B T C Bob Tedrick Construction Inc
- Based in
- Livermore
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 790 07th Av | unit #101: revision to #202601224272. framing repairs on one side elevation of buildingDetails
unit #101: revision to #202601224272. framing repairs on one side elevation of building | $75,000 |
| Jan 22, 2026 | In progress issued Jan 2026 | 790 07th Av | remove/replace 1174 sf stucco, remove/replace 8) 5030 & 2) 5040 windows, exterior stair landing membrane. windows are all in kind.Details
remove/replace 1174 sf stucco, remove/replace 8) 5030 & 2) 5040 windows, exterior stair landing membrane. windows are all in kind. | $93,000 |
| Dec 11, 2024 | Completed final sign-off May 2025 | 7 Burnett Ave North Av | unit 2- repair (e) roof deck , replace damaged parts ion kind and remove and resinstall (e) guardrail in kindDetails
unit 2- repair (e) roof deck , replace damaged parts ion kind and remove and resinstall (e) guardrail in kind | $10,000 |
| Jan 9, 2024 | Completed final sign-off Mar 2025 | 1327 07th Av | unit #9: partial and limited elevated deck framing repairDetails
unit #9: partial and limited elevated deck framing repair | $8,500 |
| May 10, 2023 | Completed final sign-off Oct 2023 | 3 Burnett Ave North Av | unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight.Details
unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight. | $16,000 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 3 Burnett Ave North Av | unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weightDetails
unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weight | $16,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 5 Burnett Ave North Av | unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes.Details
unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes. | $12,000 |