Lokman Construction
- Based in
- Petaluma
- On San Francisco permits
- Nov 2001 to Aug 2020
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2020 | Completed final sign-off Dec 2021 | 1125 Jackson St | renovate e kitchen. no change to footprintDetails
renovate e kitchen. no change to footprint | $15,000 |
| Mar 12, 2020 | Completed final sign-off May 2021 | 1020 Union St | reinstall deck after roof replacement. recreate to original configureation. reference 2019-1106-6611.Details
reinstall deck after roof replacement. recreate to original configureation. reference 2019-1106-6611. | $12,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 1020 Union St | unit 2: stiffen the (e) curb & reduce wind deflection of the glass railing on existing roof deck. no visual impact.Details
unit 2: stiffen the (e) curb & reduce wind deflection of the glass railing on existing roof deck. no visual impact. | $2,000 |
| Sep 4, 2019 | Expired or cancelled cancelled Oct 2019 | 1020 Union St | unit 2: stiffen teh (e) curb & reduce deflection of the glass screen on existing roof deck, brace the curb with diagonal bracing.Details
unit 2: stiffen teh (e) curb & reduce deflection of the glass screen on existing roof deck, brace the curb with diagonal bracing. | $8,200 |
| Oct 1, 2018 | Completed final sign-off Dec 2018 | 362 Waller St | renovate existing bathroom wiht new fixtures and tiles. no structural work.Details
renovate existing bathroom wiht new fixtures and tiles. no structural work. | $9,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2019 | 329 Prospect Av | install handrail at two stairs. replace fire rated door at unit 329. re-vemt dryer to comply with physical inspection report cc-8312. transition dryer duct no more than 6 feet per cmc.Details
install handrail at two stairs. replace fire rated door at unit 329. re-vemt dryer to comply with physical inspection report cc-8312. transition dryer duct no more than 6 feet per cmc. | $2,000 |
| Sep 17, 2018 | Completed final sign-off Feb 2019 | 329 Prospect Av | to obtain final inspection for work approved under pa# 9708961, 2002-0222-9778. all work is complete.Details
to obtain final inspection for work approved under pa# 9708961, 2002-0222-9778. all work is complete. | |
| Jul 10, 2018 | Completed final sign-off Sep 2018 | 143 Willard North St | remove tile from deck. insstall (n) membrane & tile. existing deckDetails
remove tile from deck. insstall (n) membrane & tile. existing deck | $11,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 1125 Jackson St | new gas line and hot water heater. replace heater. new subpanel & plug circuits. repair drywall.Details
new gas line and hot water heater. replace heater. new subpanel & plug circuits. repair drywall. | $10,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 1127 Jackson St | new gas line and hot water heater. new subpanel & plug & light circuits. new furnace. repair drywall.Details
new gas line and hot water heater. new subpanel & plug & light circuits. new furnace. repair drywall. | $20,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 143 Willard North St | renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works.Details
renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works. | $10,000 |
| Jun 15, 2017 | Completed final sign-off Nov 2017 | 1125 Jackson St | replace sash in existing double hung window. wood sash in kind.Details
replace sash in existing double hung window. wood sash in kind. | $5,000 |
| Jun 24, 2016 | Completed final sign-off Nov 2016 | 710 Guerrero St | interior remodel of an existing bedroomand bath on gr fl of 2 story apartment in a 3 story 2 unit building. 1 rear window replaced with sliding doorDetails
interior remodel of an existing bedroomand bath on gr fl of 2 story apartment in a 3 story 2 unit building. 1 rear window replaced with sliding door | $100,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 983 Dolores St | renovate existing bathroom, new fixtures & tile, same configuration. high efficacy lighting or controlled by manual-on sensor with high efficacy main light.Details
renovate existing bathroom, new fixtures & tile, same configuration. high efficacy lighting or controlled by manual-on sensor with high efficacy main light. | $10,000 |
| Aug 4, 2015 | Completed final sign-off Aug 2016 | 930 Esmeralda Av | revision to pa#201402218991, stuctural revision: add piers.Details
revision to pa#201402218991, stuctural revision: add piers. | $18,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 192 Graystone Tr | new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered.Details
new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered. | $12,000 |
| Nov 4, 2014 | Never finaled issued Nov 2014, no final | 2377 Bay St | renovate (e) master bathroom, no changes to floor plan, replace fixtures & tile. compliance with maher ordinance no 155-13 not required.Details
renovate (e) master bathroom, no changes to floor plan, replace fixtures & tile. compliance with maher ordinance no 155-13 not required. | $12,000 |
| Feb 25, 2014 | Completed final sign-off Mar 2014 | 362 Waller St | revised to application 2012-0828-8341. header size changed. foundation detail changed.Details
revised to application 2012-0828-8341. header size changed. foundation detail changed. | |
| Feb 21, 2014 | Completed final sign-off Aug 2016 | 930 Esmeralda Av | rear yard addition:l 372 sf. at g/f: 1 bedroom; 220 sf at 2/f: expand living roomDetails
rear yard addition:l 372 sf. at g/f: 1 bedroom; 220 sf at 2/f: expand living room | $125,000 |
| Jun 21, 2013 | Completed final sign-off Nov 2013 | 2725 Broderick St | remodel existing kitchen. replace appliances, cabinets. reconfigure existing pantry. replace lighting in kitchen and family room. no structural work. no exterior work.Details
remodel existing kitchen. replace appliances, cabinets. reconfigure existing pantry. replace lighting in kitchen and family room. no structural work. no exterior work. | $50,000 |
| May 21, 2013 | Completed final sign-off Jul 2014 | 335 Joost Av | interior remodel adding a bathroom at basementand on the 1st floor.Details
interior remodel adding a bathroom at basementand on the 1st floor. | $40,000 |
| Sep 26, 2012 | Completed final sign-off Aug 2013 | 51 Capra Wy | remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lightingDetails
remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lighting | $42,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 49 Capra Wy | interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unitDetails
interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unit | $120,000 |
| Jul 8, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | amend permit to include new window.revision to app#201103303057Details
amend permit to include new window.revision to app#201103303057 | $2,000 |
| Mar 30, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | interior kitchen remodel and adding a bathroom at the basement level with in the extg buildingDetails
interior kitchen remodel and adding a bathroom at the basement level with in the extg building | $65,000 |
| Jan 29, 2002 | Completed final sign-off May 2002 | 3765 Fillmore St | renovate existing bathroom and kitchen. no changeDetails
renovate existing bathroom and kitchen. no change | $18,000 |
| Nov 28, 2001 | Completed final sign-off Feb 2002 | 3763 Fillmore St | repair dry rot in post & beam at front of houseDetails