Singh Construction
- Based in
- Corona
- On San Francisco permits
- Nov 2013 to Aug 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2023 | In progress issued Dec 2023 | 535 Fell St | shoring plan, added to pa# 201806071297sDetails
shoring plan, added to pa# 201806071297s | |
| Jul 6, 2023 | Expired or cancelled withdrawn Jun 2024 | 25 Alta St | to comply w/ 202290459 & 202292608 repair (e) foundationDetails
to comply w/ 202290459 & 202292608 repair (e) foundation | $85,000 |
| Jun 30, 2021 | Completed final sign-off Oct 2023 | 2622 Greenwich St | revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0.Details
revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0. | $10,000 |
| Mar 3, 2021 | Completed final sign-off Aug 2021 | 3356 Cesar Chavez St | #b. kitchen remodel - replace sink, faucet, hood, cabinets and counter top. upgrade all plumbing & electricla to meet code. bathroom remodel - replace tub, toilet, cabinet. upgrade all plumbing & electrical. paint entire unit, new drywall.Details
#b. kitchen remodel - replace sink, faucet, hood, cabinets and counter top. upgrade all plumbing & electricla to meet code. bathroom remodel - replace tub, toilet, cabinet. upgrade all plumbing & electrical. paint entire unit, new drywall. | $25,000 |
| Feb 18, 2020 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | alter site permit to 2014-0106-5657s w/ increased elevator penthouse size.**maher n/a**Details
alter site permit to 2014-0106-5657s w/ increased elevator penthouse size.**maher n/a** | |
| Dec 6, 2018 | Completed final sign-off Jan 2022 | 52 Pond St | horizontal & vertical addition @ rear of the property. (3) new bedrooms @ 3rd flr addition.Details
horizontal & vertical addition @ rear of the property. (3) new bedrooms @ 3rd flr addition. | $450,000 |
| Nov 26, 2018 | Completed final sign-off Aug 2020 | 327 Park St | temporary shoring incl concrete, reinforcing steel, weldingDetails
temporary shoring incl concrete, reinforcing steel, welding | $100,000 |
| Jun 7, 2018 | Never finaled issued Nov 2021, no final | 535 Fell St | interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a)Details
interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a) | $300,000 |
| Jun 14, 2017 | Completed final sign-off Jul 2024 | 453 Buena Vista East Av | renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r.Details
renovation of (e) 3-unit multi-family bldg w/ 1-car garage. (n) addition consists of (1)(n) level 1-car stacker for (2) cars, (2) units comprising (2)bed/(2)bath each. (1) unit comprising of (3) bed/(1) rec room/(2.5)bath, (n) design/build. sprinkler system per nfpa-13r. | $890,500 |
| Jan 6, 2014 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | erect a 6-story, 1 basement, 7 units condo building. compliance with maher ordinance no. 155-13 required. route to dph.Details
erect a 6-story, 1 basement, 7 units condo building. compliance with maher ordinance no. 155-13 required. route to dph. | $1,800,000 |
| Jan 6, 2014 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | demo two story single family dwelling. compliance with ordinance no. 155-13 not required. excacavation <50 cu.yd.Details
demo two story single family dwelling. compliance with ordinance no. 155-13 not required. excacavation <50 cu.yd. | $10,000 |
| Nov 22, 2013 | Expired or cancelled expired May 2024 | 4555 19th St | horiz & vert addition, basement bld out & full remodel to (e) 1 fam dwg, remove & replace (e) slab & structure at basemt, infill(e) lightwell, convert un-conditioned space to habitable space, extend(e) 2 story structure to rear set back line, excavate and grade (e) rear yard, add 2(n) stories,Details
horiz & vert addition, basement bld out & full remodel to (e) 1 fam dwg, remove & replace (e) slab & structure at basemt, infill(e) lightwell, convert un-conditioned space to habitable space, extend(e) 2 story structure to rear set back line, excavate and grade (e) rear yard, add 2(n) stories, | $417,844 |