Gelling & Judd Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Oct 2021
- Last 24 months
- 0 permits filed
92 permits since 2000: 82 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2021 | Completed final sign-off Oct 2021 | 800 El Camino Del Mar | renew for final 1457704 201803133499Details
renew for final 1457704 201803133499 | |
| Mar 29, 2021 | Completed final sign-off Apr 2022 | 278 Juanita Wy | renew permit application for final inspection. all work is completed. 1) 202102134092 ex: 05/25/2016; 20 200603318054 ex: 05/25/2016.Details
renew permit application for final inspection. all work is completed. 1) 202102134092 ex: 05/25/2016; 20 200603318054 ex: 05/25/2016. | |
| Mar 23, 2021 | Completed final sign-off Apr 2022 | 278 Juanita Wy | renew permit applications for final inspction: all work is completed. 1( 201702280254- 03/09/2018 2) 201604013753- 04/10/2017Details
renew permit applications for final inspction: all work is completed. 1( 201702280254- 03/09/2018 2) 201604013753- 04/10/2017 | |
| Mar 19, 2021 | Completed final sign-off May 2021 | 587 29th St | remove (e) internal driveway & replace in-kind. replace internal slab 10'x26'Details
remove (e) internal driveway & replace in-kind. replace internal slab 10'x26' | $6,750 |
| Mar 29, 2019 | Completed final sign-off Aug 2019 | 2120 Pierce St | resheath rood deck waterproof new plywood 1"8 ply code nailing, install insulation sheetrock paint reinstall pedestal platformDetails
resheath rood deck waterproof new plywood 1"8 ply code nailing, install insulation sheetrock paint reinstall pedestal platform | $18,650 |
| Feb 1, 2019 | Completed final sign-off May 2019 | 308 Precita Av | install 5/8" type x gyp board at interior face of wall and geiling within garage & wall shelving. existing garage area approx. 300 sf.Details
install 5/8" type x gyp board at interior face of wall and geiling within garage & wall shelving. existing garage area approx. 300 sf. | $18,500 |
| Oct 17, 2018 | Completed final sign-off Dec 2018 | 3788 Clay St | cosmetic changes. round columns to square. make fireplace surround smaller. remove wainscotting. small trim work. fill in floor for breakfast nook. no change in existing floor plan.Details
cosmetic changes. round columns to square. make fireplace surround smaller. remove wainscotting. small trim work. fill in floor for breakfast nook. no change in existing floor plan. | $24,000 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 255 17th Av | interior remodel to (e) single family dwelling & add new non structural partition walls, doors, finishes to create new 3rd bedroom & closet. no structural work, no work on any other levelDetails
interior remodel to (e) single family dwelling & add new non structural partition walls, doors, finishes to create new 3rd bedroom & closet. no structural work, no work on any other level | $20,000 |
| Mar 13, 2018 | Expired or cancelled expired Oct 2021 | 800 El Camino Del Mar | revision to 201404042616s1. revise kitchen design to eliminate a structural shear wall and add new strong wall shear in alternate location with new steel beam below. add new built in with sink in wine roomDetails
revision to 201404042616s1. revise kitchen design to eliminate a structural shear wall and add new strong wall shear in alternate location with new steel beam below. add new built in with sink in wine room | $25,000 |
| Mar 12, 2018 | Completed final sign-off Jun 2021 | 2670 Chestnut St | remodel/addition to (e) single family howe. new vertical adds 3rd flr(level 3) and roof terrace. **maher n/a**Details
remodel/addition to (e) single family howe. new vertical adds 3rd flr(level 3) and roof terrace. **maher n/a** | $620,000 |
| Feb 13, 2018 | Expired or cancelled expired May 2026 | 72 05th Av | rear horizontal addition at 1st and 2nd fl. renovation to existing 1st, 2nd and 3rd fl of main house. new bath at 2nd flDetails
rear horizontal addition at 1st and 2nd fl. renovation to existing 1st, 2nd and 3rd fl of main house. new bath at 2nd fl | $500,000 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 800 El Camino Del Mar | street spaceDetails
street space | |
| Dec 21, 2017 | Completed final sign-off Jan 2018 | 416 28th St | revision to 201707273124 & 201311202347 to clarify special inspectionDetails
revision to 201707273124 & 201311202347 to clarify special inspection | |
| Jul 27, 2017 | Completed final sign-off Jan 2018 | 416 28th St | install new retaining wall in the rear yard adjacent to existing retaining wall approved under bpa #201311202347. new retaining wall to be no taller than 5 feet above existing grade with concrete piers to extent no deeper than 1 foot below existing grade. no other work.Details
install new retaining wall in the rear yard adjacent to existing retaining wall approved under bpa #201311202347. new retaining wall to be no taller than 5 feet above existing grade with concrete piers to extent no deeper than 1 foot below existing grade. no other work. | |
| May 31, 2017 | Completed final sign-off Oct 2018 | 8 Dellbrook Av | mold was found demo bathroom walls, tile replace with new tile, delete shower move toilet to shower areaDetails
mold was found demo bathroom walls, tile replace with new tile, delete shower move toilet to shower area | $9,000 |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 255 17th Av | revision to pa #201702169549 - to correct the previous pa #201702169549 - forgot to delete to add an exterior stair. scope of work for this permit is additoin of exterior wood stair from level 2 to rear yard.Details
revision to pa #201702169549 - to correct the previous pa #201702169549 - forgot to delete to add an exterior stair. scope of work for this permit is additoin of exterior wood stair from level 2 to rear yard. | $10,000 |
| Mar 7, 2017 | Completed final sign-off Jan 2018 | 416 28th St | in addition to work indicated in permit app#201311202347: demolish extg rotted front entry stair framing and finishes, add new foundation, new framing and new finishes for new entry stair.Details
in addition to work indicated in permit app#201311202347: demolish extg rotted front entry stair framing and finishes, add new foundation, new framing and new finishes for new entry stair. | $3,000 |
| Feb 16, 2017 | Completed final sign-off Jun 2017 | 255 17th Av | remodel of a family residence; interior renovation of main level (level 2), new fenestrations at rear (west) and addition of exterior rear stair.Details
remodel of a family residence; interior renovation of main level (level 2), new fenestrations at rear (west) and addition of exterior rear stair. | $200,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 255 17th Av | remodel bathroom & kitchen in kind.Details
remodel bathroom & kitchen in kind. | $30,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2018 | 416 28th St | revision to pa 2013-1120-2347. add shotcrete to special inspectionDetails
revision to pa 2013-1120-2347. add shotcrete to special inspection | |
| Apr 7, 2015 | Completed final sign-off Feb 2016 | 3580 21st St | revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade.Details
revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade. | $2,500 |
| Jan 16, 2015 | Completed final sign-off Feb 2016 | 3580 21st St | revision to app#201011305785. revision to structural work on 4th floor, supporting new stair and landing previously permitted under app#201011305785.Details
revision to app#201011305785. revision to structural work on 4th floor, supporting new stair and landing previously permitted under app#201011305785. | |
| Dec 10, 2014 | Completed final sign-off Dec 2014 | 1256 Lombard St | remodel to unconditioned store; add non struc wlls & closet doors to e b/f store. new wine storage, new gyp bd to e storage walls and ceilings. add new guardrail/handrail to stair ,add 1 step; lightings; no work on other fls.Details
remodel to unconditioned store; add non struc wlls & closet doors to e b/f store. new wine storage, new gyp bd to e storage walls and ceilings. add new guardrail/handrail to stair ,add 1 step; lightings; no work on other fls. | $15,000 |
| Oct 24, 2014 | Completed final sign-off Feb 2016 | 3580 21st St | revision permit #2010.1130.5785. additional architectural and structural work at front yard retaining walls and replace entry steps per plan.Details
revision permit #2010.1130.5785. additional architectural and structural work at front yard retaining walls and replace entry steps per plan. | |
| Sep 16, 2014 | Completed final sign-off Jul 2015 | 1256 Lombard St | to obtain final inspection for work approved under pa#200502256300 all work is complete. n/a ordinance #155-13.Details
to obtain final inspection for work approved under pa#200502256300 all work is complete. n/a ordinance #155-13. | |
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 1256 Lombard St | to comply with physical inspection report #cc-7849 electrical, plumbing and building report bring upto code. n/a ordinance #155-13.Details
to comply with physical inspection report #cc-7849 electrical, plumbing and building report bring upto code. n/a ordinance #155-13. | $2,000 |
| Sep 16, 2014 | Completed final sign-off Feb 2016 | 757 Chenery St | new fence and guardrail at front setback to replace extg fence to be 6 foot maximum. ref app#201310310744 for approved work in front setback.Details
new fence and guardrail at front setback to replace extg fence to be 6 foot maximum. ref app#201310310744 for approved work in front setback. | $5,000 |
| Jul 28, 2014 | Completed final sign-off Dec 2014 | 150 17th Av | remove planter boxes on 2nd and 3rd flrs in front of building (brackets to remain); construct horizontal belts bet 2nd and 3rd flrs. , re-stucco front of building.Details
remove planter boxes on 2nd and 3rd flrs in front of building (brackets to remain); construct horizontal belts bet 2nd and 3rd flrs. , re-stucco front of building. | $25,000 |
| May 7, 2014 | Completed final sign-off Sep 2014 | 22 Abbey St | remodel existing 4th bathroom. all same locations, just new fixtures.Details
remodel existing 4th bathroom. all same locations, just new fixtures. | $6,000 |
| Apr 4, 2014 | Completed final sign-off Oct 2021 | 800 El Camino Del Mar | remodel of (e) residence & vertical addition over portion of (e) residence creation new 3rd floor. variance needed for small side yard encroachment at north / east corner. addition to include 4 new bedrooms & 3 new baths.Details
remodel of (e) residence & vertical addition over portion of (e) residence creation new 3rd floor. variance needed for small side yard encroachment at north / east corner. addition to include 4 new bedrooms & 3 new baths. | $600,000 |
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 1830 Mcallister St | revision to previous bath remodel permit 201311202413. new footings at perimeter of gr floor bath.Details
revision to previous bath remodel permit 201311202413. new footings at perimeter of gr floor bath. | $5,000 |
| Jan 30, 2014 | Completed final sign-off Jan 2017 | 53 States St | demolish 2 stories, 1 basement, type 5, 1 dwelling units building.Details
demolish 2 stories, 1 basement, type 5, 1 dwelling units building. | $15,000 |
| Jan 30, 2014 | Completed final sign-off Nov 2019 | 53 States St | erect 4 stories, type 5, 2 dwelling units building.Details
erect 4 stories, type 5, 2 dwelling units building. | $694,873 |
| Jan 16, 2014 | Completed final sign-off Feb 2016 | 757 Chenery St | renovate (e) bathroom. no structural change or change to fixture count new tub, wc: lav. to replace (e), new tile to replace (e0. plumbing & electrical work filed under separate permit.Details
renovate (e) bathroom. no structural change or change to fixture count new tub, wc: lav. to replace (e), new tile to replace (e0. plumbing & electrical work filed under separate permit. | $10,000 |
| Dec 31, 2013 | Completed final sign-off Sep 2015 | 4218 24th St | add 60 minute fire rated wall openings, indicated as openings e, i,j,& m on sheet a10.30 approved permit 201201051743 sir2Details
add 60 minute fire rated wall openings, indicated as openings e, i,j,& m on sheet a10.30 approved permit 201201051743 sir2 | $2,500 |
| Dec 4, 2013 | Completed final sign-off Dec 2013 | 4120 24th St | to obtain final inspeciton for work approved under pa# 200709243544. all work is complete.Details
to obtain final inspeciton for work approved under pa# 200709243544. all work is complete. | |
| Nov 22, 2013 | Completed final sign-off Jan 2016 | 587 29th St | (e) 2-story residence is to be preserved & raised in order to accomodate a (n) garage w/ 2 off-street parking spaces, a new three-story addition is added at the rear of the (e) structure.Details
(e) 2-story residence is to be preserved & raised in order to accomodate a (n) garage w/ 2 off-street parking spaces, a new three-story addition is added at the rear of the (e) structure. | $550,000 |
| Nov 20, 2013 | Completed final sign-off Jan 2018 | 416 28th St | addition + remodel to (e) single family swelling: convert unconditioned basement space to habitable space, extend (e) i st flr to rear set back line, add (n) 2nd flr structure, extend 1st + 2nd flrs as rear yard 'pop-out' full interior remodel, rear yard landscaping + grading.Details
addition + remodel to (e) single family swelling: convert unconditioned basement space to habitable space, extend (e) i st flr to rear set back line, add (n) 2nd flr structure, extend 1st + 2nd flrs as rear yard 'pop-out' full interior remodel, rear yard landscaping + grading. | $340,417 |
| Nov 20, 2013 | Completed final sign-off Apr 2014 | 1830 Mcallister St | convert (e) storage room to (n) bathroom.Details
convert (e) storage room to (n) bathroom. | $25,000 |
| Aug 28, 2013 | Completed final sign-off Sep 2014 | 22 Abbey St | replace in kind kind, 3 bathrooms & remodel. paint throughout resand floors.Details
replace in kind kind, 3 bathrooms & remodel. paint throughout resand floors. | $57,000 |
| Jun 28, 2013 | Never finaled issued Sep 2013, no final | 414 Liberty St | revision to pa# 2012/10/16/2105. remodel front facade, new windows & doors & siding.Details
revision to pa# 2012/10/16/2105. remodel front facade, new windows & doors & siding. | $18,000 |
| May 7, 2013 | Completed final sign-off Oct 2013 | 25 Chabot Tr | demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliancesDetails
demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliances | $75,000 |
| Feb 12, 2013 | Never finaled issued Aug 2013, no final | 4222 24th St | temporary shoring at east side of property to support construction at 4218 - 24th street, under pa# 2012/01/05/1743.Details
temporary shoring at east side of property to support construction at 4218 - 24th street, under pa# 2012/01/05/1743. | $10,000 |
| Feb 12, 2013 | Completed final sign-off Feb 2014 | 4214 24th St | temporary shoring @ west side of property for porposed excavation under pa# 2012/01/05/1743.Details
temporary shoring @ west side of property for porposed excavation under pa# 2012/01/05/1743. | $10,000 |
| Feb 12, 2013 | Completed final sign-off Sep 2015 | 4218 24th St | temporary shoring for proposed excavation under pa# 2012/01/05/1743.Details
temporary shoring for proposed excavation under pa# 2012/01/05/1743. | $10,000 |
| Feb 8, 2013 | Completed final sign-off Aug 2013 | 522 Alvarado St | conversion ground flr storage in (n) habitable space includ family rm,storage, bedroom, bathroom & laundry, replace stair, finishes, fixtures,casework,plbg, elec & havac, (n) slab at lowered elevation,foundation strengthed is req'd, (n) rear yard steps, retaining walls & slab. ref #2012.0912.9581.Details
conversion ground flr storage in (n) habitable space includ family rm,storage, bedroom, bathroom & laundry, replace stair, finishes, fixtures,casework,plbg, elec & havac, (n) slab at lowered elevation,foundation strengthed is req'd, (n) rear yard steps, retaining walls & slab. ref #2012.0912.9581. | $88,679 |
| Jan 8, 2013 | Completed final sign-off Oct 2013 | 282 28th Av | partial excavation of ground floor & horizontal extension at rear under (e) deck. extension of deck to north property line installation of new fire wall & new stairs down to grade.Details
partial excavation of ground floor & horizontal extension at rear under (e) deck. extension of deck to north property line installation of new fire wall & new stairs down to grade. | $42,000 |
| Dec 11, 2012 | Completed final sign-off Oct 2013 | 282 28th Av | interior remdoel to include addition of (n) cabinetry & media unit and nw wall w/pocket door and overhead beam at 1st fl. partial excavation at basement level w/(n) bathroom, study, laundry, storage and office. garage door and opening to be widened. (n) window at front at basement level.Details
interior remdoel to include addition of (n) cabinetry & media unit and nw wall w/pocket door and overhead beam at 1st fl. partial excavation at basement level w/(n) bathroom, study, laundry, storage and office. garage door and opening to be widened. (n) window at front at basement level. | $125,000 |
| Nov 29, 2012 | Completed final sign-off Oct 2013 | 282 28th Av | demo existing bathroom, new location for toilet/sink & shower, tile & paint on 2nd floor; no change on walls and openingDetails
demo existing bathroom, new location for toilet/sink & shower, tile & paint on 2nd floor; no change on walls and opening | $14,000 |
| Nov 27, 2012 | Completed final sign-off Jun 2013 | 1 Hoffman Av | replacement of extg vinyl windows with new aluminum clad wood windows. new windows to be installed in extg openings. no new openings will be made to facade. visible from street. all 8 windows to be double hung. total windows to be replaced is 11.Details
replacement of extg vinyl windows with new aluminum clad wood windows. new windows to be installed in extg openings. no new openings will be made to facade. visible from street. all 8 windows to be double hung. total windows to be replaced is 11. | $18,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2014 | 414 Liberty St | conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & pavedDetails
conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & paved | $30,252 |
| Sep 14, 2012 | Completed final sign-off Nov 2012 | 1845 Church St | kitchen remodel, replace drywall, install floor, install cabinets, replace (e) window w/ one of identical size. u factor less than .4 lighting shall comply w/ t-24Details
kitchen remodel, replace drywall, install floor, install cabinets, replace (e) window w/ one of identical size. u factor less than .4 lighting shall comply w/ t-24 | $18,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1 Hoffman Av | remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit.Details
remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit. | $159,000 |
| Sep 12, 2012 | Completed final sign-off Aug 2013 | 522 Alvarado St | remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd flDetails
remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd fl | $138,897 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 352 Diamond St | exploratory work only - remove 10 sectons approximately 6'x6' - replace with sheetrockDetails
exploratory work only - remove 10 sectons approximately 6'x6' - replace with sheetrock | |
| Mar 23, 2012 | Completed final sign-off Jul 2012 | 186 Stanyan St | demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings.Details
demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings. | $95,000 |
| Jan 5, 2012 | Completed final sign-off Sep 2015 | 4218 24th St | renov 2 story over garage type-v structure, vertical addition of 3rd story over garage that is setback fr front+side property lines.reduce footprint at rear,horizontal addition @ lower level (subterranean).alt frnt + rear facades&new garage door&curbcut. new mech & elec sys throughout.Details
renov 2 story over garage type-v structure, vertical addition of 3rd story over garage that is setback fr front+side property lines.reduce footprint at rear,horizontal addition @ lower level (subterranean).alt frnt + rear facades&new garage door&curbcut. new mech & elec sys throughout. | $750,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 3791 21st St | replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear.Details
replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear. | $117,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 2700 Diamond St | unit #2702-kitchen remodel in upper unit. lighting to comply with cec 150 (k).Details
unit #2702-kitchen remodel in upper unit. lighting to comply with cec 150 (k). | $12,000 |
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 22 Chabot Tr | remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permitDetails
remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit | $250,000 |
| Feb 2, 2011 | Completed final sign-off Sep 2011 | 2700 Diamond St | removal of lower level, illegal studio and deck with no address. replace garage door. removal of existing lower level door.Details
removal of lower level, illegal studio and deck with no address. replace garage door. removal of existing lower level door. | $15,000 |
| Jan 27, 2011 | Completed final sign-off Jul 2011 | 770 Teresita Bl | renovate kitchen & enclose (e) lightwell (located in center of building), per plans.Details
renovate kitchen & enclose (e) lightwell (located in center of building), per plans. | $50,000 |
| Sep 23, 2010 | Completed final sign-off Dec 2010 | 518 Alvarado St | additional work to 201004160432, 201005253196. mse permit to be filed separtely. replace e non conforming entry stair and gaurdrails with new conforming stair and guardrails. new stair to encroach 12" into public sidewalk. per section cbc 3202.2.1 (2007 california building code)Details
additional work to 201004160432, 201005253196. mse permit to be filed separtely. replace e non conforming entry stair and gaurdrails with new conforming stair and guardrails. new stair to encroach 12" into public sidewalk. per section cbc 3202.2.1 (2007 california building code) | $2,000 |
| Sep 14, 2010 | Never finaled issued Sep 2010, no final | 53 Chabot Tr | rev. to pa# 2009.12.03.2589. replace (e) skylights w/ 2 new glass tempered skylights. one in powder rm, and 2nd one in entrance.Details
rev. to pa# 2009.12.03.2589. replace (e) skylights w/ 2 new glass tempered skylights. one in powder rm, and 2nd one in entrance. | $2,500 |
| Aug 2, 2010 | Completed final sign-off Aug 2010 | 200 Ripley St | threads & riser replaced due to dry rot stringers if neccessary less than 50% of structure for front exterior stairs.Details
threads & riser replaced due to dry rot stringers if neccessary less than 50% of structure for front exterior stairs. | $2,700 |
| May 25, 2010 | Completed final sign-off Dec 2010 | 518 Alvarado St | in addition to bldg. permit#201004160432. remove (e) rear addition roof structure & replace with (n) @ lower pitch. renew substandard foundations in basement where indicated. (n) concrete landscaping retaining walls in rear yard. reconfigure (n) basement stairs.Details
in addition to bldg. permit#201004160432. remove (e) rear addition roof structure & replace with (n) @ lower pitch. renew substandard foundations in basement where indicated. (n) concrete landscaping retaining walls in rear yard. reconfigure (n) basement stairs. | $2,500 |
| Apr 28, 2010 | Completed final sign-off Aug 2010 | 3774 23rd St | to obtain final inspection for work approved under pa 200107093228; all work is completeDetails
to obtain final inspection for work approved under pa 200107093228; all work is complete | |
| Apr 16, 2010 | Completed final sign-off Dec 2010 | 518 Alvarado St | remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rearDetails
remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rear | $182,668 |
| Apr 14, 2010 | Completed final sign-off Sep 2010 | 186 Stanyan St | lower units 1 and 2, first fl. removal of (e) kitchen cabinetry and installation of new kitchen counters and cabs along woth minor demo of non-load bearing partitions. replace appliances as per plan.Details
lower units 1 and 2, first fl. removal of (e) kitchen cabinetry and installation of new kitchen counters and cabs along woth minor demo of non-load bearing partitions. replace appliances as per plan. | $30,000 |
| Mar 4, 2010 | Completed final sign-off Oct 2010 | 1256 Lombard St | removal of wall at bottom of stair at 2nd floor, work to be done in conjuction with dwelling unit merger, merging (e) housekeeping unit at 2nd floor into the dwelling unit on the third floor.Details
removal of wall at bottom of stair at 2nd floor, work to be done in conjuction with dwelling unit merger, merging (e) housekeeping unit at 2nd floor into the dwelling unit on the third floor. | $400 |
| Jan 25, 2010 | Completed final sign-off Nov 2011 | 4206 23rd St | vertical second story addition to exisitng single story hoem with finished basement, remodel of finishes in exisitng floors. horizontal add under (e) permitted deck, relocate rear stair from deck to ground.Details
vertical second story addition to exisitng single story hoem with finished basement, remodel of finishes in exisitng floors. horizontal add under (e) permitted deck, relocate rear stair from deck to ground. | $200,000 |
| Dec 3, 2009 | Never finaled issued Feb 2010, no final | 53 Chabot Tr | the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 28 Chabot Tr | remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Oct 15, 2009 | Completed final sign-off Dec 2009 | 520 Elizabeth St | to obtain final inspection for work approved under app #200607196951. all work is complete.Details
to obtain final inspection for work approved under app #200607196951. all work is complete. | |
| Oct 14, 2009 | Completed final sign-off Dec 2009 | 395 Collingwood St | create new deck over e flat roof at 3rd floorDetails
create new deck over e flat roof at 3rd floor | $13,000 |
| Sep 22, 2009 | Completed final sign-off Sep 2009 | 4120 24th St | to obtain final inspection for work approved under pa#200706123637 all work is complete.Details
to obtain final inspection for work approved under pa#200706123637 all work is complete. | |
| Sep 21, 2009 | Completed final sign-off Sep 2009 | 4120 24th St | to obtain final inspection for work approved under pa 200709243544; all work is completeDetails
to obtain final inspection for work approved under pa 200709243544; all work is complete | |
| Jun 15, 2009 | Completed final sign-off Jun 2009 | 2741 Divisadero St | to obtain final inspection for work approved under pa#200803046269Details
to obtain final inspection for work approved under pa#200803046269 | |
| Jun 15, 2009 | Completed final sign-off Jun 2009 | 74 Lundys Ln | to obtain final inspection for work approved under pa#200602164827s.Details
to obtain final inspection for work approved under pa#200602164827s. | |
| Jun 15, 2009 | Completed final sign-off Jun 2009 | 74 Lundys Ln | to obtain final inspection for work approved under pa#200706275323.Details
to obtain final inspection for work approved under pa#200706275323. | |
| Jun 11, 2009 | Completed final sign-off Jun 2009 | 2741 Divisadero St | renew pa# 2008/01/07/1994 to obtain final inspection. all work has been completed.Details
renew pa# 2008/01/07/1994 to obtain final inspection. all work has been completed. | |
| Jun 11, 2009 | Completed final sign-off Jun 2009 | 2741 Divisadero St | renew pa# 2005/10/11/5242 to obtain final inspection. all work has been completed.Details
renew pa# 2005/10/11/5242 to obtain final inspection. all work has been completed. | |
| Apr 8, 2009 | Completed final sign-off Dec 2009 | 395 Collingwood St | create new conditioned space on 1st floor within extg garage/storage area. add powder room, bathroom, bedroom, family room, study and laundry room. add new wndws and exterior door. rebuild extg interior stair.Details
create new conditioned space on 1st floor within extg garage/storage area. add powder room, bathroom, bedroom, family room, study and laundry room. add new wndws and exterior door. rebuild extg interior stair. | $185,000 |
| Mar 23, 2009 | Completed final sign-off Apr 2009 | 1700 16th St | to obtain final inspection for work approved under pa#200803278202. all work has been completed.Details
to obtain final inspection for work approved under pa#200803278202. all work has been completed. | |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 4120 24th St | interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ductingDetails
interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ducting | $38,000 |
| Jul 22, 2008 | Completed final sign-off Jan 2009 | 2741 Divisadero St | remodel kitchen on 2nd floor. no structural work.Details
remodel kitchen on 2nd floor. no structural work. | $100,000 |
| May 28, 2008 | Completed final sign-off Jun 2009 | 2741 Divisadero St | documentation of structural field revisions as requested by field inspector, steel upgrade in floor framing, helical piers to be covered under future revisionDetails
documentation of structural field revisions as requested by field inspector, steel upgrade in floor framing, helical piers to be covered under future revision | $20,000 |
| Mar 27, 2008 | Expired or cancelled expired Apr 2009 | 1700 16th St | renew pa#200702093840 for final inspection.Details
renew pa#200702093840 for final inspection. | |
| Aug 27, 2007 | Completed final sign-off Nov 2007 | 231 Eureka St | work @ unit# 229 (top floor). demo & remodel bathroom as per plan. new skylight.Details
work @ unit# 229 (top floor). demo & remodel bathroom as per plan. new skylight. | $11,500 |
| Jun 21, 2007 | Completed final sign-off Jun 2007 | 4155 24th St | replace damaged lath & plaster, with sheetrock . remove carpet and paint, about 10% of all walls for plaster repair.Details
replace damaged lath & plaster, with sheetrock . remove carpet and paint, about 10% of all walls for plaster repair. | $4,500 |
| Jun 12, 2007 | Expired or cancelled expired Sep 2009 | 4120 24th St | approximate 20% of the existing stairs affected. finishes to match existing.Details
approximate 20% of the existing stairs affected. finishes to match existing. | $2,500 |
| Feb 9, 2007 | Expired or cancelled expired Oct 2007 | 1700 16th St | repair entrance dry rot + restucco. only in the front. replace exterior crown moulding to building some lights + outlets.Details
repair entrance dry rot + restucco. only in the front. replace exterior crown moulding to building some lights + outlets. | $6,800 |