Green City Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Dec 2010 to Jul 2026
- Last 24 months
- 12 permits filed
151 permits since 2000: 112 completed, 10 in progress, 22 never finaled, 7 expired or cancelled.
Of the 22 never-finaled permits, 1 is 3 to 5 years old, 16 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 151.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 346 32nd Av | 2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house forDetails
2nd & 3rd floor interior remodel, open kitchen, dining & family room, relocate powder room, remodel stair at 2nd floor, remodel 3 bedrooms, add a new master bathroom, remodel existing roofdeck, replace all rear & side windows with aluminum & replace all doors, add a new deck at rear of the house for | $120,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 860 Moultrie St | to comply w/ nov# 20162001: 2nd floor remodel at kitchen, bathroom convert to master bath, new powder room, new window replacement at the back. attic floor lv remodel at bathroom, bedroom, convert new bedroom at front room space. new dormers at attic floor level.Details
to comply w/ nov# 20162001: 2nd floor remodel at kitchen, bathroom convert to master bath, new powder room, new window replacement at the back. attic floor lv remodel at bathroom, bedroom, convert new bedroom at front room space. new dormers at attic floor level. | $100,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 346 32nd Av | structural revision to 201510262805Details
structural revision to 201510262805 | |
| Dec 26, 2025 | In progress issued Feb 2026 | 860 Moultrie St | 1st floor/basement improvement w (n) family room w kitchenette, bedrm, bathrm, & vestibule/laundry. (n) reduced garage area (n) door & windows replace rear (n) water heater & furnace (n) interior connecting stair. comply w nov#20201961 replace stairs. replace front door, windows, garage doorDetails
1st floor/basement improvement w (n) family room w kitchenette, bedrm, bathrm, & vestibule/laundry. (n) reduced garage area (n) door & windows replace rear (n) water heater & furnace (n) interior connecting stair. comply w nov#20201961 replace stairs. replace front door, windows, garage door | $150,000 |
| Dec 26, 2025 | In progress issued Mar 2026 | 346 32nd Av | replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroomDetails
replace 10 front wood windows, door, garage door. 1st/f: rework entry/foyer, new interior hallway to habitable space bedroom, remodel e) stair to 2nd/f, relocate laundry area, remodel e) bedroom, new bathroom, remodel e) 1 car garage to 2 cars. basement/f: remodel e) exercise room w/ new bathroom | $150,000 |
| Nov 13, 2025 | In progress issued Nov 2025 | 346 32nd Av | remodel kitchen & 2 bathrooms. tub to shower.Details
remodel kitchen & 2 bathrooms. tub to shower. | $35,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 860 Moultrie St | to comply with nov #20162001: remodel the (e) kitchen and two bathrooms. change tub to shower.Details
to comply with nov #20162001: remodel the (e) kitchen and two bathrooms. change tub to shower. | $35,000 |
| Jun 11, 2025 | Completed final sign-off Oct 2025 | 3300 Jackson St | 4th floor: install new stucco at the 4th floor to match the existing stucco. like for like.Details
4th floor: install new stucco at the 4th floor to match the existing stucco. like for like. | $20,000 |
| May 1, 2025 | Expired or cancelled withdrawn Nov 2025 | 3300 Jackson St | existing front garage/driveway enclosure to be removedDetails
existing front garage/driveway enclosure to be removed | $10,000 |
| Jan 22, 2025 | Completed final sign-off Jul 2025 | 785 03rd Av | revision 202411014259- remodel family , addition of (n) bathroom and (n) laundry room located in basement and convert (e) laundry area into (n) office space and remodel garage area. to add (n) kitchenette on ground floorDetails
revision 202411014259- remodel family , addition of (n) bathroom and (n) laundry room located in basement and convert (e) laundry area into (n) office space and remodel garage area. to add (n) kitchenette on ground floor | $25,000 |
| Dec 12, 2024 | Completed final sign-off Apr 2025 | 88 Onondaga Av | unit #3: reinstall the tile for the bathroom. no moving walls/no layout change.Details
unit #3: reinstall the tile for the bathroom. no moving walls/no layout change. | $10,000 |
| Nov 1, 2024 | Completed final sign-off Jul 2025 | 785 03rd Av | 1 kitchen, 2 full bathrooms and 1 powder room remodel in kind. (everything the same)Details
1 kitchen, 2 full bathrooms and 1 powder room remodel in kind. (everything the same) | $35,000 |
| Sep 30, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) denDetails
ref 202405152223- ground floor (e) to remain except to provide a (n) elevator to 4 floors. 1st floor to redesign and remodel kitchen, bathroom, bedroom, powder room. 2nd floor to redesign and remodel bedrooms, bathrooms, laundry and (n) int. stair w/handrails to top floor. 3rd floor redesign (n) den | $250,000 |
| Aug 29, 2024 | Completed final sign-off Mar 2026 | 2750 Cabrillo St | as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flrDetails
as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flr | $10,000 |
| Aug 26, 2024 | In progress issued Aug 2024 | 88 Onondaga Av | unit 2 & 4: reinstall tile for bathroom, reinstall the (e) kitchen cabinet & counter top in kitchen. replace hard wood floor & repair drywall by water damaged for both units. all work is in-kind. no moving walls. no layout changes.Details
unit 2 & 4: reinstall tile for bathroom, reinstall the (e) kitchen cabinet & counter top in kitchen. replace hard wood floor & repair drywall by water damaged for both units. all work is in-kind. no moving walls. no layout changes. | $20,000 |
| Aug 26, 2024 | Completed final sign-off Sep 2024 | 1127 Burrows St | to obtain final inspection for work approved under pa# 202011259757. all work is complete.Details
to obtain final inspection for work approved under pa# 202011259757. all work is complete. | |
| Jun 4, 2024 | In progress issued Jun 2025 | 1887 Funston Av | revision to permit# 202108307421: repair dry rot at window sills and 1/f and 4/f decks, strengthen cantilver with c 10 x 25 steel channels.Details
revision to permit# 202108307421: repair dry rot at window sills and 1/f and 4/f decks, strengthen cantilver with c 10 x 25 steel channels. | $20,000 |
| May 15, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stairDetails
interior remodel basement improvement into habitable space for new bedroom w bath, family room with kitchenette, powder room and laundry area and wineroom, interior stair | $70,000 |
| Feb 6, 2024 | Completed final sign-off Nov 2025 | 3300 Jackson St | remodel the (e) kitchen, (e) 7 bathrooms rem., 1 bar and laundry room, replace 4 bedrooms & top floor family room, ceiling , and drywall repair. repair the roof less than 50 %. replace front facing garage door wood. replace family room sliding door wood and windows glazing with double-pane glass.Details
remodel the (e) kitchen, (e) 7 bathrooms rem., 1 bar and laundry room, replace 4 bedrooms & top floor family room, ceiling , and drywall repair. repair the roof less than 50 %. replace front facing garage door wood. replace family room sliding door wood and windows glazing with double-pane glass. | $65,000 |
| Feb 9, 2023 | Completed final sign-off Nov 2023 | 1296 Dolores St | replace the existing stucco (approx 2000 sq ft) front, rear, and side and brick iin kind. replace the 2 garage doors.Details
replace the existing stucco (approx 2000 sq ft) front, rear, and side and brick iin kind. replace the 2 garage doors. | $10,000 |
| Dec 6, 2022 | Completed final sign-off Nov 2023 | 1296 Dolores St | revision to bpa#202108196733, revise interior layout, add new bedroom @ 3/f, add mechanical room @garage for 1296-1298 dolores, revise kitchen, closet, remove stair skylight. dwg's rev. to reflect as built.Details
revision to bpa#202108196733, revise interior layout, add new bedroom @ 3/f, add mechanical room @garage for 1296-1298 dolores, revise kitchen, closet, remove stair skylight. dwg's rev. to reflect as built. | |
| Nov 29, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | revision to bpa#202206216769 reconfigure layouts, replace stairs to spiral staircase, change lightwell exterior wall from siding to stuccoDetails
revision to bpa#202206216769 reconfigure layouts, replace stairs to spiral staircase, change lightwell exterior wall from siding to stucco | $15,000 |
| Nov 23, 2022 | In progress issued Sep 2025 | 2725 Broadway | basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces.Details
basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces. | $175,000 |
| Nov 15, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | replace garage foundation to replace brick foundation found during constrcutionDetails
replace garage foundation to replace brick foundation found during constrcution | $5,000 |
| Nov 15, 2022 | Completed final sign-off Jun 2023 | 1864 09th Av | rev to pa# 2022-0228-8877: revisions to interior layout remove (1)bedroom on level 1; add (1)bedroom on level 2Details
rev to pa# 2022-0228-8877: revisions to interior layout remove (1)bedroom on level 1; add (1)bedroom on level 2 | |
| Nov 9, 2022 | Completed final sign-off Apr 2023 | 520 Miramar Av | roof repair due to fire damage; voluntary strengthen (e) roof framing by adding strongbacks, collars ties, and sister (n) rafters at locations where neededDetails
roof repair due to fire damage; voluntary strengthen (e) roof framing by adding strongbacks, collars ties, and sister (n) rafters at locations where needed | $600 |
| Aug 30, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | replace the front stucco with dryrock in-kind and the rear stucco to repair dry rot in kindDetails
replace the front stucco with dryrock in-kind and the rear stucco to repair dry rot in kind | $6,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | 1st/f: remodel bath, add family, office, 1 bedroom and 1 full bath. 2nd fl: remodel kitchen, bath, add 1 full bath. infill lightwell, repair deck.Details
1st/f: remodel bath, add family, office, 1 bedroom and 1 full bath. 2nd fl: remodel kitchen, bath, add 1 full bath. infill lightwell, repair deck. | $128,000 |
| Jun 17, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% lessDetails
replace front windows + door with hung wood with og windows. remodel + add 1 bedroom, bathroom, family room, cooking counter with sink, at ground fl. remodel kitchen, bath & living room at 2nd fl. remodel 2 bathrooms + bedrooms at 3rd fl. repair (e) front + rear decks. repair front stair. 50% less | $200,000 |
| Jun 16, 2022 | Completed final sign-off Dec 2022 | 3159 Baker St | repair the extg front stair with brick to match existing. less than 50%. repair in-kind.Details
repair the extg front stair with brick to match existing. less than 50%. repair in-kind. | $5,000 |
| May 3, 2022 | Completed final sign-off Jun 2024 | 1340 Dolores St | to comply with nov# 202290102 & 202067043. repair guardrail. remodel existing 3 bathrooms, (1) kitchen, and laundry. replace 13 windows and 5 doors at rear & side of the house. no work visible from street.Details
to comply with nov# 202290102 & 202067043. repair guardrail. remodel existing 3 bathrooms, (1) kitchen, and laundry. replace 13 windows and 5 doors at rear & side of the house. no work visible from street. | $56,000 |
| May 3, 2022 | Completed final sign-off Jul 2023 | 3150 Baker St | remodel three (e) bathrooms, one (e) kitchen, (e) laundry. replace six windows & 3 doors at rear & side of the house. not visible from street.Details
remodel three (e) bathrooms, one (e) kitchen, (e) laundry. replace six windows & 3 doors at rear & side of the house. not visible from street. | $55,000 |
| Apr 27, 2022 | Completed final sign-off Jul 2023 | 1864 09th Av | remodel (e) kitchen, 3 bathrooms, & (e) luandry, replace the exterior 8 doors & 15 windows at rear and side of the house only.Details
remodel (e) kitchen, 3 bathrooms, & (e) luandry, replace the exterior 8 doors & 15 windows at rear and side of the house only. | $50,000 |
| Feb 28, 2022 | Completed final sign-off Oct 2022 | 149 03rd Av | revision to pa#202105210774 with as buid plans and add a new rear deck.Details
revision to pa#202105210774 with as buid plans and add a new rear deck. | $5,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2023 | 1864 09th Av | replace extg windows and patio doors with aluminum clad wood window. 1st floor change to 2 car garage, add cooking & sink bar counter, remodel 2 bedrooms & bath. add family room & interior stair connecting to living room. add 3 dormer with windows; voluntariy strengthen each level by adding new plwDetails
replace extg windows and patio doors with aluminum clad wood window. 1st floor change to 2 car garage, add cooking & sink bar counter, remodel 2 bedrooms & bath. add family room & interior stair connecting to living room. add 3 dormer with windows; voluntariy strengthen each level by adding new plw | $80,000 |
| Aug 19, 2021 | Completed final sign-off Nov 2023 | 1296 Dolores St | g/f: new habitable space. interior remodel of (e) bathrooms, ktichen & add 2 new bathroom on 2/f & 3/f. replace (e) all (e) windows with alum clad wood. add a roof deck.Details
g/f: new habitable space. interior remodel of (e) bathrooms, ktichen & add 2 new bathroom on 2/f & 3/f. replace (e) all (e) windows with alum clad wood. add a roof deck. | $200,000 |
| May 21, 2021 | Completed final sign-off Nov 2022 | 149 03rd Av | improvement into habitable space on g/f per plans: interior remodel of kitchen, living room, 1/2bath,new laundry and new stair to g/f.remodeling (e) stair per plan 2/f.remodel bath,bedrooms; add (n) bath, new roof deck over (e) roof on 3/f.Details
improvement into habitable space on g/f per plans: interior remodel of kitchen, living room, 1/2bath,new laundry and new stair to g/f.remodeling (e) stair per plan 2/f.remodel bath,bedrooms; add (n) bath, new roof deck over (e) roof on 3/f. | $45,000 |
| Apr 1, 2021 | Completed final sign-off Mar 2023 | 536 40th Av | replace (e) wood siding to new wood siding repair (e) roof shingles repair (e) staircase less than 50% not visible from the streetDetails
replace (e) wood siding to new wood siding repair (e) roof shingles repair (e) staircase less than 50% not visible from the street | $21,000 |
| Mar 12, 2021 | Never finaled issued Sep 2023, no final | 350 Day St | one story vertical & horizontal addition with roof deck on (e) 2 story.Details
one story vertical & horizontal addition with roof deck on (e) 2 story. | $400,000 |
| Mar 11, 2021 | Completed final sign-off Aug 2021 | 307 Faxon Av | basement/1st floor improvement: convert storage area to office room. convert portion/utility area into exercise room. provide new half bathroom and laundry room.Details
basement/1st floor improvement: convert storage area to office room. convert portion/utility area into exercise room. provide new half bathroom and laundry room. | $15,000 |
| Feb 26, 2021 | Completed final sign-off Jan 2022 | 102 03rd Av | revision to pa# 202010196784: add 2nd level juliet balcony includes windows into french doors per plan at 2nd fl. change full bathroom to powder room split with wine room at 1st fl. 3rd fl roof convert to roof deck with 42" high solid railing. re-arrange master bathroom layout. add 2 skylights.Details
revision to pa# 202010196784: add 2nd level juliet balcony includes windows into french doors per plan at 2nd fl. change full bathroom to powder room split with wine room at 1st fl. 3rd fl roof convert to roof deck with 42" high solid railing. re-arrange master bathroom layout. add 2 skylights. | $5,000 |
| Dec 3, 2020 | Expired or cancelled withdrawn Jul 2023 | 1035 Natoma St | 1/f: remodel/improvement for habitable aera. add bedroom, family room, den, 2 bathrooms and laundry area per plan. 2/f remodel per plan and prev permit 202005267749.Details
1/f: remodel/improvement for habitable aera. add bedroom, family room, den, 2 bathrooms and laundry area per plan. 2/f remodel per plan and prev permit 202005267749. | $100,000 |
| Nov 25, 2020 | Expired or cancelled expired Sep 2024 | 1127 Burrows St | 1st fl: interior remodel/improvement space as per plan, provide new bedroom, family room, & full bathroom, replacement of window/door to the back and sheetrocking work.Details
1st fl: interior remodel/improvement space as per plan, provide new bedroom, family room, & full bathroom, replacement of window/door to the back and sheetrocking work. | $40,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2023 | 536 40th Av | new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area.Details
new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area. | $72,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f.Details
improvement into habitable space area as per plan: add 2 new bathrooms, 1 bedroom, family room at g/f. add a new 1/2 bath, connecting stair to basement to be reconfigured. new replacement plus french doors, windows at rear bedroom, remodel 2 (e) bathrooms on 3/f. | $70,000 |
| Oct 19, 2020 | Completed final sign-off Jul 2021 | 307 Faxon Av | revision to pa #202005277836 - add a new bathroom at 2/f & a new bathroom on 3/f. change the family room to officeDetails
revision to pa #202005277836 - add a new bathroom at 2/f & a new bathroom on 3/f. change the family room to office | $25,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2022 | 102 03rd Av | remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with dividedDetails
remodeling (e) kitchen, two bathrooms, living room in kind, repair the front stair 50% or less. replace the existing windows with aluminum clad wood windows. replace the front with wood siding & replace the rear with stucco. hung windows no sliders - no changes to existing front windows with divided | $60,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2021 | 1035 Natoma St | to comply with nov #202041311 & city planning complaint 2020-007318enf - rebuild/repair front entry stair in kind.Details
to comply with nov #202041311 & city planning complaint 2020-007318enf - rebuild/repair front entry stair in kind. | $5,000 |
| Aug 22, 2020 | Completed final sign-off Mar 2023 | 536 40th Av | foundation replacement & lower existing slab by 7". structural work only. no change to 2nd fl. seismic upgrade of lower level.Details
foundation replacement & lower existing slab by 7". structural work only. no change to 2nd fl. seismic upgrade of lower level. | $28,000 |
| Jul 8, 2020 | Completed final sign-off Jan 2021 | 307 Faxon Av | replace 17 windows w/ aluminum-clad wood windows; casement-fixed-casement @ front bay w/ dh in single window above stairs; replace wood siding at rear elevation & restucco front siding (same texture as existing); all wood window trim and decorative accents -wood posts/grill above stair under dhDetails
replace 17 windows w/ aluminum-clad wood windows; casement-fixed-casement @ front bay w/ dh in single window above stairs; replace wood siding at rear elevation & restucco front siding (same texture as existing); all wood window trim and decorative accents -wood posts/grill above stair under dh | $33,000 |
| Jun 1, 2020 | Completed final sign-off Jan 2022 | 1135 Pacific Av | remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work.Details
remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work. | $45,000 |
| May 27, 2020 | Completed final sign-off Jul 2021 | 307 Faxon Av | remodel the existing kitchen & bathroom in-kind.Details
remodel the existing kitchen & bathroom in-kind. | $20,000 |
| May 26, 2020 | Completed final sign-off Feb 2021 | 1035 Natoma St | to comply with nov# 202026344. remodeling the existing kitchen and 1 and 1/2 bathroom.Details
to comply with nov# 202026344. remodeling the existing kitchen and 1 and 1/2 bathroom. | $25,000 |
| Mar 10, 2020 | Never finaled issued Mar 2020, no final | 3245 Clay St | street spaceDetails
street space | |
| Feb 24, 2020 | Never finaled filed Feb 2020, never issued | 34 Walter St | change wood stair to metal spiral stair per plan to comply with nov 201247583 item 2 rev 201805239898Details
change wood stair to metal spiral stair per plan to comply with nov 201247583 item 2 rev 201805239898 | |
| Feb 20, 2020 | Completed final sign-off Jul 2021 | 2427 Bay St | install new stucco at rear & side of the houseDetails
install new stucco at rear & side of the house | $5,000 |
| Jan 29, 2020 | Never finaled issued Jul 2020, no final | 355 Byxbee St | remodel bathroom (e) bathroom @ 2/fDetails
remodel bathroom (e) bathroom @ 2/f | $6,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2022 | 570 El Camino Del Mar | remodel (e) family room, add new bedroom, bath room and wine room at ground fl. remodel (e) bedrooms, bath room & kitchen, add new 1/2 bathroom at garage. replace s.o.g. at family rm area, adding plywood sheating (voluntary strenginening)Details
remodel (e) family room, add new bedroom, bath room and wine room at ground fl. remodel (e) bedrooms, bath room & kitchen, add new 1/2 bathroom at garage. replace s.o.g. at family rm area, adding plywood sheating (voluntary strenginening) | $35,000 |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 130 09th Av | street spaceDetails
street space | |
| Jul 31, 2019 | Completed final sign-off Nov 2021 | 1976 Quesada Av | rear deck with staircase to ground, change single door to sliding double door. new windows same size.Details
rear deck with staircase to ground, change single door to sliding double door. new windows same size. | $9,000 |
| Jul 17, 2019 | Completed final sign-off Aug 2020 | 2746 Cabrillo St | replace foundationDetails
replace foundation | $25,000 |
| Jul 2, 2019 | Never finaled issued Jan 2021, no final | 2750 Cabrillo St | erect type-v, 4-story, two dwelling units with no basement.Details
erect type-v, 4-story, two dwelling units with no basement. | $850,000 |
| Mar 29, 2019 | Completed final sign-off Aug 2020 | 2746 Cabrillo St | interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood)Details
interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood) | $120,000 |
| Jan 29, 2019 | Expired or cancelled withdrawn Aug 2019 | 34 Walter St | change rear wood stair to metal spiral stair. ref complaint 201247583Details
change rear wood stair to metal spiral stair. ref complaint 201247583 | |
| Jan 29, 2019 | Completed final sign-off Jun 2019 | 671 15th Av | revision to pa 201812188643. add new bathroom at rear room at 3rd flrDetails
revision to pa 201812188643. add new bathroom at rear room at 3rd flr | $8,000 |
| Dec 18, 2018 | Completed final sign-off Jun 2019 | 671 15th Av | relocate (e) kitchen , convert (e) kitchen toom into new bedroom. remodel (e) bathroom w/washer/dryer stackable. ele,plm system updgrades. no exterior work.Details
relocate (e) kitchen , convert (e) kitchen toom into new bedroom. remodel (e) bathroom w/washer/dryer stackable. ele,plm system updgrades. no exterior work. | $20,000 |
| Dec 18, 2018 | Completed final sign-off Apr 2019 | 478 Anderson St | revise the front facade of bldg to comply with complaint 201805171, revert back arched & window trim.Details
revise the front facade of bldg to comply with complaint 201805171, revert back arched & window trim. | |
| Oct 24, 2018 | Never finaled issued Jul 2019, no final | 2427 Bay St | horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high.Details
horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high. | $162,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2019 | 669 15th Av | remodel the kitchen in-kind. no walls moved. layout remains unchanged.Details
remodel the kitchen in-kind. no walls moved. layout remains unchanged. | $5,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 58 Lapidge St | revision to 201804176530 to remove rear dormer and add fixed skylight insteadDetails
revision to 201804176530 to remove rear dormer and add fixed skylight instead | |
| Sep 10, 2018 | Completed final sign-off Aug 2019 | 58 Lapidge St | remove cement siding from front and rear of building. replace with new stucco finish.Details
remove cement siding from front and rear of building. replace with new stucco finish. | $6,000 |
| Aug 30, 2018 | Never finaled issued Sep 2018, no final | 2427 Bay St | 1/f: remodel/re-arrange (e) bathrm, closet @ bedrm, and laundry rm; 2/f: remodel/re-arrange (e) kitchen, powder rm & new pantry; 3/f: remodel (e) bathrm & put in new bathrm, add new residential elevator & spiral staircaseDetails
1/f: remodel/re-arrange (e) bathrm, closet @ bedrm, and laundry rm; 2/f: remodel/re-arrange (e) kitchen, powder rm & new pantry; 3/f: remodel (e) bathrm & put in new bathrm, add new residential elevator & spiral staircase | $160,000 |
| Jun 25, 2018 | Completed final sign-off Aug 2019 | 3945 23rd St | filled-in 1st floor below (e) deck. create a new master bedroom with new bath room. re-work (e) deck guardrailing to provide new glass railing & re-work waterproofing.Details
filled-in 1st floor below (e) deck. create a new master bedroom with new bath room. re-work (e) deck guardrailing to provide new glass railing & re-work waterproofing. | $58,000 |
| Jun 1, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndwsDetails
1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| May 23, 2018 | Completed final sign-off Mar 2019 | 34 Walter St | rev #201710161350; interior remodel and adjustment layout add bath & bedroom at 4th floor. stucco the rear building 3-4 sprinkler under sep permit. seismic upgrade under pa #201710161350.Details
rev #201710161350; interior remodel and adjustment layout add bath & bedroom at 4th floor. stucco the rear building 3-4 sprinkler under sep permit. seismic upgrade under pa #201710161350. | $15,000 |
| Apr 24, 2018 | Completed final sign-off Aug 2019 | 3945 23rd St | remodel 2nd floor. add new bedrooms and bathroom, laundry at ground floor. replace windows. replace new rear deck, re-stucco rear house and replace the new roof. (tile to remain)Details
remodel 2nd floor. add new bedrooms and bathroom, laundry at ground floor. replace windows. replace new rear deck, re-stucco rear house and replace the new roof. (tile to remain) | $170,000 |
| Apr 17, 2018 | Never finaled issued May 2018, no final | 58 Lapidge St | remodel and move extg kitchen and powder room on 2nd floor. put in new slidiers in rear on 2nd floor. remodel 2 extg bathrooms on 3rd floor . put in spiral stairs to attic above. put in 3 dormers. dormer area is 17.36 y. of roof area & rear dormer is well within 457 setbackline.Details
remodel and move extg kitchen and powder room on 2nd floor. put in new slidiers in rear on 2nd floor. remodel 2 extg bathrooms on 3rd floor . put in spiral stairs to attic above. put in 3 dormers. dormer area is 17.36 y. of roof area & rear dormer is well within 457 setbackline. | $283,000 |
| Mar 2, 2018 | Completed final sign-off Mar 2018 | 575 35th Av | revision to opa 2017-0530-7931. add rear deck at 3rd fl. change location for bathroom, kitchen, doors and windows per plan. change the layout for bathroom for 2nd and 3rd floor.Details
revision to opa 2017-0530-7931. add rear deck at 3rd fl. change location for bathroom, kitchen, doors and windows per plan. change the layout for bathroom for 2nd and 3rd floor. | $2,000 |
| Jan 29, 2018 | Completed final sign-off Aug 2018 | 1556 Grove St | remodel existing kitchen and two bathrooms. in kindDetails
remodel existing kitchen and two bathrooms. in kind | $30,000 |
| Jan 29, 2018 | Never finaled issued Jul 2018, no final | 58 Lapidge St | fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shownDetails
fill in space under (e) deck to create additional living space to (e) family room of 132 sqft. move (e) deck stairs to south side w/ (n) metal stairs - non combustible. (e) family room modified to create bedroom & family room. replace (e) rear windows & door @ 1st fl w/ (n) slider as shown | $15,000 |
| Jan 16, 2018 | Never finaled issued Feb 2018, no final | 58 Lapidge St | create family room & bathroom on (e) 1st floor storage area. no exterior change. relocate (e) w&d & laundry sink to 1st flDetails
create family room & bathroom on (e) 1st floor storage area. no exterior change. relocate (e) w&d & laundry sink to 1st fl | $18,000 |
| Dec 20, 2017 | Completed final sign-off Aug 2019 | 58 Lapidge St | move (e) deck landing to south side of rear property line.Details
move (e) deck landing to south side of rear property line. | $20,000 |
| Nov 28, 2017 | Never finaled issued Dec 2017, no final | 58 Lapidge St | foundation strengthening (localized replacement/addition )Details
foundation strengthening (localized replacement/addition ) | $54,000 |
| Nov 27, 2017 | Completed final sign-off Jun 2018 | 71 Pierce St | to obtain final inspection for work approved under pa#201511132608, 201504022681, 201012227203. all work is completeDetails
to obtain final inspection for work approved under pa#201511132608, 201504022681, 201012227203. all work is complete | |
| Nov 16, 2017 | Completed final sign-off Mar 2022 | 138 Clinton Pk | add two adu units on ground floor per ordinance 162-16, (2) one-bedroom units; (1) kitchen & (1) bath for each unit.Details
add two adu units on ground floor per ordinance 162-16, (2) one-bedroom units; (1) kitchen & (1) bath for each unit. | $275,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 844 Duncan St | modify approved permit 201510028711 with changes to a2.1. add wine cellar, widen entry door and sidelites. 1st fl- a2.2, move e fireplace, increase window size in bedrm 2 and 3, add 10" deep picture balcony, a2.3 relocate m bath, add new bath, take out e roof in front, extend deck to part ofDetails
modify approved permit 201510028711 with changes to a2.1. add wine cellar, widen entry door and sidelites. 1st fl- a2.2, move e fireplace, increase window size in bedrm 2 and 3, add 10" deep picture balcony, a2.3 relocate m bath, add new bath, take out e roof in front, extend deck to part of | $35,000 |
| Oct 16, 2017 | Completed final sign-off Mar 2019 | 34 Walter St | revise interior layout redesigned with pa 2015-0130-7146 r3. to comply with 201469471 - provide new additional attic dormers with access stair per plans. provide new roof deck per plan.Details
revise interior layout redesigned with pa 2015-0130-7146 r3. to comply with 201469471 - provide new additional attic dormers with access stair per plans. provide new roof deck per plan. | $30,000 |
| Aug 16, 2017 | Completed final sign-off Aug 2018 | 306 Lawton St | residential renovation to duplex. primary work on 3rd fl unit : kitchen & bath renovations, add one (n) full bath. garage level (n) new partitions to create seperate garages. repair work on the 2nd fl unit. replace (e) 3rd flr windows(2) like for likeDetails
residential renovation to duplex. primary work on 3rd fl unit : kitchen & bath renovations, add one (n) full bath. garage level (n) new partitions to create seperate garages. repair work on the 2nd fl unit. replace (e) 3rd flr windows(2) like for like | $350,000 |
| Jun 5, 2017 | Completed final sign-off Jun 2018 | 762 31st Av | remodel kitchen, 2 1.2 bathrooms, 3 bedrooms, dining & living room at 2nd flr. add 2 bathrooms, 2 bedrooms and family room at graound floorDetails
remodel kitchen, 2 1.2 bathrooms, 3 bedrooms, dining & living room at 2nd flr. add 2 bathrooms, 2 bedrooms and family room at graound floor | $120,000 |
| May 31, 2017 | Never finaled issued May 2017, no final | 575 35th Av | remodel living room , dinning room & bedroom replace the drywall 100sf per roomDetails
remodel living room , dinning room & bedroom replace the drywall 100sf per room | $3,000 |
| May 30, 2017 | Completed final sign-off Feb 2018 | 575 35th Av | remodel & addition living. half bathroom, kitchen & dining & family room at ground floor. remodel 3 bedrooms, 2 bathrooms @ 2nd floor. remodel bedroom & add a bathroom & 3rd floor. replace front windows with aluminum clad wood window. no roof deckDetails
remodel & addition living. half bathroom, kitchen & dining & family room at ground floor. remodel 3 bedrooms, 2 bathrooms @ 2nd floor. remodel bedroom & add a bathroom & 3rd floor. replace front windows with aluminum clad wood window. no roof deck | $120,000 |
| May 30, 2017 | Completed final sign-off Nov 2017 | 478 Anderson St | revision to pa 2017-0320-1891, remove the rear stair & foundation work revision per plan.Details
revision to pa 2017-0320-1891, remove the rear stair & foundation work revision per plan. | |
| Apr 27, 2017 | Completed final sign-off Sep 2018 | 422 Jersey St | replace front windows with wood transome & casement windows (7), addendum to (e) permit 201702099102Details
replace front windows with wood transome & casement windows (7), addendum to (e) permit 201702099102 | $4,000 |
| Apr 27, 2017 | Completed final sign-off Aug 2017 | 90 Apollo St | remodel kitchen bathroom & add a new bath @ 2nd floor. replace the rear bedroom window & convert den to bedroomDetails
remodel kitchen bathroom & add a new bath @ 2nd floor. replace the rear bedroom window & convert den to bedroom | $35,000 |
| Mar 31, 2017 | Completed final sign-off Aug 2017 | 335 Ralston St | repair the existing deck, less than 50%. to comply with complaint #201766412Details
repair the existing deck, less than 50%. to comply with complaint #201766412 | $2,000 |
| Mar 29, 2017 | Completed final sign-off Nov 2017 | 80 Pinehurst Wy | interior remodel of extg master bedroom & bathrm on 1st flr. add 2 new closets(walk-in), add 2 new french doors in extg locations of windows on 1st fl., add 2 new windows in the laundry & storage area(no change in cieling ht in this space 7'-4"). volunteer seismic strengthening as shown on 1st fl.Details
interior remodel of extg master bedroom & bathrm on 1st flr. add 2 new closets(walk-in), add 2 new french doors in extg locations of windows on 1st fl., add 2 new windows in the laundry & storage area(no change in cieling ht in this space 7'-4"). volunteer seismic strengthening as shown on 1st fl. | $62,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2017 | 478 Anderson St | remodel kitchen, living room, dining room, bathroom, add a new bath @ 2nd floor. add 2 bathroom, 2 bedrooms, family room at ground floor. add a new roof deck. replace all windowsDetails
remodel kitchen, living room, dining room, bathroom, add a new bath @ 2nd floor. add 2 bathroom, 2 bedrooms, family room at ground floor. add a new roof deck. replace all windows | $120,000 |
| Feb 9, 2017 | Completed final sign-off Sep 2018 | 422 Jersey St | revision to 201612144924 general interio alterations to change home from (e) condition of 3 bedrooms, 2 baths to proposed condition of 4 bedrooms, 3 bathDetails
revision to 201612144924 general interio alterations to change home from (e) condition of 3 bedrooms, 2 baths to proposed condition of 4 bedrooms, 3 bath | $160,000 |
| Feb 3, 2017 | Completed final sign-off Mar 2021 | 1405 15th St | per unit legalization ordinance# 43-14. legalize (e) dwelling unit on the 1st floor to become 4 to 5 units building. legalize unit will be a (1) bedroom unit w/ kitchen & bath. soft story per 201701187351. maher n/a.Details
per unit legalization ordinance# 43-14. legalize (e) dwelling unit on the 1st floor to become 4 to 5 units building. legalize unit will be a (1) bedroom unit w/ kitchen & bath. soft story per 201701187351. maher n/a. | $150,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 422 Jersey St | remodel existing kitchen & 2 bathroom at 2nd floor and remodel existing bathroom at ground floor. replace doors & trims.Details
remodel existing kitchen & 2 bathroom at 2nd floor and remodel existing bathroom at ground floor. replace doors & trims. | $35,000 |