Bach Construction, Inc.
- Based in
- Burlingame
- On San Francisco permits
- May 2000 to Nov 2023
- Last 24 months
- 0 permits filed
70 permits since 2000: 49 completed, 1 in progress, 12 never finaled, 8 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2023 | In progress issued Dec 2023 | 815 Powell St | t.i. cua convert vacant cafe space to car rental retail space. powell entrance replaced in-kind w/ auto openers, 10 (e) garage stalls: 1 (e) car wash station to be used by sixtDetails
t.i. cua convert vacant cafe space to car rental retail space. powell entrance replaced in-kind w/ auto openers, 10 (e) garage stalls: 1 (e) car wash station to be used by sixt | $275,000 |
| May 31, 2023 | Completed final sign-off Sep 2023 | 1650 Owens St | 2/f: t.i., remove (e) open office(229) & furniture, replace (e) carpet w/vct to match adj finish, add new lab(229) install new lay-in ceiling, mobile lab tables, vacuum, lab air, electrical dropsDetails
2/f: t.i., remove (e) open office(229) & furniture, replace (e) carpet w/vct to match adj finish, add new lab(229) install new lay-in ceiling, mobile lab tables, vacuum, lab air, electrical drops | $225,000 |
| Dec 9, 2022 | Completed final sign-off Mar 2023 | 1650 Owens St | 2nd flr t.i conversion of 2 offices to (b) lab.Details
2nd flr t.i conversion of 2 offices to (b) lab. | $125,000 |
| Jul 5, 2022 | Completed final sign-off Aug 2022 | 564 Bush St | revision to 201912119213/r1: modifiy location of accessible counter top at new bar. add sink and counter behind bar.Details
revision to 201912119213/r1: modifiy location of accessible counter top at new bar. add sink and counter behind bar. | $5,000 |
| Mar 24, 2022 | Never finaled issued Mar 2022, no final | 566 Bush St | revision to 2020 0819 2089. for gate revision. omit center strike post at rectory gate to maintain clearance for pall bearers carrying caskets into the church. add can bolt on one leaf of rectory gate cane bolt replaces post.Details
revision to 2020 0819 2089. for gate revision. omit center strike post at rectory gate to maintain clearance for pall bearers carrying caskets into the church. add can bolt on one leaf of rectory gate cane bolt replaces post. | $800 |
| Oct 22, 2021 | Completed final sign-off Mar 2022 | 505 Montgomery St | non-structural partitions, doors glazing millwork, ceiling assemblies light fixtures plumping and electrical to warm shell condition. paint finish on remaining walls, doors, frames and clg. sprinkler pa# 2021-1029-1442Details
non-structural partitions, doors glazing millwork, ceiling assemblies light fixtures plumping and electrical to warm shell condition. paint finish on remaining walls, doors, frames and clg. sprinkler pa# 2021-1029-1442 | $300,000 |
| Oct 22, 2021 | Completed final sign-off Mar 2022 | 637 Commercial St | demolition of non-structural partitions, door, glazing, millwork, ceiling assembly light fixtures, plumbing and electrical - to warm shell condition. minimal new lighting per code and apint finish on remaining walls, doors, frames, and ceiling.Details
demolition of non-structural partitions, door, glazing, millwork, ceiling assembly light fixtures, plumbing and electrical - to warm shell condition. minimal new lighting per code and apint finish on remaining walls, doors, frames, and ceiling. | $78,000 |
| Oct 4, 2021 | Completed final sign-off Dec 2021 | 505 Montgomery St | 5th fl: deferred electrical to pa# 202105251023. installation of power/data devices installation of 2019 title 24 compliant lighting controlsDetails
5th fl: deferred electrical to pa# 202105251023. installation of power/data devices installation of 2019 title 24 compliant lighting controls | |
| Sep 27, 2021 | Expired or cancelled withdrawn Apr 2022 | 325 Mason St | renovate (e) commercial space: new flooring, wall finishes, drop ceiling and lighting. install new service desks and install new partition to create employee breakroom.Details
renovate (e) commercial space: new flooring, wall finishes, drop ceiling and lighting. install new service desks and install new partition to create employee breakroom. | $50,000 |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 505 Montgomery St | 5th floor: deferred mep submittal ref bpa#2021-0525-1023.demo & install new duct & hvac system.Details
5th floor: deferred mep submittal ref bpa#2021-0525-1023.demo & install new duct & hvac system. | |
| May 27, 2021 | Completed final sign-off Mar 2022 | 2501 Ocean Av | t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred.Details
t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred. | $868,803 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 505 Montgomery St | suite 550 t.i. install non structural gyp board office partitions w/ sidelite,door frames, hardware, electrical,millwork,finishes, light fixtures & acoustical ceiling system where indicated - mep deferred.Details
suite 550 t.i. install non structural gyp board office partitions w/ sidelite,door frames, hardware, electrical,millwork,finishes, light fixtures & acoustical ceiling system where indicated - mep deferred. | $731,753 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 640 Sacramento St | per accessible building entrance checklist submittal: provide new automatic door opener and accessible sign. roughen surface of (e) sidwalk surface.Details
per accessible building entrance checklist submittal: provide new automatic door opener and accessible sign. roughen surface of (e) sidwalk surface. | $6,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 637 Commercial St | per accessible building entrance checklist submittal: relocation of (1) automatic door opener. roughen surface of (e) sloped sidewalk surface.Details
per accessible building entrance checklist submittal: relocation of (1) automatic door opener. roughen surface of (e) sloped sidewalk surface. | $2,500 |
| Nov 5, 2020 | Completed final sign-off Mar 2021 | 1650 Owens St | interior renovation includes new partition dividing existing room and existing hall. combine (e) rooms #506 & #507. demolish partition separating (e) rooms #508 & #509a. no structural and no exterior workDetails
interior renovation includes new partition dividing existing room and existing hall. combine (e) rooms #506 & #507. demolish partition separating (e) rooms #508 & #509a. no structural and no exterior work | $35,000 |
| Aug 19, 2020 | Completed final sign-off Jun 2022 | 566 Bush St | install metal security gate on the south property line, adjacent to the sidewalk.Details
install metal security gate on the south property line, adjacent to the sidewalk. | $50,000 |
| Mar 11, 2020 | Completed final sign-off Jan 2021 | 847 Kansas St | revision to 201803163855 foundation, 1 metal beam, 1 wood beamDetails
revision to 201803163855 foundation, 1 metal beam, 1 wood beam | $10,000 |
| Dec 11, 2019 | Completed final sign-off Aug 2022 | 564 Bush St | relocate kitchen wall and ele panel, replace bath finishes, fixtures, fittings in kind, replace e wet bar, add doors in e openings between kitchen storage and hallDetails
relocate kitchen wall and ele panel, replace bath finishes, fixtures, fittings in kind, replace e wet bar, add doors in e openings between kitchen storage and hall | $135,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 505 Montgomery St | per accessible building entrance checklist submittal: exterior sidewalk improvement at retail entrances along commercial street, addition of automatic door openings (aciuators) at four entrancesDetails
per accessible building entrance checklist submittal: exterior sidewalk improvement at retail entrances along commercial street, addition of automatic door openings (aciuators) at four entrances | |
| Aug 21, 2019 | Completed final sign-off Dec 2020 | 2174 Market St | replacing existing non-historical main doors and supporting framework at 2174 entry; remove & replace non-historic glass window facing market with leaded glass windows to match the balance of the leaded glass facing market street.Details
replacing existing non-historical main doors and supporting framework at 2174 entry; remove & replace non-historic glass window facing market with leaded glass windows to match the balance of the leaded glass facing market street. | $50,000 |
| Apr 16, 2019 | Completed final sign-off May 2019 | 659 Pine St | voluntary seismic bracing of (e) clay tile wall at entry vestibule.Details
voluntary seismic bracing of (e) clay tile wall at entry vestibule. | $6,500 |
| Feb 22, 2019 | Completed final sign-off Jun 2019 | 505 Montgomery St | suite 1250: t.i incl demo interior, paritions, doors, sidelights. replace light fixtures w/led, t24 fixtures. (n) non-structural partitions, door assemblies, cabs, recepts & finishes. mep, fls & sprinklers under sep permit.Details
suite 1250: t.i incl demo interior, paritions, doors, sidelights. replace light fixtures w/led, t24 fixtures. (n) non-structural partitions, door assemblies, cabs, recepts & finishes. mep, fls & sprinklers under sep permit. | $180,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2021 | 847 Kansas St | interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room.Details
interior remodel: update kitchen and bathrooms. remodel kitchen, family room , bathroom on main flr, new stairs to lower floors. lower floor remodel master bedroom, bath, closet and laundry room. | $225,000 |
| Feb 13, 2018 | Never finaled issued Feb 2018, no final | 1560 40th Av | visible exterior work on east & west elevation only w/triangular seismic bracingDetails
visible exterior work on east & west elevation only w/triangular seismic bracing | $15,000 |
| Jul 17, 2017 | Completed final sign-off Oct 2017 | 505 Montgomery St | #600 6/f- demo partial (e) ceiling, 2 lights & flooring/finishes. new scope new rated 20 min entry door & side light assembly ceiling, light fixtures & rated full height gyp. board partition, new non structural partitions, side lights and finishes. mep/fire deferred submittal. n/a ordinance #155-1Details
#600 6/f- demo partial (e) ceiling, 2 lights & flooring/finishes. new scope new rated 20 min entry door & side light assembly ceiling, light fixtures & rated full height gyp. board partition, new non structural partitions, side lights and finishes. mep/fire deferred submittal. n/a ordinance #155-1 | $115,000 |
| May 22, 2017 | Never finaled issued Jun 2017, no final | 665 Elizabeth St | partial voulntary upgrade @ 1st floor only. no exterior workDetails
partial voulntary upgrade @ 1st floor only. no exterior work | $80,000 |
| Apr 17, 2017 | Completed final sign-off Apr 2017 | 1200 Carroll Av | 2 temporary concrete slabs in existing vacant lot maher not reqDetails
2 temporary concrete slabs in existing vacant lot maher not req | $25,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 3801 Balboa St | includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroomDetails
includes accommodating structural seismic strengthening to the existing building. project also includes providing a unisex ada restroom | $775,000 |
| Mar 16, 2017 | Never finaled issued Jun 2017, no final | 476 24th Av | includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the buildingDetails
includes accommodating structural seismic strengthening to (e) building. project also includes providing fully complaint access into the main building as well as providing a fully compliant ada unixex bathroom in the basement level of the building | $575,000 |
| Jan 24, 2017 | Never finaled issued May 2017, no final | 419 Hearst Av | remodel (e) girls and boys toilets to include ada stalls. add 1 unisex ada stall for adult use.Details
remodel (e) girls and boys toilets to include ada stalls. add 1 unisex ada stall for adult use. | $15,000 |
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 505 Montgomery St | 23/f- t.i., new doors, hardware, card readers and ceiling height gyp. board partition. n/a ordinance #155-13Details
23/f- t.i., new doors, hardware, card readers and ceiling height gyp. board partition. n/a ordinance #155-13 | $50,000 |
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 50 Thomas More Wy | revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam.Details
revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam. | |
| May 19, 2016 | Completed final sign-off Oct 2016 | 751 37th Av | remove rotten siding & replace with like at rear of building. woodsiding approximately 350 sq. ft., r-19 insulation at accessible wall cavity.Details
remove rotten siding & replace with like at rear of building. woodsiding approximately 350 sq. ft., r-19 insulation at accessible wall cavity. | $20,000 |
| Mar 16, 2016 | Never finaled issued Jun 2016, no final | 50 Thomas More Wy | build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit.Details
build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit. | $200,000 |
| Oct 2, 2014 | Completed final sign-off Oct 2014 | 2168 Market St | revision to app#201404183577 and 201311222585 and 200611087219 (r1). remove restroom fixtures from scope of work because of duplucate permitting on 201312315432,201312315436,201403140844. n/a maherDetails
revision to app#201404183577 and 201311222585 and 200611087219 (r1). remove restroom fixtures from scope of work because of duplucate permitting on 201312315432,201312315436,201403140844. n/a maher | |
| Apr 18, 2014 | Completed final sign-off Oct 2014 | 2168 Market St | revision to pa#201311222585 barrier removal, revision includes minor adjustments to basement and 1 st floor restrooms and minor structurcal changes to elevator shaft. n/a to ordinance #155-13. clarifying code to be used 2001 cbc code.Details
revision to pa#201311222585 barrier removal, revision includes minor adjustments to basement and 1 st floor restrooms and minor structurcal changes to elevator shaft. n/a to ordinance #155-13. clarifying code to be used 2001 cbc code. | |
| Mar 10, 2014 | Completed final sign-off May 2014 | 505 Montgomery St | tenant improvement in existing office space. revision to 2013-10-25-0212. reduced scope: test kitchen, conference room, phone rooms deleted.Details
tenant improvement in existing office space. revision to 2013-10-25-0212. reduced scope: test kitchen, conference room, phone rooms deleted. | |
| Dec 19, 2013 | Completed final sign-off Dec 2014 | 1142 Shotwell St | bathroom remodel, approximately 40 sq.ft. and no removal of wallsDetails
bathroom remodel, approximately 40 sq.ft. and no removal of walls | $20,000 |
| Nov 22, 2013 | Completed final sign-off Oct 2014 | 2168 Market St | revision to app#201309166953 & 200611087219: barrier removal modify as approved non ada elevator to ada elevator, modify entry and orientation of approved toilets. adding addition toilet stalls.Details
revision to app#201309166953 & 200611087219: barrier removal modify as approved non ada elevator to ada elevator, modify entry and orientation of approved toilets. adding addition toilet stalls. | $4,000 |
| Oct 25, 2013 | Completed final sign-off May 2014 | 505 Montgomery St | 3rd floor-interior remodel-t.i of (e) office space, (e) office tenent in commercial office bldg expanding into adjacent lease space on same multi tenant sloor. new construction of offices, meeting rooms & test kitchen, no cookingDetails
3rd floor-interior remodel-t.i of (e) office space, (e) office tenent in commercial office bldg expanding into adjacent lease space on same multi tenant sloor. new construction of offices, meeting rooms & test kitchen, no cooking | $468,700 |
| Sep 16, 2013 | Completed final sign-off Oct 2014 | 2168 Market St | to renew app# 200611087219 for commencement of work not started under approved permit app# 200611087219.Details
to renew app# 200611087219 for commencement of work not started under approved permit app# 200611087219. | $731,000 |
| Jul 31, 2013 | Completed final sign-off Aug 2013 | 505 Montgomery St | 3rd floor-demolition of non structural tenant improvement-minor new work including new partitions, relocation of door & new door. m.e.p & fire life safety under a seperate permit 3rd floorDetails
3rd floor-demolition of non structural tenant improvement-minor new work including new partitions, relocation of door & new door. m.e.p & fire life safety under a seperate permit 3rd floor | $20,000 |
| Jul 19, 2013 | Completed final sign-off Aug 2013 | 505 Montgomery St | demolition of non structural t.i., minor new work including new partitions, relocation of door & suite to remain unoccupied per ab-017. mep. and fire life safety per seperate permit.Details
demolition of non structural t.i., minor new work including new partitions, relocation of door & suite to remain unoccupied per ab-017. mep. and fire life safety per seperate permit. | $5,000 |
| Jun 18, 2013 | Completed final sign-off Nov 2013 | 826 30th Av | demolitoin of (e) stairs & landing, (n) construction of wood stairs & landing/1-hr wall @ prop line, (n) construction of roof & skylight, replacement of (e) windows w/tempered glass.Details
demolitoin of (e) stairs & landing, (n) construction of wood stairs & landing/1-hr wall @ prop line, (n) construction of roof & skylight, replacement of (e) windows w/tempered glass. | $15,000 |
| Mar 14, 2013 | Completed final sign-off Apr 2013 | 332 Gates St | remodel bath - remove & replace (1) sink, (1) toilet, (1) shower, install new flooring & paint, no change on walls.Details
remodel bath - remove & replace (1) sink, (1) toilet, (1) shower, install new flooring & paint, no change on walls. | $10,000 |
| Feb 28, 2013 | Completed final sign-off May 2013 | 3255 Folsom St | repair plaster crack in back of church in church parking lot @ exteriorDetails
repair plaster crack in back of church in church parking lot @ exterior | $5,000 |
| Nov 13, 2012 | Expired or cancelled expired Feb 2014 | 3255 Folsom St | build a new retaining wall.Details
build a new retaining wall. | $25,000 |
| Oct 26, 2012 | Completed final sign-off Feb 2013 | 2174 Market St | voluntary upgrade of existing trusses. sffd truss sign requiredDetails
voluntary upgrade of existing trusses. sffd truss sign required | $85,000 |
| Aug 31, 2012 | Completed final sign-off Jan 2013 | 295 Precita Av | dry rot repair at exterior wall, additional damage foundDetails
dry rot repair at exterior wall, additional damage found | $35,000 |
| Jun 8, 2012 | Completed final sign-off Jan 2013 | 295 Precita Av | repair dryort at entry at bldg on corner of precita and shotwell. replace in kind, approx 50 sq ft. bldg has multi-purpose rooms.Details
repair dryort at entry at bldg on corner of precita and shotwell. replace in kind, approx 50 sq ft. bldg has multi-purpose rooms. | $1,500 |
| May 1, 2012 | Completed final sign-off Dec 2012 | 637 Commercial St | demo the windows on the 2nd and 3rd fl on the north and south elevations and demo of interior furred walls at ext walls at 2nd and 3rd fl. newenergy efficient window system to be installed, insulation to be added to ext walls adjacent to new windows with new furred partitions to enclose insulationDetails
demo the windows on the 2nd and 3rd fl on the north and south elevations and demo of interior furred walls at ext walls at 2nd and 3rd fl. newenergy efficient window system to be installed, insulation to be added to ext walls adjacent to new windows with new furred partitions to enclose insulation | $140,000 |
| Sep 15, 2009 | Completed final sign-off Feb 2010 | 505 Montgomery St | 6th floor - finish improvements to existing elevator lobby,tenant corridor & restroom. mechanical & electrical under separate permit.Details
6th floor - finish improvements to existing elevator lobby,tenant corridor & restroom. mechanical & electrical under separate permit. | $117,000 |
| Jul 3, 2008 | Never finaled issued Jul 2008, no final | 650 Townsend St | renew permit application # 200712261302 for finalDetails
renew permit application # 200712261302 for final | |
| Dec 26, 2007 | Never finaled issued Dec 2007, no final | 650 Townsend St | remove existing exit sign in suite # 200 2nd floor.Details
remove existing exit sign in suite # 200 2nd floor. | $524 |
| Jun 15, 2006 | Never finaled issued Jun 2006, no final | 650 Townsend St | add walls for new reception area & lounge areaDetails
add walls for new reception area & lounge area | $20,000 |
| Apr 29, 2005 | Completed final sign-off May 2005 | 650 Townsend St | oti-2 2nd floor elDetails
oti-2 2nd floor el | $700 |
| Mar 30, 2005 | Completed final sign-off May 2005 | 650 Townsend St | oti-1, 2nd floor, el, ls.Details
oti-1, 2nd floor, el, ls. | $8,500 |
| Sep 24, 2004 | Completed final sign-off Apr 2005 | 741 Filbert St | interior garage layout alteration as revision to app #200408161668Details
interior garage layout alteration as revision to app #200408161668 | |
| Aug 16, 2004 | Completed final sign-off Apr 2005 | 741 Filbert St | add garage door and curb cut, interior remodelDetails
add garage door and curb cut, interior remodel | $80,000 |
| Sep 4, 2002 | Completed final sign-off Sep 2002 | 650 Townsend St | relocat partition to create office space in suite 260Details
relocat partition to create office space in suite 260 | $20,000 |
| Jul 30, 2002 | Completed final sign-off Aug 2002 | 650 Townsend St | revise fire sprinklers for application 200204234709Details
revise fire sprinklers for application 200204234709 | $2,000 |
| Apr 23, 2002 | Completed final sign-off Aug 2002 | 650 Townsend St | revise partitions/door for ada, cange doors to bldg standards, paint, revise power outlets, fire alaDetails
revise partitions/door for ada, cange doors to bldg standards, paint, revise power outlets, fire ala | $10,000 |
| Jan 17, 2002 | Expired or cancelled expired Aug 2002 | 320 Maple St | voluntary seismic work, bolting of fndtn sill,new shear walls,strapping of beamsDetails
voluntary seismic work, bolting of fndtn sill,new shear walls,strapping of beams | $10,000 |
| Nov 27, 2001 | Expired or cancelled expired Jul 2002 | 30 Child St | as built drawings for field changes td meet code. additional permit req by building inspectorDetails
as built drawings for field changes td meet code. additional permit req by building inspector | $18,000 |
| Jun 5, 2001 | Expired or cancelled expired Jun 2002 | 322 Maple St | non structural work onlyDetails
non structural work only | $80,000 |
| May 18, 2001 | Expired or cancelled expired Sep 2002 | 30 Child St | apartment renovation, remove & addition of n-bearing walls, new kitchen cabinets & plumbing/sinksDetails
apartment renovation, remove & addition of n-bearing walls, new kitchen cabinets & plumbing/sinks | $95,000 |
| Jul 10, 2000 | Expired or cancelled cancelled Feb 2001 | 600 Townsend St | oti-2 2nd floor me lDetails
oti-2 2nd floor me l | $5,000 |
| Jul 10, 2000 | Expired or cancelled expired Jan 2001 | 600 Townsend St | oti-2 el, me, l/s 2nd floorDetails
oti-2 el, me, l/s 2nd floor | $15,000 |
| Jun 26, 2000 | Completed final sign-off Sep 2000 | 600 Townsend St | oti-2 2nd floor elDetails
oti-2 2nd floor el | $33,000 |
| May 18, 2000 | Completed final sign-off Sep 2000 | 600 Townsend St | oti-1, 2nd floor, el, me, l/s, spDetails
oti-1, 2nd floor, el, me, l/s, sp | $20,000 |