Jewell Construction Inc
- Based in
- Woodland
- On San Francisco permits
- Sep 2019 to Oct 2020
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2020 | Completed final sign-off May 2021 | 156 Beulah St | interior renovation of (e) kitchen and bath. removal of 2 walls.Details
interior renovation of (e) kitchen and bath. removal of 2 walls. | $75,000 |
| Jul 31, 2020 | Completed final sign-off Nov 2020 | 17 College Tr | removing two e windows at the top story on the front facade (visible from street) and replacing in-kind with new marvin ultimate aluminum-clad wood replacement casement windows. no changes will be made to the rough openings -same size units as existing into the same openings.Details
removing two e windows at the top story on the front facade (visible from street) and replacing in-kind with new marvin ultimate aluminum-clad wood replacement casement windows. no changes will be made to the rough openings -same size units as existing into the same openings. | $5,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 14 College Tr | replace two smaller windows at front facade in-kind. new windows will be marvin ultimate series double hung windows to match function of existing windows.Details
replace two smaller windows at front facade in-kind. new windows will be marvin ultimate series double hung windows to match function of existing windows. | $3,500 |
| Sep 19, 2019 | Completed final sign-off Oct 2020 | 14 College Tr | replace (2) windows, trim and surrounding stucco. aluminum-clad casement-fixed-casement on bay windows. replace boards as-needed at projecting parapet.Details
replace (2) windows, trim and surrounding stucco. aluminum-clad casement-fixed-casement on bay windows. replace boards as-needed at projecting parapet. | $15,000 |