D Kelly Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jan 2025
- Last 24 months
- 1 permit filed
167 permits since 2000: 126 completed, 1 in progress, 25 never finaled, 15 expired or cancelled.
Of the 25 never-finaled permits, 1 is 3 to 5 years old, 12 are 5 to 10 years old, 12 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 167.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2025 | In progress filed Jan 2025, not yet issued | 2201 Broadway | repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage.Details
repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage. | $25,000 |
| Mar 18, 2024 | Completed final sign-off Oct 2024 | 2222 Broadway | remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit.Details
remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit. | $175,000 |
| Nov 18, 2022 | Completed final sign-off Oct 2023 | 580 Sutter St | water supply fixture unit calcs for sfpuc review. ref pa 2022-0216-8154. no added work or costDetails
water supply fixture unit calcs for sfpuc review. ref pa 2022-0216-8154. no added work or cost | |
| May 16, 2022 | Never finaled issued May 2022, no final | 475 Collingwood St | dry rot repair. patch back existing finishes. in rear of building, 3/f. not visible from street.Details
dry rot repair. patch back existing finishes. in rear of building, 3/f. not visible from street. | $7,500 |
| Feb 24, 2021 | Completed final sign-off Mar 2023 | 2222 Broadway | tenant improvement mechanical work. revise existing duckwork & hydronic piping as necessary to accomodate new work. furnish & install new air terminals, vrf systems, fan & piping/ductwork as necessary. air balance & title 24. ref pa# 201910013159.Details
tenant improvement mechanical work. revise existing duckwork & hydronic piping as necessary to accomodate new work. furnish & install new air terminals, vrf systems, fan & piping/ductwork as necessary. air balance & title 24. ref pa# 201910013159. | $225,000 |
| Feb 24, 2021 | Never finaled issued Apr 2021, no final | 2222 Broadway | new lighting & power signal for existing assembly space, new panel board, new theatrical lighting control system. title 24. ref pa# 201910013159.Details
new lighting & power signal for existing assembly space, new panel board, new theatrical lighting control system. title 24. ref pa# 201910013159. | $310,000 |
| Nov 21, 2020 | Completed final sign-off Dec 2021 | 420 Jersey St | new home office on ground floor. excavation to achieve greater ceiling hight. new concrete slab & concrete foundation underpping in area of work. relocation of steel support post. 3 new windows at property line.Details
new home office on ground floor. excavation to achieve greater ceiling hight. new concrete slab & concrete foundation underpping in area of work. relocation of steel support post. 3 new windows at property line. | $30,000 |
| Nov 6, 2020 | Completed final sign-off Feb 2021 | 1 Embarcadero Center | 24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unitDetails
24/f: install 2 new vav boxes and duct work. move one existing thermostat. reroute control to one existing induction unit | $16,500 |
| Nov 6, 2020 | Completed final sign-off Feb 2021 | 1 Embarcadero Center | 23/f: install one vav box and associated duct work at (e) tenant spaceDetails
23/f: install one vav box and associated duct work at (e) tenant space | $16,500 |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 1715 Octavia St | electrical power and lighting title 24, ref pa 2019-0612-3274Details
electrical power and lighting title 24, ref pa 2019-0612-3274 | $145,000 |
| Oct 1, 2019 | Completed final sign-off Mar 2023 | 2222 Broadway | interior renovation of existing assembly space in a private k-12 girls school. no change in use or occupancy. mep & fire alarm under separate permit.Details
interior renovation of existing assembly space in a private k-12 girls school. no change in use or occupancy. mep & fire alarm under separate permit. | $465,120 |
| Jun 12, 2019 | Completed final sign-off Aug 2020 | 1715 Octavia St | new kitchen & restrooms at hight school multipurpose room, work includes new walls, doors, millwork, lighting, mechanical, elec, plumbing, and finishes, mep, title 24 energy calcs, fire sprinklers and life safety permitted sep. decorative brackets to be salvaged/reinstalled.Details
new kitchen & restrooms at hight school multipurpose room, work includes new walls, doors, millwork, lighting, mechanical, elec, plumbing, and finishes, mep, title 24 energy calcs, fire sprinklers and life safety permitted sep. decorative brackets to be salvaged/reinstalled. | $475,000 |
| May 23, 2019 | Completed final sign-off Aug 2020 | 1715 Octavia St | interior demolition per ab-017 at high school multi-purpose room in preperation for future improvement under seperate permit.Details
interior demolition per ab-017 at high school multi-purpose room in preperation for future improvement under seperate permit. | $45,000 |
| May 8, 2019 | Completed final sign-off Nov 2019 | 615 Prague St | revision to pa 2017-0124-7807.... to comply with nov 201690034Details
revision to pa 2017-0124-7807.... to comply with nov 201690034 | |
| Apr 24, 2019 | Never finaled issued May 2019, no final | 2255 Vallejo St | revision to pa 2018-0816-7498 (soft story) revised structural detailsDetails
revision to pa 2018-0816-7498 (soft story) revised structural details | |
| Jan 4, 2019 | Never finaled issued Mar 2019, no final | 201 Eddy St | g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work.Details
g/f: minor tenant improvement including one new non-load bearing partition, light fixtures, and interior finishes. no plumbing & no structural work. | $116,118 |
| Oct 2, 2018 | Completed final sign-off Jan 2019 | 149 Taylor St | ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work.Details
ground floor t.i. including new non-load bearing parttions, light fixtures, and interior finishes. no structural and plumbing work. | $53,265 |
| Aug 16, 2018 | Completed final sign-off Nov 2019 | 2255 Vallejo St | soft story retrofit uising cebc ch a4Details
soft story retrofit uising cebc ch a4 | $180,000 |
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 2222 Broadway | new lighting and branch circuit to existing panel. title 24 compliance ref 201803264571, int renovation of existing restrooms, 2 floorsDetails
new lighting and branch circuit to existing panel. title 24 compliance ref 201803264571, int renovation of existing restrooms, 2 floors | $22,000 |
| Apr 25, 2018 | Completed final sign-off Jan 2019 | 1 Embarcadero Center | 23rd flr. tenant improvement to 8100 sqft. existing office space incl non-structural demo, title 24 lighting upgrade, (n) partitions & finishes & mep. new lunch room w/ bar sink. (e) restrooms compliant - no work, no exterior, no signage, no landscaping, no rooftop units.Details
23rd flr. tenant improvement to 8100 sqft. existing office space incl non-structural demo, title 24 lighting upgrade, (n) partitions & finishes & mep. new lunch room w/ bar sink. (e) restrooms compliant - no work, no exterior, no signage, no landscaping, no rooftop units. | $500,000 |
| Mar 26, 2018 | Completed final sign-off Aug 2018 | 2222 Broadway | interior renovation of 2 existing girls restrooms in private 5-12 girls school. no change in use or occupancy. no change to exterior of buildings. mep to be separate permit. fire alarm to be separate permit.Details
interior renovation of 2 existing girls restrooms in private 5-12 girls school. no change in use or occupancy. no change to exterior of buildings. mep to be separate permit. fire alarm to be separate permit. | $56,400 |
| Mar 5, 2018 | Never finaled issued Apr 2018, no final | 1155 04th St | g/f - base building upgrade by ownership for tenant - electrical, plumbing, mechanical, new accessible toilet room - unisex. remain unoccupied & separate ti permit.Details
g/f - base building upgrade by ownership for tenant - electrical, plumbing, mechanical, new accessible toilet room - unisex. remain unoccupied & separate ti permit. | $120,702 |
| Jan 19, 2018 | Completed final sign-off Sep 2022 | 1522 Howard St | to comply with nov #201721371. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher naDetails
to comply with nov #201721371. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na | $40,000 |
| Dec 12, 2017 | Never finaled issued Feb 2018, no final | 1 Embarcadero Center | ste 2410-2440 - 3995 sq ft ti including elect/mech/plumbing. fully accessible, no occ class change. no exterior planting, signage, landscape or roof top work. maher naDetails
ste 2410-2440 - 3995 sq ft ti including elect/mech/plumbing. fully accessible, no occ class change. no exterior planting, signage, landscape or roof top work. maher na | $487,111 |
| Aug 24, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | 2nd and 3rd flr restrooms - mechanical and electrical plans and t-24. ref. app#2017-05-24-7475Details
2nd and 3rd flr restrooms - mechanical and electrical plans and t-24. ref. app#2017-05-24-7475 | $72,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | mechanical plan & title 24, electrical plan & title 24. ref pa 201705237325Details
mechanical plan & title 24, electrical plan & title 24. ref pa 201705237325 | $122,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 1 Embarcadero Center | 24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinanceDetails
24th floor #2440 - tenant improvement to (e) 3385 sq ft office suite. remove & replace (e) finishes. (n) t-24 compliant lighting, (n) partitions (non-structural), relocate (1) sink, make ada accessible . no exterior work. (e) restrooms accessible. n/a maher ordinance | $265,000 |
| Jul 25, 2017 | Never finaled issued Jul 2017, no final | 1715 Octavia St | demo (e) hood and ductwork. furnach & install new type i hood, welded ductwork . new make-up air and exhaust fan. ref pa#201603212640.Details
demo (e) hood and ductwork. furnach & install new type i hood, welded ductwork . new make-up air and exhaust fan. ref pa#201603212640. | $55,000 |
| Jul 17, 2017 | Never finaled issued Jul 2017, no final | 1235 04th St | temporary entry walkway on existing city sidewalk. wood sloping pathway to create accessible entry to existing entry (city sidewalk has sunk/lowered at elevation, damaged)Details
temporary entry walkway on existing city sidewalk. wood sloping pathway to create accessible entry to existing entry (city sidewalk has sunk/lowered at elevation, damaged) | $4,000 |
| May 24, 2017 | Completed final sign-off Aug 2017 | 2222 Broadway | interior renovation of (2) existing girls restroom in a private k-12 girls school. no change in use or occupancy. no change to exterior of building. mep to be separate design build permit. fire alarm to be separate permitDetails
interior renovation of (2) existing girls restroom in a private k-12 girls school. no change in use or occupancy. no change to exterior of building. mep to be separate design build permit. fire alarm to be separate permit | $53,852 |
| May 23, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | interior renovation of existing science classrooms to a private k-12 school. mep to separate design build pemrit. no change in use or occupancy. fire larm and sprinklers to be separate permit.Details
interior renovation of existing science classrooms to a private k-12 school. mep to separate design build pemrit. no change in use or occupancy. fire larm and sprinklers to be separate permit. | $300,000 |
| Feb 23, 2017 | Never finaled issued Apr 2017, no final | 1225 04th St | new fully accesable toilet room, new rear exit door, new mechanical heating and cooling system electrical service to space and panel for commercial space.Details
new fully accesable toilet room, new rear exit door, new mechanical heating and cooling system electrical service to space and panel for commercial space. | $39,500 |
| Jan 24, 2017 | Completed final sign-off Nov 2019 | 615 Prague St | legalization of dwelling unit installed without permit.Details
legalization of dwelling unit installed without permit. | $75,700 |
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 1235 04th St | ground floor: ti- new partitions, ceiling, lighting, power mechanical & plumbing. new finishes on walls and floorDetails
ground floor: ti- new partitions, ceiling, lighting, power mechanical & plumbing. new finishes on walls and floor | $32,000 |
| Dec 16, 2016 | Never finaled issued Dec 2016, no final | 2201 Broadway | reinforcing the structure by using shotcrete & steel on one of the garage doors, voluntary seismic upgrade to the structure.Details
reinforcing the structure by using shotcrete & steel on one of the garage doors, voluntary seismic upgrade to the structure. | $82,000 |
| Dec 6, 2016 | Expired or cancelled cancelled Feb 2020 | 1235 04th St | commercial space-base building upgrade, mechanical, elelctrical, plumbing architecture, new accessible toilet room: tenent improvement under superate permit application.Details
commercial space-base building upgrade, mechanical, elelctrical, plumbing architecture, new accessible toilet room: tenent improvement under superate permit application. | $39,550 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | electrical plan, lighting, t-24 for room 2b01. ref app# 201607212943Details
electrical plan, lighting, t-24 for room 2b01. ref app# 201607212943 | $2,500 |
| Sep 15, 2016 | Completed final sign-off Dec 2016 | 75 Yerba Buena Ln | demilition of 18'x13' concrete bebench, patch concrete surfaceDetails
demilition of 18'x13' concrete bebench, patch concrete surface | $5,000 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 1715 Octavia St | on 2nd floor - electrical and mechanical t-24. ref pa 2016-0321-2640. fire under seperate permit.Details
on 2nd floor - electrical and mechanical t-24. ref pa 2016-0321-2640. fire under seperate permit. | $96,500 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2201 Broadway | electrical t-24 (power lighting) and mechanical t-24 (replace fan coil). ref pa 20160602-8956 admissions offices on first floorDetails
electrical t-24 (power lighting) and mechanical t-24 (replace fan coil). ref pa 20160602-8956 admissions offices on first floor | $62,200 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floorDetails
electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floor | $24,500 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permitDetails
electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permit | $15,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | ti - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout.Details
ti - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout. | $135,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 2201 Broadway | interior renovation of basement level including new offices & updated restrooms, property is considered historic, no exterior work, mep under separate permit. life safety deferred.Details
interior renovation of basement level including new offices & updated restrooms, property is considered historic, no exterior work, mep under separate permit. life safety deferred. | $100,000 |
| May 13, 2016 | Completed final sign-off Jun 2016 | 3838 California St | suite #305- remodel of (e) medical office space to create accessible exam. & procedure rooms, demo partitions, install (n) partitions, floor, finishes, painting & minor modifications to (e) electrical & hvac.Details
suite #305- remodel of (e) medical office space to create accessible exam. & procedure rooms, demo partitions, install (n) partitions, floor, finishes, painting & minor modifications to (e) electrical & hvac. | $98,000 |
| Apr 26, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | interior renovation of office space to classroom. demolition of non bearing walls, new finishes. no exterior work, no sprinklers, fire alarm sep permit, and mep seperate permit.Details
interior renovation of office space to classroom. demolition of non bearing walls, new finishes. no exterior work, no sprinklers, fire alarm sep permit, and mep seperate permit. | $56,400 |
| Apr 18, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | demo of non-bearing interior walls & finishes, new wall & door for new president's office. mep to be separate design build permit. no change of use or occupancy. no exterior work. fire alarm under separate permitDetails
demo of non-bearing interior walls & finishes, new wall & door for new president's office. mep to be separate design build permit. no change of use or occupancy. no exterior work. fire alarm under separate permit | $88,968 |
| Apr 12, 2016 | Expired or cancelled cancelled Jan 2026 | 2201 Broadway | demolition of non-bearing walls & finishes, construction of new walls, replacement of restoom fixtures, new doors, & finishes. mep to be separate design build permitDetails
demolition of non-bearing walls & finishes, construction of new walls, replacement of restoom fixtures, new doors, & finishes. mep to be separate design build permit | $150,000 |
| Mar 21, 2016 | Completed final sign-off Aug 2016 | 1715 Octavia St | interior renovation of (e) science classrooms to a private 9-12. limited to demolition & replacement of casework finishes. interior shear wall, doors on 2nd floor of (e) building in 2000. no change in use & occupancy.Details
interior renovation of (e) science classrooms to a private 9-12. limited to demolition & replacement of casework finishes. interior shear wall, doors on 2nd floor of (e) building in 2000. no change in use & occupancy. | $529,800 |
| Feb 4, 2016 | Never finaled filed Feb 2016, never issued | 615 Prague St | (post notice epr ordinance no.208-15 is required) comply with nov 201690034 demo non comply work including electrical, plumbing, fixtures, walls, demo exterior deck (remove one illegal unit on ground floor)Details
(post notice epr ordinance no.208-15 is required) comply with nov 201690034 demo non comply work including electrical, plumbing, fixtures, walls, demo exterior deck (remove one illegal unit on ground floor) | $10,000 |
| Nov 6, 2015 | Never finaled issued Feb 2016, no final | 2340 Clay St | rev. to pa#201505156458. n/a ordinance #133-15. new framing for elevator equipment at elevator machine room.Details
rev. to pa#201505156458. n/a ordinance #133-15. new framing for elevator equipment at elevator machine room. | $20,000 |
| Aug 27, 2015 | Completed final sign-off May 2016 | 2300 California St | #105- voluntary access barrier removal in the first floor existing suite. demo existing laundry to enlarge officeDetails
#105- voluntary access barrier removal in the first floor existing suite. demo existing laundry to enlarge office | $50,000 |
| Jul 27, 2015 | Completed final sign-off May 2016 | 2300 California St | voluntary access barrier removal in common spaces in bldg. upgrade doors, signage, public toilets, parking.Details
voluntary access barrier removal in common spaces in bldg. upgrade doors, signage, public toilets, parking. | $180,000 |
| Jul 23, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | revision to 201506249771. room 5306 a remove existing panic hardware add sign not and exit to door.Details
revision to 201506249771. room 5306 a remove existing panic hardware add sign not and exit to door. | $300 |
| Jul 17, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor.Details
revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor. | $3,000 |
| Jul 15, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | revision to 201506249820. 2nd fl open area and new officeDetails
revision to 201506249820. 2nd fl open area and new office | $2,000 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | 3rd floor - remodel of art room #5306a & b. new gypsum ceiling, mill work & new cabinets. sprinklers and fire alarm separate permit.Details
3rd floor - remodel of art room #5306a & b. new gypsum ceiling, mill work & new cabinets. sprinklers and fire alarm separate permit. | $63,855 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | lower level: remodel existing classroom #104 and 105, new ceiling light fixtures millwork flooringDetails
lower level: remodel existing classroom #104 and 105, new ceiling light fixtures millwork flooring | $49,600 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | lower level: remodel of classroom 1b06, new gypsum ceiling, new lighting fixtures, millwork, new flooring, new soffitDetails
lower level: remodel of classroom 1b06, new gypsum ceiling, new lighting fixtures, millwork, new flooring, new soffit | $34,250 |
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 2222 Broadway | 2nd fl: demo only as per ab-017 interior non bearing partitions, doors, electrical fixtures, plumbing, flooring. tenant improvement under separate permit. life safety (if required) deferred.Details
2nd fl: demo only as per ab-017 interior non bearing partitions, doors, electrical fixtures, plumbing, flooring. tenant improvement under separate permit. life safety (if required) deferred. | $5,000 |
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 2201 Vallejo St | 3rd fl: demo only as per ab-017 interior ceiling, light fixtures, flooring, mill work. tenant improvement under separate permit.Details
3rd fl: demo only as per ab-017 interior ceiling, light fixtures, flooring, mill work. tenant improvement under separate permit. | $3,000 |
| Jun 15, 2015 | Completed final sign-off Jan 2016 | 2300 California St | 2nd floor: t.i. of 4 suites into 1 larger suite. provide accessible exam rooms and corridors. upgrade finishes in existing suite.Details
2nd floor: t.i. of 4 suites into 1 larger suite. provide accessible exam rooms and corridors. upgrade finishes in existing suite. | $1,400,000 |
| May 15, 2015 | Never finaled issued Oct 2015, no final | 2340 Clay St | barrier removal, upgrades to elevators; maher n/aDetails
barrier removal, upgrades to elevators; maher n/a | $180,000 |
| May 8, 2015 | Completed final sign-off Jun 2015 | 460 Ellis St | entry door repair - replace door in-kind. 3' x 7'. compliance with maher ordinance 155-13 not required.Details
entry door repair - replace door in-kind. 3' x 7'. compliance with maher ordinance 155-13 not required. | $500 |
| Apr 1, 2015 | Completed final sign-off Nov 2015 | 1692 Haight St | revision to appl #201305318358; clarifications to structural drawings.Details
revision to appl #201305318358; clarifications to structural drawings. | |
| Jan 30, 2015 | Completed final sign-off Apr 2015 | 3838 California St | ste #606: minor remodel of (e) office space. selective demo of 2 doors. portion of (e) partitions to form (n) opening, casework & sink.infill 1 interior door opening.(n) prep room casework & sink, paintwork & minor modifications to (e) elec & plumbing systems.Details
ste #606: minor remodel of (e) office space. selective demo of 2 doors. portion of (e) partitions to form (n) opening, casework & sink.infill 1 interior door opening.(n) prep room casework & sink, paintwork & minor modifications to (e) elec & plumbing systems. | $25,000 |
| Jan 7, 2015 | Completed final sign-off Sep 2015 | 3838 California St | revision to pa#2013-0529-8111, signage, toilet rooms, and water fountains.Details
revision to pa#2013-0529-8111, signage, toilet rooms, and water fountains. | $8,000 |
| Dec 23, 2014 | Never finaled issued Jan 2015, no final | 3838 California St | install 2 (n) hydronic heating boilers & 2 (n) domestic hot water heating boilers.Details
install 2 (n) hydronic heating boilers & 2 (n) domestic hot water heating boilers. | $1,000 |
| Dec 9, 2014 | Completed final sign-off Apr 2016 | 2300 California St | voluntary accessibilty barrier removal. upgrade extg elevators.Details
voluntary accessibilty barrier removal. upgrade extg elevators. | $180,000 |
| Jun 19, 2014 | Completed final sign-off Oct 2014 | 333 Post St | commissary-storage area, walk in freezer, clean up ara for carts. no sprinklers, life safety; maher not rquiredDetails
commissary-storage area, walk in freezer, clean up ara for carts. no sprinklers, life safety; maher not rquired | $75,000 |
| Nov 22, 2013 | Completed final sign-off Apr 2014 | 3838 California St | suite # 707. upgrade (e) closet to accommodate idf equipment.Details
suite # 707. upgrade (e) closet to accommodate idf equipment. | $16,000 |
| Nov 13, 2013 | Never finaled issued Nov 2013, no final | 1245 04th St | revision to 201309096307. patch membrane from drain addition. add new floor drainDetails
revision to 201309096307. patch membrane from drain addition. add new floor drain | |
| Sep 9, 2013 | Never finaled issued Oct 2013, no final | 1245 04th St | ground floor unit c: t.i. first time build out, includes demo of one store front entry and build back non structural partitions. all new or revised hvac electrical, plmg, and life safety work will be design build and submitted seperately. bldg fully sprinklered.Details
ground floor unit c: t.i. first time build out, includes demo of one store front entry and build back non structural partitions. all new or revised hvac electrical, plmg, and life safety work will be design build and submitted seperately. bldg fully sprinklered. | $117,000 |
| Jul 31, 2013 | Never finaled issued Sep 2013, no final | 1355 Sutter St | add exit signage & lighting, as directed by fire marshalDetails
add exit signage & lighting, as directed by fire marshal | $50,000 |
| Jul 19, 2013 | Completed final sign-off Apr 2014 | 3838 California St | removal of 5 suites on the 8th floor into one suite in an extg 8 story building barrier remove in publc corridor to be completed in sepeate architectural package. reference app#201305298111Details
removal of 5 suites on the 8th floor into one suite in an extg 8 story building barrier remove in publc corridor to be completed in sepeate architectural package. reference app#201305298111 | $795,450 |
| Apr 24, 2013 | Completed final sign-off Jul 2013 | 1355 Sutter St | fire alarm panel replacement for new elevators. existing devices to be replaced with new. alarm includes sprinkler monitoringDetails
fire alarm panel replacement for new elevators. existing devices to be replaced with new. alarm includes sprinkler monitoring | $35,000 |
| Feb 5, 2013 | Completed final sign-off Jan 2014 | 633 Folsom St | revision to pa# 201208036500. add (3) private offices in (e) work station area. modify and add (e) hvac and electrical.Details
revision to pa# 201208036500. add (3) private offices in (e) work station area. modify and add (e) hvac and electrical. | $27,500 |
| Nov 13, 2012 | Completed final sign-off Feb 2013 | 633 Folsom St | co #2. add electrical pane, attach shelving.Details
co #2. add electrical pane, attach shelving. | $10,000 |
| Nov 13, 2012 | Completed final sign-off Feb 2013 | 633 Folsom St | balance extg supply diffuser. ref:201208036500Details
balance extg supply diffuser. ref:201208036500 | $500 |
| Oct 9, 2012 | Completed final sign-off Apr 2013 | 1375 Sutter St | 3rd floor interior remodel of medical offices suite 305 & 307 w/connection to (e) suite 308 are occupied by single tenant. new partitions & ceiling lighting, exam rooms, storage & utility rooms, new casework, new finishes.Details
3rd floor interior remodel of medical offices suite 305 & 307 w/connection to (e) suite 308 are occupied by single tenant. new partitions & ceiling lighting, exam rooms, storage & utility rooms, new casework, new finishes. | $130,000 |
| Sep 13, 2012 | Completed final sign-off Jan 2014 | 633 Folsom St | revision to 201208036500. change e 3-0 door to 4-0 door. change location of furniture system, add 5 electric outlets, add 1 data outletDetails
revision to 201208036500. change e 3-0 door to 4-0 door. change location of furniture system, add 5 electric outlets, add 1 data outlet | $10,000 |
| Aug 3, 2012 | Completed final sign-off Sep 2012 | 633 Folsom St | tenant improvement on 1st. floor. sprinkler and fire alarm under separate permitsDetails
tenant improvement on 1st. floor. sprinkler and fire alarm under separate permits | $35,000 |
| May 18, 2012 | Completed final sign-off Dec 2012 | 3700 California St | remove extg casework and install stainers in lab with associated mechanical, plumbing and electrical work. replace door knobs with ada compliant lever handles. oshpd 3 project---Details
remove extg casework and install stainers in lab with associated mechanical, plumbing and electrical work. replace door knobs with ada compliant lever handles. oshpd 3 project--- | $10,000 |
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 1 Embarcadero Center | work on the 24th floor, revision appl. 2011.10.11.6482, office space converted to workstations.Details
work on the 24th floor, revision appl. 2011.10.11.6482, office space converted to workstations. | |
| Nov 17, 2011 | Completed final sign-off Apr 2012 | 633 Folsom St | create 1 office and 1 storage room from existing open office area. add partitions and doors. relocate e electrical and renovate 1st floor security deskDetails
create 1 office and 1 storage room from existing open office area. add partitions and doors. relocate e electrical and renovate 1st floor security desk | $35,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 1 Embarcadero Center | tenant improvement. demo carpet, walls, new walls, ceeiling ht/low wall, new carpe, paint, millwork, ceiling repair, drapery modification to 1780 sf, elec outlets, fixture relocates, data, aluminum door frames, new doors, glass sidelites, ada hardwareDetails
tenant improvement. demo carpet, walls, new walls, ceeiling ht/low wall, new carpe, paint, millwork, ceiling repair, drapery modification to 1780 sf, elec outlets, fixture relocates, data, aluminum door frames, new doors, glass sidelites, ada hardware | $179,000 |
| Mar 23, 2011 | Completed final sign-off Sep 2012 | 871 Sutter St | revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level.Details
revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level. | $18,950 |
| May 26, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | 1st. flr.: relocate (e) horizontal run of fire dry standpipe for new ceiling ht. no change in pipe length. no change in (e) fire dept. connections.Details
1st. flr.: relocate (e) horizontal run of fire dry standpipe for new ceiling ht. no change in pipe length. no change in (e) fire dept. connections. | $3,500 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | refer to arch pa# 2010-0423-0944-structural for t.i. of (e) 1st fl-ste 101, structural scope includes metal stud partition walls at mri & xray exam rms, overhead supports of hung equipment at exam rooms, support anchorage of ceiling at mri room, rf shield engineering shop reference drawings includedDetails
refer to arch pa# 2010-0423-0944-structural for t.i. of (e) 1st fl-ste 101, structural scope includes metal stud partition walls at mri & xray exam rms, overhead supports of hung equipment at exam rooms, support anchorage of ceiling at mri room, rf shield engineering shop reference drawings included | |
| Apr 26, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | 2nd floor suite 222 t.i. improvement/remodel.demolish & build new partitions & ceiling grid. add reception & chart storage, waiting room, exam rooms, offices, new finishes,power-data & lighting throughout. no structural work, m.e.p. (incl t-24) & fire life safety under separate permits.Details
2nd floor suite 222 t.i. improvement/remodel.demolish & build new partitions & ceiling grid. add reception & chart storage, waiting room, exam rooms, offices, new finishes,power-data & lighting throughout. no structural work, m.e.p. (incl t-24) & fire life safety under separate permits. | $78,724 |
| Apr 23, 2010 | Completed final sign-off Jul 2010 | 1355 Sutter St | revision to pa# 2010-0111-4498-minor plan reconfiguration of 3 exam rooms, storage & waiting. no change in tenant program, scope of cost, no change in occupant load or sq footage, minor millwork, finish clarifications, minor construction clarificationsDetails
revision to pa# 2010-0111-4498-minor plan reconfiguration of 3 exam rooms, storage & waiting. no change in tenant program, scope of cost, no change in occupant load or sq footage, minor millwork, finish clarifications, minor construction clarifications | |
| Apr 16, 2010 | Completed final sign-off Oct 2010 | 1375 Sutter St | ste#208 -(e) suite demo & build (n) partitions & clg. (n) waiting rm. exam rms., storage rms., restroom & off. (n) finishe, millwork & signage, expansion suite demo millwork. (n) millwork, demo door & frame @ vitals rm. add (n) curtain track. mech./elec., plumbing, life safety under separate permit.Details
ste#208 -(e) suite demo & build (n) partitions & clg. (n) waiting rm. exam rms., storage rms., restroom & off. (n) finishe, millwork & signage, expansion suite demo millwork. (n) millwork, demo door & frame @ vitals rm. add (n) curtain track. mech./elec., plumbing, life safety under separate permit. | $207,692 |
| Apr 5, 2010 | Completed final sign-off Oct 2010 | 1375 Sutter St | cpmc. ti remodel of (e) 1st fl suite 120. demo and build new partitions and clg grid.add reception, waiting rm, lab/sample,, exam rms, chart storage, restrooms, breakeroom and offices. new finioshes, power data and lighting. mep and life saftey under separate permitDetails
cpmc. ti remodel of (e) 1st fl suite 120. demo and build new partitions and clg grid.add reception, waiting rm, lab/sample,, exam rms, chart storage, restrooms, breakeroom and offices. new finioshes, power data and lighting. mep and life saftey under separate permit | $133,377 |
| Mar 15, 2010 | Expired or cancelled expired Jan 2012 | 1375 Sutter St | 1st floor - repair waterproof membrane and flashing at 1st floor patio (1 exterior wall) and courtyard (2 exterior walls) no new structural, no mepDetails
1st floor - repair waterproof membrane and flashing at 1st floor patio (1 exterior wall) and courtyard (2 exterior walls) no new structural, no mep | $12,488 |
| Jan 27, 2010 | Completed final sign-off Sep 2012 | 871 Sutter St | add wood framed, stucco finish elevator shaft to rear of (e) building. elevator cab to serve 1st./ground level floor and basement. modify existing window opening to accomodate new elevator. modify (e) stairs for code compliance upgrades.Details
add wood framed, stucco finish elevator shaft to rear of (e) building. elevator cab to serve 1st./ground level floor and basement. modify existing window opening to accomodate new elevator. modify (e) stairs for code compliance upgrades. | $87,465 |
| Jan 11, 2010 | Completed final sign-off Jul 2010 | 1355 Sutter St | ti of 1st fl suite 101.demo/build new partitions/ceiling grid. add reception,2 xray exam rooms, 1 mri exam room, reception,2 xray exam rooms,1 mri exam room, reg exam rooms,restrooms,offices,break room, finishes.structral,mep,ower,data,lighting,life safety on separate permitDetails
ti of 1st fl suite 101.demo/build new partitions/ceiling grid. add reception,2 xray exam rooms, 1 mri exam room, reception,2 xray exam rooms,1 mri exam room, reg exam rooms,restrooms,offices,break room, finishes.structral,mep,ower,data,lighting,life safety on separate permit | $217,671 |
| Aug 7, 2009 | Completed final sign-off Oct 2009 | 633 Folsom St | revision to pa# 2009.07.10.2396. install a new non structural 9' high partition. remove (e) counter and cabinets.Details
revision to pa# 2009.07.10.2396. install a new non structural 9' high partition. remove (e) counter and cabinets. | $1,500 |
| Aug 4, 2009 | Completed final sign-off Feb 2010 | 1375 Sutter St | 1st floor, suite 103 remodel of doctor's office: demolish & build new partitions, add exam rooms, employee break room & offices, new restrooms, new millwork & finishes, new power/data, lighting. no structural work. m.e. (incl t-24). p. & fire/life safety under separate permits.Details
1st floor, suite 103 remodel of doctor's office: demolish & build new partitions, add exam rooms, employee break room & offices, new restrooms, new millwork & finishes, new power/data, lighting. no structural work. m.e. (incl t-24). p. & fire/life safety under separate permits. | $210,000 |
| Jul 16, 2009 | Completed final sign-off Oct 2009 | 1375 Sutter St | remodel of third floor doctor's office suite. demolish and build new partitions; add exam rooms, employee breakroom and offices, new finishes. new power-data & lighting. no structural work. mechanical, electrical(including t-24), plumbing and fire life safety under separate permit.Details
remodel of third floor doctor's office suite. demolish and build new partitions; add exam rooms, employee breakroom and offices, new finishes. new power-data & lighting. no structural work. mechanical, electrical(including t-24), plumbing and fire life safety under separate permit. | $119,000 |
| Jul 10, 2009 | Completed final sign-off Oct 2009 | 633 Folsom St | remodel existing cafe space on 1st flr to include new non structural 36' high partition, remove existing countertop and cabinets and 5 new equipment circuits.Details
remodel existing cafe space on 1st flr to include new non structural 36' high partition, remove existing countertop and cabinets and 5 new equipment circuits. | $7,500 |