Fareed Himmati
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Himmati Engineering Inc.
- Based in
- Pleasanton
- On San Francisco permits
- Oct 2004 to Oct 2026
504 permits since 2000 (engineer on 462 permits, architect on 37 permits, authorized agent-others on 5 permits, designer on 4 permits): 336 completed, 35 in progress, 56 never finaled, 77 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 504.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 2146 Great Hy | voluntary seismic strengthening of ground level. balcony repair in-kind. replace 1 (e) window on 2nd levelDetails
voluntary seismic strengthening of ground level. balcony repair in-kind. replace 1 (e) window on 2nd level | $8,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1137 Folsom St | convert (e) garage to lounge, laundry room, trash room, & egress corridor. (n) accessible common area toilet. remove (e) sink & ranges from individual hotel units. remove (e) shared bathrooms flrs 2-4. (n) bathrooms & wet bars to hotel units. combining smaller hotel units and replacing lost unit....Details
convert (e) garage to lounge, laundry room, trash room, & egress corridor. (n) accessible common area toilet. remove (e) sink & ranges from individual hotel units. remove (e) shared bathrooms flrs 2-4. (n) bathrooms & wet bars to hotel units. combining smaller hotel units and replacing lost unit.... | $1,200,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 810 Vallejo St | Reliable Construction Inc | foundation replacement.Details
foundation replacement. | $45,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 2516 Union St | Noa Construction Llc | demolish (e) condemned timber columns, new steel post and footings clad to match (e) column size and shape. revision to bpa:2026.0217.6031Details
demolish (e) condemned timber columns, new steel post and footings clad to match (e) column size and shape. revision to bpa:2026.0217.6031 | $18,000 |
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 810 Vallejo St | g/f: convert (e) storage space into two (2) adu units per calstate program.Details
g/f: convert (e) storage space into two (2) adu units per calstate program. | $250,000 | |
| Aug 25, 2026 | In progress issued Aug 2026 | 790 Ellis St | Occidental Express | voluntary strengthening of the roof diaphragm, and roof out of plans anchorage. comply with nov #202286371 #2.Details
voluntary strengthening of the roof diaphragm, and roof out of plans anchorage. comply with nov #202286371 #2. | $10,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 228 Connecticut St | David Edward Conroy | revision to existing shear wall, revising permit #202607084728Details
revision to existing shear wall, revising permit #202607084728 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 2450 16th Av | repairs and replacement in kind of front entry stairsDetails
repairs and replacement in kind of front entry stairs | $15,000 | |
| May 13, 2026 | Completed final sign-off Jun 2026 | 1633 Cabrillo St | Jg Engineering And Construction Inc | foundation shoring design, revision to 201707202498Details
foundation shoring design, revision to 201707202498 | $8,000 |
| May 5, 2026 | In progress issued Jun 2026 | 31 Landers St | revision 202510107244. new storage room at exising foundation between front and rear bldgs w open space roof deck above. seismic structural strengthening at 1st story to rear bldgs. replace e brick at front facade in kind and garage door (new)Details
revision 202510107244. new storage room at exising foundation between front and rear bldgs w open space roof deck above. seismic structural strengthening at 1st story to rear bldgs. replace e brick at front facade in kind and garage door (new) | $30,000 | |
| Apr 15, 2026 | In progress issued Apr 2026 | 1 Richardson Av | revision to 201609137551. soft story strenghening. revision to approved plan.Details
revision to 201609137551. soft story strenghening. revision to approved plan. | $5,000 | |
| Apr 6, 2026 | Completed final sign-off Apr 2026 | 2579 15th Av | Diviney Construction Inc | revision to 202504094037 to reduce scope of work with no work to front facade windows.Details
revision to 202504094037 to reduce scope of work with no work to front facade windows. | |
| Apr 1, 2026 | In progress issued Apr 2026 | 120 25th Av | Jfieco | remove and replace (e) deck within buildable area, add lower deck within 3' of (e) grade.Details
remove and replace (e) deck within buildable area, add lower deck within 3' of (e) grade. | $30,000 |
| Mar 24, 2026 | In progress issued Mar 2026 | 2909 Mission St | Jg Engineering And Construction Inc | foundation replacement at rear structure due to a substandard, failing foundationDetails
foundation replacement at rear structure due to a substandard, failing foundation | $130,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 2694 Mcallister St | Hawthorne Construction | provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room.Details
provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room. | $75,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 2516 Union St | Noa Construction Llc | revision to pa# 202602170631. replace front dining room door to match height of entry door and widen. patch and replace siding in-kind at front facade.Details
revision to pa# 202602170631. replace front dining room door to match height of entry door and widen. patch and replace siding in-kind at front facade. | $1,000 |
| Feb 25, 2026 | Completed final sign-off Jul 2026 | 307 Oak St | Reliable Construction Inc | interior column removal on 3rd floor level and voluntary wall structural strengthening, no other workDetails
interior column removal on 3rd floor level and voluntary wall structural strengthening, no other work | $9,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 2516 Union St | Noa Construction Llc | remodle of single family home (e) upgrade and enlarge window/patio door sytem on all levels reconfigure first level new bedroom and bathroom, gym, reconfigure primary suite on thrird level. modify first fl. entry dining/kitchen layout enlarge openings. relocate (e) laundry and add new laundry in 2ndDetails
remodle of single family home (e) upgrade and enlarge window/patio door sytem on all levels reconfigure first level new bedroom and bathroom, gym, reconfigure primary suite on thrird level. modify first fl. entry dining/kitchen layout enlarge openings. relocate (e) laundry and add new laundry in 2nd | $450,000 |
| Feb 2, 2026 | Completed final sign-off Jun 2026 | 324 Holloway Av | Bail Construction | voluntary foundation replacement in localized area.Details
voluntary foundation replacement in localized area. | $10,000 |
| Dec 19, 2025 | In progress issued Apr 2026 | 246 28th Av | De Jong Construction | revision to 202506239241. shearwall modification on 2nd flDetails
revision to 202506239241. shearwall modification on 2nd fl | $1,000 |
| Nov 12, 2025 | Completed final sign-off Aug 2026 | 3355 Taraval St | replacement of the existing exterior rooted stair in kind. replace railing to comply with code requirements (street visible)Details
replacement of the existing exterior rooted stair in kind. replace railing to comply with code requirements (street visible) | $20,000 | |
| Oct 10, 2025 | In progress issued Nov 2025 | 31 Landers St | revision to permits 202508143044, and 202504245195. construct a new patio area at 1/f. relocate garage door, modify layout of utility room and toilet at 1st floor. relocate new egress door at front. (main entry and side exit door)Details
revision to permits 202508143044, and 202504245195. construct a new patio area at 1/f. relocate garage door, modify layout of utility room and toilet at 1st floor. relocate new egress door at front. (main entry and side exit door) | $15,000 | |
| Sep 23, 2025 | Completed final sign-off Jul 2026 | 709 Broderick St | Cma Development Inc | 2/f: replacement of rear patio door and window with slight modification to rough opening. replacement of rear patio door at level 3 and level 1 in kind. no change to rough opening.Details
2/f: replacement of rear patio door and window with slight modification to rough opening. replacement of rear patio door at level 3 and level 1 in kind. no change to rough opening. | $10,000 |
| Sep 23, 2025 | Completed final sign-off Jul 2026 | 709 Broderick St | Cma Development Inc | 2nd/f unit: interior remodel w/ minor structural adjustments on 1st/f to support 2nd/f. no footage added. kitchen renovation, and relocation of a powder room.Details
2nd/f unit: interior remodel w/ minor structural adjustments on 1st/f to support 2nd/f. no footage added. kitchen renovation, and relocation of a powder room. | $200,000 |
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | Doran Construction & Design, Olive Remodeling | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Aug 27, 2025 | In progress filed Aug 2025, not yet issued | 1750 Washington St | strengthening of the front faade bay window framing at the 2nd floor level.Details
strengthening of the front faade bay window framing at the 2nd floor level. | $5,500 | |
| Jun 30, 2025 | In progress issued Feb 2026 | 1437 Mason St | facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope.Details
facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope. | $467,000 | |
| Jun 18, 2025 | In progress issued Jul 2026 | 31 Presidio Tr | Ggd Inc. | interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egressDetails
interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egress | $1,500,000 |
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 239 Randall St | revision to existing pa# 202502180560. retaining wall foundation at rear storage area.Details
revision to existing pa# 202502180560. retaining wall foundation at rear storage area. | $8,000 | |
| Jun 4, 2025 | Completed final sign-off Oct 2025 | 1634 Hayes St | Reliable Construction Inc | revision to pa 202503273178 structural strengthening partition wall discovered to bee load bearing of roofDetails
revision to pa 202503273178 structural strengthening partition wall discovered to bee load bearing of roof | $6,400 |
| Apr 22, 2025 | In progress issued Jul 2025 | 334 Divisadero St | D'angeles Construction | opening middle wall removal on 2nd and 3rd floor. (remodel)architectural alterations to 2nd and 3rd floor. for both units: convert laundry to full bath, relocate laundry, add one bath. relocate kitchenDetails
opening middle wall removal on 2nd and 3rd floor. (remodel)architectural alterations to 2nd and 3rd floor. for both units: convert laundry to full bath, relocate laundry, add one bath. relocate kitchen | $30,000 |
| Apr 9, 2025 | Completed final sign-off Apr 2026 | 2579 15th Av | Diviney Construction Inc | localized alab on grade/footing replacement. exterior siding replacement. all windows/door replacement. in kind existing deck ledger replacement.Details
localized alab on grade/footing replacement. exterior siding replacement. all windows/door replacement. in kind existing deck ledger replacement. | $70,000 |
| Mar 26, 2025 | In progress issued Jul 2025 | 215 Missouri St | Gngc Builders Inc | rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage doorDetails
rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage door | $275,000 |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 2000 Ulloa St | installation of a fence structure w/ elements including lattice and solid fencing in rear yard.Details
installation of a fence structure w/ elements including lattice and solid fencing in rear yard. | $15,000 | |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 555 Ofarrell St | response to nov# 202292979. rear facade repair (concrete facade)Details
response to nov# 202292979. rear facade repair (concrete facade) | $6,000 | |
| Dec 18, 2024 | In progress issued Dec 2024 | 400 Crescent Av | Loona Construction Inc | revision to pa 202408269501 & 202411145012 modify approved foundation plan/framingDetails
revision to pa 202408269501 & 202411145012 modify approved foundation plan/framing | |
| Nov 15, 2024 | In progress issued Dec 2024 | 1318 05th Av | interior remodel - structural retrofit. new windows (except front, recently upgraded), new wiring and plumbing, new heating system in 1320.Details
interior remodel - structural retrofit. new windows (except front, recently upgraded), new wiring and plumbing, new heating system in 1320. | $100,000 | |
| Oct 31, 2024 | In progress issued Nov 2024 | 4935 Anza St | Dacora | foundation strengthening and ground level soft story seismic upgrade. to comply with the nov# 202430111. current building is unoccupied, costs will not be passed through to tenants.Details
foundation strengthening and ground level soft story seismic upgrade. to comply with the nov# 202430111. current building is unoccupied, costs will not be passed through to tenants. | $35,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 189 Magnolia St | Ashbury Gen Constructing & Eng | revision to pa# 201701197470, interior remodel, relocate entrance, create full bath and pg&e meter room on ground flor (unit# 1), replace all 1/2 bathrooms with full bathrooms on 2nd and 3rd flr unit #3 - unit# 6.Details
revision to pa# 201701197470, interior remodel, relocate entrance, create full bath and pg&e meter room on ground flor (unit# 1), replace all 1/2 bathrooms with full bathrooms on 2nd and 3rd flr unit #3 - unit# 6. | |
| Sep 5, 2024 | In progress issued Sep 2024 | 1980 Grant Av | replacement of (e) 4x10 wood beam with steel beam in unit 9Details
replacement of (e) 4x10 wood beam with steel beam in unit 9 | $4,500 | |
| Aug 5, 2024 | Completed final sign-off Sep 2025 | 938 Sanchez St | Rosemount Construction | revision to pa# 202112224931. replacement of slab on grade. field related details addition.Details
revision to pa# 202112224931. replacement of slab on grade. field related details addition. | $10,000 |
| Jul 31, 2024 | Completed final sign-off Oct 2024 | 508 Cabrillo St | Gorman Construction | repair damaged brick facade due to auto accident remove dagmaged material, brick, framing and reinstall new to match (e) complaint #202419955Details
repair damaged brick facade due to auto accident remove dagmaged material, brick, framing and reinstall new to match (e) complaint #202419955 | $5,000 |
| Jul 19, 2024 | In progress filed Jul 2024, not yet issued | 1428 Shotwell St | interior renovation to upper fl. relocate kitchen, laundry & bath within upper fl. replace three windows and add 1 (n) window. two (n) skylights at the rear of the home not street visibleDetails
interior renovation to upper fl. relocate kitchen, laundry & bath within upper fl. replace three windows and add 1 (n) window. two (n) skylights at the rear of the home not street visible | $120,000 | |
| May 9, 2024 | In progress issued May 2024 | 2824 Scott St | Noa Construction Llc | (n) door opening in study wall, (n) partition wall for primary bedroom layout. misc lighting and electrical changes, misc cabinetry replacement , remove decoartive ceiling beams at 4th floor officeDetails
(n) door opening in study wall, (n) partition wall for primary bedroom layout. misc lighting and electrical changes, misc cabinetry replacement , remove decoartive ceiling beams at 4th floor office | $50,000 |
| May 7, 2024 | In progress issued May 2024 | 2080 Mcallister St | revision to permit 202307142215. roof framing replacement.lower top unit ceiling height. no change to roof height.Details
revision to permit 202307142215. roof framing replacement.lower top unit ceiling height. no change to roof height. | $40,000 | |
| Mar 19, 2024 | Completed final sign-off Sep 2025 | 938 Sanchez St | Rosemount Construction | revision to permit app# 202112224931: edit demolition plans to show location of hardi panels installation. cut back (e) deck.Details
revision to permit app# 202112224931: edit demolition plans to show location of hardi panels installation. cut back (e) deck. | $1,200 |
| Jan 30, 2024 | Expired or cancelled expired May 2026 | 449 Pennsylvania Av | Precise Construction & Design/Dba Precis, Fgv Construction Co | revision to pa#202203029030: change to the facade, modifying the bay window, new stucco, add 1 additional window, add new garage door. move entry door 24inches (closer to the street). build privacy walls at 2nd floor rear of building.Details
revision to pa#202203029030: change to the facade, modifying the bay window, new stucco, add 1 additional window, add new garage door. move entry door 24inches (closer to the street). build privacy walls at 2nd floor rear of building. | |
| Jan 19, 2024 | Completed final sign-off Dec 2025 | 2277 33rd Av | Polytec Construction Company Inc | (1) interior renovation and conversion of existing senior care facility with 9 bedrooms and 3.5 bathrooms into a single-family home of 4 bedrooms and 4 bathrooms. (2) relocate interior staircase (3) extend garage at the ground floor to fit 2 cars tandem. (4) replace windows and interior doors,Details
(1) interior renovation and conversion of existing senior care facility with 9 bedrooms and 3.5 bathrooms into a single-family home of 4 bedrooms and 4 bathrooms. (2) relocate interior staircase (3) extend garage at the ground floor to fit 2 cars tandem. (4) replace windows and interior doors, | $150,000 |
| Dec 1, 2023 | Completed final sign-off Nov 2024 | 82 Woodward St | Doran Construction & Design | (e) middle beam strengethening with related footings (1st level). voluntary localized strengthening of 1st / garage level.Details
(e) middle beam strengethening with related footings (1st level). voluntary localized strengthening of 1st / garage level. | $35,000 |
| Nov 8, 2023 | Expired or cancelled expired May 2026 | 449 Pennsylvania Av | Precise Construction & Design/Dba Precis, Fgv Construction Co | revision to permit 202203029030; requesting to revise the foundationDetails
revision to permit 202203029030; requesting to revise the foundation | |
| Oct 31, 2023 | In progress issued Nov 2023 | 1116 Balboa St | Planart Construction Corp | rebuilt and repair rear property. laundry structure. related foundation work.Details
rebuilt and repair rear property. laundry structure. related foundation work. | $12,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2025 | 1568 Noe St | Rebase Building | kitchen remodel remove wall betw kitc & dining. remove chiminey. relocate water lines & gas lines. install new laundry faucet. rought in waste, vent and water supply for new island sink location. installation of a new sub-pannel, new fixtures. heater & furnanceDetails
kitchen remodel remove wall betw kitc & dining. remove chiminey. relocate water lines & gas lines. install new laundry faucet. rought in waste, vent and water supply for new island sink location. installation of a new sub-pannel, new fixtures. heater & furnance | $29,500 |
| Aug 22, 2023 | Completed final sign-off Aug 2024 | 808 Divisadero St | Sft Construction Corp | revision to 202302091729, 202302091731. revision to soft story lateral strengthening elements per field conditions.Details
revision to 202302091729, 202302091731. revision to soft story lateral strengthening elements per field conditions. | |
| Jun 6, 2023 | Completed final sign-off Jan 2024 | 400 Grant Av | Dacora | revision to 202207138387. minor foundation stem alteration.Details
revision to 202207138387. minor foundation stem alteration. | |
| May 1, 2023 | In progress issued Apr 2024 | 599 Oak Park Dr | Gorman Construction | garden retaining wall (soldier beam /lagging wall)Details
garden retaining wall (soldier beam /lagging wall) | $20,000 |
| Apr 7, 2023 | Never finaled issued May 2023, no final | 2080 Mcallister St | revision to pa# 202209303560 & 202108206860, rear walls between buildings side 2080 & 2082 build as 1hr fire rated and 2084 & 2086 same firewall built, 2 walls as drawingDetails
revision to pa# 202209303560 & 202108206860, rear walls between buildings side 2080 & 2082 build as 1hr fire rated and 2084 & 2086 same firewall built, 2 walls as drawing | $500 | |
| Feb 9, 2023 | Completed final sign-off Aug 2024 | 808 Divisadero St | residential apts above the soft story 1st level to address nov# 202206676 & 201766336. no work on upper levels.Details
residential apts above the soft story 1st level to address nov# 202206676 & 201766336. no work on upper levels. | $70,000 | |
| Feb 9, 2023 | Completed final sign-off Aug 2024 | 808 Divisadero St | commercial: soft story strenghthening of the 1/f. to address nov# 202200676 & 201766336 plus accessibiity upgrade to building entrance by replacing storefrontDetails
commercial: soft story strenghthening of the 1/f. to address nov# 202200676 & 201766336 plus accessibiity upgrade to building entrance by replacing storefront | $24,000 | |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 944 Chestnut St | Noa Construction Llc | revision to pa# 202103126470r2. as built drawings. minor revison to foundation.Details
revision to pa# 202103126470r2. as built drawings. minor revison to foundation. | $6,000 |
| Feb 7, 2023 | Completed final sign-off Nov 2023 | 2869 Broderick St | Pfautz Design And Construction | as built drawings. revision to pa# 202111122281. additional foundation work and minor framing alteration to comply with filed condition.Details
as built drawings. revision to pa# 202111122281. additional foundation work and minor framing alteration to comply with filed condition. | $10,000 |
| Feb 7, 2023 | Completed final sign-off Sep 2023 | 155 Beacon St | Cal C A D E Construction Inc | partial roof repar in kind ue to tree falling realted damage. to address complaint #202301175Details
partial roof repar in kind ue to tree falling realted damage. to address complaint #202301175 | $8,000 |
| Nov 23, 2022 | Completed final sign-off Jan 2026 | 1310 18th St | Urban West Construction Inc | voluntary soft story seismic retrofit at base & first floor level. no exterior work.Details
voluntary soft story seismic retrofit at base & first floor level. no exterior work. | $63,000 |
| Nov 17, 2022 | Completed final sign-off Aug 2023 | 349 Pierce St | Beale Builders & Construction | revision to permit 201809119786 (commercial). alteration to moment frame and shear wall alterations.Details
revision to permit 201809119786 (commercial). alteration to moment frame and shear wall alterations. | |
| Sep 30, 2022 | Never finaled issued Oct 2022, no final | 2080 Mcallister St | Shamrock Engineering Concrete | excavation for new rear patio, related retaining walls, railing, drainage, and patio doorsDetails
excavation for new rear patio, related retaining walls, railing, drainage, and patio doors | $15,000 |
| Aug 29, 2022 | Completed final sign-off Jan 2025 | 351 San Carlos St | Stroub Construction | new foundation replacement.Details
new foundation replacement. | $200,000 |
| Aug 10, 2022 | Expired or cancelled cancelled Jan 2026 | 246 Jersey St | install rear concrete patio & deck.Details
install rear concrete patio & deck. | $25,000 | |
| Jul 26, 2022 | Completed final sign-off Aug 2023 | 1234 26th Av | revision to pa# 202110069971. reducing scope of work at ground level and removing additional foundation work.Details
revision to pa# 202110069971. reducing scope of work at ground level and removing additional foundation work. | ||
| Jul 13, 2022 | Completed final sign-off Dec 2022 | 878 Capp St | to document (e) storage units in garage, enclose (e) stairs. to comply w/bid nov#202288211Details
to document (e) storage units in garage, enclose (e) stairs. to comply w/bid nov#202288211 | $8,000 | |
| Jul 13, 2022 | Completed final sign-off Jan 2024 | 400 Grant Av | Dacora | new window opening on south facade wallDetails
new window opening on south facade wall | $8,000 |
| Jun 1, 2022 | Completed final sign-off Jul 2023 | 351 San Carlos St | Stroub Construction | temporary house cribbing.Details
temporary house cribbing. | $10,000 |
| Mar 16, 2022 | Completed final sign-off Mar 2022 | 944 Chestnut St | Noa Construction Llc | revision to pa#201608185428. structural detail for front garden retaining wall.Details
revision to pa#201608185428. structural detail for front garden retaining wall. | $8,000 |
| Mar 16, 2022 | Never finaled issued Mar 2022, no final | 2080 Mcallister St | Shamrock Engineering Concrete | temporary shoring permit for pa#202108206860Details
temporary shoring permit for pa#202108206860 | $8,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2023 | 679 14th Av | Threemile Construction | ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room.Details
ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room. | $150,000 |
| Dec 1, 2021 | In progress issued Oct 2025 | 1645 Jones St | Flmc Development Corp Dba Adamo Campagna | to construct a new 2 unit residential of type v-b, 4-story over 1 basementDetails
to construct a new 2 unit residential of type v-b, 4-story over 1 basement | $500,000 |
| Nov 30, 2021 | Completed final sign-off May 2022 | 955 Corbett Av | partial removal of interior bearing wall on main level.Details
partial removal of interior bearing wall on main level. | $9,000 | |
| Nov 12, 2021 | Completed final sign-off Nov 2023 | 2865 Broderick St | Pfautz Design And Construction | interior renovation of 1st floor unit. kitchen renovation, renovate 2 bath rooms. new laundry room. reconfiguration of some room layoutsDetails
interior renovation of 1st floor unit. kitchen renovation, renovate 2 bath rooms. new laundry room. reconfiguration of some room layouts | $100,000 |
| Sep 22, 2021 | Completed final sign-off Aug 2024 | 1970 Green St | Flmc Development Corp Dba Adamo Campagna | renovation to lower unit, partial excavation of basement o create habitable space; minor interior reconfig of floor plan at 1/f and 2/f.reloctae of stairs from 1/f to bsemen t with reconfig of stair from 1/f to 2nd.Details
renovation to lower unit, partial excavation of basement o create habitable space; minor interior reconfig of floor plan at 1/f and 2/f.reloctae of stairs from 1/f to bsemen t with reconfig of stair from 1/f to 2nd. | $85,000 |
| Sep 8, 2021 | Expired or cancelled cancelled Jan 2026 | 840 Capp St | rear building: voluntary foundation upgrade per ab-094. separate application for main building.Details
rear building: voluntary foundation upgrade per ab-094. separate application for main building. | $35,000 | |
| Sep 8, 2021 | Expired or cancelled cancelled Jan 2026 | 840 Capp St | front building: voluntary upgrade per ab-094, brick foundation replacement & ground floor (garage) lateral strengthening.Details
front building: voluntary upgrade per ab-094, brick foundation replacement & ground floor (garage) lateral strengthening. | $90,000 | |
| Aug 24, 2021 | Expired or cancelled expired Sep 2025 | 102 Baker St | Actually Design Build Inc | localized foundation detail revision to pa# 201905140612Details
localized foundation detail revision to pa# 201905140612 | $4,000 |
| Aug 10, 2021 | Never finaled issued Jan 2023, no final | 634 19th Av | Dacora | new 2/f deck in rear with spiral stairs. no other work on any floor.Details
new 2/f deck in rear with spiral stairs. no other work on any floor. | $21,000 |
| Aug 5, 2021 | Expired or cancelled expired Jan 2025 | 2115 14th Av | Justin Farrelly Incorporated | interior remodel: localized framing and lateral strengthening.Details
interior remodel: localized framing and lateral strengthening. | $20,000 |
| Jul 15, 2021 | In progress issued Apr 2024 | 2519 Broadway | Farallon General Contractors Inc. | interior remodel only. remodel of interior portions @ 2nd fl & 3rd fl level with (n) 2nd fl elevation. infill of (e) lightwell. relocation of stairwell. new windows @ east, west and south. (n) door @ south. no work @ front facade. sprinklered building. no work in public right of wayDetails
interior remodel only. remodel of interior portions @ 2nd fl & 3rd fl level with (n) 2nd fl elevation. infill of (e) lightwell. relocation of stairwell. new windows @ east, west and south. (n) door @ south. no work @ front facade. sprinklered building. no work in public right of way | $600,000 |
| Jun 30, 2021 | Completed final sign-off Oct 2023 | 2622 Greenwich St | Richard Avelar &Assoc Reconstr/Dba Recon, Singh Construction | revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0.Details
revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0. | $10,000 |
| Jun 25, 2021 | Never finaled issued Oct 2021, no final | 1 Avenue Of The Palms | Crown Construction San Francisco | temporary tent structure & furniture layout; duration will be 6 months from date of permit issuance.Details
temporary tent structure & furniture layout; duration will be 6 months from date of permit issuance. | $10,000 |
| Apr 21, 2021 | Completed final sign-off Apr 2022 | 656 Vermont St | Pacific Peninsula Group | minor condo remodel,wall removal to open kithen, living room with use of structural beam, convert office to new full bathroom, kitchen remodelDetails
minor condo remodel,wall removal to open kithen, living room with use of structural beam, convert office to new full bathroom, kitchen remodel | $20,000 |
| Nov 24, 2020 | Expired or cancelled expired Mar 2024 | 2622 Greenwich St | Creatively Built Inc | new shoring plan. reference pa #2019-1028-5775Details
new shoring plan. reference pa #2019-1028-5775 | $10,000 |
| Nov 18, 2020 | Expired or cancelled cancelled Jan 2026 | 532 Clayton St | new roof deck additionDetails
new roof deck addition | $15,000 | |
| Oct 13, 2020 | Completed final sign-off Feb 2022 | 944 Chestnut St | Noa Construction Llc | revision to permit application #201807124449, 2019-0627-4610, 2014-0529-7045 - framing alterations.Details
revision to permit application #201807124449, 2019-0627-4610, 2014-0529-7045 - framing alterations. | $20,000 |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 140 Bradford St | Flying Colors | bolting of mud sill and soft story strengthening of 1st flr level.Details
bolting of mud sill and soft story strengthening of 1st flr level. | $15,000 |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 55 Lundys Ln | Orchard Construction | replace partial section of existing failing retaining wall.Details
replace partial section of existing failing retaining wall. | $10,000 |
| Oct 9, 2020 | Expired or cancelled withdrawn May 2021 | 1116 Balboa St | basement storage level lateral and beam strengthening. exterior fence and related foundation.Details
basement storage level lateral and beam strengthening. exterior fence and related foundation. | $15,000 | |
| Sep 21, 2020 | Completed final sign-off Feb 2021 | 2172 Pacific Av | Prosper Construction Dev Inc. | to remodel a deck more than 50% in kind.Details
to remodel a deck more than 50% in kind. | $8,000 |
| Aug 22, 2020 | Completed final sign-off Mar 2023 | 536 40th Av | Green City Construction Inc | foundation replacement & lower existing slab by 7". structural work only. no change to 2nd fl. seismic upgrade of lower level.Details
foundation replacement & lower existing slab by 7". structural work only. no change to 2nd fl. seismic upgrade of lower level. | $28,000 |
| Jun 1, 2020 | Completed final sign-off Jan 2022 | 1135 Pacific Av | Green City Construction Inc | remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work.Details
remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work. | $45,000 |
| Feb 25, 2020 | Completed final sign-off Jul 2022 | 1707 Powell St | Beale Builders & Construction, Justin Farrelly Incorporated | voluntary lateral strengthening of east half of building. soft story on 1st fl level. maher naDetails
voluntary lateral strengthening of east half of building. soft story on 1st fl level. maher na | $50,000 |
| Feb 21, 2020 | Never finaled issued Mar 2020, no final | 846 Shotwell St | Gorman Construction | lower unit framing strengthening. replacement of brick foundation and voluntary lateral strengthening.Details
lower unit framing strengthening. replacement of brick foundation and voluntary lateral strengthening. | $130,000 |
| Nov 25, 2019 | Never finaled filed Nov 2019, never issued | 840 Capp St | add one accesory dwelling unit at the rear of the property / unit-1d. (units-1a, 1b, 1c, under separate permit: pa 2016-0818-5410.)Details
add one accesory dwelling unit at the rear of the property / unit-1d. (units-1a, 1b, 1c, under separate permit: pa 2016-0818-5410.) | $60,000 | |
| Oct 30, 2019 | Expired or cancelled withdrawn Feb 2020 | 249 04th Av | soft story retrofit per 2016 cebc appendix a-4Details
soft story retrofit per 2016 cebc appendix a-4 | $60,000 | |
| Oct 30, 2019 | Completed final sign-off Mar 2021 | 450 South Van Ness Av | Mulhall Construction Inc. | soft story retrofit per 2016 cebc appendix a-4Details
soft story retrofit per 2016 cebc appendix a-4 | $60,000 |