Jahandar Yadegar
- Listed as
- architect, engineer
- Firm
- John Yadegar Structural Eng.
- Based in
- Oakland
- On San Francisco permits
- Oct 2004 to Jul 2025
75 permits since 2000 (engineer on 73 permits, architect on 2 permits): 57 completed, 10 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2025 | Completed final sign-off Feb 2026 | 1133 Fell St | Steelcore Builders Inc | replacement of 4 damaged wood posts with steel at rear of building in common area at rear of garageDetails
replacement of 4 damaged wood posts with steel at rear of building in common area at rear of garage | $70,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 1056 Sanchez St | Z Construction Company Inc | revision to pa #201901291543 to remove walls between kitchen and the additions and adding a powder room and a laundry room.Details
revision to pa #201901291543 to remove walls between kitchen and the additions and adding a powder room and a laundry room. | $20,000 |
| Mar 9, 2021 | Never finaled issued Oct 2021, no final | 1490 Willard St | Steelcore Builders Inc | interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard.Details
interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard. | $110,000 |
| Feb 25, 2021 | Expired or cancelled cancelled May 2022 | 567 Sanchez St | Alpha Restoration & Wateproof | the project involves a small length of foundation to be underpinned as part of foundation work and neighboring property, 561 sanchez st. ref bpa#202012140963Details
the project involves a small length of foundation to be underpinned as part of foundation work and neighboring property, 561 sanchez st. ref bpa#202012140963 | $20,000 |
| Dec 14, 2020 | Completed final sign-off Sep 2022 | 561 Sanchez St | Alpha Restoration & Wateproof | g/f: lower (e) slab to 8ft, add conditioned space within building footprint (master bdrm,bath,closet); relocate stairs. upper floor:relocate (e) bathroom, add powder room, new kitchen finishes.Details
g/f: lower (e) slab to 8ft, add conditioned space within building footprint (master bdrm,bath,closet); relocate stairs. upper floor:relocate (e) bathroom, add powder room, new kitchen finishes. | $67,000 |
| Mar 2, 2020 | Completed final sign-off Mar 2020 | 2 Church St | Steelcore Builders Inc | rev to pa201609309307: deismic strengthening revision to shear walls. maher n/a.Details
rev to pa201609309307: deismic strengthening revision to shear walls. maher n/a. | |
| Jan 21, 2020 | Completed final sign-off Feb 2022 | 23 Baker St | Restoration Workshop Ltd | structural revision: replace (e) wood-framed floor with new concrete slab.Details
structural revision: replace (e) wood-framed floor with new concrete slab. | |
| Nov 28, 2018 | Completed final sign-off Apr 2020 | 1155 Powell St | Blue Wood Construction Inc. | interior remodel including moving bedrooms to street side of building, kitchen & bath remodel, associaed elec & plumbing, wood interior/aluminum exterior windows to be fully simulated(sp?)Details
interior remodel including moving bedrooms to street side of building, kitchen & bath remodel, associaed elec & plumbing, wood interior/aluminum exterior windows to be fully simulated(sp?) | $225,000 |
| Jul 20, 2018 | Completed final sign-off Mar 2020 | 3124 Laguna St | Mulhall Construction Inc. | seismic strengthening measures to comply with the san francisco soft story retrofit per sfebc ch 4d ordinance, design per iebc appx.a-4. maher n /a.Details
seismic strengthening measures to comply with the san francisco soft story retrofit per sfebc ch 4d ordinance, design per iebc appx.a-4. maher n /a. | $50,000 |
| May 25, 2018 | Completed final sign-off Apr 2019 | 179 Castro St | rev: 201612296243 to eliminate adu work from plans leaving only structural work.Details
rev: 201612296243 to eliminate adu work from plans leaving only structural work. | ||
| Apr 12, 2018 | Never finaled filed Apr 2018, never issued | 116 10th Av | seismic upgrade. renovation of attic, renovation of (e) kitchen & (e) bathrooms, addition of interior stairs, 2 shed dormers, new windows.Details
seismic upgrade. renovation of attic, renovation of (e) kitchen & (e) bathrooms, addition of interior stairs, 2 shed dormers, new windows. | $225,000 | |
| Oct 10, 2017 | Completed final sign-off Sep 2019 | 959 Haight St | Steelcore Builders Inc | seismic strengthening measure to comply with soft story ordinance. disnged per iebc appendix a-4.Details
seismic strengthening measure to comply with soft story ordinance. disnged per iebc appendix a-4. | $66,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 730 Powell St | Steelcore Builders Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13 | $95,600 |
| Sep 15, 2017 | Completed final sign-off Dec 2019 | 2625 Franklin St | soft story retrofit to comply with sf city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls have been added or strenghtened and concrete foundations have been added where addedDetails
soft story retrofit to comply with sf city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls have been added or strenghtened and concrete foundations have been added where added | $77,000 | |
| Sep 15, 2017 | Completed final sign-off Jul 2019 | 318 Arbor St | Blue Mountain Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $30,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 720 Powell St | Steelcore Builders Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13 | $47,800 |
| Sep 15, 2017 | Completed final sign-off Oct 2019 | 4715 Balboa St | A M Rocca Inc. | soft story retrofit to comply with city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls have been added or strenghtened & concrete foundations have been added where addedDetails
soft story retrofit to comply with city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls have been added or strenghtened & concrete foundations have been added where added | $94,000 |
| Sep 15, 2017 | Completed final sign-off May 2019 | 160 Addison St | Blue Mountain Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $25,000 |
| Sep 15, 2017 | Completed final sign-off May 2019 | 82 Addison St | Blue Mountain Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 15, 2017 | Completed final sign-off May 2019 | 36 Addison St | Blue Mountain Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $25,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 130 Bemis St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $25,000 | |
| Aug 1, 2017 | Never finaled issued Aug 2017, no final | 413 10th St | Sf Hills Construction, Inc. | replace exterior brick facade in kind. use is catering. n/a ordinance #155-13Details
replace exterior brick facade in kind. use is catering. n/a ordinance #155-13 | $40,000 |
| Jul 31, 2017 | Completed final sign-off Nov 2018 | 568 28th Av | soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f.Details
soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f. | $80,000 | |
| Jul 31, 2017 | Completed final sign-off Nov 2019 | 10 Capra Wy | Mulhall Construction Inc. | soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f. conc. footings added as needed. n/a ordinance #155-13Details
soft story rettrofit per sfebc chapter 4d, 2016 cebc appendix a-4. add plywood shear walls & steel special moment frames at g/f. conc. footings added as needed. n/a ordinance #155-13 | $126,350 |
| Jun 13, 2017 | Completed final sign-off Jul 2017 | 2070 Fell St | Steelcore Builders Inc | revision to pa#201607283589 shear wall modifications & construction details. n/a ordinance #155-13.Details
revision to pa#201607283589 shear wall modifications & construction details. n/a ordinance #155-13. | $16,820 |
| Sep 15, 2016 | Completed final sign-off Oct 2017 | 1445 Eddy St | Steelcore Builders Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 at ground floorDetails
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 at ground floor | $112,435 |
| Sep 15, 2016 | Completed final sign-off Dec 2018 | 2080 Gough St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $166,425 | |
| Aug 25, 2016 | Expired or cancelled expired Aug 2024 | 618 Baker St | Restoration Workshop Ltd | voluntary structural strengthening per plan, ref. to pa#201406067734Details
voluntary structural strengthening per plan, ref. to pa#201406067734 | $18,000 |
| Aug 18, 2016 | Expired or cancelled expired Sep 2019 | 112 Woodland Av | Stokely Marcus Construction Inc | revision to ref pa 201605258377 cap portion of (e) foundation as indicated on plan, instead replacingDetails
revision to ref pa 201605258377 cap portion of (e) foundation as indicated on plan, instead replacing | |
| Jul 28, 2016 | Completed final sign-off Jul 2017 | 2070 Fell St | Steelcore Builders Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthened with plywood shear walls & new concrete foundation. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthened with plywood shear walls & new concrete foundation. n/a ordinance #155-13 | $112,500 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 177 Post St | Western Allied Mechanical Inc. | replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower.Details
replace existing cooling tower with new tower of same capacity, install new structural support for cooling tower. | $75,000 |
| May 12, 2016 | Expired or cancelled withdrawn Jul 2016 | 1301 Folsom St | renovate (e) building include mechanical, electrical, lighting, plumbing, toilets, windows making it a leed platinum, net zero building. ** maher: disturbance of at least 50 cu.yd of soil; route to dph **Details
renovate (e) building include mechanical, electrical, lighting, plumbing, toilets, windows making it a leed platinum, net zero building. ** maher: disturbance of at least 50 cu.yd of soil; route to dph ** | $7,606,600 | |
| Apr 26, 2016 | Completed final sign-off Jun 2016 | 108 Mallorca Wy | widen existing garage door from 6'8' to 8'4' wide, replace existing furnace and strengthen existing beam and footing; maher n/aDetails
widen existing garage door from 6'8' to 8'4' wide, replace existing furnace and strengthen existing beam and footing; maher n/a | $40,000 | |
| Feb 24, 2016 | Completed final sign-off Aug 2016 | 230 Central Av | Steelcore Builders Inc | sloft story retrofit per sfvc chapter 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
sloft story retrofit per sfvc chapter 34b engineering criteria 2012 iebc appendix a-4. maher na | $165,865 |
| Feb 24, 2016 | Completed final sign-off Oct 2016 | 1223 Arguello Bl | Seismic Retrofitters Inc. | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. | $70,000 |
| Feb 11, 2016 | Expired or cancelled expired Jun 2018 | 1537 06th Av | Artisan Builders Corp | revision to appl #201412113544 - (for grid lines 6-10) move foundation.Details
revision to appl #201412113544 - (for grid lines 6-10) move foundation. | |
| Sep 15, 2015 | Never finaled issued Oct 2015, no final | 157 Albion St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $15,000 | |
| Aug 11, 2015 | Completed final sign-off Feb 2016 | 2401 Jackson St | Trush Construction Company Inc. | soft story retrofit per sfbc chapter 34b. 2012iebc appendix a-4 (commercial). residential soft story under pa 201508043306Details
soft story retrofit per sfbc chapter 34b. 2012iebc appendix a-4 (commercial). residential soft story under pa 201508043306 | $23,510 |
| Aug 4, 2015 | Completed final sign-off Feb 2016 | 2401 Jackson St | Trush Construction Company Inc. | this project involve seismic strenghthening measures to comply with the san francisco soft story using the iebc appendix a-4. sfbc chapter 34b. see pa# 201508113935 per commerical soft story.Details
this project involve seismic strenghthening measures to comply with the san francisco soft story using the iebc appendix a-4. sfbc chapter 34b. see pa# 201508113935 per commerical soft story. | $82,290 |
| Aug 4, 2015 | Expired or cancelled withdrawn Aug 2016 | 494 29th Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $20,000 | |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 1226 Montgomery St | Plath & Company Inc | revision to pa #201504012574 - add short section of footing for shear wall. (soft story upgrade per sfbc ch 34b. 2012 iebc appendix a-4Details
revision to pa #201504012574 - add short section of footing for shear wall. (soft story upgrade per sfbc ch 34b. 2012 iebc appendix a-4 | $2,500 |
| Jul 14, 2015 | Expired or cancelled withdrawn Mar 2018 | 474 27th Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $10,000 | |
| May 1, 2015 | Never finaled issued May 2015, no final | 1432 South Van Ness Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $15,000 | |
| Apr 7, 2015 | Completed final sign-off Feb 2016 | 3580 21st St | Gelling & Judd Inc. | revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade.Details
revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade. | $2,500 |
| Apr 1, 2015 | Completed final sign-off Nov 2015 | 1692 Haight St | D Kelly Construction Inc. | revision to appl #201305318358; clarifications to structural drawings.Details
revision to appl #201305318358; clarifications to structural drawings. | |
| Feb 6, 2015 | Expired or cancelled expired Jan 2020 | 628 Central Av | soft story redtrofit per sfbc chapter 34b, 2010 iebc appendix a-4.Details
soft story redtrofit per sfbc chapter 34b, 2010 iebc appendix a-4. | $5,000 | |
| Nov 3, 2014 | Never finaled issued Feb 2015, no final | 444 De Haro St | Principal Builders Inc. | 1st floor - slab peneratation & strengthening at existing slab refer to pa #2014.0729.2395. n/a maher ordinanceDetails
1st floor - slab peneratation & strengthening at existing slab refer to pa #2014.0729.2395. n/a maher ordinance | $44,000 |
| Sep 18, 2014 | Completed final sign-off Mar 2015 | 1426 Waller St | A M Rocca Inc. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $50,000 |
| Jul 25, 2014 | Completed final sign-off Apr 2015 | 215 Claremont Bl | revision to appl #2014.0613.8322 - remove two posts. change in structural beam located in garage. no change on use in the garage. remove 2 posts, no change of use in garage.Details
revision to appl #2014.0613.8322 - remove two posts. change in structural beam located in garage. no change on use in the garage. remove 2 posts, no change of use in garage. | ||
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 149 Arkansas St | rear bldg - removal of four wood posts in lower level of existing 3 story wood framed structure at hte rear of the property seismic improvement will be made (as a voluntary measure) to the ground floor. n/a maher ordinanceDetails
rear bldg - removal of four wood posts in lower level of existing 3 story wood framed structure at hte rear of the property seismic improvement will be made (as a voluntary measure) to the ground floor. n/a maher ordinance | $6,000 | |
| Jun 30, 2014 | Never finaled issued Oct 2017, no final | 4075 20th St | add new garage , install new windows and siding, square off bay windowDetails
add new garage , install new windows and siding, square off bay window | $225,000 | |
| Jun 12, 2014 | Completed final sign-off Jan 2016 | 718 Waller St | replace (e) guardrails at roof decks with new 6'-8" high wood & glass windscreens. this permit superceeds permit pa#201402279545-s, approved for site permit (planning dept failed to sent out 30 day nofification).Details
replace (e) guardrails at roof decks with new 6'-8" high wood & glass windscreens. this permit superceeds permit pa#201402279545-s, approved for site permit (planning dept failed to sent out 30 day nofification). | ||
| Dec 11, 2013 | Completed final sign-off Jan 2014 | 1999 Broadway | stained glass window opening on stairway wall adjacent to interior hallway at 7th fl. stairwell is non rated and is not an exist stairway. all work is on interior of buildingDetails
stained glass window opening on stairway wall adjacent to interior hallway at 7th fl. stairwell is non rated and is not an exist stairway. all work is on interior of building | $8,000 | |
| Nov 13, 2013 | Completed final sign-off Nov 2014 | 501 Darien Wy | Barton Builders | interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room.Details
interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room. | $120,000 |
| May 31, 2013 | Completed final sign-off Nov 2015 | 1692 Haight St | Jame L Kelly Construction | mandatory soft story retrofit per chapter 34b. seismic upgrade to existing soft story construction. additional work includes new insulation, ada upgrade to single occupant toilet. space to be readied for future tenant improvements.Details
mandatory soft story retrofit per chapter 34b. seismic upgrade to existing soft story construction. additional work includes new insulation, ada upgrade to single occupant toilet. space to be readied for future tenant improvements. | $100,000 |
| Mar 18, 2013 | Completed final sign-off Jun 2013 | 261 Joost Av | Michael C Hargrove Construction | partial foundation replacement at front (utility room & crawl space), no change to conditioned/habitable space.Details
partial foundation replacement at front (utility room & crawl space), no change to conditioned/habitable space. | $32,000 |
| Oct 26, 2012 | Completed final sign-off Feb 2013 | 2174 Market St | Bach Construction, Inc. | voluntary upgrade of existing trusses. sffd truss sign requiredDetails
voluntary upgrade of existing trusses. sffd truss sign required | $85,000 |
| Sep 12, 2012 | Completed final sign-off Jan 2013 | 1350 California St | Trush Construction Company Inc. | remove two balconies. framing & grating work to take place in the common area only. sprinkler heads to be removed on separate permit. replace existing glass doors with windows (same width & height as needed) as per plans. replace (e) sliding glass door with windows in kind. same width. in-fill heighDetails
remove two balconies. framing & grating work to take place in the common area only. sprinkler heads to be removed on separate permit. replace existing glass doors with windows (same width & height as needed) as per plans. replace (e) sliding glass door with windows in kind. same width. in-fill heigh | $23,635 |
| Aug 21, 2012 | Completed final sign-off Aug 2013 | 4029 23rd St | Preservation Trust Builder | interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly roomDetails
interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly room | $105,364 |
| Aug 17, 2012 | Completed final sign-off Jun 2013 | 1896 Pacific Av | C H Burnham Inc | 9th floor penthouse unit interior work consists of demoliton & relocation of the (e) kitchen & bathroom. the master bedroom wall is being demolished & a new laundry room, powder room & storage room. new interior stairs will be added to connect the bedrooms.Details
9th floor penthouse unit interior work consists of demoliton & relocation of the (e) kitchen & bathroom. the master bedroom wall is being demolished & a new laundry room, powder room & storage room. new interior stairs will be added to connect the bedrooms. | $350,000 |
| Jul 3, 2012 | Completed final sign-off Apr 2014 | 1620 Montgomery St | T S Christ Constructors Inc | alteration of g/f. new interior walls. 2 new access staircases. interior work mainlyDetails
alteration of g/f. new interior walls. 2 new access staircases. interior work mainly | $95,000 |
| Jun 28, 2012 | Completed final sign-off Sep 2013 | 2435 47th Av | Richard De Nola | add 300 sq feet to rear of existing dwelling for a bedroom & bathroom. no other work.Details
add 300 sq feet to rear of existing dwelling for a bedroom & bathroom. no other work. | $60,000 |
| May 1, 2012 | Completed final sign-off Aug 2012 | 1363 Filbert St | C H Burnham Inc | removal of section of wall between kitchen & dining room. enlargement & upgrade of existing bathroom.Details
removal of section of wall between kitchen & dining room. enlargement & upgrade of existing bathroom. | $25,000 |
| Feb 24, 2012 | Completed final sign-off Oct 2014 | 171 South Park | renovate apartment (2nd floor) - replace plumbing fixtures at kitchen & bathroom, new electrical lighting throughout, new interior finishes, expand & replace existing windows, add 1 new bathroom.Details
renovate apartment (2nd floor) - replace plumbing fixtures at kitchen & bathroom, new electrical lighting throughout, new interior finishes, expand & replace existing windows, add 1 new bathroom. | $120,000 | |
| Nov 21, 2011 | Completed final sign-off Jan 2013 | 2345 Pine St | Roebbelen Contracting Inc | mechanical work associated with installation of new telecommunication equipment.all electrical & architectural work associated with this work.Details
mechanical work associated with installation of new telecommunication equipment.all electrical & architectural work associated with this work. | $500,000 |
| Jul 18, 2011 | Completed final sign-off May 2012 | 2535 Lyon St | Upscale Construction Inc. | revision to permit: 201011245615. two exterior windows moved 1 ft. west. several structural sketches issued for in the field conditions.Details
revision to permit: 201011245615. two exterior windows moved 1 ft. west. several structural sketches issued for in the field conditions. | |
| Jul 8, 2011 | Completed final sign-off Jan 2012 | 325 Wawona St | Gil Construction & Assoc Inc. | voluntary foundation seismic strengthening.Details
voluntary foundation seismic strengthening. | $6,000 |
| May 6, 2010 | Completed final sign-off Aug 2012 | 659 Ellsworth St | remodel of upper floor, including bathroom. minor change on main flr. move 1-wall, add pocket doors, (n) roof w/(n) slope & 2'-5" added height. new small roof deck w/ guardrail.Details
remodel of upper floor, including bathroom. minor change on main flr. move 1-wall, add pocket doors, (n) roof w/(n) slope & 2'-5" added height. new small roof deck w/ guardrail. | $80,000 | |
| Mar 31, 2010 | Completed final sign-off Nov 2010 | 30 Onondaga Av | Roebbelen Contracting Inc | install acoustic screen wall (12ft high) around existing chillers for sound attenuation. includes structural steel and acoustic panels. patch and repair roof. screen wall to be painted to match building color.Details
install acoustic screen wall (12ft high) around existing chillers for sound attenuation. includes structural steel and acoustic panels. patch and repair roof. screen wall to be painted to match building color. | $75,000 |
| Jan 16, 2009 | Completed final sign-off Nov 2009 | 18 Elsie St | Mascheroni Construction | remodel kitchen, new fixtures in bathroom, removal of portion of wall to open into living rm.Details
remodel kitchen, new fixtures in bathroom, removal of portion of wall to open into living rm. | $40,000 |
| Nov 14, 2008 | Completed final sign-off May 2009 | 2424 Washington St | revision to pa# 2008-0916-1778-delete lightwell & 2 property line windows, add stairs to garage and a transparent one-hour fire-wall assembly.Details
revision to pa# 2008-0916-1778-delete lightwell & 2 property line windows, add stairs to garage and a transparent one-hour fire-wall assembly. | ||
| Aug 12, 2008 | Completed final sign-off Dec 2009 | 4570 19th St | enclose space under existing kitchen. within ex. basement, install 1 full bath, laundry room, trash room, relocate water heater and furnance to under space. rebuild 1 interior stair, 1 exterior rear stair and new front stair from sidewalk to the front door. new fire wall.Details
enclose space under existing kitchen. within ex. basement, install 1 full bath, laundry room, trash room, relocate water heater and furnance to under space. rebuild 1 interior stair, 1 exterior rear stair and new front stair from sidewalk to the front door. new fire wall. | $50,000 | |
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 3230 Jackson St | Ggd Inc. | revision to appl#200806023413- add 1 moment frame and shear walls per structural engineer recommendation. replace rear door in existing location. replace in kind.Details
revision to appl#200806023413- add 1 moment frame and shear walls per structural engineer recommendation. replace rear door in existing location. replace in kind. | $190,000 |
| Jun 9, 2008 | Never finaled issued Jun 2008, no final | 2685 18th Av | Trush Construction Company Inc. | a deck will be built on ground floor under this permit and an existing upper deck will be re-supported.Details
a deck will be built on ground floor under this permit and an existing upper deck will be re-supported. | $8,000 |
| Oct 18, 2004 | Completed final sign-off Jul 2005 | 706 Broderick St | Douglas Gower Dba Mesa Construction | repairs for fire damage to 3rd & 2nd floors of res.reframing approx.1/3 of roof.resheet & reroofDetails
repairs for fire damage to 3rd & 2nd floors of res.reframing approx.1/3 of roof.resheet & reroof | $85,000 |