Singular Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Sep 2026
- Last 24 months
- 44 permits filed
71 permits since 2000: 31 completed, 37 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1 California St | mechanical and electrical work for t.i. at suite 1825. ref: 202606223639Details
mechanical and electrical work for t.i. at suite 1825. ref: 202606223639 | $82,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 1 California St | #1850: mechanical and electrical work to tenant improvement ref 202605261889Details
#1850: mechanical and electrical work to tenant improvement ref 202605261889 | $60,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 655 Brotherhood Wy | emergency (exterior) dry rot demolition to wood columns directly above underpinnig. approximately 700 sf wall.Details
emergency (exterior) dry rot demolition to wood columns directly above underpinnig. approximately 700 sf wall. | $15,000 |
| Jul 16, 2026 | In progress issued Aug 2026 | 800 Presidio Av | g/f: minor interior t.i. to staff & program space: demo & relocate 1) non load bearing wall, demo of e) linoleum flooring & replacement w. new carper & limoleum in 2 offices & 1 classroom, new interior storefront doors tied into e) access control, mep under separated permitDetails
g/f: minor interior t.i. to staff & program space: demo & relocate 1) non load bearing wall, demo of e) linoleum flooring & replacement w. new carper & limoleum in 2 offices & 1 classroom, new interior storefront doors tied into e) access control, mep under separated permit | $326,134 |
| Jul 15, 2026 | In progress issued Sep 2026 | 57 Post St | 2nd & 3rd/f t.i. build out individual study rooms at 3rd/f. general update to finieshes, repainting walls and ceiling, carpeting floors, staining wood. replacement of light & casework, upgrade to mech cooling in the 3rd/f it closetDetails
2nd & 3rd/f t.i. build out individual study rooms at 3rd/f. general update to finieshes, repainting walls and ceiling, carpeting floors, staining wood. replacement of light & casework, upgrade to mech cooling in the 3rd/f it closet | $1,880,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 333 Ofarrell St | remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)Details
remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683) | $75,000 |
| Jun 22, 2026 | In progress issued Jul 2026 | 1 California St | 18th floor: #1825: interior tenant improvement, new construction of non-structural partitions, ceiling and light fixtures, finishes, & millwork. mep & fire life safety under seperate permit.Details
18th floor: #1825: interior tenant improvement, new construction of non-structural partitions, ceiling and light fixtures, finishes, & millwork. mep & fire life safety under seperate permit. | $370,336 |
| Jun 4, 2026 | In progress issued Aug 2026 | 235 Stockton St | (n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarmDetails
(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm | $1,030,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 655 Brotherhood Wy | grading & ground improvement for outdoor play yard to make ready site for future build back currently under pa# 202602105607, no structural work under this permit.Details
grading & ground improvement for outdoor play yard to make ready site for future build back currently under pa# 202602105607, no structural work under this permit. | $221,400 |
| Jun 2, 2026 | In progress issued Jun 2026 | 940 Battery St | a small portion of exploratory work requested by the structural engineer in relation to site permit application #201912169604, rebar will be exposed at 4 locations & 1 horiz bar removed for testing(replace & patch back per memo) 24 concrete cores 6"0 or less to be taken(6/floor)(pach back/memo)Details
a small portion of exploratory work requested by the structural engineer in relation to site permit application #201912169604, rebar will be exposed at 4 locations & 1 horiz bar removed for testing(replace & patch back per memo) 24 concrete cores 6"0 or less to be taken(6/floor)(pach back/memo) | $40,000 |
| Jun 1, 2026 | In progress issued Jul 2026 | 655 Brotherhood Wy | shoring and underpinning at demolished exterior stairs to make ready site for future build back under bpa 202602105607. stair demo under bpa 202605181443.Details
shoring and underpinning at demolished exterior stairs to make ready site for future build back under bpa 202602105607. stair demo under bpa 202605181443. | $104,000 |
| May 26, 2026 | In progress issued Jul 2026 | 1 California St | 18/f -interior tenetn improvement, demo of non structural partitions, new partitoins, ceiling and light fixtures, finishes, millwork. mep, fire and life safety under sep permit.Details
18/f -interior tenetn improvement, demo of non structural partitions, new partitoins, ceiling and light fixtures, finishes, millwork. mep, fire and life safety under sep permit. | $392,975 |
| May 15, 2026 | Expired or cancelled withdrawn May 2026 | 655 Brotherhood Wy | grading and ground improvement for outdoor play yards to make ready site for future build back currently under bpa#: 202602105607Details
grading and ground improvement for outdoor play yards to make ready site for future build back currently under bpa#: 202602105607 | $221,400 |
| May 15, 2026 | In progress issued Jul 2026 | 55 Cyril Magnin St | 22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218)Details
22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218) | $90,000 |
| May 6, 2026 | In progress issued May 2026 | 301 14th Av | revision to 202512111503 to allow for the use of starc lite barrier demountable partitions,in lieu of approved framed partitions. alterations at partitions locations are temporary. the use fits with the intended temporary nature of walls.Details
revision to 202512111503 to allow for the use of starc lite barrier demountable partitions,in lieu of approved framed partitions. alterations at partitions locations are temporary. the use fits with the intended temporary nature of walls. | |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | 9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd)Details
9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd) | $150,000 |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | 8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd)Details
8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd) | $42,600 |
| Apr 7, 2026 | In progress issued Jun 2026 | 2261 Fillmore St | interior demo of non structural elements and treatment of interior defining features. in preparation for future renovation approved by planning. per ab 017, ti, mep and accessiblity is deferred under a separate permitDetails
interior demo of non structural elements and treatment of interior defining features. in preparation for future renovation approved by planning. per ab 017, ti, mep and accessiblity is deferred under a separate permit | $34,632 |
| Mar 18, 2026 | In progress issued Jun 2026 | 728 Pacific Av | 4/fl- ti to convert (e) clicnic space into (n) accpunture clinic and restroom remodelDetails
4/fl- ti to convert (e) clicnic space into (n) accpunture clinic and restroom remodel | $600,000 |
| Mar 6, 2026 | In progress issued Jul 2026 | 655 Brotherhood Wy | construction of 101sf gatehouse. addition to basement story of (e) clssrm bldg.site improvemvent of 2 (e) outdoor playyards.renovation of classrooom space on g/f of (e) gym into full kitchen,renov faculty lounge space of basement of gym bldg of admin space for kitchen staff, including kitchen strg.Details
construction of 101sf gatehouse. addition to basement story of (e) clssrm bldg.site improvemvent of 2 (e) outdoor playyards.renovation of classrooom space on g/f of (e) gym into full kitchen,renov faculty lounge space of basement of gym bldg of admin space for kitchen staff, including kitchen strg. | $5,000,000 |
| Feb 23, 2026 | In progress issued Mar 2026 | 1045 Sansome St | interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor.Details
interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor. | $250,000 |
| Jan 5, 2026 | In progress issued Apr 2026 | 301 14th Av | provide temp presschool location during construction under pa 202508082684.remove 3 int partitions,erect 5 partitions with4 int doors.infill (e) sunken floor with new framing.provide new toilet compartment privacy screen at (e) restroom. no change to l/s & meps.Details
provide temp presschool location during construction under pa 202508082684.remove 3 int partitions,erect 5 partitions with4 int doors.infill (e) sunken floor with new framing.provide new toilet compartment privacy screen at (e) restroom. no change to l/s & meps. | $48,000 |
| Dec 26, 2025 | In progress issued Jul 2026 | 3153 17th St | alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the twoDetails
alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two | $105 |
| Dec 18, 2025 | In progress issued Jun 2026 | 153 Townsend St | 1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered)Details
1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered) | $189,254 |
| Dec 9, 2025 | In progress issued Jul 2026 | 3175 17th St | change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.Details
change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings. | $7,273,634 |
| Nov 24, 2025 | In progress issued Aug 2026 | 299 West Portal Av | change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc.Details
change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc. | $1,108,500 |
| Oct 22, 2025 | In progress issued Jul 2026 | 3251 20th Av | tenant improvement with roof-top mounted hvac equipment.Details
tenant improvement with roof-top mounted hvac equipment. | $400,000 |
| Oct 9, 2025 | Completed final sign-off Dec 2025 | 3900 03rd St | construct a wood deck and trash enclosure for the use of the building and tenants, location at rear of buildingDetails
construct a wood deck and trash enclosure for the use of the building and tenants, location at rear of building | $107,000 |
| Aug 25, 2025 | In progress issued Aug 2026 | 301 14th Av | new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave.Details
new security gate, entry stairs, accessible ramps, planters and landscaping at 15th ave entrance; new landscaping at enclosed front patio and central courtyard (improved permeability and play areas); new stairs and accessible ramp connecting preschool to existing 2f terrace & to 14th ave. | $3,000,000 |
| Jun 30, 2025 | In progress issued Jun 2025 | 350 Masonic Av | to continue the work authorized by pa # 202405011192 which was erroneously finalized and closed by sfdbi field inspectors. no additional construction for administrative purposes only.Details
to continue the work authorized by pa # 202405011192 which was erroneously finalized and closed by sfdbi field inspectors. no additional construction for administrative purposes only. | |
| May 8, 2025 | Completed final sign-off Dec 2025 | 3900 03rd St | priority: soft story upgrade per city of san francisco mandatory soft story program (mssp)-19 srosDetails
priority: soft story upgrade per city of san francisco mandatory soft story program (mssp)-19 sros | $90,000 |
| Apr 8, 2025 | Completed final sign-off Apr 2025 | 190 Post St | addition of 6 retractable fabric awnings above storefront windows & 1 fabric banner sign on (e) brackets.Details
addition of 6 retractable fabric awnings above storefront windows & 1 fabric banner sign on (e) brackets. | $30,000 |
| Apr 3, 2025 | Completed final sign-off Apr 2025 | 190 Post St | revision to pa 202407257271 to show the ceiling mounted chandelier attachment details. approved t24 mep under pa 202408239343Details
revision to pa 202407257271 to show the ceiling mounted chandelier attachment details. approved t24 mep under pa 202408239343 | |
| Mar 25, 2025 | In progress issued Jun 2025 | 190 Post St | revision to bpa# 202408239343. minor update to mechanical diffusers and light fixtures. other misc. changes to mep per plans.t.i under bpa#202407257271Details
revision to bpa# 202408239343. minor update to mechanical diffusers and light fixtures. other misc. changes to mep per plans.t.i under bpa#202407257271 | |
| Mar 10, 2025 | Completed final sign-off Apr 2026 | 3900 03rd St | renov. of shared bathrooms @ lvls 2&3. convert (e) g.f. retail space to support services for (p) boarding rms abv. legalize 1 sleeping room (307) for a total of 20 sleeping rms. energy upgrades incl: (n) lighting and mechanical units. replce all int. flooring, cabinets,plumbing fixtures and finishesDetails
renov. of shared bathrooms @ lvls 2&3. convert (e) g.f. retail space to support services for (p) boarding rms abv. legalize 1 sleeping room (307) for a total of 20 sleeping rms. energy upgrades incl: (n) lighting and mechanical units. replce all int. flooring, cabinets,plumbing fixtures and finishes | $1,365,000 |
| Mar 3, 2025 | Completed final sign-off Apr 2025 | 190 Post St | revision to 202411074563. remove box columns from storefront plan detailsDetails
revision to 202411074563. remove box columns from storefront plan details | |
| Feb 26, 2025 | Expired or cancelled withdrawn Jul 2026 | 3900 03rd St | residential- commencement of work not started under previously approved permit application number pa# 2019-0422-8620Details
residential- commencement of work not started under previously approved permit application number pa# 2019-0422-8620 | $45,000 |
| Feb 26, 2025 | Expired or cancelled withdrawn Jul 2026 | 3900 03rd St | commercial - commencement of work not started under previously approved permit application number pa# 2019-0422-8642Details
commercial - commencement of work not started under previously approved permit application number pa# 2019-0422-8642 | $45,000 |
| Feb 25, 2025 | Completed final sign-off Feb 2026 | 120 Maiden Ln | (n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service doorDetails
(n) soffit above main entrance service door and side window replacement of (e) first floor glazing with (n) security glazing. (n) secuirty shutter at all first floor glazing. construction of 1 (n) face sign above entrance and one (n) blade sign above service door | $120,000 |
| Feb 24, 2025 | Completed final sign-off Apr 2025 | 190 Post St | basement and 2nd fl - revision to pa 202407257271 minor changes to layout; structural details for interior sliding doors on 1st fl.Details
basement and 2nd fl - revision to pa 202407257271 minor changes to layout; structural details for interior sliding doors on 1st fl. | $10,000 |
| Jan 21, 2025 | In progress issued Mar 2025 | 190 Post St | installation of a (n) security gate @ (e) entry vestibuleDetails
installation of a (n) security gate @ (e) entry vestibule | $5,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 3900 03rd St | demolish non structural partitions, plumbing fixtures, mechanical units, casework. new interior renovations under sep permit 202412035993Details
demolish non structural partitions, plumbing fixtures, mechanical units, casework. new interior renovations under sep permit 202412035993 | $250,000 |
| Dec 9, 2024 | Completed final sign-off Dec 2025 | 3900 03rd St | replace all windows in (e) openings in kind. repair and repainting of (e) siding in kind. street facing.Details
replace all windows in (e) openings in kind. repair and repainting of (e) siding in kind. street facing. | $180,000 |
| Nov 7, 2024 | In progress issued Dec 2024 | 190 Post St | from sidewalk height to bottom of bldg's 2nd flr windows from the corner of post st. and grant ave. 3 bays at ground flr, 4 bays at 2nd flr along grant av. 3 bay at ground flr, 2 bays at 2nd flr along post st. installation of (n) storefront btw vertical plasters w/(n) finishes, glazing, entry doorsDetails
from sidewalk height to bottom of bldg's 2nd flr windows from the corner of post st. and grant ave. 3 bays at ground flr, 4 bays at 2nd flr along grant av. 3 bay at ground flr, 2 bays at 2nd flr along post st. installation of (n) storefront btw vertical plasters w/(n) finishes, glazing, entry doors | $450,000 |
| Sep 30, 2024 | Completed final sign-off Apr 2025 | 190 Post St | soft demo of (e) storefront . interior space to remain vacant until all ada features are restored per ab-017. t.i. under separate permit.Details
soft demo of (e) storefront . interior space to remain vacant until all ada features are restored per ab-017. t.i. under separate permit. | $60,000 |
| Sep 24, 2024 | In progress issued Jan 2025 | 190 Post St | deferred mep to bpa#202407257271Details
deferred mep to bpa#202407257271 | $200,000 |
| Sep 18, 2024 | Completed final sign-off Apr 2025 | 190 Post St | revision to pa#: 202404301110. to adjust elevator shaft size to accomdate future elevatorDetails
revision to pa#: 202404301110. to adjust elevator shaft size to accomdate future elevator | |
| Sep 10, 2024 | In progress filed Sep 2024, not yet issued | 190 Post St | installation of a construction barricade at the (e) store front interior scope of work under pa# 2024-0725-7271Details
installation of a construction barricade at the (e) store front interior scope of work under pa# 2024-0725-7271 | $2,000 |
| Aug 9, 2024 | Completed final sign-off Dec 2024 | 1 Sansome St | interior remoel of 9th fl. ti in an (e) high rise work to include new partitions, doors, glazing, new suspended ceiling with new light fuxtures, new finishes, electrical, lighting and hvac and plumbingDetails
interior remoel of 9th fl. ti in an (e) high rise work to include new partitions, doors, glazing, new suspended ceiling with new light fuxtures, new finishes, electrical, lighting and hvac and plumbing | $658,252 |
| Jul 25, 2024 | In progress issued Aug 2024 | 190 Post St | interior tenant improvement (n) floor finishes, ceilings, non-bearing partitions, millwork finishes. mep and envelope shall be deferred to separate permits.Details
interior tenant improvement (n) floor finishes, ceilings, non-bearing partitions, millwork finishes. mep and envelope shall be deferred to separate permits. | $1,650,000 |
| Jun 27, 2024 | Completed final sign-off Apr 2025 | 190 Post St | interior floor leveling for basement and first floor infill and reinforcement of the (e) slab at ground floor. additional colums and doundations underneath the midspan of 6 girders at basement. ref 202404301110Details
interior floor leveling for basement and first floor infill and reinforcement of the (e) slab at ground floor. additional colums and doundations underneath the midspan of 6 girders at basement. ref 202404301110 | $200,000 |
| Jun 27, 2024 | Completed final sign-off Oct 2024 | 255 Post St | installation of emergency evacuation signs within e tenant spaceDetails
installation of emergency evacuation signs within e tenant space | $1,500 |
| Jun 5, 2024 | Completed final sign-off Nov 2024 | 1201 Illinois St | emergency stablization repair to historical western facade on unoccupied potrere power station "station a building" stablization repair is temporary & required to abate immennent life safety concerns, ab-017Details
emergency stablization repair to historical western facade on unoccupied potrere power station "station a building" stablization repair is temporary & required to abate immennent life safety concerns, ab-017 | $12,000 |
| Jun 4, 2024 | Completed final sign-off Nov 2024 | 255 Post St | revision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes.Details
revision to pa#2023-0614-0038. minor changes to floor plan layout at first floor, minor change to retail stair, and minor changes to retail lighting and finishes. | |
| May 30, 2024 | Completed final sign-off Oct 2024 | 255 Post St | to erect electrical sign. (patek philippe)Details
to erect electrical sign. (patek philippe) | $2,500 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 255 Post St | "rolex" sign - (see plans for details) 2'3 3/4" x 3'10 3/4"Details
"rolex" sign - (see plans for details) 2'3 3/4" x 3'10 3/4" | $2,500 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 255 Post St | to erect electrical sign. (patek philippe)Details
to erect electrical sign. (patek philippe) | $2,500 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 255 Post St | 'rolex sign' (see plans for details) 3' 1/4" x 1' 10 3/4"Details
'rolex sign' (see plans for details) 3' 1/4" x 1' 10 3/4" | $2,500 |
| May 10, 2024 | In progress issued Jul 2024 | 1 Yacht Rd | remodel (e) member bar. new electrical, plumbing, and lighting. new built-in furnishings and fixtures at bar area. new service equipment in drinks prep area.Details
remodel (e) member bar. new electrical, plumbing, and lighting. new built-in furnishings and fixtures at bar area. new service equipment in drinks prep area. | $750,000 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 350 Masonic Av | ti hallway renovations (finishes, partitions, lighting); bathroom ada upgrades on ground fl; add 1 adult bathroom on ground fl; no structural workDetails
ti hallway renovations (finishes, partitions, lighting); bathroom ada upgrades on ground fl; add 1 adult bathroom on ground fl; no structural work | $660,000 |
| Apr 30, 2024 | In progress issued Jul 2024 | 190 Post St | basement-2nd flr- ti retail- interior basement elev. pit ground and second floor slab holes, shaft wall machine room, structural reinforcement and support for future 3 stop elevatorDetails
basement-2nd flr- ti retail- interior basement elev. pit ground and second floor slab holes, shaft wall machine room, structural reinforcement and support for future 3 stop elevator | $350,000 |
| Mar 5, 2024 | Completed final sign-off Sep 2024 | 99 Harding Rd | installation of (2) 1500 gallon septic tanks serving new golf-learning center. reference pa#202203029071Details
installation of (2) 1500 gallon septic tanks serving new golf-learning center. reference pa#202203029071 | $30,000 |
| Nov 14, 2023 | Completed final sign-off Oct 2024 | 99 Harding Rd | revision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building.Details
revision to pa 202203029071 s. update use/occupancy of the site permit to b occupancy (not a occupancy). no assembly use in this building. | |
| Nov 9, 2023 | Completed final sign-off Sep 2024 | 99 Harding Rd | ref 202203029071 s1 & 202311140753 mep work only: (n) mechanical equipment-variable refrigerant flow system with fan cools and air cooled outdoor condenser heat pump. outside air ventilation is provided by energy recovery unit. (erv) (n) ductwork, piping and air distribution. life safety deferred.Details
ref 202203029071 s1 & 202311140753 mep work only: (n) mechanical equipment-variable refrigerant flow system with fan cools and air cooled outdoor condenser heat pump. outside air ventilation is provided by energy recovery unit. (erv) (n) ductwork, piping and air distribution. life safety deferred. | $335,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1278 Minnesota St | change of use. level 1 & 2: renovation of (e) workshop space into community facility, mep deferred.Details
change of use. level 1 & 2: renovation of (e) workshop space into community facility, mep deferred. | $525,000 |
| Sep 25, 2023 | In progress issued Oct 2023 | 988 Market St | conversion of existing office space into residential units with-in a historical building. with no modifications to the exterior or height of the building.Details
conversion of existing office space into residential units with-in a historical building. with no modifications to the exterior or height of the building. | $9,000,000 |
| Jul 25, 2023 | Completed final sign-off Feb 2024 | 250 Valencia St | replace fence and lightingDetails
replace fence and lighting | $40,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | demo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systemsDetails
demo and replacement of e 1st fl post street retail storefront. removal of structural and non structural partitons and finishes. opening in masonry stucco building facade, new retail storefront, non structural partitons, structural n hss structural for storefront systems | $150,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | 1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mepDetails
1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep | $1,500,000 |
| Sep 28, 2022 | Completed final sign-off Nov 2023 | 2645 Gough St | barrier removal work- construction of an accessible concrete ramp on grade at the side of the buiding. replace extg side door.Details
barrier removal work- construction of an accessible concrete ramp on grade at the side of the buiding. replace extg side door. | $20,000 |
| Mar 2, 2022 | Completed final sign-off Oct 2024 | 99 Harding Rd | priority process - new building construction recreation centerDetails
priority process - new building construction recreation center | $700,000 |