Ene Construction Metal Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2017 to Nov 2025
- Last 24 months
- 2 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 250 Wilde Av | revision to pa # 201711214600 & 202209293413: to document unpermitted work. removal/modification of unauthorized site fence/wall to meet planning requirements. removal of the pent roof structure and paving of rear yard. layout change.Details
revision to pa # 201711214600 & 202209293413: to document unpermitted work. removal/modification of unauthorized site fence/wall to meet planning requirements. removal of the pent roof structure and paving of rear yard. layout change. | $5,000 |
| Sep 8, 2025 | Completed final sign-off Feb 2026 | 250 Wilde Av | garage: comply with enforcement #2017-003312enf. remdeol detatched garage 50% in required rear setback. front bldg: revision to pa #201711214600 & 202209293413. to document unpermitted work removal/modification on unauthorized fence/wall to meet planning requirements. remove pent roof structure.Details
garage: comply with enforcement #2017-003312enf. remdeol detatched garage 50% in required rear setback. front bldg: revision to pa #201711214600 & 202209293413. to document unpermitted work removal/modification on unauthorized fence/wall to meet planning requirements. remove pent roof structure. | $15,000 |
| Sep 29, 2022 | Completed final sign-off Feb 2026 | 250 Wilde Av | replace 4 side siding to stucco per plan.Details
replace 4 side siding to stucco per plan. | $15,000 |
| Jan 6, 2022 | Completed final sign-off Dec 2022 | 3725 Alemany Bl | 1/f: add 2 bedroom, media and 1 full bath. add new 3' reetaining wall.Details
1/f: add 2 bedroom, media and 1 full bath. add new 3' reetaining wall. | $58,000 |
| Mar 26, 2021 | Completed final sign-off May 2023 | 275 Monticello St | convert lower level garage/storage area to hobby room, family room, reconfig bedroom; replace/upsize electrical service, in living space, relocate furnamce per code, remove old water heater to provide gas tankless water heater per code.Details
convert lower level garage/storage area to hobby room, family room, reconfig bedroom; replace/upsize electrical service, in living space, relocate furnamce per code, remove old water heater to provide gas tankless water heater per code. | $45,000 |
| Nov 21, 2017 | Completed final sign-off Feb 2026 | 250 Wilde Av | comply w/ nov #201607421. add (1) dwelling unit per ord #95-17. (2) story vertical addition. 1st floor: add (4)bedroom, (2)full baths, kitchen, dining and living room; 2nd floor: (3)(n) baths;Details
comply w/ nov #201607421. add (1) dwelling unit per ord #95-17. (2) story vertical addition. 1st floor: add (4)bedroom, (2)full baths, kitchen, dining and living room; 2nd floor: (3)(n) baths; | $160,000 |