Fgv Construction Co
- Based in
- Richmond
- On San Francisco permits
- Mar 2022 to Sep 2026
- Last 24 months
- 10 permits filed
25 permits since 2000: 20 completed, 2 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 230 Yale St | kitchen remodel in kind approx 98 sf. like for like. siding replacement: removing 4x8 sheet of siding (approx 500sf) on the left hand side of house and installing new hardy plank smooth siding.Details
kitchen remodel in kind approx 98 sf. like for like. siding replacement: removing 4x8 sheet of siding (approx 500sf) on the left hand side of house and installing new hardy plank smooth siding. | $24,500 |
| Jul 2, 2026 | Completed final sign-off Sep 2026 | 747 16th Av | all work at 749 16th ave, top floor: remodel two bathrooms in kind like for like. one of the bathroom has a bathtub + the other bathroom has a shower. each bathroom approx 45 sqft.Details
all work at 749 16th ave, top floor: remodel two bathrooms in kind like for like. one of the bathroom has a bathtub + the other bathroom has a shower. each bathroom approx 45 sqft. | $22,000 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 136 Mallorca Wy | bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing.Details
bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing. | $28,000 |
| Mar 9, 2026 | Completed final sign-off May 2026 | 449 Pennsylvania Av | to obtain final inspection for work approved under pa#202311080467 & 202401304930. all work is complete.Details
to obtain final inspection for work approved under pa#202311080467 & 202401304930. all work is complete. | |
| Sep 29, 2025 | Completed final sign-off Mar 2026 | 436 Persia Av | existing deck and staircase to rear yard to be replaced. no change at the front, existing dwelling unit and interiors.Details
existing deck and staircase to rear yard to be replaced. no change at the front, existing dwelling unit and interiors. | $9,200 |
| Aug 21, 2025 | Completed final sign-off Oct 2025 | 136 Mallorca Wy | unit 138: bathroom remodel in kind.Details
unit 138: bathroom remodel in kind. | $11,000 |
| Aug 14, 2025 | In progress issued Jan 2026 | 323 Byxbee St | comply w/ nov #202431941 & nov #202534571: new adu unit "studio" at g/f per state adu program. removal of unpermitted exterior staircase enclosure at rear. removal of unpermitted deck at 2/f.Details
comply w/ nov #202431941 & nov #202534571: new adu unit "studio" at g/f per state adu program. removal of unpermitted exterior staircase enclosure at rear. removal of unpermitted deck at 2/f. | $56,500 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 50 Elsie St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Mar 27, 2025 | Completed final sign-off Apr 2025 | 3870 24th St | remove 3 lines of siding to install 28' bolt foundations due to insurance requirement. we are adding 5/8"x10" at 4' o.c. with apoxy 'Details
remove 3 lines of siding to install 28' bolt foundations due to insurance requirement. we are adding 5/8"x10" at 4' o.c. with apoxy ' | $2,500 |
| Feb 14, 2025 | Expired or cancelled cancelled Aug 2025 | 323 Byxbee St | to comply with nov 2024-31941 for fire damage repair; upgrade electric in two bedrooms and bathroom in kind; install drywall two bedrooms and bathroom update plumbing from (e) bathroom in kind, all work on garage level, no wall construction or demolition, no change in plumbing fixture count.Details
to comply with nov 2024-31941 for fire damage repair; upgrade electric in two bedrooms and bathroom in kind; install drywall two bedrooms and bathroom update plumbing from (e) bathroom in kind, all work on garage level, no wall construction or demolition, no change in plumbing fixture count. | $18,000 |
| May 10, 2024 | Completed final sign-off Aug 2024 | 288 Roosevelt Wy | two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchenDetails
two bathroom remodel in kind like for like. includes rewiring entire unit. replace counter top in kitchen | $28,000 |
| May 10, 2024 | Completed final sign-off Jun 2024 | 17 Stoneman St | replace base cabiets only like to lik. install (n) counter top. install flooring vinyl flooring due to flood.Details
replace base cabiets only like to lik. install (n) counter top. install flooring vinyl flooring due to flood. | $7,500 |
| Jan 30, 2024 | Expired or cancelled expired May 2026 | 449 Pennsylvania Av | revision to pa#202203029030: change to the facade, modifying the bay window, new stucco, add 1 additional window, add new garage door. move entry door 24inches (closer to the street). build privacy walls at 2nd floor rear of building.Details
revision to pa#202203029030: change to the facade, modifying the bay window, new stucco, add 1 additional window, add new garage door. move entry door 24inches (closer to the street). build privacy walls at 2nd floor rear of building. | |
| Dec 29, 2023 | Completed final sign-off Feb 2024 | 736 Great Hy | one bathroom remodel in kindDetails
one bathroom remodel in kind | $8,500 |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 286 Roosevelt Wy | revision to pa 202310309748 -replacement of (e) wood railing @ (e) balcony (front yard) to metal penetrate railing 42 inch high. not like kind.Details
revision to pa 202310309748 -replacement of (e) wood railing @ (e) balcony (front yard) to metal penetrate railing 42 inch high. not like kind. | |
| Nov 17, 2023 | Completed final sign-off Jun 2024 | 288 Roosevelt Wy | replacement of exterior railing not like kind 65 lf of aluminum railing proposed replacement of (e) deckDetails
replacement of exterior railing not like kind 65 lf of aluminum railing proposed replacement of (e) deck | $3,400 |
| Nov 15, 2023 | Completed final sign-off Nov 2023 | 750 Great Hy | unit 3: replace two bay windows milgrad ultra series fiberglass 3 panels, exact replacement of existing windows like for like, in kind. non street facingDetails
unit 3: replace two bay windows milgrad ultra series fiberglass 3 panels, exact replacement of existing windows like for like, in kind. non street facing | $7,500 |
| Nov 8, 2023 | Expired or cancelled expired May 2026 | 449 Pennsylvania Av | revision to permit 202203029030; requesting to revise the foundationDetails
revision to permit 202203029030; requesting to revise the foundation | |
| Oct 30, 2023 | Completed final sign-off Jun 2024 | 286 Roosevelt Wy | two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing.Details
two bathroom remodel in kind- replace kitchen counter in kind- update electric- tear out ceiling, drywall only whole unit. removed existing tile on front deck and replace tracks decking. removed existing wood railing front b/d with metal railing. | $70,000 |
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 83 Benton Av | bathroom remodeling in basement and make a french drain around the exterior of house. not visible from street. in kindDetails
bathroom remodeling in basement and make a french drain around the exterior of house. not visible from street. in kind | $12,000 |
| May 25, 2023 | Completed final sign-off May 2024 | 44 Winfield St | repair rear yard retaining wall.Details
repair rear yard retaining wall. | $3,000 |
| Jan 27, 2023 | Completed final sign-off Mar 2023 | 59 Manchester St | kitchen remodel in kind. no changes to floor plans or walls.Details
kitchen remodel in kind. no changes to floor plans or walls. | $18,000 |
| Oct 17, 2022 | Completed final sign-off Nov 2022 | 70 Manchester St | bathroom remodel replacing in-kind (bathroom #2)Details
bathroom remodel replacing in-kind (bathroom #2) | $7,500 |
| Sep 26, 2022 | Completed final sign-off Nov 2022 | 70 Manchester St | kitchen and bath remodel and laundry. in kind no changes to floor plans or walls.Details
kitchen and bath remodel and laundry. in kind no changes to floor plans or walls. | $30,000 |
| Mar 2, 2022 | Completed final sign-off May 2026 | 449 Pennsylvania Av | convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor.Details
convert 1st floor to habitable spaces. extend existing first floor towards the rear. firsts floor will have two new bathrooms, a new study, new family room and new master bedroom. remodel second floor, raise roof three feet and build new deck at rear over first floor. | $49,999 |