Vahid Sattary
- Listed as
- architect, engineer
- Firm
- Sattart Structural Engineer
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jul 2026
45 permits since 2000 (engineer on 43 permits, architect on 2 permits): 23 completed, 7 in progress, 7 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 1158 Sutter St | Unlimited Construction | repair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengtheningDetails
repair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengthening | $46,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 555 Mission St | Gci, Inc | 21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mepDetails
21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep | $2,012,760 |
| Apr 13, 2026 | In progress issued Apr 2026 | 1365 Scott St | R Bay Construction | unit #6: balcony repair inkind, blacony size 10x5.3. new 4x12 pressure treated, new 2x8 pressure treated, new 2x6 redwood decking. metal hangers. will keep existing metal handrailDetails
unit #6: balcony repair inkind, blacony size 10x5.3. new 4x12 pressure treated, new 2x8 pressure treated, new 2x6 redwood decking. metal hangers. will keep existing metal handrail | $27,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 1357 Scott St | R Bay Construction | balcony repair inkind - balcony size 10x5.3" new 4x12 pressure treated, new 2x8, new 2x6 redwood decking, metal hangers will keep existing metal handrailDetails
balcony repair inkind - balcony size 10x5.3" new 4x12 pressure treated, new 2x8, new 2x6 redwood decking, metal hangers will keep existing metal handrail | $27,000 |
| Nov 24, 2025 | In progress issued Aug 2026 | 299 West Portal Av | Singular Builders, Heneghan Developers Llc | change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc.Details
change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc. | $1,108,500 |
| Dec 6, 2024 | Completed final sign-off Dec 2025 | 143 Laidley St | Forma Construction | replace glass guardrail in (e) balcony & repair or replace waterproofing impacted by guardrail workDetails
replace glass guardrail in (e) balcony & repair or replace waterproofing impacted by guardrail work | $130,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 1000 Lombard St | revision to 202407126367: e windows on the kitchen of proposed 3rd fl plan sheet a2.3 to be replaced with wood frame alum clad exterior, color tbd by owner. to clarify alum clad windows.Details
revision to 202407126367: e windows on the kitchen of proposed 3rd fl plan sheet a2.3 to be replaced with wood frame alum clad exterior, color tbd by owner. to clarify alum clad windows. | ||
| Jul 3, 2024 | In progress issued Aug 2024 | 149 Cole St | Top Estate Construction | replace backyard concrete slab to resolve nov# 202305245.Details
replace backyard concrete slab to resolve nov# 202305245. | $5,000 |
| Sep 13, 2023 | Completed final sign-off Apr 2025 | 1940 Vallejo St | Jetton Construction | unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinetsDetails
unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinets | $200,000 |
| May 10, 2023 | Completed final sign-off Oct 2023 | 3 Burnett Ave North Av | B T C Bob Tedrick Construction Inc | unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight.Details
unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight. | $16,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 555 Post St | priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints.Details
priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints. | $165,000 | |
| Sep 1, 2022 | Completed final sign-off Dec 2022 | 5000 Fulton St | repair damage to small area of southeast corner wall caused by a car crash: repair framework; replace garage door frame/casings; replace garage door. to comply w/202291197.Details
repair damage to small area of southeast corner wall caused by a car crash: repair framework; replace garage door frame/casings; replace garage door. to comply w/202291197. | $20,000 | |
| May 23, 2022 | Completed final sign-off Nov 2024 | 1919 Quesada Av | Form & Function Landscapes Llc, X O Builders | build new 452 sf deck/stairs and new railing at the back of the property, 5lf from p|l.Details
build new 452 sf deck/stairs and new railing at the back of the property, 5lf from p|l. | $90,000 |
| Apr 12, 2022 | Completed final sign-off Mar 2023 | 555 Mission St | Skyline Construction | 16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17thDetails
16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17th | $478,662 |
| Jan 31, 2022 | Completed final sign-off Mar 2022 | 5 Burnett Ave North Av | Unlimited Construction | repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo.Details
repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo. | $15,000 |
| Jan 28, 2022 | Never finaled issued May 2022, no final | 351 California St | Constructive Solutions Inc. | new storefront system and entry door at 2nd bay from east side of building. new exterior steps at entrance. new accessible entry at east wall of exterior vestibule.Details
new storefront system and entry door at 2nd bay from east side of building. new exterior steps at entrance. new accessible entry at east wall of exterior vestibule. | $165,000 |
| Oct 3, 2020 | Completed final sign-off Jan 2021 | 550 California St | City Building Inc. | rooftop: furnish & install stell catwalk on top of (e) steel structure on the roof.Details
rooftop: furnish & install stell catwalk on top of (e) steel structure on the roof. | $60,000 |
| Jul 23, 2020 | Completed final sign-off Jul 2024 | 650 24th Av | Zhongwei Construction | remodel and add 1 story to existing 2 story single family dwelling.Details
remodel and add 1 story to existing 2 story single family dwelling. | $100,000 |
| Mar 2, 2020 | Completed final sign-off Sep 2020 | 75 Hawthorne St | C B 2 Builders Incorporated | revise (e) 7th fl roof tie back to conform with cal osha.Details
revise (e) 7th fl roof tie back to conform with cal osha. | $50,000 |
| Jan 28, 2020 | Completed final sign-off Feb 2022 | 685 Market St | Swinerton Builders | ground floor - core & shell strengthen 3 floor beams fill in slab at existing doorDetails
ground floor - core & shell strengthen 3 floor beams fill in slab at existing door | $50,000 |
| Feb 4, 2019 | Completed final sign-off Aug 2019 | 1248 Funston Av | correction to construction previous permit app#201505186540Details
correction to construction previous permit app#201505186540 | ||
| Aug 15, 2018 | Completed final sign-off Jun 2019 | 171 02nd St | Western Waterproofing/Brisk Wp | comply with nov 201842221; repair damaged brick facade facing 2nd street.Details
comply with nov 201842221; repair damaged brick facade facing 2nd street. | $40,000 |
| Jun 8, 2018 | Completed final sign-off Aug 2018 | 1401 Howard St | Palisade Builders Inc | revision/amendment to #201612215621. materials & details for interior stairs. to comply with complaint #201782061Details
revision/amendment to #201612215621. materials & details for interior stairs. to comply with complaint #201782061 | |
| Jan 19, 2017 | Completed final sign-off Jul 2018 | 685 Market St | Swinerton Builders | voluntary local structural strengthening to improve seismic response. ** maher: n/a **Details
voluntary local structural strengthening to improve seismic response. ** maher: n/a ** | $400,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 685 Market St | Swinerton Builders | 10/f & roof: repair rust damage at existing mechanical platform. n/a ordinance #155-13Details
10/f & roof: repair rust damage at existing mechanical platform. n/a ordinance #155-13 | $250,000 |
| Sep 2, 2016 | Completed final sign-off Nov 2018 | 1301 Leavenworth St | West Coast Premier Construction Inc | soft story retrofit per 2012 iebc appendix a-4. n/a for maherDetails
soft story retrofit per 2012 iebc appendix a-4. n/a for maher | $100,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2017 | 709 Geary St | create two 12-ft wide openings at a ground level wall.Details
create two 12-ft wide openings at a ground level wall. | $20,000 | |
| Jul 27, 2016 | Expired or cancelled expired Jan 2019 | 65 Buena Vista East Av | soft story seismic retrofit per sfbc chapter 34b, engineering criteria - fema p-807. n/a maher ordinanceDetails
soft story seismic retrofit per sfbc chapter 34b, engineering criteria - fema p-807. n/a maher ordinance | $100,000 | |
| Jul 31, 2015 | Expired or cancelled cancelled Jan 2026 | 3545 California St | opening between spaces to be created. stairs and elevator lift installed ref pa 201508144345Details
opening between spaces to be created. stairs and elevator lift installed ref pa 201508144345 | $15,000 | |
| May 18, 2015 | Completed final sign-off Aug 2019 | 1248 Funston Av | All Construction Services | square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room.Details
square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room. | $200,000 |
| Dec 16, 2014 | Expired or cancelled expired Apr 2019 | 965 Mission St | Abolfath Hosseinioun | 5th floor t.i. work to existing offices - (n) offices, conference rooms & storage room. take improvements to doors & walls.Details
5th floor t.i. work to existing offices - (n) offices, conference rooms & storage room. take improvements to doors & walls. | $50,519 |
| Aug 12, 2014 | Completed final sign-off May 2015 | 299 Cole St | All Construction Services | structural support in lobby & garage & bay window in unit #2.Details
structural support in lobby & garage & bay window in unit #2. | $20,000 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 3545 California St | repair structural damage to existing wall that was caused by automobile accident.Details
repair structural damage to existing wall that was caused by automobile accident. | $21,000 | |
| Jul 31, 2014 | Never finaled issued Jul 2014, no final | 965 Mission St | Abolfath Hosseinioun | demolition of certain walls & remove ceiling partially. demo per ab-17Details
demolition of certain walls & remove ceiling partially. demo per ab-17 | $5,000 |
| Jul 28, 2014 | Never finaled issued Jan 2016, no final | 965 Mission St | Abolfath Hosseinioun | 1st floor - demolitoin & relocation of minna st egress doors. remove (e) 1st floor minna st side windows - replace with new windows. new trash access placed at (e) egress opening. new egress doors at mission st.Details
1st floor - demolitoin & relocation of minna st egress doors. remove (e) 1st floor minna st side windows - replace with new windows. new trash access placed at (e) egress opening. new egress doors at mission st. | $33,550 |
| May 7, 2014 | Never finaled issued May 2014, no final | 685 Market St | Truebeck Construction | structural design for pa#201402198795. n/a ordinance#155-13.Details
structural design for pa#201402198795. n/a ordinance#155-13. | |
| Apr 10, 2014 | Completed final sign-off Jun 2017 | 685 Market St | Giampolini & Co Dba Giampolini/Courtney | consist exterior facade maintenance & repair incl removal (e) paint,brick masonry repair & restoration, structural steel repair, terra cotta repair & restoration, sheet metal repair & restoration, flashing & water proofing, gfrc repair, new paint. ** maher ordinance# 155-13 not applicable **Details
consist exterior facade maintenance & repair incl removal (e) paint,brick masonry repair & restoration, structural steel repair, terra cotta repair & restoration, sheet metal repair & restoration, flashing & water proofing, gfrc repair, new paint. ** maher ordinance# 155-13 not applicable ** | $4,739,000 |
| Mar 20, 2014 | Expired or cancelled cancelled Jan 2026 | 685 Market St | Truebeck Construction | revision to pa #2014.0219.8795 - structural for supporting door assembly. compliance with ordinance #155-13 not requiredDetails
revision to pa #2014.0219.8795 - structural for supporting door assembly. compliance with ordinance #155-13 not required | |
| Sep 12, 2013 | Completed final sign-off Sep 2014 | 150 04th Ti St | Andes General Construction | bldg #449-the scope of work is limited to minor remodeling of the existing building concrete walls including cutting 3.5'x7' doors at north of south walls and 2 11'x7' openings for 2 sets of double doors at west wall, design of the new steel header jamb complies with provisions of 2010 ca bldg. codeDetails
bldg #449-the scope of work is limited to minor remodeling of the existing building concrete walls including cutting 3.5'x7' doors at north of south walls and 2 11'x7' openings for 2 sets of double doors at west wall, design of the new steel header jamb complies with provisions of 2010 ca bldg. code | $42,859 |
| Nov 26, 2012 | Completed final sign-off Jul 2014 | 1440 Harrison St | Wci-Gc Inc | revision to appl #2011.0623.8797 - in lieu of demolishing concrete walls per original permit, sawcut 1 (one) new opening in existing concrete wall & reinforce with steel elements per plan, accessibility to be provided under original permit..Details
revision to appl #2011.0623.8797 - in lieu of demolishing concrete walls per original permit, sawcut 1 (one) new opening in existing concrete wall & reinforce with steel elements per plan, accessibility to be provided under original permit.. | |
| Apr 20, 2010 | Completed final sign-off May 2010 | 2340 Larkin St | Dawson - Clinton Gen Contr Corp | unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414Details
unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414 | $8,000 |
| Sep 28, 2007 | Expired or cancelled expired Nov 2013 | 685 Market St | International Waterproofing | repair brick wall cracking and rusted beam at interior courtyard.Details
repair brick wall cracking and rusted beam at interior courtyard. | $123,000 |
| Sep 14, 2007 | Expired or cancelled expired Jul 2010 | 350 Parnassus Av | Niscayah Inc. | install prefabricated atm on existing plaza. (e) atm structure to be legalized and made accessible per ada requirements.Details
install prefabricated atm on existing plaza. (e) atm structure to be legalized and made accessible per ada requirements. | $10,000 |
| Jul 28, 2006 | Expired or cancelled expired Jan 2008 | 1431 Hudson Av | construct concrete piers for support of 5 h x 90' dry stacked rock retaining wall.Details
construct concrete piers for support of 5 h x 90' dry stacked rock retaining wall. | $20,000 | |
| Mar 2, 2005 | Expired or cancelled expired Jan 2009 | 2448 Folsom St | removal of existing brick foundation repacing w/concrete and moving retaining wall front of houseDetails
removal of existing brick foundation repacing w/concrete and moving retaining wall front of house | $56,000 |