Norcross Building Solutions
- Based in
- Elk Grove
- On San Francisco permits
- Dec 2015 to Dec 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2021 | Completed final sign-off Jun 2022 | 1200 Sloat Bl | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment. | $45,000 |
| Jun 8, 2021 | Never finaled issued Jul 2021, no final | 719 Avalon Av | 2nd fl: remodel (e) kitchen w/(n) finishes cabinets & appliances. enlarge (e) opening btw dining & kitchen and kitchen & hall. remove (e) window (no t visible from st), frame-in w/(n) interior & exterior finishes to match existing, (n) skylight (not visible from st)Details
2nd fl: remodel (e) kitchen w/(n) finishes cabinets & appliances. enlarge (e) opening btw dining & kitchen and kitchen & hall. remove (e) window (no t visible from st), frame-in w/(n) interior & exterior finishes to match existing, (n) skylight (not visible from st) | $25,933 |
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 1268 Clayton St | partil interior remoel of (e) kitchen incluing cabinets, counters, range hood, elec outlets, switches, lighting. no new appliances. no new plumbing fixtures. no wall removal, no new wall opening. no new (e) wall relocation, lighting shall comply with cec 150.0 (ic) 3Details
partil interior remoel of (e) kitchen incluing cabinets, counters, range hood, elec outlets, switches, lighting. no new appliances. no new plumbing fixtures. no wall removal, no new wall opening. no new (e) wall relocation, lighting shall comply with cec 150.0 (ic) 3 | $12,000 |
| Dec 29, 2016 | Completed final sign-off Nov 2017 | 155 San Aleso Av | at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights.Details
at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights. | $96,000 |
| Dec 9, 2015 | Completed final sign-off Apr 2016 | 3845 California St | unit #1: demo kitchen & bathroom in 1st flr unit & replace all new. update elec & plumbing to code,no framing or structural work both rooms will stay the same dimensions.Details
unit #1: demo kitchen & bathroom in 1st flr unit & replace all new. update elec & plumbing to code,no framing or structural work both rooms will stay the same dimensions. | $60,000 |