Barton Builders
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to May 2026
- Last 24 months
- 4 permits filed
23 permits since 2000: 15 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Sep 2026 | 730 Noe St | exterior work only: creation of concrete drainage french in (e) south facing yard. connectto (e) municipal storm drain system. install (n) 2x4 wood fence on top of (n) 6 inch high concrete stem wall at (e) south property lineDetails
exterior work only: creation of concrete drainage french in (e) south facing yard. connectto (e) municipal storm drain system. install (n) 2x4 wood fence on top of (n) 6 inch high concrete stem wall at (e) south property line | $5,500 |
| Dec 2, 2025 | In progress issued Dec 2025 | 1039 Green St | recommencement and completion of work approved under pa# 201903114863Details
recommencement and completion of work approved under pa# 201903114863 | $25,000 |
| Jun 18, 2025 | In progress issued Nov 2025 | 306 Roosevelt Wy | extension at the rear of the property to include a new bathroom & laundry. removal of structural interior wall and load bearing exterior walls. replacement of (e) window along property line, new interior finishes, replacement portion of (e) deck and minor deck extensionDetails
extension at the rear of the property to include a new bathroom & laundry. removal of structural interior wall and load bearing exterior walls. replacement of (e) window along property line, new interior finishes, replacement portion of (e) deck and minor deck extension | $300,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 1033 Green St | replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290Details
replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290 | $12,000 |
| Mar 21, 2024 | Completed final sign-off May 2024 | 232 Roosevelt Wy | replace approx 500 sq ft. shingle siding in kindDetails
replace approx 500 sq ft. shingle siding in kind | $15,000 |
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Mar 16, 2023 | Completed final sign-off Feb 2024 | 7 Upper Tr | revision to pa# 2021-1230-5207. adding structural dwgs to reinforce substandard roof & ceiling framing above kitchen.Details
revision to pa# 2021-1230-5207. adding structural dwgs to reinforce substandard roof & ceiling framing above kitchen. | $2,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2024 | 7 Upper Tr | revision # 2021-1230-5207: replace approximately 200 sqft of siding in kind. not street facing.Details
revision # 2021-1230-5207: replace approximately 200 sqft of siding in kind. not street facing. | $2,000 |
| Feb 28, 2022 | In progress issued Sep 2024 | 1039 Green St | correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863.Details
correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863. | $250,000 |
| Dec 30, 2021 | Completed final sign-off Jun 2024 | 7 Upper Tr | remodel (e) bathroom, change cabinets/counter @ (e) kitchenDetails
remodel (e) bathroom, change cabinets/counter @ (e) kitchen | $15,000 |
| Jan 22, 2021 | Completed final sign-off Aug 2023 | 7 Upper Tr | remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom.Details
remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom. | $60,000 |
| Feb 21, 2020 | Expired or cancelled withdrawn Jan 2021 | 7 Upper Tr | legalization & upgrades of an (e) ground fl unit in a 2-story residence. demolition of (e) wall, replacement of windows, door in rear, (n) kitchen, reconfigure bathroomDetails
legalization & upgrades of an (e) ground fl unit in a 2-story residence. demolition of (e) wall, replacement of windows, door in rear, (n) kitchen, reconfigure bathroom | $82,500 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1314 Page St | restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082Details
restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082 | |
| May 22, 2017 | Completed final sign-off Apr 2018 | 1466 44th Av | replace exisitng concrete site retaining wall & stairs from garage to rear yard & provide new wood deck @ 2nd floor level (10'x20').Details
replace exisitng concrete site retaining wall & stairs from garage to rear yard & provide new wood deck @ 2nd floor level (10'x20'). | $12,500 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 151 Alice B Toklas Pl | unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan.Details
unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan. | $20,000 |
| Jul 20, 2015 | Completed final sign-off Oct 2024 | 3629 Jackson St | remodel of third floor kitchen and fourth floor roof deck. enlarge windows and doors at third floor kitchen and fourth floor roof deck.Details
remodel of third floor kitchen and fourth floor roof deck. enlarge windows and doors at third floor kitchen and fourth floor roof deck. | $100,000 |
| Apr 8, 2015 | Completed final sign-off Dec 2015 | 3629 Jackson St | interior remodel of 4th fl bath and closets. new skylights on roof above bedroom- n/a maker ord. # 155-13Details
interior remodel of 4th fl bath and closets. new skylights on roof above bedroom- n/a maker ord. # 155-13 | $20,000 |
| Nov 13, 2013 | Completed final sign-off Nov 2014 | 501 Darien Wy | interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room.Details
interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room. | $120,000 |
| Oct 7, 2013 | Completed final sign-off Jan 2014 | 1501 06th Av | revision to bpa# 201309267845. repair substrate @ front, side and back of house. repair framing @ entry and back of houseDetails
revision to bpa# 201309267845. repair substrate @ front, side and back of house. repair framing @ entry and back of house | $3,000 |
| Sep 26, 2013 | Completed final sign-off Jan 2014 | 1501 06th Av | stucco remodel on front, side and back of building, repair in kind.Details
stucco remodel on front, side and back of building, repair in kind. | $20,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 594 Clipper St | addition of exterior rooftop deck (197 sq ft) to (e) single family residence. addition of exterior access door where before there was a window, re-configuration of roof drainage & water proofing of areaDetails
addition of exterior rooftop deck (197 sq ft) to (e) single family residence. addition of exterior access door where before there was a window, re-configuration of roof drainage & water proofing of area | $25,000 |
| Aug 1, 2012 | Completed final sign-off Jun 2013 | 710 Powell St | cosmetic design to building, new paint, new screens and new lighting cornice detailDetails
cosmetic design to building, new paint, new screens and new lighting cornice detail | $70,000 |
| Oct 7, 2010 | Never finaled issued Oct 2010, no final | 669 Alvarado St | remove siding that appears to have dryrot. replace with new at right side of bldg about 320 sq.ft.Details
remove siding that appears to have dryrot. replace with new at right side of bldg about 320 sq.ft. | $10,000 |