Alan C. Burr
- Listed as
- engineer
- Firm
- Murphy Burr Curry
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to May 2026
49 permits since 2000 (engineer on 49 permits): 32 completed, 2 in progress, 9 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2026 | In progress issued Sep 2026 | 451 Pacific Av | Build Group Inc. | revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab woodDetails
revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab wood | $50,000 |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 703 Market St | Build Group Inc. | 11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered.Details
11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered. | $25,000 |
| Jun 6, 2025 | In progress issued Nov 2025 | 451 Pacific Av | Build Group Inc. | addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes.Details
addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes. | $2,100,000 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 649 Mission St | Doherty Restoration, Inc. | repair steel lintels at wll on minna st and general brick repairs.Details
repair steel lintels at wll on minna st and general brick repairs. | $120,000 |
| May 5, 2023 | Completed final sign-off Dec 2024 | 157 Shipley St | Andrew Chekene Enterprises/ Dba Ac Enter | remove ~300 sf of t1-11 siding. remove (e) trim around doors & window. install 300 sf of 1/2 cdx plywood. install new weather barrier, new trim around (e) doors & windows. (n) hard plank siding on 1st, 2nd & 3rd fl. (e) deck guard rails will remain.Details
remove ~300 sf of t1-11 siding. remove (e) trim around doors & window. install 300 sf of 1/2 cdx plywood. install new weather barrier, new trim around (e) doors & windows. (n) hard plank siding on 1st, 2nd & 3rd fl. (e) deck guard rails will remain. | $18,000 |
| Apr 17, 2023 | Completed final sign-off Jun 2024 | 1801 25th St | Cahill Contractors Llc. | revision to 202006108345-s1 per field conditions and soil improvementsDetails
revision to 202006108345-s1 per field conditions and soil improvements | $50,000 |
| Mar 14, 2023 | Completed final sign-off May 2024 | 1333 Page St | S F Garage Company Inc. | revision to 201606170215 structural changes to comply with 202173434, 202182490. structural renovations to the main seismic force resisting work previously permited under ab-017 as mandatory work .therenovation shown will make bldg comply with 2022 sfebc ch 5e.Details
revision to 201606170215 structural changes to comply with 202173434, 202182490. structural renovations to the main seismic force resisting work previously permited under ab-017 as mandatory work .therenovation shown will make bldg comply with 2022 sfebc ch 5e. | $22,300 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 100 Vallejo St | Birmingham Builders, Inc | revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement.Details
revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement. | |
| Jan 24, 2023 | Completed final sign-off Jan 2024 | 200 Rhode Island St | Skyline Capital Builders Llc | deferred friction piles for the main core + shell permit #201910023333 per approved structural drawings, the drilled piers replace micropiles per contractor's optionDetails
deferred friction piles for the main core + shell permit #201910023333 per approved structural drawings, the drilled piers replace micropiles per contractor's option | |
| Jan 12, 2023 | Completed final sign-off Jan 2024 | 333 Market St | Richlen Construction | roof: 1 new back-up condenser water pump is being added.Details
roof: 1 new back-up condenser water pump is being added. | $375,023 |
| Nov 18, 2022 | Completed final sign-off May 2023 | 115 Red Rock Wy | Andrew Chekene Enterprises/ Dba Ac Enter | remove and replace gazebo and decking like for like. remove and replace framing and decking like for like. remove and replace railing like for like.Details
remove and replace gazebo and decking like for like. remove and replace framing and decking like for like. remove and replace railing like for like. | $115,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 244 Hartford St | Sasso Construction Inc. | revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction.Details
revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction. | $7,522 |
| Sep 27, 2022 | Completed final sign-off Aug 2024 | 1907 Leavenworth St | Connor Daly Corporation | voluntary strengthening of the foundation level of the subject property.Details
voluntary strengthening of the foundation level of the subject property. | $1,048,000 |
| Sep 26, 2022 | Never finaled filed Sep 2022, never issued | 420 Montgomery St | 2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of useDetails
2nd fl - partial ti - selective demo, new partitions, door, ceilings, mechanical, electrical and plumbing. also includes a kitchenette for employee self use only. no outside catering will be provided. there is no change of use | $3,120,000 | |
| Jul 13, 2022 | Completed final sign-off Dec 2023 | 633 Battery St | Acco Engineered Systems Inc. Dba Acco En | interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room.Details
interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room. | $655,000 |
| Jun 24, 2022 | Expired or cancelled cancelled Jan 2026 | 464 California St | Swinerton Builders | repair/replace sidewalk topping slab, 2 new curb ramps.Details
repair/replace sidewalk topping slab, 2 new curb ramps. | $125,000 |
| Jun 9, 2022 | Completed final sign-off Mar 2023 | 15 Noe St | Sincere Construction Company Inc | soft story upgrade per chapter 4d. design criteria from cebs appendix chapter a4.Details
soft story upgrade per chapter 4d. design criteria from cebs appendix chapter a4. | $77,000 |
| May 25, 2022 | Completed final sign-off Dec 2022 | 101 Henry Adams St | 3rd fl - new tenant suite second egress exit. (n) rated exit corridor, exit door and brick wall opening. this is not an accessible entrance, see accessible path of travel sheets included for reference onlyDetails
3rd fl - new tenant suite second egress exit. (n) rated exit corridor, exit door and brick wall opening. this is not an accessible entrance, see accessible path of travel sheets included for reference only | $150,000 | |
| Mar 7, 2022 | Completed final sign-off Mar 2023 | 180 Townsend St | Rossi Builders Inc. | submitting deferred structural drawing per 202101152837, a1.01d.Details
submitting deferred structural drawing per 202101152837, a1.01d. | |
| Feb 9, 2022 | Never finaled issued Jun 2022, no final | 899 Howard St | Plant Construction Co, Lp | cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs.Details
cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs. | $3,000,000 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1515 Waller St | voluntary soft story retrofit & building repair. replace electrical & plumbing in-kind under slab. core and shell upgrade - ada compliant.Details
voluntary soft story retrofit & building repair. replace electrical & plumbing in-kind under slab. core and shell upgrade - ada compliant. | $40,000 | |
| Nov 4, 2021 | Completed final sign-off Jul 2023 | 124 Geary St | Dickinson Cameron Construction Company I | barracade construction on both sides of t.i. does not attach to historical facade cast iron store front or terracotta surround.Details
barracade construction on both sides of t.i. does not attach to historical facade cast iron store front or terracotta surround. | $5,000 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 111 Maiden Ln | Northern Sun Associates | t.i. : reframing a portion of the first floor framing between gril lines 3 & 4 and b & 1.5d to accommodate a future t.i.Details
t.i. : reframing a portion of the first floor framing between gril lines 3 & 4 and b & 1.5d to accommodate a future t.i. | $100,000 |
| Aug 2, 2021 | Completed final sign-off Nov 2021 | 110 Sutter St | Giampolini & Co Dba Giampolini/Courtney | sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone.Details
sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone. | $100,000 |
| May 3, 2021 | Never finaled issued Aug 2021, no final | 560 Mission St | Clune Construction Company L P | t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep.Details
t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep. | $2,345,801 |
| Feb 10, 2021 | Completed final sign-off Dec 2022 | 1234 Washington St | Sgdm Llc | replacement of deteriorated semi-enclosed stairway in common area. not visible from the street.Details
replacement of deteriorated semi-enclosed stairway in common area. not visible from the street. | $80,000 |
| Feb 8, 2021 | Expired or cancelled cancelled Jan 2026 | 445 Wawona St | Western Allied Mechanical Inc. | addition of dedicated outside air system to upgrade ventilation to parts of building.new air handler w/ hot water heating,no cooling. use (e) vertical duct distribution, new taps into duck riser,fsds where ducts exist shaft.hot water piping to heating coils at each flr,to tune supply air temperatureDetails
addition of dedicated outside air system to upgrade ventilation to parts of building.new air handler w/ hot water heating,no cooling. use (e) vertical duct distribution, new taps into duck riser,fsds where ducts exist shaft.hot water piping to heating coils at each flr,to tune supply air temperature | $175,000 |
| Feb 5, 2021 | Completed final sign-off May 2022 | 924 Divisadero St | revision to soft story pa# 201706270458. soft story upgrade per sf building code.Details
revision to soft story pa# 201706270458. soft story upgrade per sf building code. | $180,000 | |
| Jan 6, 2021 | Completed final sign-off Oct 2023 | 27 Maiden Ln | Novo Construction Inc | roof deck improvements: additional prefabricated pergola.Details
roof deck improvements: additional prefabricated pergola. | $15,000 |
| Dec 24, 2020 | Completed final sign-off Jul 2023 | 35 South Park | Novo Construction Inc | voluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations.Details
voluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations. | $250,000 |
| Nov 24, 2020 | Never finaled issued Oct 2021, no final | 612 Howard St | J..H. Construction Co./John A Huerta Co | sidewalk repair, vault / basement reinforcement.Details
sidewalk repair, vault / basement reinforcement. | $10,000 |
| Oct 28, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.Details
revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit. | $750,000 |
| Oct 24, 2020 | Completed final sign-off Feb 2022 | 885 Folsom St | Guzman Construction Group Inc. | seismic strengthening to (e) non-occupied 2-story type vb building to full seismic code compliance per ab-17. disabled access not addressed in scope. floor assembly shall be 1-hr rated per ab-005 for potential future conversion to type va construction.Details
seismic strengthening to (e) non-occupied 2-story type vb building to full seismic code compliance per ab-17. disabled access not addressed in scope. floor assembly shall be 1-hr rated per ab-005 for potential future conversion to type va construction. | $400,000 |
| Jun 10, 2020 | Completed final sign-off Dec 2025 | 1801 25th St | Cahill Contractors Llc., Siemens Industry, Inc. | priority processing - 100 % affordable housing. to erect a type 3-a over 1-a, 7 story, residential building with 157 dwelling units- no basement.Details
priority processing - 100 % affordable housing. to erect a type 3-a over 1-a, 7 story, residential building with 157 dwelling units- no basement. | $80,000,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2024 | 2121 Laguna St | Rainbow Waterproofing & Restor | common area: remove/reinstall cabinets & air ducts on n. wall of garage. prep cmu wall & repair cracks for waterproofing membrane. instl sheet waterproofing system/dowels. instl new shotcrete wall 6" thick, move fire hose cabinet (sep permit)to new location. nov #201918839. comply w/sffc 1103.7.6.1.Details
common area: remove/reinstall cabinets & air ducts on n. wall of garage. prep cmu wall & repair cracks for waterproofing membrane. instl sheet waterproofing system/dowels. instl new shotcrete wall 6" thick, move fire hose cabinet (sep permit)to new location. nov #201918839. comply w/sffc 1103.7.6.1. | $143,910 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 1221 Jones St | Everest Waterproofing & Restoration Inc. | repair concrete balcony slabs as needed n/a maherDetails
repair concrete balcony slabs as needed n/a maher | $25,000 |
| Sep 4, 2019 | Expired or cancelled cancelled Oct 2019 | 1020 Union St | Lokman Construction, K & R Builders Inc | unit 2: stiffen teh (e) curb & reduce deflection of the glass screen on existing roof deck, brace the curb with diagonal bracing.Details
unit 2: stiffen teh (e) curb & reduce deflection of the glass screen on existing roof deck, brace the curb with diagonal bracing. | $8,200 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 630 Grand View Av | Doherty Restoration, Inc. | revision to pa# 2016-0822-5688 to shear wall to brace frameDetails
revision to pa# 2016-0822-5688 to shear wall to brace frame | |
| Mar 5, 2019 | Never finaled issued Aug 2019, no final | 445 Wawona St | Western Allied Mechanical Inc. | like for like replacement of equipment serving the heating hot water & domestic hot water systems in the basement mechanical room at the arden wood facility. new louvers @ (e) windows, new equipment flue thru wall penetrations, (1) new outdoor pad mounted unitDetails
like for like replacement of equipment serving the heating hot water & domestic hot water systems in the basement mechanical room at the arden wood facility. new louvers @ (e) windows, new equipment flue thru wall penetrations, (1) new outdoor pad mounted unit | $500,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2024 | 3359 26th St | North Star Plumbing & Fire Protection, O Donoghue Construction Inc. | vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial.Details
vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial. | $500,000 |
| Jun 2, 2017 | Completed final sign-off Sep 2017 | 875 La Playa | Everest Waterproofing & Restoration Inc. | repair to walkway steel posts at interior courtyards. not visible from streetDetails
repair to walkway steel posts at interior courtyards. not visible from street | $35,000 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 16, 2015 | Expired or cancelled cancelled Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | revision t0 201411030544. miscellanous changes to mechanical as requested by field inspector.Details
revision t0 201411030544. miscellanous changes to mechanical as requested by field inspector. | $1,000 |
| Oct 23, 2014 | Never finaled issued Nov 2014, no final | 2602 Pacific Av | voluntary seismic upgrade of 4 story single family home.Details
voluntary seismic upgrade of 4 story single family home. | $100,000 | |
| Sep 4, 2013 | Completed final sign-off Dec 2018 | 801 Brannan St | Balfour Beatty Construction Llc | to erect 6 stories, no basement, 434 dwelling units, type 1a & 3a, residential/retail/parking building. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 6 stories, no basement, 434 dwelling units, type 1a & 3a, residential/retail/parking building. ** maher: compliance with ordinance no# 155-13 not required ** | $112,000,000 |
| Jul 3, 2008 | Expired or cancelled expired Apr 2026 | 728 Castro St | True Blue Builders | enlarge ex. closet door located on a load bearing wall 2nd floor, install new dishwasher in ex. kitchen and construct some carbinetry in the bedroom, closet and living room. some lighting in the closets & vanityDetails
enlarge ex. closet door located on a load bearing wall 2nd floor, install new dishwasher in ex. kitchen and construct some carbinetry in the bedroom, closet and living room. some lighting in the closets & vanity | $30,000 |
| Nov 1, 2007 | Completed final sign-off Jan 2009 | 154 Ewing Tr | Ashbury Gen Constructing & Eng | ground floor addition on north side of home & develop undeveloped ground floor space. new stair case connecting 2nd floor to new ground floor. new 2nd floor, powder room. new deck on roof of new ground floor addition. remodel bathroom #1. relocate bedroom #2 closets into walk in close.Details
ground floor addition on north side of home & develop undeveloped ground floor space. new stair case connecting 2nd floor to new ground floor. new 2nd floor, powder room. new deck on roof of new ground floor addition. remodel bathroom #1. relocate bedroom #2 closets into walk in close. | $350,000 |
| Oct 21, 2004 | Expired or cancelled withdrawn Mar 2005 | 1 Front St | Swinerton Builders | 2nd floor - stair infill and steel support for operable partitionDetails
2nd floor - stair infill and steel support for operable partition | $20,000 |