Aecore Inc.
- Based in
- San Jose
- On San Francisco permits
- Aug 2018 to Sep 2026
- Last 24 months
- 11 permits filed
35 permits since 2000: 21 completed, 10 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 808 Brannan St | revision to pa #202608146603(original permits to pa #202605292119). ground floor break room, restrooms and some partitions reverted to existing conditions. basement program revised to family room and gym. no mepDetails
revision to pa #202608146603(original permits to pa #202605292119). ground floor break room, restrooms and some partitions reverted to existing conditions. basement program revised to family room and gym. no mep | |
| Sep 10, 2026 | In progress issued Sep 2026 | 572 07th St | revision to pa #202608146609(original permits to pa #202605292118). ground floor break room, restrooms and some partitions reverted to existing conditions. basement program revised to family room and gym. no mepDetails
revision to pa #202608146609(original permits to pa #202605292118). ground floor break room, restrooms and some partitions reverted to existing conditions. basement program revised to family room and gym. no mep | |
| Aug 14, 2026 | In progress issued Sep 2026 | 808 Brannan St | revision to pa #202605292119. new ground floor robotics testing lab layouts. new ground floor 8'-0" high partitions with structural steel posts. new ground floor 8'-0" high partitions with diagonal kickers.Details
revision to pa #202605292119. new ground floor robotics testing lab layouts. new ground floor 8'-0" high partitions with structural steel posts. new ground floor 8'-0" high partitions with diagonal kickers. | $7,500 |
| Aug 14, 2026 | In progress issued Sep 2026 | 572 07th St | revision to pa #202605292118. new ground floor robotics testing lab layouts. new ground floor 8'-0" high partitions with structural steel posts. new ground floor 8'-0" high partitions with diagonal kickers.Details
revision to pa #202605292118. new ground floor robotics testing lab layouts. new ground floor 8'-0" high partitions with structural steel posts. new ground floor 8'-0" high partitions with diagonal kickers. | $7,500 |
| May 29, 2026 | In progress issued Jun 2026 | 572 07th St | t.i. of an (e) office space. new millwork and office partitions. remodel of (e) restrooms. no exterior work. no work to egreess components. mep and fire sprinkler are deferred permit.Details
t.i. of an (e) office space. new millwork and office partitions. remodel of (e) restrooms. no exterior work. no work to egreess components. mep and fire sprinkler are deferred permit. | $20,000 |
| May 29, 2026 | In progress issued Jun 2026 | 808 Brannan St | t.i. of an (e) office space. new millwork and office partitions. remodel of (e) restrooms. no exterior work. no work to egreess components. this permit is addressing violation#: 202656822 ( inetrior only ). mep and fire sprinkler are deferred permit. ecterior work voilation under seperate permitDetails
t.i. of an (e) office space. new millwork and office partitions. remodel of (e) restrooms. no exterior work. no work to egreess components. this permit is addressing violation#: 202656822 ( inetrior only ). mep and fire sprinkler are deferred permit. ecterior work voilation under seperate permit | $55,000 |
| May 1, 2026 | In progress issued May 2026 | 572 07th St | demolition of interior non-structural partitions and finishes, lighting,millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits.Details
demolition of interior non-structural partitions and finishes, lighting,millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits. | $75,000 |
| May 1, 2026 | In progress issued May 2026 | 808 Brannan St | demolition of interior non-structural partitions and finishes, lighting,millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits.Details
demolition of interior non-structural partitions and finishes, lighting,millwork, and equipment in preparation for forthcoming tenant improvement project. mep's/ fs are desing build and under separate permits. | $75,000 |
| Apr 9, 2026 | In progress issued May 2026 | 821 Sansome St | 1/fl- replace front doors, add 3 enclosed offices, revise bathrooms and add showerDetails
1/fl- replace front doors, add 3 enclosed offices, revise bathrooms and add shower | $50,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 2550 Mission St | revision to 202509266248 with electrical changes to sheets e2.1, e2.2, e3.1 for new powered reclindersDetails
revision to 202509266248 with electrical changes to sheets e2.1, e2.2, e3.1 for new powered reclinders | |
| Sep 26, 2025 | Completed final sign-off Apr 2026 | 2550 Mission St | theater 1-5: replace (e) theater seats w/ new powered recliner theater seats, replace finishes as shown on a4.1 & a4.2. update electrical & ventilation for new seat layout.Details
theater 1-5: replace (e) theater seats w/ new powered recliner theater seats, replace finishes as shown on a4.1 & a4.2. update electrical & ventilation for new seat layout. | $50,000 |
| Jan 8, 2024 | Completed final sign-off Mar 2024 | 222 02nd St | 4th fl - ref pa 2023-1122-1285. revision to pa 2023-1130-1637 new ductwork to serve renovated office space. ref pa 2024-0108-3556Details
4th fl - ref pa 2023-1122-1285. revision to pa 2023-1130-1637 new ductwork to serve renovated office space. ref pa 2024-0108-3556 | $7,776 |
| Jan 8, 2024 | Completed final sign-off Mar 2024 | 222 02nd St | revision to pa 2023-1122-1285 - additional scope includes converting (2) existing rooms into conference rooms on 4th * 5th flDetails
revision to pa 2023-1122-1285 - additional scope includes converting (2) existing rooms into conference rooms on 4th * 5th fl | $46,008 |
| Dec 18, 2023 | Completed final sign-off Oct 2024 | 222 02nd St | revision to 20212239060. response to corrective dated 8/26/2021 by inspector kucel. phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe. permit revision on locations. add more phone booths on floor 4, 5, 8, 9 & 10 only.Details
revision to 20212239060. response to corrective dated 8/26/2021 by inspector kucel. phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe. permit revision on locations. add more phone booths on floor 4, 5, 8, 9 & 10 only. | |
| Nov 30, 2023 | Completed final sign-off Mar 2024 | 222 02nd St | floors# 4, 5, 9: executive office refresh. relocating and replacing liner slot diffuser. deferred mechanical submittal. reference permit# 202311221285.Details
floors# 4, 5, 9: executive office refresh. relocating and replacing liner slot diffuser. deferred mechanical submittal. reference permit# 202311221285. | $26,400 |
| Nov 22, 2023 | Completed final sign-off Mar 2024 | 222 02nd St | 4th, 5th and 9th - minor ti demo non load bearing partitions to combine (e) 2 rooms in (1) room at (4) locations. construction of new finishes. mechanical & electrical for (5) total rooms under separate permit.Details
4th, 5th and 9th - minor ti demo non load bearing partitions to combine (e) 2 rooms in (1) room at (4) locations. construction of new finishes. mechanical & electrical for (5) total rooms under separate permit. | $156,200 |
| May 9, 2023 | Never finaled issued Jul 2023, no final | 222 02nd St | 2-22/f: new card reader at stairwellDetails
2-22/f: new card reader at stairwell | $50,000 |
| Dec 23, 2022 | Completed final sign-off Oct 2024 | 222 02nd St | 4, 5 , 6, 7, 8, 9, 10 and 11 flr- response to corrective dated 8/26/21 by inspector kucel phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobeDetails
4, 5 , 6, 7, 8, 9, 10 and 11 flr- response to corrective dated 8/26/21 by inspector kucel phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe | |
| Dec 13, 2021 | Completed final sign-off May 2022 | 444 Bush St | renovation of a portion of the existing lobby. work to include the installation of new decorative columns, decorative sculptures, electrical work, new wall finished and new ceiling finishesDetails
renovation of a portion of the existing lobby. work to include the installation of new decorative columns, decorative sculptures, electrical work, new wall finished and new ceiling finishes | $300,000 |
| Jan 28, 2021 | Completed final sign-off Aug 2021 | 1209 Cole St | bath and kitchen remodel, demo of single interior wall and construction of two interior walls, two new doors, new finishes, plumbing fixtures, equipment throughoutDetails
bath and kitchen remodel, demo of single interior wall and construction of two interior walls, two new doors, new finishes, plumbing fixtures, equipment throughout | $25,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2022 | 235 Faxon Av | bathroom remodel. no demo. non fixtures replaced in same location. finishes replaced.Details
bathroom remodel. no demo. non fixtures replaced in same location. finishes replaced. | $14,000 |
| Dec 1, 2020 | Completed final sign-off Sep 2021 | 3620 Webster St | small kitchen remodel 200 sq ft. demolish one non-load bearing partition. replace interior finishes & plumbing fixtures.Details
small kitchen remodel 200 sq ft. demolish one non-load bearing partition. replace interior finishes & plumbing fixtures. | $60,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 505 Howard St | 4th fl - demo only - a wall and door. maher naDetails
4th fl - demo only - a wall and door. maher na | $10,000 |
| Nov 19, 2019 | Completed final sign-off Nov 2020 | 818 Mission St | revision to pa #201907115620. sheet a-9.0 revised with the following scope - change doors e211, e218, e410, e416, 500a, and 500b from hw set #4 to hw set #6.Details
revision to pa #201907115620. sheet a-9.0 revised with the following scope - change doors e211, e218, e410, e416, 500a, and 500b from hw set #4 to hw set #6. | |
| Nov 12, 2019 | Completed final sign-off Feb 2021 | 333 Broadway | 2nd fl - interior ti to office space. new partitions and restroom. mep under separate permitDetails
2nd fl - interior ti to office space. new partitions and restroom. mep under separate permit | $404,300 |
| Nov 12, 2019 | Completed final sign-off Feb 2021 | 333 Broadway | basement & 1st fl - interiore ti to office space. new partitions and restrooms. mep under separate permitDetails
basement & 1st fl - interiore ti to office space. new partitions and restrooms. mep under separate permit | $904,507 |
| Nov 6, 2019 | Completed final sign-off Feb 2020 | 570 Pacific Av | 2nd fl: t.i. selective demo of partitions etc, (n) interior partitions doors and glazing, mep, and fire protection under separate permitDetails
2nd fl: t.i. selective demo of partitions etc, (n) interior partitions doors and glazing, mep, and fire protection under separate permit | $331,100 |
| Sep 12, 2019 | Completed final sign-off Nov 2020 | 818 Mission St | revision to 201907115620 - accessibility upgrades misc work at vestibule on fls 2,4,5. bld entrance and adjacent sidewalk upgradedDetails
revision to 201907115620 - accessibility upgrades misc work at vestibule on fls 2,4,5. bld entrance and adjacent sidewalk upgraded | $25,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 660 Market St | demo of non structural wall, new construction consists of non-structural wall, new millwork, and replacing light fixtures, no structural work included, no increase in area, no change in occupancy or use life safety,& sprinkler to be design build mep & life safety under sep permitDetails
demo of non structural wall, new construction consists of non-structural wall, new millwork, and replacing light fixtures, no structural work included, no increase in area, no change in occupancy or use life safety,& sprinkler to be design build mep & life safety under sep permit | $155,960 |
| Jul 11, 2019 | Completed final sign-off Nov 2020 | 818 Mission St | demo of non-structural walls, construct (n) non-structural wall, new millwork and replacing light fixture. no structural and mep work to be incl in scope. mep under separate permit.Details
demo of non-structural walls, construct (n) non-structural wall, new millwork and replacing light fixture. no structural and mep work to be incl in scope. mep under separate permit. | $142,796 |
| May 23, 2019 | Completed final sign-off Jul 2019 | 400 Sutter St | demolition of fixtures, carpet, electrical, plumbing, and drywall and framing. ti under separate permit. ab-017 applies.Details
demolition of fixtures, carpet, electrical, plumbing, and drywall and framing. ti under separate permit. ab-017 applies. | $4,751 |
| Dec 6, 2018 | Never finaled issued Dec 2018, no final | 180 Sutter St | demo low side ductwork in basement storage area. install new low side ductwork to supply basement storage area ref 201808137214Details
demo low side ductwork in basement storage area. install new low side ductwork to supply basement storage area ref 201808137214 | $15,000 |
| Oct 23, 2018 | Never finaled issued Nov 2018, no final | 814 Mission St | 4th flr - demo under sep permit. new construction is non structural walls, new millwork, replaceing light fixtures. mep/fire/life safety under sep permitDetails
4th flr - demo under sep permit. new construction is non structural walls, new millwork, replaceing light fixtures. mep/fire/life safety under sep permit | $200,000 |
| Oct 11, 2018 | Never finaled issued Oct 2018, no final | 814 Mission St | 4th flr demo of (e) non structural walls and finishesDetails
4th flr demo of (e) non structural walls and finishes | $25,000 |
| Aug 13, 2018 | Completed final sign-off Feb 2019 | 180 Sutter St | (n) partitions and (n) doors in (e) storage rooms on basement level. no change in occupant load to (e) basement spacesDetails
(n) partitions and (n) doors in (e) storage rooms on basement level. no change in occupant load to (e) basement spaces | $6,500 |