Urban West Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Sep 2026
- Last 24 months
- 41 permits filed
52 permits since 2000: 29 completed, 22 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 940 Baker St | unit 4 on 3/f: revision to permit 202503132200. remove juliet balcony. add window restrictor. no other work.Details
unit 4 on 3/f: revision to permit 202503132200. remove juliet balcony. add window restrictor. no other work. | $1,500 |
| Sep 3, 2026 | In progress issued Sep 2026 | 940 Baker St | unit 2 on 2/f: revision to permit 202503132199. remove juliet balcony. add window restrictor. no other work.Details
unit 2 on 2/f: revision to permit 202503132199. remove juliet balcony. add window restrictor. no other work. | $1,500 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 1850 Polk St | (e) empty ground floor retail unit to restaurant w/ no cooking. (n) plumbing, (n) electrical, (n) commercial food service equipment for coffee & tea preparation. (n) finishes & lighing throughout,(n) millwork all partitions are (e) to remain restrooms are (e) to remain.mep deferredDetails
(e) empty ground floor retail unit to restaurant w/ no cooking. (n) plumbing, (n) electrical, (n) commercial food service equipment for coffee & tea preparation. (n) finishes & lighing throughout,(n) millwork all partitions are (e) to remain restrooms are (e) to remain.mep deferred | $60,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 2060 Ofarrell St | bldg b - revision to pa 202601264571 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg b - revision to pa 202601264571 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 2121 Geary Bl | bldg e - revision to pa 202601264573 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg e - revision to pa 202601264573 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 1415 Scott St | bldg f - revision to pa 202601264569 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg f - revision to pa 202601264569 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 2040 O'farrell St | bldg a - revision to pa 202601264570 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg a - revision to pa 202601264570 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 2141 Geary Bl | bldg d - revision to pa 202601264574 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg d - revision to pa 202601264574 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 12, 2026 | In progress issued Jul 2026 | 1450 Divisadero St | bldg c - revision to pa 202601264572 to include the removal of some patio balcony guardrails & replace with similar system to match existingDetails
bldg c - revision to pa 202601264572 to include the removal of some patio balcony guardrails & replace with similar system to match existing | $30,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 340 Bryant St | core & shell remodel to 2nd & 3rd & 4th floor. interior partition for offices & conference room in the future. new interior stair. electrical of plumbing & fire protections systems shall be submitted as deferred submittal by design - build contractor.Details
core & shell remodel to 2nd & 3rd & 4th floor. interior partition for offices & conference room in the future. new interior stair. electrical of plumbing & fire protections systems shall be submitted as deferred submittal by design - build contractor. | $55,000 |
| Mar 20, 2026 | In progress issued Apr 2026 | 112 Anderson St | revision to 202204252925. no interior work at 1st/2nd flor of main structure reduction in structural work to reflect only structural upgrades to rear front structure eliminate special inspection 18c for hold down. pull test since work has been eliminated.Details
revision to 202204252925. no interior work at 1st/2nd flor of main structure reduction in structural work to reflect only structural upgrades to rear front structure eliminate special inspection 18c for hold down. pull test since work has been eliminated. | |
| Jan 26, 2026 | In progress issued Jun 2026 | 2141 Geary Bl | building d-remove and replace doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building d-remove and replace doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Jan 26, 2026 | In progress issued Jun 2026 | 1450 Divisadero St | building c - remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building c - remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Jan 26, 2026 | In progress issued Jun 2026 | 2060 Ofarrell St | building b-remove and replace doors visible from street located on private decks within the same opening. doors will be aluminum. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building b-remove and replace doors visible from street located on private decks within the same opening. doors will be aluminum. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Jan 26, 2026 | In progress issued Jun 2026 | 2121 Geary Bl | building e-remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building e-remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Jan 26, 2026 | In progress issued Jun 2026 | 1415 Scott St | building f- remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building f- remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Jan 26, 2026 | In progress issued Jun 2026 | 2040 O'farrell St | building a- remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.Details
building a- remove and replace all doors visible from street located on private decks within the same opening. . painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only. | $650,000 |
| Dec 18, 2025 | Completed final sign-off May 2026 | 5150 Diamond Heights Bl | unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of wallsDetails
unit 304b: renovation w/ selective demo, modifications to plumbing and electrical systems as required. full kitchen replacement, new plumbing and lighting fixtures; retiling of floor in bathroom 1; full remodel of bathroom 2; new flooring throughout; & full painting. no removal of walls | $99,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 449 Octavia St | installation of (n) retractable scissor security gate at storefront window & entry. surface mounted w/ one way 3/8"x3" lags screws. (e) accessibility to remain.gate to remain locked in the open position during operating hours.Details
installation of (n) retractable scissor security gate at storefront window & entry. surface mounted w/ one way 3/8"x3" lags screws. (e) accessibility to remain.gate to remain locked in the open position during operating hours. | $2,000 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 57 Hotaling Pl | installation of (4) general receptalces. to pa# 202509290631 & ew202511191007 removal of lighting from scope of work.Details
installation of (4) general receptalces. to pa# 202509290631 & ew202511191007 removal of lighting from scope of work. | |
| Oct 31, 2025 | Completed final sign-off Mar 2026 | 398 Eddy St | revision to pa #202507020051 to address foundation conditions foundation in field.Details
revision to pa #202507020051 to address foundation conditions foundation in field. | |
| Oct 20, 2025 | In progress issued Mar 2026 | 425 01st St | hoa/common area: replace exterior security access gate at e) stair to podium lvl, this work won't effect public walkwayDetails
hoa/common area: replace exterior security access gate at e) stair to podium lvl, this work won't effect public walkway | $190,000 |
| Oct 15, 2025 | Completed final sign-off Jan 2026 | 150 Page St | kitchen remodel and removal of carpet swap out of existing light fixtures and paint unit. (unit 410)Details
kitchen remodel and removal of carpet swap out of existing light fixtures and paint unit. (unit 410) | $40,000 |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 449 Octavia St | removal of some trim and non bearing wall, installation of new millwork, flooring and interior and exterior painting.Details
removal of some trim and non bearing wall, installation of new millwork, flooring and interior and exterior painting. | $120,000 |
| Oct 14, 2025 | In progress issued Oct 2025 | 1830 Polk St | work includes repairing of damaged drywall in the space with (n) gypboundDetails
work includes repairing of damaged drywall in the space with (n) gypbound | $20,000 |
| Sep 29, 2025 | Completed final sign-off Dec 2025 | 57 Hotaling Pl | install of additional electrical outlets and lighting fixtures. (n) lvt flooring, mounting of mirrors and decorative acoustical materialDetails
install of additional electrical outlets and lighting fixtures. (n) lvt flooring, mounting of mirrors and decorative acoustical material | $31,600 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 398 Eddy St | level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift.Details
level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift. | $250,000 |
| Aug 8, 2025 | Completed final sign-off Dec 2025 | 1200 California St | removal of e non bearing wall, relocate electrical and tv stand above the fire place, includes necessary blocking. remove and replace stone in kind at fire placeDetails
removal of e non bearing wall, relocate electrical and tv stand above the fire place, includes necessary blocking. remove and replace stone in kind at fire place | $10,000 |
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed.Details
unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed. | $5,000 |
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed.Details
unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed. | $5,000 |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 105 Lundys Ln | remodel of e) basement. basement is to be unconditioned space. replace entry door. move & replace garage door. remove kitchenette, living area, & bedroom & convert to non-habitable spaceDetails
remodel of e) basement. basement is to be unconditioned space. replace entry door. move & replace garage door. remove kitchenette, living area, & bedroom & convert to non-habitable space | $15,000 |
| Jun 9, 2025 | Completed final sign-off Aug 2025 | 62 Digby St | revision to pa #202504154462 to replace dry rotted deck and roof under as well as portions of rear wall.Details
revision to pa #202504154462 to replace dry rotted deck and roof under as well as portions of rear wall. | $60,000 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 2301 Mission St | ste 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211.Details
ste 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211. | $2,000 |
| Apr 15, 2025 | Completed final sign-off Sep 2025 | 98 Clarendon Av | recommencement and completion of work approved under pa# 2021-0614-2305Details
recommencement and completion of work approved under pa# 2021-0614-2305 | $2,500 |
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 62 Digby St | repair and replacement in-kind of 50% of dry rot area of (e) exterior deck.Details
repair and replacement in-kind of 50% of dry rot area of (e) exterior deck. | $100,000 |
| Apr 15, 2025 | Completed final sign-off Sep 2025 | 98 Clarendon Av | ref pa# 2021-0614-2305: per inspector requirement for new scope of work for bathroom remodel includes installation of new plumbing and lighting fixtures, new tile flooring and wall finishes, modifiction to plumbing and electrical systems as requiredDetails
ref pa# 2021-0614-2305: per inspector requirement for new scope of work for bathroom remodel includes installation of new plumbing and lighting fixtures, new tile flooring and wall finishes, modifiction to plumbing and electrical systems as required | $2,300 |
| Apr 15, 2025 | Completed final sign-off Jun 2025 | 3024 Taraval St | repair and replacement in-kind of 25% of dry rot area at exterior overhand along 5 commercial units. like for like no changesDetails
repair and replacement in-kind of 25% of dry rot area at exterior overhand along 5 commercial units. like for like no changes | $56,000 |
| Mar 24, 2025 | Completed final sign-off Jan 2026 | 1310 18th St | relocate approved toilet room, revision to 202211237150 & 202412066296Details
relocate approved toilet room, revision to 202211237150 & 202412066296 | |
| Dec 6, 2024 | Completed final sign-off Jan 2026 | 1310 18th St | revision 202211237150 to soft story seismic upgrade at basement and 1st fl levels. modify toilet location, partition walls and rough in plumbingDetails
revision 202211237150 to soft story seismic upgrade at basement and 1st fl levels. modify toilet location, partition walls and rough in plumbing | |
| Oct 30, 2024 | Completed final sign-off Mar 2025 | 1200 California St | unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodelDetails
unit #17c interior non structural remodel. new kitchen cabinets with (n) counter, addition of laundry room for washer dryer. remodel 3 bathrooms,1 bathroom tub to shower, one bathroom to powder room. new flooring and plumbing fixtures in areas of remodel | $420,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 317 Texas St | replace bathtub due to enamel erosionDetails
replace bathtub due to enamel erosion | $1,000 |
| Oct 1, 2024 | Completed final sign-off Sep 2025 | 98 Clarendon Av | remove and replace (e) exterior stairs on east side of building - in kind.Details
remove and replace (e) exterior stairs on east side of building - in kind. | $5,000 |
| Jun 4, 2024 | Completed final sign-off Jul 2024 | 2595 Clay St | unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower headDetails
unit 2: one kitchen remodel: bathroom fixture replacement, new floors. bathroom remodel consists of new tile floor, new vanity, new shower trim and new shower head | $15,000 |
| Apr 18, 2024 | Completed final sign-off Sep 2024 | 2301 Mission St | tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. elec work will consist of adding outlets /switches, relocate elec panel. add alternatte work to add small office at 3rd fl.Details
tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. elec work will consist of adding outlets /switches, relocate elec panel. add alternatte work to add small office at 3rd fl. | $110,000 |
| Mar 20, 2024 | Completed final sign-off Jun 2024 | 112 Anderson St | replace (e) concrete patio slab at rear yard. 10'x10' on grade in backyard.Details
replace (e) concrete patio slab at rear yard. 10'x10' on grade in backyard. | $5,000 |
| Feb 2, 2024 | Completed final sign-off Jun 2024 | 112 Anderson St | rev to pa# 2022-0425-2925; upgrade fl. framing of rear sunroom structure based on (e) joist conditions remove center post of south sunroom beam & upgrade psl beam/post footingsDetails
rev to pa# 2022-0425-2925; upgrade fl. framing of rear sunroom structure based on (e) joist conditions remove center post of south sunroom beam & upgrade psl beam/post footings | $15,000 |
| Feb 1, 2024 | Completed final sign-off Jun 2024 | 112 Anderson St | revision to pa# 202204252925: reduce scope of work - no foundation repair at north - west corner of residence. no work at lower level. remodel limited to scecond floor only and foundation at rear structure. rebuild (e) rear stair.Details
revision to pa# 202204252925: reduce scope of work - no foundation repair at north - west corner of residence. no work at lower level. remodel limited to scecond floor only and foundation at rear structure. rebuild (e) rear stair. | |
| Sep 27, 2023 | Completed final sign-off Aug 2024 | 1281 Greenwich St | to comply with enforcement case 2022-007739. contruct wall around staircase to seperate both units at this address. legalize 3/f kitchen. house remains a 2 unit buildingDetails
to comply with enforcement case 2022-007739. contruct wall around staircase to seperate both units at this address. legalize 3/f kitchen. house remains a 2 unit building | $40,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2026 | 850 Van Ness Av | t.i. change from retail to office. 3 new restrooms, new door actuator for entry door, mep defered.Details
t.i. change from retail to office. 3 new restrooms, new door actuator for entry door, mep defered. | $50,000 |
| Aug 14, 2023 | Completed final sign-off Oct 2023 | 2757 Divisadero St | bathroom remodel - tub to shower.Details
bathroom remodel - tub to shower. | $15,000 |
| Nov 23, 2022 | Completed final sign-off Jan 2026 | 1310 18th St | voluntary soft story seismic retrofit at base & first floor level. no exterior work.Details
voluntary soft story seismic retrofit at base & first floor level. no exterior work. | $63,000 |
| Sep 16, 2021 | Never finaled filed Sep 2021, never issued | 1177 Polk St | tenant improvement for full restaurant into existing shell space, including new dining and kitchen areas, new equipment, new lighting, new finishes, and new mep work.Details
tenant improvement for full restaurant into existing shell space, including new dining and kitchen areas, new equipment, new lighting, new finishes, and new mep work. | $150,000 |