Birmingham Builders, Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 3 permits filed
70 permits since 2000: 21 completed, 4 in progress, 33 never finaled, 12 expired or cancelled.
Of the 33 never-finaled permits, 4 are 3 to 5 years old, 8 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1349 Larkin St | minor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittalDetails
minor ti of 2 levels. and a mezzanine. project scope focuses on new entry doors, lobby, break room, and toilets. this includes non-structural demo, non-structural partitions, and new finishes throughout. mep and structural for stairs will be submitted as deferred submittal | $125,000 |
| Jun 18, 2025 | In progress issued Jul 2025 | 34 Woodward St | work is to remove 3 (e) windows. prepare (e) walls for 3 (n) windows openings and install (n) windows into the framed portion of of (e) building on the street facing wall on level 2.Details
work is to remove 3 (e) windows. prepare (e) walls for 3 (n) windows openings and install (n) windows into the framed portion of of (e) building on the street facing wall on level 2. | $34,000 |
| Mar 20, 2025 | In progress issued May 2025 | 1301 Sansome St | 2nd & 3rd - minor 2nd & 3rd fl interior renovations to existing office space. renovations to include addition of new convenience stair between the 2nd and 3rd fl, connected to mezzanine. demolition includes alteration to (e) mezzanine guardrail for stair openingDetails
2nd & 3rd - minor 2nd & 3rd fl interior renovations to existing office space. renovations to include addition of new convenience stair between the 2nd and 3rd fl, connected to mezzanine. demolition includes alteration to (e) mezzanine guardrail for stair opening | $40,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 147 Winfield St | addition of (n) bathroom at lower level. convert (e) family room into office. office not to be used for sleeping purposes.Details
addition of (n) bathroom at lower level. convert (e) family room into office. office not to be used for sleeping purposes. | $50,000 |
| Jun 6, 2024 | Completed final sign-off Sep 2024 | 1301 Sansome St | minor 1st/f interior renovation to e) office space for grove collobrative (tenant) renvation included new non-load bearing partitions, doors, interior glazing & millwork modifications. no exterior work, no life safety/fire sprinkler modification under this permitDetails
minor 1st/f interior renovation to e) office space for grove collobrative (tenant) renvation included new non-load bearing partitions, doors, interior glazing & millwork modifications. no exterior work, no life safety/fire sprinkler modification under this permit | $50,000 |
| Feb 26, 2024 | Completed final sign-off May 2024 | 1301 Sansome St | 5/f: minor interior renovations to (e) office space, renovations to include new non-load bearing partitions, doors, interior glazing and millwork modifications.Details
5/f: minor interior renovations to (e) office space, renovations to include new non-load bearing partitions, doors, interior glazing and millwork modifications. | $50,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 921 Front St | addition of accessible restroom in existing gr fl tenant suiteDetails
addition of accessible restroom in existing gr fl tenant suite | $42,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 100 Vallejo St | revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement.Details
revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement. | |
| Aug 9, 2022 | Never finaled issued Aug 2022, no final | 710 Sansome St | to obtain final inspection for work approved under pa#201310290563. all work is complete.Details
to obtain final inspection for work approved under pa#201310290563. all work is complete. | |
| Aug 9, 2022 | Never finaled issued Aug 2022, no final | 710 Sansome St | to obtain final inspection for work approved under pa#201301097587. all work is complete.Details
to obtain final inspection for work approved under pa#201301097587. all work is complete. | |
| Jun 28, 2022 | Completed final sign-off Jul 2022 | 710 Sansome St | recommencement and completion of work approved under pa# 201307182170.Details
recommencement and completion of work approved under pa# 201307182170. | $100,000 |
| Jun 9, 2022 | Completed final sign-off Feb 2023 | 1475 Folsom St | new roof deck to replace existing.Details
new roof deck to replace existing. | $20,000 |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 100 Vallejo St | reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferredDetails
reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferred | $85,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2022 | 710 Sansome St | 2/f & 3/f tenant improvement including construction of (n) walls, doors, all (e) floor and celing finishes are to remain. less than 10% of (e) lighting affected. entry doors on jackson place to be replaced with ada compliant doors.Details
2/f & 3/f tenant improvement including construction of (n) walls, doors, all (e) floor and celing finishes are to remain. less than 10% of (e) lighting affected. entry doors on jackson place to be replaced with ada compliant doors. | $75,000 |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 921 Front St | project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred.Details
project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred. | $375,500 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 921 Front St | 2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit.Details
2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit. | $8,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 217 02nd St | install 1 set of 90 minute fire rated doors on electronic hold openDetails
install 1 set of 90 minute fire rated doors on electronic hold open | $7,500 |
| Jul 30, 2019 | Never finaled issued Aug 2019, no final | 945 Green St | renovate existing co-op unit full floor on 4th fl. relocate bedroom #3 to face court that discharges to green st. relcoate & reconfigure laundry room & 1 bathroom. reconfigure closets @ master bedroom. no exterior work.Details
renovate existing co-op unit full floor on 4th fl. relocate bedroom #3 to face court that discharges to green st. relcoate & reconfigure laundry room & 1 bathroom. reconfigure closets @ master bedroom. no exterior work. | $62,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2640 Broadway | interior remodel at (e) studio room at top floor of (e) single family residence. demo portions of (e) interior walls, removal of 1 interior door. new wall framing, 2 new internal doors. extension of (e) raised platform for (n) configuration of bed. (n) cabinetryDetails
interior remodel at (e) studio room at top floor of (e) single family residence. demo portions of (e) interior walls, removal of 1 interior door. new wall framing, 2 new internal doors. extension of (e) raised platform for (n) configuration of bed. (n) cabinetry | $10,000 |
| May 6, 2019 | Never finaled issued May 2019, no final | 217 02nd St | connecting the 2 top floors (4/f & 5/f) & adding a new gyp board ceiling to the 5th floor.Details
connecting the 2 top floors (4/f & 5/f) & adding a new gyp board ceiling to the 5th floor. | $37,000 |
| Nov 2, 2018 | Never finaled issued Nov 2018, no final | 1301 Sansome St | (n) lobby area and partial t.i at ground flr. (n) entry glazing, (n) partitions & interior finishes, (n) breakroom. mep structural under separate permitDetails
(n) lobby area and partial t.i at ground flr. (n) entry glazing, (n) partitions & interior finishes, (n) breakroom. mep structural under separate permit | $170,000 |
| Oct 29, 2018 | Expired or cancelled cancelled Jan 2026 | 1301 Sansome St | ref pa# 201810153212; indentifying roof deck at 5th floor as a-2 occupancy.Details
ref pa# 201810153212; indentifying roof deck at 5th floor as a-2 occupancy. | |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | 4th and 5th floors: t. i. for restroom upgrades, mep, demo, fire life safety under seperate permit. no exterior work.Details
4th and 5th floors: t. i. for restroom upgrades, mep, demo, fire life safety under seperate permit. no exterior work. | $480,000 |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | 1st, 2nd, & 3rd floors: t. i. for restroom upgrades floor 1 mep, demo, fire life safety under seperate permit. no exterior work.Details
1st, 2nd, & 3rd floors: t. i. for restroom upgrades floor 1 mep, demo, fire life safety under seperate permit. no exterior work. | $570,000 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | 1,2,3,4,5,6,floors soft demo; exit paths to be maintained.Details
1,2,3,4,5,6,floors soft demo; exit paths to be maintained. | $20,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 111 Chestnut St | space #1605: install new lighting and installation of new sink in existing office space. per ab-017, ada under sep permitDetails
space #1605: install new lighting and installation of new sink in existing office space. per ab-017, ada under sep permit | $15,000 |
| May 21, 2015 | Completed final sign-off Jun 2015 | 33 Clementina St | to obtain final inspection for work approved under pa 201205231071; all work is completeDetails
to obtain final inspection for work approved under pa 201205231071; all work is complete | |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 111 Chestnut St | demolition of interior partition walls per ab-017. this space is vacant.Details
demolition of interior partition walls per ab-017. this space is vacant. | $3,500 |
| Oct 30, 2014 | Never finaled issued Nov 2014, no final | 30 La Ferrera Tr | reinforce the (e) post between the two garage doors.Details
reinforce the (e) post between the two garage doors. | $35,000 |
| Jan 28, 2014 | Never finaled issued Jan 2014, no final | 1479 Folsom St | non structural interior demolition of walls at 2 story portion of bldg. n/a for the maher ordinance #155-13 not required. excavation <50 cu.yd.Details
non structural interior demolition of walls at 2 story portion of bldg. n/a for the maher ordinance #155-13 not required. excavation <50 cu.yd. | $5,000 |
| Jan 28, 2014 | Expired or cancelled expired Mar 2026 | 729 Sansome St | revision to appl #2013.03.07.1711: in lieu of beams & posts, provide knee bracing at stairs opening. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to appl #2013.03.07.1711: in lieu of beams & posts, provide knee bracing at stairs opening. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 |
| Nov 7, 2013 | Never finaled issued Nov 2013, no final | 217 02nd St | to obtain final to app#201002257147. no work to be completed.Details
to obtain final to app#201002257147. no work to be completed. | |
| Oct 29, 2013 | Never finaled issued Nov 2013, no final | 710 Sansome St | differred fire escape construction plans under approved permit p.a.#201307182170 structural onlyDetails
differred fire escape construction plans under approved permit p.a.#201307182170 structural only | $5,000 |
| Oct 15, 2013 | Never finaled issued Oct 2013, no final | 945 Battery St | non structural soft demo of inteior partitions and constructionDetails
non structural soft demo of inteior partitions and construction | $10,000 |
| Jul 18, 2013 | Never finaled issued Aug 2013, no final | 710 Sansome St | basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural workDetails
basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural work | $450,000 |
| Jul 18, 2013 | Never finaled issued Aug 2013, no final | 729 Sansome St | convert (e) storage room to a ada restroom at basementDetails
convert (e) storage room to a ada restroom at basement | $10,000 |
| Jul 1, 2013 | Never finaled issued Jul 2013, no final | 945 Battery St | soft demolition and t.i. to 3rd mezzanine and 4th floors. ada shower upgrade, relocate partitions, new cabinetry and finishes.Details
soft demolition and t.i. to 3rd mezzanine and 4th floors. ada shower upgrade, relocate partitions, new cabinetry and finishes. | $200,000 |
| Jun 17, 2013 | Never finaled issued Jun 2013, no final | 729 Sansome St | basement & 1st floor - t.i. adding interior partitoins, interior window walls, a kitchen (no oven) & associated lighting & finishes.Details
basement & 1st floor - t.i. adding interior partitoins, interior window walls, a kitchen (no oven) & associated lighting & finishes. | $10,000 |
| May 29, 2013 | Never finaled issued May 2013, no final | 729 Sansome St | t.i. adding partitions, interior window walls, a kitchen and associated lighting and finishes on 3rd floor. upgrade 3/f restrooms.Details
t.i. adding partitions, interior window walls, a kitchen and associated lighting and finishes on 3rd floor. upgrade 3/f restrooms. | $10,000 |
| May 21, 2013 | Completed final sign-off Nov 2013 | 217 02nd St | to obtain final inspection for work approved under pa200106292734. all work is completeDetails
to obtain final inspection for work approved under pa200106292734. all work is complete | |
| Mar 7, 2013 | Expired or cancelled expired Mar 2026 | 729 Sansome St | modification of (e) basement involving installation of connecting stair; demo (e) stair at sw corner of bldg; modify (e) floor 1 involving install steel beams; openings with guardrails & interior walls; modify (e) floor 2 & floor 3 involving installation of floor.Details
modification of (e) basement involving installation of connecting stair; demo (e) stair at sw corner of bldg; modify (e) floor 1 involving install steel beams; openings with guardrails & interior walls; modify (e) floor 2 & floor 3 involving installation of floor. | $60,000 |
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 729 Sansome St | basement excavation and installation of new concrete slab on grade. in accordance wtih certificate of appropriateness motion 20120811a. excavation will not affect exteriorDetails
basement excavation and installation of new concrete slab on grade. in accordance wtih certificate of appropriateness motion 20120811a. excavation will not affect exterior | $20,000 |
| Jan 9, 2013 | Never finaled issued Jan 2013, no final | 710 Sansome St | modifaction of exterior parapet and repair of existing wood cornice.Details
modifaction of exterior parapet and repair of existing wood cornice. | $2,500 |
| Dec 3, 2012 | Never finaled issued Dec 2012, no final | 710 Sansome St | demo of all non-structural & non load bearing walls, glazing, doors, finishes. soft demo only per ab-017 remains vacant.Details
demo of all non-structural & non load bearing walls, glazing, doors, finishes. soft demo only per ab-017 remains vacant. | $25,000 |
| Nov 6, 2012 | Never finaled issued Nov 2014, no final | 1479 Folsom St | addition of roof deck to (e) roof w/ (n) door in (e) masonry wall proving access to roof deck.Details
addition of roof deck to (e) roof w/ (n) door in (e) masonry wall proving access to roof deck. | $10,000 |
| May 23, 2012 | Expired or cancelled expired Nov 2014 | 33 Clementina St | unit #1: expansion of extg mezzanine at 1st floor unit and redefinition of same to be a new story(allowing area to be greater than 1/3 limit) work of same to include addition of 1 bedroom and alterations to extg bathroom. extg hvac and sprinkler system to be extended to new bedroom.Details
unit #1: expansion of extg mezzanine at 1st floor unit and redefinition of same to be a new story(allowing area to be greater than 1/3 limit) work of same to include addition of 1 bedroom and alterations to extg bathroom. extg hvac and sprinkler system to be extended to new bedroom. | $100,000 |
| Apr 25, 2012 | Completed final sign-off Jul 2012 | 1275 Sacramento St | interior non structural demo. all work to comply with ab-017Details
interior non structural demo. all work to comply with ab-017 | $6,000 |
| Apr 4, 2012 | Completed final sign-off Sep 2012 | 1275 Sacramento St | a reconfiguration of (e) partial corridor space converted to a learning center & the reconfiguration of (e) classroom & office. scope of work occurs only at 4th flr.only non structural demo is being proposed. the new classroom is for students inthe upper classes limited to ,3rd through 8th gradeDetails
a reconfiguration of (e) partial corridor space converted to a learning center & the reconfiguration of (e) classroom & office. scope of work occurs only at 4th flr.only non structural demo is being proposed. the new classroom is for students inthe upper classes limited to ,3rd through 8th grade | $120,000 |
| Oct 12, 2011 | Never finaled issued Nov 2011, no final | 589 Howard St | reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor.Details
reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor. | $86,850 |
| Jul 21, 2011 | Completed final sign-off Feb 2012 | 560 Pacific Av | interior construction of walls, doors, finishes, breakroom, and restroom upgradesDetails
interior construction of walls, doors, finishes, breakroom, and restroom upgrades | $600,000 |
| May 26, 2011 | Completed final sign-off Nov 2011 | 560 Pacific Av | ground floor & basement interior tenant improvement including walls, doors, kitchenette counter & restrooms. mep under separate permit.Details
ground floor & basement interior tenant improvement including walls, doors, kitchenette counter & restrooms. mep under separate permit. | $48,000 |
| Apr 13, 2011 | Never finaled issued Apr 2011, no final | 560 Pacific Av | create new opening at ground floor to basement. new stairs 2 from basement to ground floor structural strengthening of basement and ground floor with new beams and footings per plans.Details
create new opening at ground floor to basement. new stairs 2 from basement to ground floor structural strengthening of basement and ground floor with new beams and footings per plans. | $80,000 |
| Apr 11, 2011 | Completed final sign-off Feb 2012 | 560 Pacific Av | new floor opening at ground floor to basement with new stairs. structural upgrade of bldg per plans. new mezzanine at 2nd floor, new stairs to mezzanine. mezzanine to be 2310 sq ft.Details
new floor opening at ground floor to basement with new stairs. structural upgrade of bldg per plans. new mezzanine at 2nd floor, new stairs to mezzanine. mezzanine to be 2310 sq ft. | $78,500 |
| Apr 7, 2011 | Completed final sign-off Aug 2012 | 217 02nd St | to obtain final inspection for work approved under pa#200803036057 all work is complete.Details
to obtain final inspection for work approved under pa#200803036057 all work is complete. | |
| Mar 17, 2011 | Completed final sign-off Feb 2012 | 560 Pacific Av | 1st & 2nd floor - interior non-structural demolition walls, doors, windows per ab-017.Details
1st & 2nd floor - interior non-structural demolition walls, doors, windows per ab-017. | $15,000 |
| Jun 10, 2010 | Completed final sign-off Sep 2010 | 50 Osgood Pl | minor tenant improvement including demolition & (n) finishes, (n) glass wall, (n) sink & cabinet in break room. also ada restroom upgrade.Details
minor tenant improvement including demolition & (n) finishes, (n) glass wall, (n) sink & cabinet in break room. also ada restroom upgrade. | $10,000 |
| May 21, 2010 | Completed final sign-off Sep 2010 | 1275 Sacramento St | cathedral school for boys. the project is the conversion of (e) corridor spaces to become a new office and class room. this includes the removal of one exit and redistribution to (e) exits. mep under separate permit.Details
cathedral school for boys. the project is the conversion of (e) corridor spaces to become a new office and class room. this includes the removal of one exit and redistribution to (e) exits. mep under separate permit. | $19,500 |
| Feb 25, 2010 | Expired or cancelled expired Dec 2014 | 217 02nd St | communicating opening between 217-2nd. street and 215-2nd. street (between buildings).sprinklers under separate permit.Details
communicating opening between 217-2nd. street and 215-2nd. street (between buildings).sprinklers under separate permit. | $2,500 |
| Feb 25, 2010 | Expired or cancelled expired Dec 2013 | 215 02nd St | communicating opening between 215-2nd. street and 217-2nd. street (between buildings).Details
communicating opening between 215-2nd. street and 217-2nd. street (between buildings). | $7,500 |
| Jan 22, 2010 | Expired or cancelled expired Nov 2013 | 215 02nd St | tenant improvement-construction of 5 new offices in basement. minor electrical & mechanical in that area under seperate permitDetails
tenant improvement-construction of 5 new offices in basement. minor electrical & mechanical in that area under seperate permit | $17,500 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 215 02nd St | to obtain final inspection for work approved under app 200803137082. all work is completeDetails
to obtain final inspection for work approved under app 200803137082. all work is complete | |
| Sep 21, 2009 | Never finaled issued Nov 2009, no final | 215 02nd St | non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement.Details
non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement. | $18,000 |
| Sep 9, 2009 | Expired or cancelled expired Dec 2010 | 921 Front St | tenant improvements @ ground flr. interior partitions, doors finishes, breakroom, cabentry. no exterior changes & no structural work. (mep under separate permit).Details
tenant improvements @ ground flr. interior partitions, doors finishes, breakroom, cabentry. no exterior changes & no structural work. (mep under separate permit). | $40,000 |
| Mar 20, 2009 | Expired or cancelled expired Dec 2010 | 921 Front St | demolition of existing restrooms and the construction of new ada compliant restrooms.Details
demolition of existing restrooms and the construction of new ada compliant restrooms. | $30,000 |
| May 31, 2005 | Expired or cancelled expired Feb 2009 | 30 La Ferrera Tr | construct a deck off second level @ rear of property. construction will require a rear yard variance.Details
construct a deck off second level @ rear of property. construction will require a rear yard variance. | $10,000 |
| Feb 2, 2005 | Completed final sign-off Mar 2005 | 1522 Howard St | repair back stairs and replace treads and risers as necessary. work to be done in kind. not toDetails
repair back stairs and replace treads and risers as necessary. work to be done in kind. not to | $1,500 |
| May 2, 2002 | Never finaled issued May 2002, no final | 545 Mission St | new bathrm,ada & elevator installation as part of 200203262410Details
new bathrm,ada & elevator installation as part of 200203262410 | $60,000 |
| Nov 21, 2001 | Completed final sign-off Mar 2003 | 710 Market St | revi ap #200101190176-r1 seismic upgrade to (e) bldg install steel brace frame concrete shear wallsDetails
revi ap #200101190176-r1 seismic upgrade to (e) bldg install steel brace frame concrete shear walls | |
| Mar 6, 2001 | Expired or cancelled expired Aug 2001 | 1810 Harrison St | rev. to appl#9812833 follow ada upgrade provided under #200002222374 accessible entry, route of travDetails
rev. to appl#9812833 follow ada upgrade provided under #200002222374 accessible entry, route of trav | |
| Feb 22, 2000 | Expired or cancelled expired Jun 2002 | 1 14th St | interior remodeling,disability access, add 861 squarefeet, miscellanious interior partitions, etc.Details
interior remodeling,disability access, add 861 squarefeet, miscellanious interior partitions, etc. | $354,000 |