T N T Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Aug 2019
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Nov 2019 | 37 West Clay St | kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visibleDetails
kitchen remodel. bathroom floor replacementtile to wood. replace 1st flr window with insulated glass - not visible | $80,000 |
| Jan 15, 2019 | Completed final sign-off May 2019 | 572 04th Av | install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom.Details
install full bathroom in ground floor level,in (e)conditioned space. install new bar sink,under counter refrigarator and cabinetry in existing ground floor music room.install new flooring in (e)ground floor music room, office and hallway.replace (e)concrete slab in area of bathroom. | $30,000 |
| Oct 29, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuildingDetails
revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuilding | $3,000 |
| Sep 21, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope.Details
rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope. | $5,000 |
| Jul 20, 2018 | Completed final sign-off Feb 2022 | 31 Carver St | vertical addition. new skylights in bath on ground floor. 2 shed roof dormers at 2nd level. addition of one new bathroom at 2nd level. new doors, window and skylights at upper level.Details
vertical addition. new skylights in bath on ground floor. 2 shed roof dormers at 2nd level. addition of one new bathroom at 2nd level. new doors, window and skylights at upper level. | $35,000 |
| Jun 15, 2018 | Completed final sign-off Dec 2020 | 89 Forest Side Av | horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel.Details
horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel. | $95,000 |
| Jun 8, 2018 | Completed final sign-off Jan 2019 | 547 Wisconsin St | interior remodel of (e) kitchen, hall bath, master bathroom, new fixtures & finishes; replacement of (e) sliding door, interior doors as noted in planDetails
interior remodel of (e) kitchen, hall bath, master bathroom, new fixtures & finishes; replacement of (e) sliding door, interior doors as noted in plan | $75,000 |
| Mar 6, 2018 | Never finaled issued Mar 2018, no final | 755 Anderson St | repair front stair: replace existing treads, risers, entry door, & handrail in-kind/ to match existing. repair in-kind less than 50%Details
repair front stair: replace existing treads, risers, entry door, & handrail in-kind/ to match existing. repair in-kind less than 50% | $10,000 |
| Mar 11, 2016 | Completed final sign-off Sep 2016 | 156 06th Av | replace (e) electrical & plumbing fixts to second floor bathroom. no build-out, same footprint. new tile for floor & walls including shower walls.Details
replace (e) electrical & plumbing fixts to second floor bathroom. no build-out, same footprint. new tile for floor & walls including shower walls. | $37,000 |
| Nov 24, 2015 | Completed final sign-off Apr 2019 | 762 29th Av | interior remodel of 794 sq ft. remodel kitchen & bathroom. add lavatory sink to (e) water closet. convert 354 sq ft of garage space to living space. (n) bathroom. infill (e) non-shared lightwell on northside. infill (e) non-shared lightwell on southside.Details
interior remodel of 794 sq ft. remodel kitchen & bathroom. add lavatory sink to (e) water closet. convert 354 sq ft of garage space to living space. (n) bathroom. infill (e) non-shared lightwell on northside. infill (e) non-shared lightwell on southside. | $225,000 |
| Apr 27, 2015 | Completed final sign-off Jun 2015 | 672 Moultrie St | to obtain final inspection for work approved under pa# 201302019315. all work is complete.Details
to obtain final inspection for work approved under pa# 201302019315. all work is complete. | |
| Jun 25, 2014 | Never finaled issued Jul 2014, no final | 174 Beaver St | voluntary structural strengthening of upper floor level at living room wall.Details
voluntary structural strengthening of upper floor level at living room wall. | $1,000 |
| Jun 20, 2014 | Completed final sign-off Apr 2015 | 174 Beaver St | remove (e) chimney 7 fireplace, remodel (e) kitchen, replace (e) living room windows & doors, change slope roof ot flat roof @ rear bay, (n) built in shelves & gas fireplace.Details
remove (e) chimney 7 fireplace, remodel (e) kitchen, replace (e) living room windows & doors, change slope roof ot flat roof @ rear bay, (n) built in shelves & gas fireplace. | $80,000 |
| Feb 1, 2013 | Expired or cancelled expired Apr 2021 | 672 Moultrie St | kitchen fire damage repairs-interior living room remodel & voluntary seismic upgradesDetails
kitchen fire damage repairs-interior living room remodel & voluntary seismic upgrades | $50,190 |
| Dec 28, 2012 | Completed final sign-off Mar 2014 | 320 Surrey St | remodel of (e) kitchen including 149 sq ft addition. remodel of (e) bath. remodel of (e) water closet at basement. (n) clad windows & door at north & east addition facades. (n) high efficiency furnace.Details
remodel of (e) kitchen including 149 sq ft addition. remodel of (e) bath. remodel of (e) water closet at basement. (n) clad windows & door at north & east addition facades. (n) high efficiency furnace. | $92,000 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 222 Montcalm St | revision to appl #2011.08.04.1769 - addition will not be constructed, horizontal extension reduced to new stair landing.Details
revision to appl #2011.08.04.1769 - addition will not be constructed, horizontal extension reduced to new stair landing. | |
| Mar 16, 2012 | Completed final sign-off Jun 2015 | 672 Moultrie St | 2nd fl addition: 2 bathrroms & laundry addition at rear of (e) 2nd floor & (n) bedroom per plan.Details
2nd fl addition: 2 bathrroms & laundry addition at rear of (e) 2nd floor & (n) bedroom per plan. | $40,000 |
| Feb 3, 2012 | Completed final sign-off Jun 2012 | 3036 Market St | remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as requiredDetails
remodel existing bath, kitchen, and closets. 3 new wood clad windows at rear. replace existing exterior door with new clad wd unit. repalce existing wd sashes at 3 windows at rear, 1 sash per window only. new gas fired furnace with new distribution as required | $60,000 |
| Aug 4, 2011 | Never finaled issued Jan 2012, no final | 222 Montcalm St | general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs.Details
general remodel, horizontal addition @ west side. add bathroom at lower level provide improved stair to downstairs, improve undeveloped habitable space on downstairs. | $150,000 |
| Oct 15, 2010 | Completed final sign-off Mar 2011 | 2953 Pacific Av | remodel bathroom, new finishes, tile, paint fixtures, in same location, new paint on master bedroom, one bathroom remodel @ grnd floor, new lightingDetails
remodel bathroom, new finishes, tile, paint fixtures, in same location, new paint on master bedroom, one bathroom remodel @ grnd floor, new lighting | $65,000 |
| Jul 26, 2010 | Completed final sign-off Aug 2010 | 478 Gates St | repair entry stairs front of building street level less than 50%; repair in kind, no structural changesDetails
repair entry stairs front of building street level less than 50%; repair in kind, no structural changes | $2,000 |
| Jun 4, 2009 | Completed final sign-off Sep 2009 | 16 Richland Av | revision to 200904226885. new headers and framing alteration. localized foundation strengthening.Details
revision to 200904226885. new headers and framing alteration. localized foundation strengthening. | $10,000 |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 16 Richland Av | remodel (e) ktichen & bathroom, replace (e) windows with same size & location. reframe 1 window, add 1 skylight. replace all flooring, replace (e) furnace.Details
remodel (e) ktichen & bathroom, replace (e) windows with same size & location. reframe 1 window, add 1 skylight. replace all flooring, replace (e) furnace. | $50,000 |
| Mar 25, 2008 | Completed final sign-off Aug 2018 | 572 04th Av | replace existing double hung windows with insulated glass double hung windows 3 @ street fascade 2/f 4 @ street fascade 3/f 3 @ rear fascade 3rd floor into (e) openingsDetails
replace existing double hung windows with insulated glass double hung windows 3 @ street fascade 2/f 4 @ street fascade 3/f 3 @ rear fascade 3rd floor into (e) openings | $7,500 |
| Mar 16, 2007 | Completed final sign-off Oct 2008 | 572 04th Av | addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath.Details
addition to 1st & 2nd floors. new wood deck to rear of building. remodel kitchen. add 1/2 bath in (e) interior space, 2nd floor. remodel 3rd floor bath. | $225,000 |
| Feb 27, 2007 | Completed final sign-off May 2007 | 2953 Pacific Av | renovation of an area of existing residence on the basement level to accomodate art storage and reduce elevator operational noise.Details
renovation of an area of existing residence on the basement level to accomodate art storage and reduce elevator operational noise. | $50,000 |