Donnie Lam
- Listed as
- architect, engineer
- Firm
- Ia Interior Architects
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Mar 2023
98 permits since 2000 (architect on 94 permits, engineer on 4 permits): 67 completed, 25 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2023 | Completed final sign-off May 2023 | 135 Townsend St | Source Planning And Construction Inc | revision to pa 2022-0609-5947 added signage for phone booth & phone rooms on 2nd & 3rd floorsDetails
revision to pa 2022-0609-5947 added signage for phone booth & phone rooms on 2nd & 3rd floors | |
| Feb 22, 2023 | Completed final sign-off Mar 2023 | 50 Fremont St | Gci, Inc | 21/f: ti, install non-structural wood slat dividing patition, selet demo of accoustical ceiling tile for wood slat dividing partition, structural partition anchorage.Details
21/f: ti, install non-structural wood slat dividing patition, selet demo of accoustical ceiling tile for wood slat dividing partition, structural partition anchorage. | $120,000 |
| Jan 13, 2023 | Expired or cancelled suspend Sep 2025 | 50 California St | partial floor interior tenant office improvement to suite 2750 on 27th fl. scope of work includes slective demo, new partitions, doors, ceilings. mech, elec, plumbing design build under deferred or sep permit. no change of useDetails
partial floor interior tenant office improvement to suite 2750 on 27th fl. scope of work includes slective demo, new partitions, doors, ceilings. mech, elec, plumbing design build under deferred or sep permit. no change of use | $250,000 | |
| Dec 27, 2022 | Completed final sign-off Mar 2023 | 135 Townsend St | Source Planning And Construction Inc | 1st, 2nd, & 3rd floors: revision to pa#202206095947. revised door schedule, hardware, update notes to add glass baffle, updated operable partition bracing.Details
1st, 2nd, & 3rd floors: revision to pa#202206095947. revised door schedule, hardware, update notes to add glass baffle, updated operable partition bracing. | |
| Dec 23, 2022 | Completed final sign-off Oct 2024 | 222 02nd St | Aecore Inc. | 4, 5 , 6, 7, 8, 9, 10 and 11 flr- response to corrective dated 8/26/21 by inspector kucel phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobeDetails
4, 5 , 6, 7, 8, 9, 10 and 11 flr- response to corrective dated 8/26/21 by inspector kucel phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe | |
| Dec 14, 2022 | Completed final sign-off Apr 2025 | 1430 Taraval St | partial floor t.i. on 2nd floor. selective demo, new elevator and shaft, partitions ceiling, lighting, mechanical, electrical, and plumbing. structural work limited to 2nd floor elevator shaft and control room floor. equipment anchorage. phase 2 of pa 202211176713Details
partial floor t.i. on 2nd floor. selective demo, new elevator and shaft, partitions ceiling, lighting, mechanical, electrical, and plumbing. structural work limited to 2nd floor elevator shaft and control room floor. equipment anchorage. phase 2 of pa 202211176713 | $600,000 | |
| Dec 2, 2022 | Completed final sign-off May 2024 | 560 Mission St | barrier removal on (e) parking garage in basement level b1; scope of work is limited to 1 accessible evcs. no structural work, no change of use, occupancy or means of egress. fire alarm/sprinklers under separate permits, if applicable. tenant parking onlyDetails
barrier removal on (e) parking garage in basement level b1; scope of work is limited to 1 accessible evcs. no structural work, no change of use, occupancy or means of egress. fire alarm/sprinklers under separate permits, if applicable. tenant parking only | $5,000 | |
| Nov 30, 2022 | Completed final sign-off Dec 2022 | 555 Buckingham Wy | Dome Construction Corp | revision to permit 202107063809. restroom conversion to storage room #112, decreasing in cost.Details
revision to permit 202107063809. restroom conversion to storage room #112, decreasing in cost. | |
| Nov 17, 2022 | Completed final sign-off Apr 2025 | 1430 Taraval St | Hillhouse Construction Company Inc | demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.Details
demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit. | $625,000 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 333 Market St | 18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use.Details
18/f: partial tenant improvement. work includes selective demolition, doors, ceilings, finishes, mechanical and electrical. no change of use. | $100,000 | |
| Oct 19, 2022 | Completed final sign-off Nov 2022 | 560 Mission St | Novo Construction Inc | revision to pa 202010196859 to modify accessible restroom stall at mens and womens restroom. ref 202010196859.Details
revision to pa 202010196859 to modify accessible restroom stall at mens and womens restroom. ref 202010196859. | |
| Oct 6, 2022 | Never finaled filed Oct 2022, never issued | 420 Montgomery St | interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of useDetails
interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use | $3,120,000 | |
| Sep 26, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | 2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of useDetails
2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of use | $3,120,000 | |
| Sep 21, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | partial ti to 4th floor in a 12 story hi-rise building. scope pf work includes selective demolition , new partitions, doors, ceilings, mechanical, electrical and plumbing. also includes work cape classified as employee break room/pantry. there is no change of use. kitchenette for employee use.Details
partial ti to 4th floor in a 12 story hi-rise building. scope pf work includes selective demolition , new partitions, doors, ceilings, mechanical, electrical and plumbing. also includes work cape classified as employee break room/pantry. there is no change of use. kitchenette for employee use. | $3,120,000 | |
| Sep 8, 2022 | Completed final sign-off Apr 2023 | 1 Market St | Gci, Inc | suite 1225: t.i. on the 12/f to include selectrive demo and construction of non-structural partitoin, ceiling, finishes, mep, life safety under sep permit.Details
suite 1225: t.i. on the 12/f to include selectrive demo and construction of non-structural partitoin, ceiling, finishes, mep, life safety under sep permit. | $700,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes.Details
revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes. | $50,000 |
| Aug 15, 2022 | Completed final sign-off Apr 2023 | 1 Bush St | Principal Builders Inc. | 9/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantry and operable partition with associated structural support.Details
9/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantry and operable partition with associated structural support. | $2,400,000 |
| Aug 15, 2022 | Completed final sign-off Mar 2023 | 1 Bush St | Principal Builders Inc. | 10/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantryDetails
10/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantry | $2,200,000 |
| Jul 25, 2022 | Never finaled issued Jul 2022, no final | 555 Market St | Gci, Inc | floors 8 & 10: install new phone booths furniture pods & strucutural achorage to concrete floor slab.Details
floors 8 & 10: install new phone booths furniture pods & strucutural achorage to concrete floor slab. | $10,000 |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
23/f: revision to bpa#202205033426 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 101 02nd St | Clune Construction Company L P | 24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanicalDetails
24/f: revision to bpa#202205033424 to include selective demo, construction of an employee breakroom/pantry, casework, finishes, ceiling, lighting, electrical, & mechanical | |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 555 California St | Skyline Construction | fire evacuation signs. ref pa# 202107194659 (4th fl), 202109178673 (7th fl), 202106253245 (8th fl), 202106243139 (9th fl), 202107194625 (110th fl).Details
fire evacuation signs. ref pa# 202107194659 (4th fl), 202109178673 (7th fl), 202106253245 (8th fl), 202106243139 (9th fl), 202107194625 (110th fl). | $3,500 |
| Jun 30, 2022 | Completed final sign-off Aug 2022 | 560 Mission St | Novo Construction Inc | 10/f: revision to pa# 202010196859 & 202105261097. to update smoke control report and non-infrigement statements. provide new smoke detectors.Details
10/f: revision to pa# 202010196859 & 202105261097. to update smoke control report and non-infrigement statements. provide new smoke detectors. | |
| Jun 29, 2022 | Never finaled issued Jul 2022, no final | 555 Market St | Gci, Inc | revision to pa# 202202288830. adding phone booths with structural anchorage.Details
revision to pa# 202202288830. adding phone booths with structural anchorage. | $5,000 |
| Jun 14, 2022 | Completed final sign-off Sep 2022 | 1 Market St | Dpr Construction A | 9th fl steuart tower: tenant improvement for lease ready. include selective demolition, new finishes, new non-bearing partitions, ceilings, accessible restroom, drinking fountain upgrades and employee breakroom. no change of occupancy, no change of use.Details
9th fl steuart tower: tenant improvement for lease ready. include selective demolition, new finishes, new non-bearing partitions, ceilings, accessible restroom, drinking fountain upgrades and employee breakroom. no change of occupancy, no change of use. | $250,000 |
| Jun 9, 2022 | Completed final sign-off May 2023 | 135 Townsend St | Source Planning And Construction Inc | t.i on 1st, 2nd & 3rd flrs. demo & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 (n) stairs btwn 1st & erd flrs. (n) openings are bracing for operable partition.Details
t.i on 1st, 2nd & 3rd flrs. demo & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 (n) stairs btwn 1st & erd flrs. (n) openings are bracing for operable partition. | $4,126,428 |
| May 26, 2022 | Completed final sign-off Jan 2023 | 101 Green St | Sc Builders, Inc | (2nd, 3rd, mezz, & 4th fl) t.i. retrofit (e) tenant spaces by adding security doors to separate elevators from tenant spaces, card readers, electronic door hardware. hvac, electrical & fire life safety will be design build + submitted separately.Details
(2nd, 3rd, mezz, & 4th fl) t.i. retrofit (e) tenant spaces by adding security doors to separate elevators from tenant spaces, card readers, electronic door hardware. hvac, electrical & fire life safety will be design build + submitted separately. | $100,000 |
| May 10, 2022 | Never finaled issued May 2022, no final | 555 Market St | Gci, Inc | 5th & 7th floor: revision to 202112134273: locating and orienting phone booths to be in line of sight of extg fire alarm strobes. structural anchorage to the concrete floor slab. sprinkler under seperate permit.Details
5th & 7th floor: revision to 202112134273: locating and orienting phone booths to be in line of sight of extg fire alarm strobes. structural anchorage to the concrete floor slab. sprinkler under seperate permit. | $20,000 |
| May 9, 2022 | Never finaled issued Mar 2023, no final | 350 Mission St | Hathaway Dinwiddie Co. | disabled access compliance documentation per ab-056 for basement 4,3&1, floors 1,2,5-30 to include parking, building entrances, elevators, restrooms, drinking fountains, & signage. replace double door, locker room benches & coat hookDetails
disabled access compliance documentation per ab-056 for basement 4,3&1, floors 1,2,5-30 to include parking, building entrances, elevators, restrooms, drinking fountains, & signage. replace double door, locker room benches & coat hook | |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| May 3, 2022 | Completed final sign-off May 2023 | 101 02nd St | Clune Construction Company L P | 23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.Details
23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical. | $1,670,000 |
| Apr 26, 2022 | Completed final sign-off Jul 2022 | 88 Kearny St | Skyline Construction | 5th fl: minor architectural tenant improvement for single tenant. work includes adding & anchoring 4 furniture phone booths to the floor.Details
5th fl: minor architectural tenant improvement for single tenant. work includes adding & anchoring 4 furniture phone booths to the floor. | $30,000 |
| Apr 14, 2022 | Completed final sign-off Feb 2023 | 50 Fremont St | Gci, Inc | fire only permit to obtain assembly permit stamps req for yoga studio 1, yogo studio 2, training rm c04, training rm c05, social lounge s01. ref 201904107583Details
fire only permit to obtain assembly permit stamps req for yoga studio 1, yogo studio 2, training rm c04, training rm c05, social lounge s01. ref 201904107583 | |
| Apr 5, 2022 | Expired or cancelled cancelled Jan 2026 | 728 Pacific Av | suite 403: tenant improvement for (e) medical office.Details
suite 403: tenant improvement for (e) medical office. | $200,000 | |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 555 Market St | Gci, Inc | floors 8 and 10: demo of non structural partitions, light fixutres and ceiling tile. new security hallways with non structural partitions, doors, frames and lighting from elevator to exit stair, new gender neutral restrooms.Details
floors 8 and 10: demo of non structural partitions, light fixutres and ceiling tile. new security hallways with non structural partitions, doors, frames and lighting from elevator to exit stair, new gender neutral restrooms. | $800,000 |
| Feb 28, 2022 | Never finaled issued Mar 2022, no final | 555 Market St | Gci, Inc | 9th fl - ti demo of existing non structural partitions, light fixtures, ceiling tile & horizontal exit w/s doors; new 2 hour rated exit passageway to be provided to comply w/exit separation, new security hallwayDetails
9th fl - ti demo of existing non structural partitions, light fixtures, ceiling tile & horizontal exit w/s doors; new 2 hour rated exit passageway to be provided to comply w/exit separation, new security hallway | $900,000 |
| Feb 24, 2022 | Expired or cancelled withdrawn Nov 2024 | 333 Bush St | Skyline Construction | 22nd, 23rd,24th floors: structural bracing for phone booths. ref pa #201902203368Details
22nd, 23rd,24th floors: structural bracing for phone booths. ref pa #201902203368 | $22,000 |
| Feb 24, 2022 | Completed final sign-off Apr 2022 | 101 California St | Ayoob & Peery Plumbing Co Inc | 44/f: add 12 fire sprinklers, relocate 22 & change out 6 fire spirnkler heads per t.i. pa202112023570. job# 22-604Details
44/f: add 12 fire sprinklers, relocate 22 & change out 6 fire spirnkler heads per t.i. pa202112023570. job# 22-604 | $12,600 |
| Feb 9, 2022 | Never finaled issued Feb 2022, no final | 560 Mission St | Clune Construction Company L P | 23/f-revision to pa# 202105039686 & 202109299498. revision includes removal of door 0012b, adding door 0012a, updates to partition fire ratings per field verified existing conditions. scope to remove priviously approved door add 90 min door to mech roomDetails
23/f-revision to pa# 202105039686 & 202109299498. revision includes removal of door 0012b, adding door 0012a, updates to partition fire ratings per field verified existing conditions. scope to remove priviously approved door add 90 min door to mech room | |
| Jan 26, 2022 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | full floor interior tenant improvement in a single story building. scope includes demo, new partitions, ceiling, lighting, and finishes, mechanical, elec,plumbing *change of use to optometry officeDetails
full floor interior tenant improvement in a single story building. scope includes demo, new partitions, ceiling, lighting, and finishes, mechanical, elec,plumbing *change of use to optometry office | $188,000 |
| Jan 25, 2022 | Never finaled issued Jan 2022, no final | 555 Market St | Gci, Inc | 5/f: rev to pa202112134273: add a secure hallway on 5/f. new partitions & door with panic hardware, new wall & floor finishe & lighting. mep deferred.Details
5/f: rev to pa202112134273: add a secure hallway on 5/f. new partitions & door with panic hardware, new wall & floor finishe & lighting. mep deferred. | |
| Jan 11, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Truebeck Construction | floors 20-24: demo of (e) walls, celiings and mep elements for future t.i. ab-017 compliances. maher n/a. ref#2022 0211 7809Details
floors 20-24: demo of (e) walls, celiings and mep elements for future t.i. ab-017 compliances. maher n/a. ref#2022 0211 7809 | $150,000 |
| Jan 7, 2022 | Completed final sign-off Apr 2022 | 45 Fremont St | Truebeck Construction | 19th fl - demo of existing walls, ceilings and mep elements from the 19th fl for future ab-017 sprinkler permit 2022 0218 8273Details
19th fl - demo of existing walls, ceilings and mep elements from the 19th fl for future ab-017 sprinkler permit 2022 0218 8273 | $35,000 |
| Dec 15, 2021 | Completed final sign-off Nov 2022 | 1798 19th Av | Transworld Construction | 1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill.Details
1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill. | $256,800 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 555 Market St | Gci, Inc | 5th and 7th floor t.i. : new partitions and doors for security vestibule with delayed egress hardware. new wall and base finishes.Details
5th and 7th floor t.i. : new partitions and doors for security vestibule with delayed egress hardware. new wall and base finishes. | $100,000 |
| Dec 2, 2021 | Never finaled issued Dec 2021, no final | 101 California St | Bcci Construction Company | 44th flr - bxc/dci suite - new partitions, ceilings, lighting, finishes, electrical and mechanical for a partial flr t.i. structural limited to headers, framing and monitor walls. fire alarm/sprinkler deferred.Details
44th flr - bxc/dci suite - new partitions, ceilings, lighting, finishes, electrical and mechanical for a partial flr t.i. structural limited to headers, framing and monitor walls. fire alarm/sprinkler deferred. | $95,000 |
| Nov 19, 2021 | Never finaled issued Nov 2021, no final | 555 Market St | Gci, Inc | 6th fl - new beverage bar w/millwork countertops over existing millwork base; decorative furring wall w/window shelving, new light fixtures & sing w/drain at lounge area. wall & floor base finish upgradeDetails
6th fl - new beverage bar w/millwork countertops over existing millwork base; decorative furring wall w/window shelving, new light fixtures & sing w/drain at lounge area. wall & floor base finish upgrade | $120,000 |
| Oct 28, 2021 | Expired or cancelled cancelled Jan 2026 | 555 California St | Skyline Construction | 9th fl: revision to approved pa# 202106243139. scope of work to include reconfiguration of operations room, and coordination of power.data locations with furniture.Details
9th fl: revision to approved pa# 202106243139. scope of work to include reconfiguration of operations room, and coordination of power.data locations with furniture. | |
| Oct 20, 2021 | Completed final sign-off Apr 2022 | 275 Brannan St | Sc Builders, Inc | 2nd fl - partial floor ti/single tenant: revised focus room, modification to (e) employee cafeteria w/limited prep. revised furniture layout. paint & carpet refresh and lighting upgrade in office areaDetails
2nd fl - partial floor ti/single tenant: revised focus room, modification to (e) employee cafeteria w/limited prep. revised furniture layout. paint & carpet refresh and lighting upgrade in office area | $276,500 |
| Oct 18, 2021 | Completed final sign-off Jun 2024 | 2574 San Bruno Av | Transworld Construction | tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520.Details
tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520. | $150,000 |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 560 Mission St | Turner Construction Co | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.Details
ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Sep 17, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a.Details
7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a. | $3,008,592 |
| Aug 5, 2021 | Completed final sign-off Jan 2022 | 188 Spear St | Skyline Construction | 7th flr: addition of a glazed addition barrier with frosted film along the (e) hallway to serve as a visual barrier to open space 07.940.Details
7th flr: addition of a glazed addition barrier with frosted film along the (e) hallway to serve as a visual barrier to open space 07.940. | $22,000 |
| Jul 19, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 4th floor: full floor single tenant improvement. including new partitions, lighting and millwork. no structural work and no change of use. deffered mep work.Details
4th floor: full floor single tenant improvement. including new partitions, lighting and millwork. no structural work and no change of use. deffered mep work. | $3,008,592 |
| Jul 7, 2021 | Completed final sign-off Sep 2021 | 555 Buckingham Wy | Dome Construction Corp | soft demo of partitions ceiling for ti work under pa# 202107063809. per ab-017.Details
soft demo of partitions ceiling for ti work under pa# 202107063809. per ab-017. | $48,000 |
| Jul 6, 2021 | Completed final sign-off Dec 2022 | 555 Buckingham Wy | Dome Construction Corp | full floor ti - new partitions, ceiling, lighting, mep new finishes and break roomDetails
full floor ti - new partitions, ceiling, lighting, mep new finishes and break room | $935,287 |
| Jul 1, 2021 | Completed final sign-off Dec 2022 | 555 California St | Skyline Construction | 9/f: mechanical,electrical & plumbing system for 9/f. ref t.i. pa 202106243139. maher n/a. fire sprinkler under separate permitDetails
9/f: mechanical,electrical & plumbing system for 9/f. ref t.i. pa 202106243139. maher n/a. fire sprinkler under separate permit | |
| Jun 25, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep.Details
8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep. | $2,793,670 |
| Jun 24, 2021 | Completed final sign-off Dec 2022 | 555 California St | Skyline Construction | 9/f: full floor single t.i. inlcuding new partitions, lighting and millwork,. no structural work and no change of use. deffered mep work.Details
9/f: full floor single t.i. inlcuding new partitions, lighting and millwork,. no structural work and no change of use. deffered mep work. | $2,793,670 |
| May 7, 2021 | Completed final sign-off Aug 2021 | 1355 Market St | Hathaway Dinwiddie Co. | 9th and 10th flrs: revision to pa 202012100770. replacement of light fixtures above the stair, removing (e) light fixures from (e) cove soffit, removing (e) stretch fabric at the ceiling and exposing the (e) gyp bd ceiling above the stair.Details
9th and 10th flrs: revision to pa 202012100770. replacement of light fixtures above the stair, removing (e) light fixures from (e) cove soffit, removing (e) stretch fabric at the ceiling and exposing the (e) gyp bd ceiling above the stair. | |
| May 3, 2021 | Never finaled issued Aug 2021, no final | 560 Mission St | Clune Construction Company L P | t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep.Details
t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep. | $2,345,801 |
| Apr 23, 2021 | Completed final sign-off Oct 2021 | 222 02nd St | M C S Construction Services | floors 19-26 - retrofitting (e) at fire fighter vesibule with new car readers and corresponding door hardwareDetails
floors 19-26 - retrofitting (e) at fire fighter vesibule with new car readers and corresponding door hardware | $25,000 |
| Mar 24, 2021 | Completed final sign-off Mar 2022 | 188 Spear St | Skyline Construction | revision to pa# 202009194548. to demo & relocate pendants, extend partition, revise soffit alignment at 6th fl. added scope at 4th & 8th floor. m.e.p. under separate permit.Details
revision to pa# 202009194548. to demo & relocate pendants, extend partition, revise soffit alignment at 6th fl. added scope at 4th & 8th floor. m.e.p. under separate permit. | $20,000 |
| Feb 22, 2021 | Completed final sign-off Aug 2021 | 1 Market St | Gci, Inc | 16th fl: revision to pa# 202009234805 to convert storage room to 2 private offices.Details
16th fl: revision to pa# 202009234805 to convert storage room to 2 private offices. | |
| Dec 29, 2020 | Never finaled issued Jul 2021, no final | 555 California St | Skyline Construction | 8/f & 9/f: full floor tenant demo of floors 8 & 9 exluding the core. no structural elements shall be modified or altered. to comply with ab-017, maher n/a.Details
8/f & 9/f: full floor tenant demo of floors 8 & 9 exluding the core. no structural elements shall be modified or altered. to comply with ab-017, maher n/a. | $415,845 |
| Dec 10, 2020 | Completed final sign-off Aug 2021 | 1355 Market St | Hathaway Dinwiddie Construct Co | interior ti to existing convenience stair connecting floors 9 & 10. work includes demo of existing stair, new stair, structural design, stair finishes, & bench below stair. no change in use, occupancy, or egress. no change to floor area. stair is not an egress stair.Details
interior ti to existing convenience stair connecting floors 9 & 10. work includes demo of existing stair, new stair, structural design, stair finishes, & bench below stair. no change in use, occupancy, or egress. no change to floor area. stair is not an egress stair. | $594,000 |
| Nov 9, 2020 | Completed final sign-off Aug 2021 | 50 Fremont St | Gci, Inc | basement: rev to pa201906052540: updated single line diagram, modified capacity rating for panels hg, lg and transformer tg. updated hg & lg panelboard schedul to reflect capcity rating. maher n/a.Details
basement: rev to pa201906052540: updated single line diagram, modified capacity rating for panels hg, lg and transformer tg. updated hg & lg panelboard schedul to reflect capcity rating. maher n/a. | |
| Nov 6, 2020 | Completed final sign-off Mar 2021 | 50 Fremont St | Gci, Inc | floors: bsmt, 5-10, 11, 12, 15-17, 19-21, 25-26, 28-29, 30-37, 40, 42. barrier removal to install power actuated door openers and associated push plates in elevator lobby, gender neutral mens and womens in a single tenant floor.Details
floors: bsmt, 5-10, 11, 12, 15-17, 19-21, 25-26, 28-29, 30-37, 40, 42. barrier removal to install power actuated door openers and associated push plates in elevator lobby, gender neutral mens and womens in a single tenant floor. | $732,940 |
| Oct 30, 2020 | Completed final sign-off Feb 2021 | 50 Fremont St | Gci, Inc | 3/f, 4/f: revision to pa # 201906052553 to extend the bottom guardrail 11" (3/f) at the interconnection stair to terminate closer to the (e) handrail.Details
3/f, 4/f: revision to pa # 201906052553 to extend the bottom guardrail 11" (3/f) at the interconnection stair to terminate closer to the (e) handrail. | |
| Oct 29, 2020 | Completed final sign-off Mar 2021 | 50 Fremont St | Gci, Inc | basement: rev to pa201906052540-remove demo of storage, ser, tenant mailroom, reception desk and turnstiles from scope of work. revise egress route due to change in demo scope. celing and in lobby to remain, tile to be replaced. maher n/aDetails
basement: rev to pa201906052540-remove demo of storage, ser, tenant mailroom, reception desk and turnstiles from scope of work. revise egress route due to change in demo scope. celing and in lobby to remain, tile to be replaced. maher n/a | |
| Oct 19, 2020 | Completed final sign-off Nov 2022 | 560 Mission St | Novo Construction Inc | 10/f: t.i. to demise floor for sublease. selective demo, new partitions, ceiling and finishes. mep included. maher n/aDetails
10/f: t.i. to demise floor for sublease. selective demo, new partitions, ceiling and finishes. mep included. maher n/a | $420,000 |
| Sep 28, 2020 | Never finaled issued Mar 2021, no final | 188 Spear St | Skyline Construction | 7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations.Details
7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations. | |
| Sep 24, 2020 | Completed final sign-off Apr 2021 | 333 Market St | Gci, Inc | 5/f:t.i. to entire floor exceptiong of (e) server room in suite 505 and (e) building infrastruture spaces. new partitions, doors, ceilings, electrical, mechanical, plumbing, interior finishes and employee breakroom & pantry. maher n/a.Details
5/f:t.i. to entire floor exceptiong of (e) server room in suite 505 and (e) building infrastruture spaces. new partitions, doors, ceilings, electrical, mechanical, plumbing, interior finishes and employee breakroom & pantry. maher n/a. | $3,177,498 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 1 Market St | Gci, Inc | partial floor tenant improvement on the 16/f to include restroom finish and fixture replacement. new gender neutral restroom. conversion of storage room to conference room and reconfigure existing file room to storage. 16/fDetails
partial floor tenant improvement on the 16/f to include restroom finish and fixture replacement. new gender neutral restroom. conversion of storage room to conference room and reconfigure existing file room to storage. 16/f | $500,000 |
| Sep 19, 2020 | Completed final sign-off Mar 2022 | 188 Spear St | Skyline Construction | partial ti to floors 2, 3, 5, & 6, to include selective demo, new partitions, ceiling modifications, lighting replacement & finishes. mep under separate permit.Details
partial ti to floors 2, 3, 5, & 6, to include selective demo, new partitions, ceiling modifications, lighting replacement & finishes. mep under separate permit. | $500,000 |
| Sep 14, 2020 | Completed final sign-off Jan 2022 | 690 Folsom St | Teamwrkx Construction Inc | 2nd fl full floor tenant improvement of 2-story bldg. new interior partitions, ceilings, finishes, electrical, mechanical, plumbing, lighting, millwork, new evac system & life safety. no change of use. structural scope limited to overhead support for operable partitions.Details
2nd fl full floor tenant improvement of 2-story bldg. new interior partitions, ceilings, finishes, electrical, mechanical, plumbing, lighting, millwork, new evac system & life safety. no change of use. structural scope limited to overhead support for operable partitions. | $2,600,000 |
| Aug 28, 2020 | Completed final sign-off Feb 2021 | 222 02nd St | M C S Construction Services | floor #2: retrofitting existing doors at fire fighter vestibule & water heater room with card readers & corresponding hardware. floors #3 - #18: retrofitting existing doors at fire fighter vestibule with new card reader & corresponding hardware. maher n/a.Details
floor #2: retrofitting existing doors at fire fighter vestibule & water heater room with card readers & corresponding hardware. floors #3 - #18: retrofitting existing doors at fire fighter vestibule with new card reader & corresponding hardware. maher n/a. | $25,000 |
| Aug 28, 2020 | Completed final sign-off Feb 2023 | 222 02nd St | Dome Construction Corp | floor #26: partial ti with new lighting, electrical, painting, & structural support for owner provided artwork. no new partitions or mech/plumbing scope. structural scope limited to support of artwork.Details
floor #26: partial ti with new lighting, electrical, painting, & structural support for owner provided artwork. no new partitions or mech/plumbing scope. structural scope limited to support of artwork. | $120,000 |
| Jul 16, 2020 | Completed final sign-off Mar 2021 | 222 02nd St | Dome Construction Corp | floors 2-26: retrofitting (3) existing stairs & vestibule doors per floor with new vision panel. maher n/a.Details
floors 2-26: retrofitting (3) existing stairs & vestibule doors per floor with new vision panel. maher n/a. | $219,000 |
| Jul 6, 2020 | Completed final sign-off Feb 2021 | 50 Fremont St | Gci, Inc | 3/f: revision to pa# 201904107583 to revise layout at the tech force area. reduced storage area and increase size of tech force lab. revision include additional power/data locations and revisions to furniture and ceiling layout.Details
3/f: revision to pa# 201904107583 to revise layout at the tech force area. reduced storage area and increase size of tech force lab. revision include additional power/data locations and revisions to furniture and ceiling layout. | |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 350 Mission St | Gci, Inc | 6th fl: minor interior construction in single floor tenant, splitting (e) mailroom into mailroom and design studio. scope of work includes selective demo, new partitions, millwork, overhead ceiling, door & finishes. mep under separate permit. maher naDetails
6th fl: minor interior construction in single floor tenant, splitting (e) mailroom into mailroom and design studio. scope of work includes selective demo, new partitions, millwork, overhead ceiling, door & finishes. mep under separate permit. maher na | $350,000 |
| Jun 4, 2020 | Never finaled filed Jun 2020, never issued | 222 02nd St | 18/f:partial tenant improvement including new partitions, ceilings, finishes, millwork, furniture, lighting, mechanical, electrical, plumbing including new catering support room with limited food prep. no structural scope of workDetails
18/f:partial tenant improvement including new partitions, ceilings, finishes, millwork, furniture, lighting, mechanical, electrical, plumbing including new catering support room with limited food prep. no structural scope of work | $1,500,000 | |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 3 Embarcadero Center | Skyline Construction | 14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishesDetails
14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes | $500,000 |
| Dec 19, 2019 | Completed final sign-off Aug 2020 | 1 Market St | Dpr Construction Inc | steaurt tower: partial t.i. to 7th floor: office suite, 10,379 sq. ft. includes, open office, breakroom (for employee use only) and conference rooms.Details
steaurt tower: partial t.i. to 7th floor: office suite, 10,379 sq. ft. includes, open office, breakroom (for employee use only) and conference rooms. | $1,750,000 |
| Dec 12, 2019 | Never finaled issued Sep 2020, no final | 1250 Tennessee St | partial exterior improvements consisting of new storefront at extg openings. new openings and accessible access ramp.Details
partial exterior improvements consisting of new storefront at extg openings. new openings and accessible access ramp. | $50,000 | |
| Dec 12, 2019 | Never finaled issued Oct 2020, no final | 1250 Tennessee St | Dpr Construction | t.i. to a part of the ground floor of a multi-tenant bldg. improvements include (n) partitions, ceilings, lighting and finishes. no change of use.Details
t.i. to a part of the ground floor of a multi-tenant bldg. improvements include (n) partitions, ceilings, lighting and finishes. no change of use. | $2,100,000 |
| Dec 3, 2019 | Completed final sign-off May 2020 | 100 Pine St | Team Commercial Construction Inc. | ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not reqDetails
ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not req | $646,014 |
| Nov 7, 2019 | Completed final sign-off Feb 2021 | 222 02nd St | Dome Construction Corp | 24/f: partial t.i. for new video production studio; new raised floor system, partitions, ceiling lighting, finishes, plumbing & mecahnical; structural includes lighting grid support, floor system & accoustical glazingDetails
24/f: partial t.i. for new video production studio; new raised floor system, partitions, ceiling lighting, finishes, plumbing & mecahnical; structural includes lighting grid support, floor system & accoustical glazing | $1,500,000 |
| Oct 23, 2019 | Expired or cancelled cancelled Jan 2026 | 560 Mission St | interior demo of non-structural partitions, ceilings, light fixtures, & finishes, selective mep. per ab-017. no plumbing fixtures being removedDetails
interior demo of non-structural partitions, ceilings, light fixtures, & finishes, selective mep. per ab-017. no plumbing fixtures being removed | $10,000 | |
| Sep 25, 2019 | Completed final sign-off Feb 2020 | 560 Mission St | Hitt Contracting Inc. | ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maherDetails
ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maher | $94,500 |
| Aug 22, 2019 | Completed final sign-off Aug 2021 | 50 Fremont St | Gci, Inc | basement garage fl: partial fl renov, incl selective demo; construction of partitions; caged storage; minor mech & elect work; structural calcs on bike racks, ramp curb & curb handrail; civic parking reconfiguration & parking stripingDetails
basement garage fl: partial fl renov, incl selective demo; construction of partitions; caged storage; minor mech & elect work; structural calcs on bike racks, ramp curb & curb handrail; civic parking reconfiguration & parking striping | $1,000,000 |
| Jun 26, 2019 | Never finaled issued Jul 2019, no final | 222 02nd St | Dome Construction Corp | 24th flr. partial floor t.i w/ (n) partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks.Details
24th flr. partial floor t.i w/ (n) partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks. | $1,500,000 |
| Jun 26, 2019 | Completed final sign-off Feb 2023 | 222 02nd St | Dome Construction Corp | 26th flr. partial floor t.i w/ (n) partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks.Details
26th flr. partial floor t.i w/ (n) partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks. | $1,500,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2021 | 50 Fremont St | Gci, Inc | revision to pa 201902203351 to revise support for the interconnecting stair between 3rd & 4th flr to be suspended from the 4th floor opening.Details
revision to pa 201902203351 to revise support for the interconnecting stair between 3rd & 4th flr to be suspended from the 4th floor opening. | |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher naDetails
23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher na | $1,500,000 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso)Details
25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso) | $1,500,000 |
| Mar 27, 2019 | Never finaled issued Jun 2019, no final | 222 02nd St | Novo Construction Inc | 3rd fl - partial demo of (e) plumbing, case and rated soffit of (e) single tenant bldg to provide new elevator stop (deferreed submittal). new furring partitions and soffit to finish new opening. (e) plumbing lines and other infrastructure located inside (e) chase to be reworkedDetails
3rd fl - partial demo of (e) plumbing, case and rated soffit of (e) single tenant bldg to provide new elevator stop (deferreed submittal). new furring partitions and soffit to finish new opening. (e) plumbing lines and other infrastructure located inside (e) chase to be reworked | $50,000 |
| Aug 14, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | Hathaway Dinwiddie Co. | 11th floor single tenant improvement to entire floor. work includes new access flooring, partitions, mep finishes, social gathering area w/pantry. work also includes modificaton to bike storage room p3. n/a maherDetails
11th floor single tenant improvement to entire floor. work includes new access flooring, partitions, mep finishes, social gathering area w/pantry. work also includes modificaton to bike storage room p3. n/a maher | $2,306,400 |