Christian Dauer
- Listed as
- architect, authorized agent-others
- Firm
- Chr Dauer Architect
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Jul 2026
79 permits since 2000 (architect on 79 permits, authorized agent-others on 1 permit): 60 completed, 5 in progress, 9 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Sep 2026 | 535 Florida St | Northern Sun Associates | ti improvement of (e) food service facility. new partitions, new millwork, new equipment, new bar. no change of use. no structural work.Details
ti improvement of (e) food service facility. new partitions, new millwork, new equipment, new bar. no change of use. no structural work. | $235,000 |
| May 12, 2026 | In progress issued Jul 2026 | 3632 18th St | interior remodel at 1st floor storage. new install of bathroom fixtures and finishes. new install of 2nd kitchen fixtures and appliances 2 burner cooktop, no oven). and cabinetry.Details
interior remodel at 1st floor storage. new install of bathroom fixtures and finishes. new install of 2nd kitchen fixtures and appliances 2 burner cooktop, no oven). and cabinetry. | $140,326 | |
| Apr 20, 2026 | In progress issued May 2026 | 136 Evelyn Wy | Saturn Construction Co | exterior remodel: remove/replace stucco siding @ w+s facades. remove select windows & doors from e,w,+s facades. replace w/ new fiber glass clad wood windows + doors. new rear patio + steps. no work @ n (front) facade. interior remodel: 1st floor: remodel/excavate for new 8'-0" ceiling height/replacDetails
exterior remodel: remove/replace stucco siding @ w+s facades. remove select windows & doors from e,w,+s facades. replace w/ new fiber glass clad wood windows + doors. new rear patio + steps. no work @ n (front) facade. interior remodel: 1st floor: remodel/excavate for new 8'-0" ceiling height/replac | $639,778 |
| Jan 9, 2026 | In progress issued Jan 2026 | 145 Ulloa St | Saturn Construction Co | interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath,Details
interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath, | $425,000 |
| May 21, 2025 | Completed final sign-off Sep 2025 | 55 Ulloa St | Saturn Construction Co | new wood fence at rear yard and partial side yard (80 lineal feet) not visible from public right of wayDetails
new wood fence at rear yard and partial side yard (80 lineal feet) not visible from public right of way | $3,920 |
| May 20, 2025 | Completed final sign-off Aug 2025 | 514 Vallejo St | Slick Construction | 2/f: interior remodel of (e) kitchen, dining room, and bath. add w.c. total of new plumbing fixtures - 2 (wc sink, kitchen dishwasher)Details
2/f: interior remodel of (e) kitchen, dining room, and bath. add w.c. total of new plumbing fixtures - 2 (wc sink, kitchen dishwasher) | $74,000 |
| Feb 3, 2025 | Expired or cancelled cancelled Feb 2026 | 205 Ellsworth St | Jonathan Tower Const. | interior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awningDetails
interior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awning | $33,000 |
| Feb 3, 2025 | Completed final sign-off Jul 2025 | 68 Whitney St | Gill Construction | interior remodel: new 1st floor family room and laundry, new window and door leaf at 1st floor front elevation. 2 new windows at lightwells not visble from the public way.Details
interior remodel: new 1st floor family room and laundry, new window and door leaf at 1st floor front elevation. 2 new windows at lightwells not visble from the public way. | $139,000 |
| Jan 28, 2025 | Completed final sign-off Feb 2026 | 310 Sanchez St | Mccowan Berrones & Company Llc | interior remodel of primary bathroom, conversion of bath tub to shower. replacement of (2) exterior rear doors, repair of dryrot at rear siding and entry stair landing (within property line)Details
interior remodel of primary bathroom, conversion of bath tub to shower. replacement of (2) exterior rear doors, repair of dryrot at rear siding and entry stair landing (within property line) | $25,000 |
| Nov 19, 2024 | Completed final sign-off Jun 2026 | 618 12th Av | Mccowan Berrones & Company Llc | 1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet.Details
1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet. | $571,275 |
| Nov 18, 2024 | Completed final sign-off Nov 2025 | 1555 Yosemite Av | Saturn Construction Co | unit #4: new office and open office partitions and work surfaces. selected bathroom new floor and wall finishes, 2 new doors. upgrade of primary entrance door hardware and interior landing/threshold. replace (e) plumbing fixtures to meet curret code.Details
unit #4: new office and open office partitions and work surfaces. selected bathroom new floor and wall finishes, 2 new doors. upgrade of primary entrance door hardware and interior landing/threshold. replace (e) plumbing fixtures to meet curret code. | $36,000 |
| Aug 9, 2024 | Completed final sign-off Sep 2025 | 55 Ulloa St | Saturn Construction Co | interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms,Details
interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms, | $185,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2025 | 25 Whitney St | Saturn Construction Co | structural revision to pa# 202312293293. revision include: additional excavation at rear portion of existing structural adjacent to addition. replacement of existing east and eastern portion of south brick foundations. new and revised strutural fopunation layout at rear portion of existing structureDetails
structural revision to pa# 202312293293. revision include: additional excavation at rear portion of existing structural adjacent to addition. replacement of existing east and eastern portion of south brick foundations. new and revised strutural fopunation layout at rear portion of existing structure | $13,420 |
| Mar 27, 2024 | Completed final sign-off Nov 2025 | 272 Anderson St | Hammerhouse Construction | basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gasDetails
basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gas | $166,196 |
| Dec 29, 2023 | Completed final sign-off Sep 2025 | 25 Whitney St | Saturn Construction Co | new 1-story rear yard addition w/ roof deck and exterior stair, replace existing interior communication stair between 1st and 2nd floors, new full bathroom @ 1st floor, relocation of laundry @ 1st floor, new fire separation between garage & 1st and 2nd floor living spaces, new roof top pv solarDetails
new 1-story rear yard addition w/ roof deck and exterior stair, replace existing interior communication stair between 1st and 2nd floors, new full bathroom @ 1st floor, relocation of laundry @ 1st floor, new fire separation between garage & 1st and 2nd floor living spaces, new roof top pv solar | $239,306 |
| Nov 3, 2023 | Completed final sign-off Jun 2024 | 549 19th Av | Duane Ernst Construction | interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell windowDetails
interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell window | $128,483 |
| Apr 27, 2023 | Never finaled issued May 2023, no final | 3202 Folsom St | to comply w/abe program per ord 51-16. abe#202001150941. remove (e) threshold & replace w/(n) threshold @ existing entry door;install 10" smooth surface kickplate @ push-side of(e) entry door; document work related to unreasonable hardship & technical infeasibililty.install push button actuatorDetails
to comply w/abe program per ord 51-16. abe#202001150941. remove (e) threshold & replace w/(n) threshold @ existing entry door;install 10" smooth surface kickplate @ push-side of(e) entry door; document work related to unreasonable hardship & technical infeasibililty.install push button actuator | $3,500 | |
| Dec 27, 2022 | In progress issued Jul 2025 | 1518 07th Av | Saturn Construction Co | horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor.Details
horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor. | $300,000 |
| Dec 5, 2022 | Completed final sign-off May 2025 | 527 Euclid Av | Sivestrini Construction | 1st flr- interior remodel of (e) living rm,fireplace w/ (n) gas inset installation. (n) windows @ east living rm wall.repair (e) front windows. no change to size. 2nd flr-interior remodel of bathrm & bedrm w/ (n) fixture & finishes, 2 new replacement windows at west & south walls.Details
1st flr- interior remodel of (e) living rm,fireplace w/ (n) gas inset installation. (n) windows @ east living rm wall.repair (e) front windows. no change to size. 2nd flr-interior remodel of bathrm & bedrm w/ (n) fixture & finishes, 2 new replacement windows at west & south walls. | $77,000 |
| Jun 17, 2022 | Completed final sign-off Aug 2022 | 77 Norwich St | lot subdivision: application in association with sfdpw pid 10794 & sf planning dept variance referral approved dated 1/22/21 and sfdbi referral conditional approved dated 1/30/21. installation of 1-hr fire rated assemblies at 77 norwich st rear wall per sfdbi conditional approval.Details
lot subdivision: application in association with sfdpw pid 10794 & sf planning dept variance referral approved dated 1/22/21 and sfdbi referral conditional approved dated 1/30/21. installation of 1-hr fire rated assemblies at 77 norwich st rear wall per sfdbi conditional approval. | $500 | |
| Sep 10, 2021 | Completed final sign-off Sep 2021 | 400 Treat Av | change of use from office to entertainment. arts and recreation occupancy of b to be maintained. responding to enforcement case 2021-005267enf/ planner justin kranDetails
change of use from office to entertainment. arts and recreation occupancy of b to be maintained. responding to enforcement case 2021-005267enf/ planner justin kran | ||
| Sep 7, 2021 | Expired or cancelled withdrawn Dec 2021 | 808 Douglass St | 1st floor: remodel (e) bedroom. excavation & new foundations @ new rear addition. new primary bedroom, bathroom, laundry room. new windows & exterior door. 2nd floor: kitchen remodel. rear addition. remodel (e) bath. remove (e) tar & gravel roof finish & install new ingle ply membrance roof materialDetails
1st floor: remodel (e) bedroom. excavation & new foundations @ new rear addition. new primary bedroom, bathroom, laundry room. new windows & exterior door. 2nd floor: kitchen remodel. rear addition. remodel (e) bath. remove (e) tar & gravel roof finish & install new ingle ply membrance roof material | $433,503 | |
| Jun 14, 2021 | Completed final sign-off Oct 2023 | 1523 Alabama St | - new 1st floor adu within an existing single family residence. work limited to creation of a compliant entry to/exit from public way, including: - replacement of front concrete landing to create step down into adu entry hall floor level. - new recessed exterior front entry vestibuleDetails
- new 1st floor adu within an existing single family residence. work limited to creation of a compliant entry to/exit from public way, including: - replacement of front concrete landing to create step down into adu entry hall floor level. - new recessed exterior front entry vestibule | $7,500 | |
| Jun 8, 2021 | Never finaled issued Jul 2021, no final | 719 Avalon Av | Norcross Building Solutions | 2nd fl: remodel (e) kitchen w/(n) finishes cabinets & appliances. enlarge (e) opening btw dining & kitchen and kitchen & hall. remove (e) window (no t visible from st), frame-in w/(n) interior & exterior finishes to match existing, (n) skylight (not visible from st)Details
2nd fl: remodel (e) kitchen w/(n) finishes cabinets & appliances. enlarge (e) opening btw dining & kitchen and kitchen & hall. remove (e) window (no t visible from st), frame-in w/(n) interior & exterior finishes to match existing, (n) skylight (not visible from st) | $25,933 |
| Apr 27, 2021 | Completed final sign-off Mar 2024 | 4018 Cesar Chavez St | Saturn Construction Co | 1st fl:replace/expand garage and remodel(e)bathroom and storage spaces.2nd fl:2(n)windows and1(n)exterior door,(n)roof deck above garage,remodel(e)bathroom/laundry.3rd fl:expand(e)dormer,(n)dormer roof to match(e),remodel1(e) bathroom&1(n)bathroom,3(n)skylight&windows.Details
1st fl:replace/expand garage and remodel(e)bathroom and storage spaces.2nd fl:2(n)windows and1(n)exterior door,(n)roof deck above garage,remodel(e)bathroom/laundry.3rd fl:expand(e)dormer,(n)dormer roof to match(e),remodel1(e) bathroom&1(n)bathroom,3(n)skylight&windows. | $295,000 |
| Apr 8, 2021 | Completed final sign-off Mar 2022 | 107 Spruce St | Upscale Construction Inc. | new 4' x 4' curb mounted skylight. not visible from street.Details
new 4' x 4' curb mounted skylight. not visible from street. | $8,500 |
| Dec 19, 2020 | Completed final sign-off Jul 2022 | 154 Beulah St | Tredway Made Inc | addition of (n) deck @ 1st fl above grade & (n) exterior door.Details
addition of (n) deck @ 1st fl above grade & (n) exterior door. | $25,000 |
| Dec 7, 2020 | Completed final sign-off Sep 2021 | 90 Norwich St | Gill Construction | (n) finishes and/or fixtures in liv-sleep-kitch-bath rms & closet. install replace 1 (n) window & 2 (n) doors at rear facade-not visible from street. (n) laundry, 2 furnaces, 1 instant water heater. 2 rated doors separating living spaces from garage.Details
(n) finishes and/or fixtures in liv-sleep-kitch-bath rms & closet. install replace 1 (n) window & 2 (n) doors at rear facade-not visible from street. (n) laundry, 2 furnaces, 1 instant water heater. 2 rated doors separating living spaces from garage. | $72,000 |
| Oct 2, 2020 | Completed final sign-off May 2021 | 156 Beulah St | Jewell Construction Inc | interior renovation of (e) kitchen and bath. removal of 2 walls.Details
interior renovation of (e) kitchen and bath. removal of 2 walls. | $75,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2021 | 507 Rhode Island St | Saturn Construction Co | amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair.Details
amend to pa202008312940: 1/f: new concrete footing and post at house centerline. 2/f:remove walls between kitchen & living room & sunroom.3/f expand master bedroom into nw eavespace, add master bath and closet. expand 2 bedroom into se eavespace. new closet.(n) attic pull down stair. | $60,000 |
| Jun 9, 2020 | Completed final sign-off Jan 2021 | 380 Wawona St | interior remodel1st floor: 1 new bathroom, 1 new bedroom, installation of 3 new rear windows and 1 exterior rear door (not visible from public way)2nd floor: 1 new powder roomDetails
interior remodel1st floor: 1 new bathroom, 1 new bedroom, installation of 3 new rear windows and 1 exterior rear door (not visible from public way)2nd floor: 1 new powder room | $78,000 | |
| Jun 4, 2020 | Completed final sign-off Mar 2022 | 21 Paramount Tr | C H Burnham Inc | new windows at (e) openings same size same location, marvin alum clad wood, at second floor front (north) facade. max u-factor 0.32 or better; no other workDetails
new windows at (e) openings same size same location, marvin alum clad wood, at second floor front (north) facade. max u-factor 0.32 or better; no other work | $5,200 |
| Jan 30, 2020 | Completed final sign-off Nov 2020 | 1284 Stanyan St | interior remodel of s.f.d. to remodel kitchen, 2 baths, and master closet. remove north facing window and 2 skylights at south. remove wood burning fire place and chimney.Details
interior remodel of s.f.d. to remodel kitchen, 2 baths, and master closet. remove north facing window and 2 skylights at south. remove wood burning fire place and chimney. | $225,000 | |
| Dec 17, 2019 | Completed final sign-off Mar 2022 | 21 Paramount Tr | C H Burnham Inc | reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bathDetails
reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bath | $325,000 |
| Jul 9, 2019 | Expired or cancelled cancelled Jan 2026 | 1525 Willard St | removal of (e) appliances, finishes & fixtures @ 1st floor. laundry room, replace w/(n) appliaces, fixtures & cabinetryDetails
removal of (e) appliances, finishes & fixtures @ 1st floor. laundry room, replace w/(n) appliaces, fixtures & cabinetry | $12,000 | |
| Jul 2, 2019 | Completed final sign-off Aug 2019 | 1525 Willard St | Sivestrini Construction | removal and replacement of extg windows at 2nd floor east (front) facade.Details
removal and replacement of extg windows at 2nd floor east (front) facade. | $6,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 158 Beulah St | Mizen Construction Inc | interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylightsDetails
interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylights | $96,000 |
| Nov 28, 2018 | Completed final sign-off Nov 2019 | 2905 23rd St | Ehline Construction Inc. | unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at officeDetails
unit 2905 - relocate kitchen & bath add 1 new exterior door at rear install new furnance & w/h. unit 2907 - remodel (e) kitchen & bath, add new windows and doors at rear add skylight at office | $135,000 |
| Jul 9, 2018 | Completed final sign-off Nov 2018 | 140 Moffitt St | Bay Rock Construction & Develop. Inc. | interior remodel of existing 1st fl bedroom, & 2nd floor bathroom. new windows and 2 new doors units and wood lap siding to match existing at rear elevation.Details
interior remodel of existing 1st fl bedroom, & 2nd floor bathroom. new windows and 2 new doors units and wood lap siding to match existing at rear elevation. | $110,000 |
| Apr 2, 2018 | Completed final sign-off Dec 2018 | 527 Euclid Av | Sivestrini Construction | water damage. remodel finishes & cabinetry in kitchen, 2 bathrooms, family room. 1 shower to covert to steam shower, 1 laundry room. replace damged sheet rock, upgrade electrical & plumbing to codes. flooring.Details
water damage. remodel finishes & cabinetry in kitchen, 2 bathrooms, family room. 1 shower to covert to steam shower, 1 laundry room. replace damged sheet rock, upgrade electrical & plumbing to codes. flooring. | $110,000 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 58 Surrey St | Andrew Durosette Aka Cfi Construction, Bay Build Design Inc | interior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%.Details
interior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%. | $93,000 |
| Nov 21, 2017 | Completed final sign-off Jul 2018 | 862 47th Av | Bay Rock Construction & Develop. Inc. | interior remodel to (e) 1st fl - new bedroom, family rm, 2 new rear windows & relocation of (e) full bathroom filed under pa 2008-0516-2247Details
interior remodel to (e) 1st fl - new bedroom, family rm, 2 new rear windows & relocation of (e) full bathroom filed under pa 2008-0516-2247 | $75,000 |
| Jun 8, 2017 | Completed final sign-off Sep 2017 | 1363 15th Av | Saturn Construction Co | new plumbing fixtures in rear yard, new hot tub, new 8'-0" rear yard fence to be replaced in kind.Details
new plumbing fixtures in rear yard, new hot tub, new 8'-0" rear yard fence to be replaced in kind. | $20,000 |
| Jun 5, 2017 | Completed final sign-off Nov 2017 | 3036 Market St | construction of a non-bearing wall between family room and vestibule.Details
construction of a non-bearing wall between family room and vestibule. | $10,000 | |
| Jan 18, 2017 | Completed final sign-off Dec 2017 | 570 Precita Av | Jln Builders | original application pa #2016-0602-8983 (r1) needs new structural drawings because original structural drwg's were never reviewed.Details
original application pa #2016-0602-8983 (r1) needs new structural drawings because original structural drwg's were never reviewed. | |
| Sep 22, 2016 | Completed final sign-off Dec 2016 | 130 Bush St | Seths Crew | new partition wall. select disabled access upgrades. sprinklers under separate permit.Details
new partition wall. select disabled access upgrades. sprinklers under separate permit. | $10,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2017 | 570 Precita Av | Jln Builders | interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit.Details
interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit. | $200,500 |
| Mar 31, 2016 | Completed final sign-off Feb 2017 | 1124 De Haro St | Saturn Construction Co | renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heaterDetails
renovation & full seismic retrofit, infill @ (e) 2nd floor lightwell(18 sq ft),new foundation per plan,new shear walls,relocate/remodel bath @ 2nd floor,remodeled kitchen @ 2nd floor,new window & door @rear facade,new skylight,new partition walls @ 2nd floor,new furnace & water heater | $162,000 |
| Dec 11, 2015 | Expired or cancelled cancelled Jan 2026 | 1250 17th St | revision to appl #2015120714368 - interior renovation including new plumbing @ restrooms + service sinks, new lighting & ventilation @ restrooms. clarify the application pts #of stories is reduced to 1 story form 2 story. n/a maher ordinanceDetails
revision to appl #2015120714368 - interior renovation including new plumbing @ restrooms + service sinks, new lighting & ventilation @ restrooms. clarify the application pts #of stories is reduced to 1 story form 2 story. n/a maher ordinance | ||
| Nov 25, 2015 | Never finaled issued Dec 2015, no final | 1240 17th St | Aaron Gordon Construction Inc | revision to app#201511193087. interior renovation including new plumbing at restrooms and service sinks. new lighting and ventilation at restrooms. n/a for maherDetails
revision to app#201511193087. interior renovation including new plumbing at restrooms and service sinks. new lighting and ventilation at restrooms. n/a for maher | |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 1240 17th St | Aaron Gordon Construction Inc | rev. to pa#201408204231 & 201410068152 to remove (e) mezz. & corridor, relocate waiting room, 1 (e) single occupancy restroom & 2 (e) sinks, add 1 new 3 occupant women's restroom, 1 new 2 occupant men's restroom and 2 new utility sinks. n/a ordinance #155-13 sprinklers under separate permitDetails
rev. to pa#201408204231 & 201410068152 to remove (e) mezz. & corridor, relocate waiting room, 1 (e) single occupancy restroom & 2 (e) sinks, add 1 new 3 occupant women's restroom, 1 new 2 occupant men's restroom and 2 new utility sinks. n/a ordinance #155-13 sprinklers under separate permit | |
| Sep 28, 2015 | Completed final sign-off Jul 2016 | 171 26th Av | Jeff King And Company Inc | revision to app#201411121222 r1. correction of location/configuration rear of south neighbor house 11" adjustment east/west dimension to stair penthouse to allow required stair headroom clearance. revise penthouse door & window sizes & type.Details
revision to app#201411121222 r1. correction of location/configuration rear of south neighbor house 11" adjustment east/west dimension to stair penthouse to allow required stair headroom clearance. revise penthouse door & window sizes & type. | |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 1250 17th St | Aaron Gordon Construction Inc | revision to pa #2014.0625.9466 - during construction wood framed parapet @ southwest corner removed due to dryrot. proposed plans to re-build parapet w/o upper windows. update stories from 2 to 1. update construction type to vb. n/a maher ordinanceDetails
revision to pa #2014.0625.9466 - during construction wood framed parapet @ southwest corner removed due to dryrot. proposed plans to re-build parapet w/o upper windows. update stories from 2 to 1. update construction type to vb. n/a maher ordinance | $20,000 |
| Jul 20, 2015 | Completed final sign-off Dec 2015 | 3641 Clay St | Upscale Construction Inc. | int. remodel of 4th flr bedroom to include new home theater equip, int framed partition, lighting & elec. distribution. ext work includes new 5'-0" x2'-10" roof pop up to enclose projector. replace(e) south facade, wood siding to match (e) @ 3rd floor level.Details
int. remodel of 4th flr bedroom to include new home theater equip, int framed partition, lighting & elec. distribution. ext work includes new 5'-0" x2'-10" roof pop up to enclose projector. replace(e) south facade, wood siding to match (e) @ 3rd floor level. | $69,000 |
| Feb 17, 2015 | Expired or cancelled cancelled Aug 2025 | 11 Surrey St | Upcycle Builders Inc. | (n) 1st & 2nd story rear addition: 2 (n) bathrms, 1 (n) bedrm. renovation/relocation of (e) kitchen, bathrm, 2 bedrms, living rm & rear deck. repair/replace damaged front facade elements in kind. (n)alumn clad wood windows & doors @ rear & side(east) facade.Details
(n) 1st & 2nd story rear addition: 2 (n) bathrms, 1 (n) bedrm. renovation/relocation of (e) kitchen, bathrm, 2 bedrms, living rm & rear deck. repair/replace damaged front facade elements in kind. (n)alumn clad wood windows & doors @ rear & side(east) facade. | $350,000 |
| Nov 12, 2014 | Completed final sign-off Jul 2016 | 171 26th Av | Jeff King And Company Inc | new interior communicating stair to new stair penhouse @ roof. new roof deck.Details
new interior communicating stair to new stair penhouse @ roof. new roof deck. | $175,000 |
| Oct 23, 2014 | Completed final sign-off Jun 2015 | 512 Vallejo St | Upcycle Builders Inc. | unit 512: interior remodel of (e) kitchen, dining room, & bath; unit 516: interior remodel of (e) kitchen, dining room, & bath.Details
unit 512: interior remodel of (e) kitchen, dining room, & bath; unit 516: interior remodel of (e) kitchen, dining room, & bath. | $120,000 |
| Jun 25, 2014 | Never finaled issued Jul 2014, no final | 1250 17th St | Aaron Gordon Construction Inc | seismic retrofit, interior remodel to (e) retail/office space; maher n/aDetails
seismic retrofit, interior remodel to (e) retail/office space; maher n/a | $450,000 |
| May 29, 2014 | Never finaled issued May 2016, no final | 127 Edgehill Wy | Aaron Gordon Construction Inc, A B J Construction | to erect 4 stories of single family dwellingDetails
to erect 4 stories of single family dwelling | $650,000 |
| Apr 23, 2014 | Completed final sign-off Sep 2014 | 1363 15th Av | Saturn Construction Co | remodel existing master bedroom, removal of (e) skylight and associated shaft, new insulation at existing master bedroom walls, ceiling and floors. infill lightwell.Details
remodel existing master bedroom, removal of (e) skylight and associated shaft, new insulation at existing master bedroom walls, ceiling and floors. infill lightwell. | $45,000 |
| Apr 11, 2014 | Completed final sign-off Sep 2016 | 130 Randall St | Cardea Bldg Dba Dimension Design Group | remove (e) 160 sf. rear wing @ 2/f. add (n) rear wing & 3/f. new windows & doors throughout. 1 new skylight. fire separation of garage from conditioned spaces. new communication stair between 1st to 3rd levels. new gas fired furnace & water heater with distribution as req.Details
remove (e) 160 sf. rear wing @ 2/f. add (n) rear wing & 3/f. new windows & doors throughout. 1 new skylight. fire separation of garage from conditioned spaces. new communication stair between 1st to 3rd levels. new gas fired furnace & water heater with distribution as req. | $410,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2015 | 37 Clipper St | Upcycle Builders Inc. | infill of bathroom window and installation of ceiling exhaust fan w/ ventillation as required.Details
infill of bathroom window and installation of ceiling exhaust fan w/ ventillation as required. | $5,000 |
| May 30, 2013 | Completed final sign-off Mar 2014 | 135 Mississippi St | Gci, Inc | exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior workDetails
exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior work | $486,000 |
| Apr 30, 2013 | Completed final sign-off Mar 2014 | 135 Mississippi St | Gci, Inc | 2nd floor-remodel of (e) office. m.e.p, sprinkler, fire alarm on seperate permitsDetails
2nd floor-remodel of (e) office. m.e.p, sprinkler, fire alarm on seperate permits | $198,300 |
| Apr 24, 2013 | Completed final sign-off Feb 2014 | 135 Mississippi St | Gci, Inc | 1st floor-remodel of (e) 1st floor office, open office areas, meeting rooms, training rooms. m.e.p, sprinkler, fire alarm under seperate permitDetails
1st floor-remodel of (e) 1st floor office, open office areas, meeting rooms, training rooms. m.e.p, sprinkler, fire alarm under seperate permit | $485,625 |
| Jan 14, 2013 | Completed final sign-off Dec 2013 | 76 Turquoise Wy | Aaron Gordon Construction Inc | remodel 2 baths, enlarge 2 windows at side elevation, replacement in kind 3 windows at side elevation. replacement in kind 5 (e) aluminum frame sliding doors. new interior flooring. new in floor radiant heat system, new 200amp servicesDetails
remodel 2 baths, enlarge 2 windows at side elevation, replacement in kind 3 windows at side elevation. replacement in kind 5 (e) aluminum frame sliding doors. new interior flooring. new in floor radiant heat system, new 200amp services | $175,000 |
| Sep 21, 2012 | Completed final sign-off Apr 2014 | 3641 Clay St | Upscale Construction Inc. | horizontal dining rm addition new & replacement windows to match in kind new & replacement wood siding to match in kind new lighting outlets at addition. replace exist gas fire forced air furnance.Details
horizontal dining rm addition new & replacement windows to match in kind new & replacement wood siding to match in kind new lighting outlets at addition. replace exist gas fire forced air furnance. | $150,000 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 87 Madrone Av | Tycon Builders Inc. | remodel of (e) kitchen/breakfast area, replace (e) & install new windows & doors, replace (e) painted stucco exterior finsih, addition of 2nd floor rear deck, legalize (e) 1st floor w.c. (toilet).Details
remodel of (e) kitchen/breakfast area, replace (e) & install new windows & doors, replace (e) painted stucco exterior finsih, addition of 2nd floor rear deck, legalize (e) 1st floor w.c. (toilet). | $50,000 |
| Feb 7, 2012 | Completed final sign-off May 2012 | 3741 26th St | Bay Area Metro Builders Inc | revision to appl #2011.09.21.5200: removal of living room east wall, installation of beam above, new non-bearing wall @ lines c betwee line 2 + 4, new 1/2 bath on 2nd floor, shear wall @ line 1, new shear wall ta bedroom #1 @ gound floor.Details
revision to appl #2011.09.21.5200: removal of living room east wall, installation of beam above, new non-bearing wall @ lines c betwee line 2 + 4, new 1/2 bath on 2nd floor, shear wall @ line 1, new shear wall ta bedroom #1 @ gound floor. | $19,000 |
| Feb 3, 2012 | Completed final sign-off Jun 2012 | 3036 Market St | T N T Construction | remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as requiredDetails
remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as required | $60,000 |
| Jan 18, 2012 | Completed final sign-off Jul 2013 | 824 Douglass St | Cardea Bldg Dba Dimension Design Group | contruct new rear addition, new windows and 2 skylights, new slab at ground fl, new furnace. new addition to include new kitchen, familyroom and master bedroom. new staircase from 2nd fl to 1st fl. new electrical and plumbing throughout.Details
contruct new rear addition, new windows and 2 skylights, new slab at ground fl, new furnace. new addition to include new kitchen, familyroom and master bedroom. new staircase from 2nd fl to 1st fl. new electrical and plumbing throughout. | $110,000 |
| Sep 21, 2011 | Completed final sign-off May 2012 | 3741 26th St | Bay Area Metro Builders Inc | excavation (+/-18") for new 1/f slab replacement of foundations. new bath, 3 new bedrooms at 1/f, new communication stair, new windows, doors throughout, remodel kitchen, fire separation of garage from occupied spaces at 1/f. new radiant heat system & elec distribution. replace front window w/woodDetails
excavation (+/-18") for new 1/f slab replacement of foundations. new bath, 3 new bedrooms at 1/f, new communication stair, new windows, doors throughout, remodel kitchen, fire separation of garage from occupied spaces at 1/f. new radiant heat system & elec distribution. replace front window w/wood | $235,000 |
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 496 Fair Oaks St | Bay Area Metro Builders Inc | replace (e) windows with new in-kind replacement units, replace entry door with new in-kind replacement unit, replace (e) stucco exterior finish with new in-kind stucco, install new painted exterior architectural trim at south & east facades.Details
replace (e) windows with new in-kind replacement units, replace entry door with new in-kind replacement unit, replace (e) stucco exterior finish with new in-kind stucco, install new painted exterior architectural trim at south & east facades. | $51,250 |
| Mar 2, 2011 | Completed final sign-off Jul 2012 | 447 Clipper St | 2/fl addition of 82.5 feet 56 of which is replacement 26.5 ft of which is new. new comunication stair betw 2nd & 1st story, kitchen remodel replace fountaion & excavation of 1/fl level. 1/fl new condition family room, lalundry/bathroom guest bedroom &closet new assoc plumbing & elec & mech.Details
2/fl addition of 82.5 feet 56 of which is replacement 26.5 ft of which is new. new comunication stair betw 2nd & 1st story, kitchen remodel replace fountaion & excavation of 1/fl level. 1/fl new condition family room, lalundry/bathroom guest bedroom &closet new assoc plumbing & elec & mech. | $250,000 | |
| Mar 7, 2008 | Completed final sign-off Jul 2008 | 4522 20th St | Saturn Construction Co | on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lightingDetails
on 2nd floor: remodel existing kitchen. remodel existing closet into 1/2 bath. replacement of existing kitchen door and additoin of transom window above new finishes, new plumbing trim, elec outlets and lighting | $42,000 |
| May 1, 2007 | Completed final sign-off Sep 2008 | 176 Edgewood Av | replace extg stucco and brick veneer exterior finishes with new wood shiplap and brick. repair dryrot to extg framing and sheathing,replace w/ new conc. foudation as indecated on plan, voluntary structural upgrade at selected areas. replace in kind window in kind and door at front facade.Details
replace extg stucco and brick veneer exterior finishes with new wood shiplap and brick. repair dryrot to extg framing and sheathing,replace w/ new conc. foudation as indecated on plan, voluntary structural upgrade at selected areas. replace in kind window in kind and door at front facade. | $30,000 | |
| Oct 30, 2006 | Completed final sign-off Mar 2009 | 3632 18th St | seismic foundation upgrade; replace (e) 3 story rear portion of house with 2-story rear yard addition and new 3rd story addition interior remodel. 1'-9" extension beyond (e) house into rear yard. new 3rd sotry addition is less than 500 sf & does not require 2nd means of egress.Details
seismic foundation upgrade; replace (e) 3 story rear portion of house with 2-story rear yard addition and new 3rd story addition interior remodel. 1'-9" extension beyond (e) house into rear yard. new 3rd sotry addition is less than 500 sf & does not require 2nd means of egress. | $209,000 | |
| Jun 9, 2005 | Completed final sign-off Jan 2006 | 4515 20th St | renovation of (e) kitchen. new replacement windows @ front & west facades, new windows @ rear(south)Details
renovation of (e) kitchen. new replacement windows @ front & west facades, new windows @ rear(south) | $75,000 | |
| Jun 3, 2005 | Completed final sign-off Oct 2005 | 1374 Sanchez St | kitchen remodel, new cabinets and finishes, new windows, potential dry rot.Details
kitchen remodel, new cabinets and finishes, new windows, potential dry rot. | $12,000 |