| Dec 26, 2025 | Completed final sign-off May 2026 | 2171 12th Av | rev: 202511069128: 2/f remodel kitchen, bathroom, add 1 bathroom. 1/f: new bedroom, media room, wetbar; relocate laundry and mech/furnace.Details
rev: 202511069128: 2/f remodel kitchen, bathroom, add 1 bathroom. 1/f: new bedroom, media room, wetbar; relocate laundry and mech/furnace. | $120,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 596 Bella Vista Wy | 1/f: 1 new bathroom, bedroom, media room with bar and 1/2 bar. infill (e) bay below and 2/f remodel kitchen and 2 new bathrooms.Details
1/f: 1 new bathroom, bedroom, media room with bar and 1/2 bar. infill (e) bay below and 2/f remodel kitchen and 2 new bathrooms. | $180,000 |
| Nov 6, 2025 | Completed final sign-off May 2026 | 2171 12th Av | 2/f front two bedrooms: replace (e) drywall on wall and ceiling with (n) 5/8in type-x gyb board. rear living rom and dining room replace (e) drywall on wall & ceiling with (n) 5/8in type-x gy brd. no walls moved or structural work.Details
2/f front two bedrooms: replace (e) drywall on wall and ceiling with (n) 5/8in type-x gyb board. rear living rom and dining room replace (e) drywall on wall & ceiling with (n) 5/8in type-x gy brd. no walls moved or structural work. | $10,000 |
| Oct 27, 2025 | Completed final sign-off Apr 2026 | 596 Bella Vista Wy | 2/f: remove/replace (e) drywall at wall/dceiling with 5/8in type-x in living room, dining room and bedrooms. no walls to be demo; no structural or layout changes.Details
2/f: remove/replace (e) drywall at wall/dceiling with 5/8in type-x in living room, dining room and bedrooms. no walls to be demo; no structural or layout changes. | $20,000 |
| Jul 25, 2025 | Completed final sign-off Nov 2025 | 2289 Union St | unit 1: replace cabinets and counter top at kitchen. replace bathtub, vanity and toilet at bathroomDetails
unit 1: replace cabinets and counter top at kitchen. replace bathtub, vanity and toilet at bathroom | $8,000 |
| Jun 3, 2025 | In progress issued Dec 2025 | 190 21st Av | remodel 8 units for additonal bedrooms and in unit laundry. remodel kitchen and bath fixtures and finishes. replace furance and ducting. add exterior windows. see apps 202504033633, 3634, 3635. comply with nov 201991371Details
remodel 8 units for additonal bedrooms and in unit laundry. remodel kitchen and bath fixtures and finishes. replace furance and ducting. add exterior windows. see apps 202504033633, 3634, 3635. comply with nov 201991371 | $100,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | add 3 adu on g/f per ord 162-16 & planning code 207c4. remove 4 garages. add unit entries with new doors & windows. see separate permit for soft story retrofit on ground floor under pa# 202504033633 to comply with complaint# 201991371.Details
add 3 adu on g/f per ord 162-16 & planning code 207c4. remove 4 garages. add unit entries with new doors & windows. see separate permit for soft story retrofit on ground floor under pa# 202504033633 to comply with complaint# 201991371. | $150,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | legalize udu on 2nd floor as unit #1a. see separate permits: add 3 adu in ground floor under pa# 202504033634 with soft story retrofit under pa# 202504033633.Details
legalize udu on 2nd floor as unit #1a. see separate permits: add 3 adu in ground floor under pa# 202504033634 with soft story retrofit under pa# 202504033633. | $150,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | soft-story retrofit of g/f to comply with nov #201991371. see separate permit to add 3 adu at ground floor under pa# 202504033634.Details
soft-story retrofit of g/f to comply with nov #201991371. see separate permit to add 3 adu at ground floor under pa# 202504033634. | $100,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 2119 Thomas Av | 1/f: 2 new bedrooms, 1 bathroom & office. relocate mech. 2/f: remodel 1 (e) bathroom & add 1 new bathroom.Details
1/f: 2 new bedrooms, 1 bathroom & office. relocate mech. 2/f: remodel 1 (e) bathroom & add 1 new bathroom. | $101,000 |
| Mar 14, 2025 | Completed final sign-off May 2025 | 742 34th Av | revision to pa #202312212973 and 202406043712. revise title 24 report to install radiant heating and remove proposed furnace and its associated hers special inspection.Details
revision to pa #202312212973 and 202406043712. revise title 24 report to install radiant heating and remove proposed furnace and its associated hers special inspection. | |
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 1605 Jerrold Av | revision to bpa# 202201135956: add deck platform to front of building.Details
revision to bpa# 202201135956: add deck platform to front of building. | $2,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 742 34th Av | revision to pa# 202312212973: 1/f - layout reconfiguration. 2/f - bathroom reconfiguration. replace entire slab.Details
revision to pa# 202312212973: 1/f - layout reconfiguration. 2/f - bathroom reconfiguration. replace entire slab. | |
| Mar 16, 2024 | Completed final sign-off Sep 2025 | 6 Roanoke St | revise previously approved permit # 202212218873 horizontal addition. revise layout of kitchen, bedroom, bathroom and family room locations. restore front facade to shiplap siding. restore previously infilled window opening at 1st floor front facade. minor structural revision.Details
revise previously approved permit # 202212218873 horizontal addition. revise layout of kitchen, bedroom, bathroom and family room locations. restore front facade to shiplap siding. restore previously infilled window opening at 1st floor front facade. minor structural revision. | $10,000 |
| Feb 14, 2024 | Completed final sign-off Mar 2024 | 5299 03rd St | repair wall hit by car in kind. facing van dyke street, non bearing. repair with stucco exterior.Details
repair wall hit by car in kind. facing van dyke street, non bearing. repair with stucco exterior. | $4,000 |
| Dec 21, 2023 | Completed final sign-off Jun 2025 | 742 34th Av | 1st fl - add 1 bedrm, 1 family rm, 1 den and 1.5 bath; 2nd fl - remodel kitchen and bathroom; add 1.5 bath; add new patio @ rear; infill lightwell; replace all front windows in-kind with aluminum clad woodDetails
1st fl - add 1 bedrm, 1 family rm, 1 den and 1.5 bath; 2nd fl - remodel kitchen and bathroom; add 1.5 bath; add new patio @ rear; infill lightwell; replace all front windows in-kind with aluminum clad wood | $180,000 |
| Sep 14, 2023 | In progress issued Oct 2023 | 235 Cortland Av | revision to bpa#201912189836, add mechnical platform @ roof for butcher shop.Details
revision to bpa#201912189836, add mechnical platform @ roof for butcher shop. | $10,000 |
| Aug 30, 2023 | Completed final sign-off Oct 2025 | 6 Roanoke St | revise previously approved pa 2022-1221-8873 refine lower level bathroom layout, foundation replacement & front window replacement. no change to plumbing fixture countDetails
revise previously approved pa 2022-1221-8873 refine lower level bathroom layout, foundation replacement & front window replacement. no change to plumbing fixture count | $10,000 |
| Jul 19, 2023 | Completed final sign-off Aug 2023 | 305 Bocana St | revision to pa#201904198489 to comply with nov 202071102.Details
revision to pa#201904198489 to comply with nov 202071102. | |
| Jun 29, 2023 | Completed final sign-off Jul 2023 | 305 Bocana St | revision to pa# 201904198489. add new stak-up laundry @ kitchen per plan on 1st floor new adu.Details
revision to pa# 201904198489. add new stak-up laundry @ kitchen per plan on 1st floor new adu. | $1,000 |
| Jun 15, 2023 | Completed final sign-off May 2024 | 783 27th St | revision to pa 2022-0812-0450 new wetbar on ground floorDetails
revision to pa 2022-0812-0450 new wetbar on ground floor | $1,000 |
| Dec 27, 2022 | In progress issued Apr 2024 | 1423 Jackson St | foundation pa under separate pa202208150497. voluntary upgrades to bldg superstructure. int remodel (e) 2-story bldg inc new br and kt. add new stairway to roof serving sgl unit. remove one common covered stair to roof and penthouse. full window replc and ext finishes. nfpa-13r under separate permitDetails
foundation pa under separate pa202208150497. voluntary upgrades to bldg superstructure. int remodel (e) 2-story bldg inc new br and kt. add new stairway to roof serving sgl unit. remove one common covered stair to roof and penthouse. full window replc and ext finishes. nfpa-13r under separate permit | $350,000 |
| Dec 21, 2022 | Completed final sign-off Sep 2025 | 6 Roanoke St | interior remodel of (e) single family dwelling. infill below (e) 2nd floor at rear. infill lightwell not visible from off-site. enlarge front window for light + air. remove one dormer, add (2) dormers at rear. no change to building height or depth.Details
interior remodel of (e) single family dwelling. infill below (e) 2nd floor at rear. infill lightwell not visible from off-site. enlarge front window for light + air. remove one dormer, add (2) dormers at rear. no change to building height or depth. | $600,000 |
| Aug 15, 2022 | Never finaled issued Dec 2022, no final | 1423 Jackson St | remove and replace (e) building foundation for voluntary structural upgrades. exploratory demolition of interior 1st fl wood sheathing where applicable. investigate 1st fl framing for damage (dry rot).Details
remove and replace (e) building foundation for voluntary structural upgrades. exploratory demolition of interior 1st fl wood sheathing where applicable. investigate 1st fl framing for damage (dry rot). | $50,000 |
| Aug 12, 2022 | Completed final sign-off May 2024 | 783 27th St | 1/f: add (1) den,office, media & (2) full bathrooms; 2/f: remodel kitchen, bathroom, add powder; add new roof deckDetails
1/f: add (1) den,office, media & (2) full bathrooms; 2/f: remodel kitchen, bathroom, add powder; add new roof deck | $89,000 |
| May 13, 2022 | Completed final sign-off May 2023 | 305 Bocana St | adding framing details to existing pa# 202110220991 as per inspector's request.Details
adding framing details to existing pa# 202110220991 as per inspector's request. | |
| Apr 19, 2022 | Completed final sign-off Sep 2024 | 912 Newhall St | prop h - place ada bathroom and kitchen in shipping container for all good pizzaDetails
prop h - place ada bathroom and kitchen in shipping container for all good pizza | $10,000 |
| Apr 14, 2022 | Completed final sign-off Jun 2023 | 305 Bocana St | revision to pa# 202007079758. new concrete slab at grade to entire floor. new foundation wall details along west property wall. new foundation at corridor and exterior wall. new drainage plan.Details
revision to pa# 202007079758. new concrete slab at grade to entire floor. new foundation wall details along west property wall. new foundation at corridor and exterior wall. new drainage plan. | $3,000 |
| Mar 28, 2022 | Completed final sign-off May 2023 | 305 Bocana St | apt a: to comply with nov #202071102. remodel extg 3rd floor, unit #a , work included: remodeling extg kitchen, new bathroom, new home office, and new laundry. new furnace and replace rear and side windows in kind.Details
apt a: to comply with nov #202071102. remodel extg 3rd floor, unit #a , work included: remodeling extg kitchen, new bathroom, new home office, and new laundry. new furnace and replace rear and side windows in kind. | $55,000 |
| Mar 11, 2022 | Completed final sign-off Sep 2022 | 2054 36th Av | 1st flr: convert bedroom to family room. remodel bathroom and add 1 powder room 2nd flr: remodel kitchen and 2 bathroom.Details
1st flr: convert bedroom to family room. remodel bathroom and add 1 powder room 2nd flr: remodel kitchen and 2 bathroom. | $70,000 |
| Jan 13, 2022 | Completed final sign-off Nov 2024 | 1605 Jerrold Av | construction of a new single occupancy ada restroom and kitchen within a metal shipping container. kitchen will not include an oven or cooktop.Details
construction of a new single occupancy ada restroom and kitchen within a metal shipping container. kitchen will not include an oven or cooktop. | $20,000 |
| Dec 29, 2021 | Completed final sign-off Jun 2022 | 1686 30th Av | 1/f: add bedroom, 2 full baths, and media room. 2/f: remodel kitchen and baths.Details
1/f: add bedroom, 2 full baths, and media room. 2/f: remodel kitchen and baths. | $100,000 |
| Jun 8, 2021 | Completed final sign-off May 2023 | 305 Bocana St | unit c: kitchen remodeling, tankless water heater, hvac update (new furnace), bathroom remodeling with new bathroom at new office basement (50 sf toilet room)Details
unit c: kitchen remodeling, tankless water heater, hvac update (new furnace), bathroom remodeling with new bathroom at new office basement (50 sf toilet room) | $25,000 |
| Jan 20, 2021 | Expired or cancelled cancelled Jun 2023 | 305 Bocana St | reinforcing deck structure by complaint # 202071102. work is less than 50%. 10'x8'.Details
reinforcing deck structure by complaint # 202071102. work is less than 50%. 10'x8'. | $1,500 |
| Nov 23, 2020 | Completed final sign-off Dec 2021 | 485 Colon Av | interior remodeling including kitchen & bathroom, addition of 2-1/2 bathrooms and new interior stair. conversoin of unfinished g/f into new living space. new windows and exterior doors to be added.Details
interior remodeling including kitchen & bathroom, addition of 2-1/2 bathrooms and new interior stair. conversoin of unfinished g/f into new living space. new windows and exterior doors to be added. | $318,450 |
| Nov 12, 2020 | Completed final sign-off Sep 2021 | 222 Bella Vista Wy | (e) kitchen upgrade, sink, cabs & appliances. (n) siding glass door at family room.Details
(e) kitchen upgrade, sink, cabs & appliances. (n) siding glass door at family room. | $49,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2021 | 69 Fernwood Dr | remodel (e) kitchen at st flDetails
remodel (e) kitchen at st fl | $16,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2020 | 144 Murray St | revision to app#201904188401. new patio at rearDetails
revision to app#201904188401. new patio at rear | $5,000 |
| Feb 24, 2020 | Completed final sign-off Jan 2021 | 5299 03rd St | new convenience door at rear of store. (manual roll-up, non egress). new structual work, no mep, no sidewalk work.Details
new convenience door at rear of store. (manual roll-up, non egress). new structual work, no mep, no sidewalk work. | $16,000 |
| Feb 7, 2020 | Completed final sign-off Apr 2021 | 125 Valdez Av | per ordinance# 95-17; convert (e) basement to adu (remove stairs & add kitchen).Details
per ordinance# 95-17; convert (e) basement to adu (remove stairs & add kitchen). | $7,000 |
| Feb 6, 2020 | Completed final sign-off Apr 2021 | 127 Valdez Av | revsion to 201911157469, structural changes to framing designDetails
revsion to 201911157469, structural changes to framing design | |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 14 Hill Point Av | deck repair (500 sf) in kind less 50%. replace surface wood to match existing in rearDetails
deck repair (500 sf) in kind less 50%. replace surface wood to match existing in rear | $5,000 |
| Dec 31, 2019 | Completed final sign-off Apr 2021 | 127 Valdez Av | add a deck in the back yard, 8'6"high, 175 sqsf, 4 ft from side property.Details
add a deck in the back yard, 8'6"high, 175 sqsf, 4 ft from side property. | $3,000 |
| Nov 15, 2019 | Completed final sign-off Apr 2021 | 127 Valdez Av | 1st fl to be remodeled (n) bedroom with 2 (n) bathrooms. 2nd fl to be remodeled (bedroom with 2 (n) bathroomsDetails
1st fl to be remodeled (n) bedroom with 2 (n) bathrooms. 2nd fl to be remodeled (bedroom with 2 (n) bathrooms | $50,000 |
| Jun 4, 2019 | Completed final sign-off Nov 2020 | 630 38th Av | remodel kitchen & 2 bathrooms. replace tounter top, cabinets @ 9e) place & interior finishes with 5/8" gyp board at bedrooms, living and dining roomDetails
remodel kitchen & 2 bathrooms. replace tounter top, cabinets @ 9e) place & interior finishes with 5/8" gyp board at bedrooms, living and dining room | $45,000 |
| May 31, 2019 | Completed final sign-off Mar 2020 | 144 Murray St | replacement partial foundation and slab per plan.Details
replacement partial foundation and slab per plan. | $6,000 |
| Apr 19, 2019 | Completed final sign-off Jul 2023 | 305 Bocana St | convert (e) garage & storage space to one new unit per ord# 162-16. (n) unit w/ (e) bldg footprint. (n) unit included bedrooms bathroom and kitchen.Details
convert (e) garage & storage space to one new unit per ord# 162-16. (n) unit w/ (e) bldg footprint. (n) unit included bedrooms bathroom and kitchen. | $30,000 |
| Apr 18, 2019 | Completed final sign-off Mar 2020 | 144 Murray St | comply with nov # 201942441, additional work to pa# 201903296716,1st fl. add 3 bedrooms, 2 full bath,wet bar&family room, 2nd fl: remodel bath, relocate bedroom, kitchen, dining & interior stair add 1 full bath, remove all exterior metal siding & restore back to stucco fiishes,replace 3 front windowDetails
comply with nov # 201942441, additional work to pa# 201903296716,1st fl. add 3 bedrooms, 2 full bath,wet bar&family room, 2nd fl: remodel bath, relocate bedroom, kitchen, dining & interior stair add 1 full bath, remove all exterior metal siding & restore back to stucco fiishes,replace 3 front window | $120,000 |
| Mar 29, 2019 | Completed final sign-off Mar 2020 | 144 Murray St | remodel kitchen: replace cabinets sink & floor tiles.Details
remodel kitchen: replace cabinets sink & floor tiles. | $8,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 400 Plymouth Av | replace exterior plastic siding with james hardie cement boards.Details
replace exterior plastic siding with james hardie cement boards. | $15,000 |
| Feb 5, 2019 | Completed final sign-off Mar 2021 | 20 Gloria Ct | 2nd fl - interior scope - kitchen upgrade, cabinets & fixtures new master bathDetails
2nd fl - interior scope - kitchen upgrade, cabinets & fixtures new master bath | $35,000 |
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 235 Cortland Av | revision to bap# 201806081402. add scope of work, insulation and new drywall for unit a and bDetails
revision to bap# 201806081402. add scope of work, insulation and new drywall for unit a and b | $5,000 |
| Oct 11, 2018 | Completed final sign-off May 2021 | 235 Cortland Av | unit c: remodel kitchen & dining, convert living rm to bedroom, add (1) full bath & non-bearing partition wallsDetails
unit c: remodel kitchen & dining, convert living rm to bedroom, add (1) full bath & non-bearing partition walls | $32,000 |
| Jun 8, 2018 | Completed final sign-off Apr 2020 | 235 Cortland Av | interior remodel - unit a - remodel kitchen & dining, convert family room to bedroom, add 3 bathrooms. unit b - relocate kitchen & bathroom. add office, bathroom & non- bearing partition walls.Details
interior remodel - unit a - remodel kitchen & dining, convert family room to bedroom, add 3 bathrooms. unit b - relocate kitchen & bathroom. add office, bathroom & non- bearing partition walls. | $70,000 |
| Jun 7, 2018 | Never finaled issued Jan 2020, no final | 237 Cortland Av | to erect 4 stories, no basement, type iii-a, 3 units residential with retail building. (r-2,m)Details
to erect 4 stories, no basement, type iii-a, 3 units residential with retail building. (r-2,m) | $800,000 |
| May 1, 2018 | Completed final sign-off Jun 2018 | 5853 Mission St | #8 - bathroom remodel; change bath to shower, new vanity, kitchen cabinet replace and countertop. n/a for maher.Details
#8 - bathroom remodel; change bath to shower, new vanity, kitchen cabinet replace and countertop. n/a for maher. | $5,000 |
| Feb 22, 2018 | Completed final sign-off Aug 2018 | 31 Exeter St | to comply with complaint # 201720261 - add two bedrooms 2 full bath, laundry and partition walls at 1st flr.Details
to comply with complaint # 201720261 - add two bedrooms 2 full bath, laundry and partition walls at 1st flr. | $39,500 |
| Jan 11, 2018 | Completed final sign-off Aug 2018 | 4608 03rd St | revision to app#201406188804. needed m.o.d. approval. revision cover accessibility issues only.Details
revision to app#201406188804. needed m.o.d. approval. revision cover accessibility issues only. | |
| Dec 12, 2017 | Completed final sign-off May 2018 | 1670 22nd Av | remove interior old plaster in 2nd floor and garage ceiling new insulation, drtwall. change 5 existing windows in front of the building with double hung wood clad windows.Details
remove interior old plaster in 2nd floor and garage ceiling new insulation, drtwall. change 5 existing windows in front of the building with double hung wood clad windows. | $7,000 |