Tracy Fitzgerald
- Listed as
- authorized agent-others, contractor, subcontractor
- Firm
- Associated Trucking Inc
- Based in
- San Bruno
- On San Francisco permits
- Dec 2006 to Feb 2025
78 permits since 2000 (contractor on 73 permits, subcontractor on 4 permits, authorized agent-others on 1 permit): 58 completed, 11 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off Aug 2025 | 440 Brannan St | Associated Trucking Inc | demolition -partition walls on the 1st and second floors ; ab-017 appliesDetails
demolition -partition walls on the 1st and second floors ; ab-017 applies | $5,000 |
| Jan 5, 2024 | Completed final sign-off Sep 2024 | 512 Nevada St | Custom Construction Enterprises | foundation repairs at northwest corner, drainage upgrades, and new interior mudroom at front entry.Details
foundation repairs at northwest corner, drainage upgrades, and new interior mudroom at front entry. | $75,000 |
| Nov 6, 2023 | Expired or cancelled expired Feb 2026 | 1358 Dolores St | Rico's General Construction | revision to 202102033863 upgrade (e) foundation based on observed site conditionDetails
revision to 202102033863 upgrade (e) foundation based on observed site condition | $20,000 |
| Apr 21, 2023 | Completed final sign-off May 2025 | 1326 Guerrero St | Mccormack Construction | replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring.Details
replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. | $510,000 |
| Mar 17, 2023 | Completed final sign-off Mar 2026 | 56 Hartford St | Mrcc | (n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level).Details
(n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level). | $125,000 |
| Sep 16, 2020 | Expired or cancelled expired Jul 2023 | 1100 Valencia St | Associated Trucking Inc | floor and ceiling/no sprinklered soft demolition for structural observation.Details
floor and ceiling/no sprinklered soft demolition for structural observation. | $4,000 |
| Feb 25, 2020 | Completed final sign-off Jan 2023 | 260 Claremont Bl | Associated Trucking Inc, Lee And Son Construction Inc. | lower level excavation - new 2 bath, 2 bedroom family room, laundry room; main floor - bath/closet, kitchen remodel; new staircase through all floorsDetails
lower level excavation - new 2 bath, 2 bedroom family room, laundry room; main floor - bath/closet, kitchen remodel; new staircase through all floors | $400,000 |
| Apr 1, 2019 | Completed final sign-off Feb 2021 | 725 44th Av | Fox Brothers Construction Inc, Associated Trucking Inc | horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading.Details
horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading. | $300,000 |
| Jun 7, 2018 | Never finaled issued Jan 2020, no final | 237 Cortland Av | Associated Trucking Inc | to demolish 1 story retail building.Details
to demolish 1 story retail building. | $5,000 |
| Apr 20, 2018 | Expired or cancelled expired Jun 2021 | 433 Anderson St | Associated Trucking Inc, Cronin Construction & Development Inc. | underpinning foundation at north property lineDetails
underpinning foundation at north property line | $10,000 |
| Apr 20, 2018 | Expired or cancelled expired Jun 2021 | 445 Anderson St | Associated Trucking Inc, Cronin Construction & Development Inc. | to comply with nov 201831361 & 201831841 (no excavation under this permit) temporary shoringDetails
to comply with nov 201831361 & 201831841 (no excavation under this permit) temporary shoring | $50,000 |
| Sep 5, 2017 | Completed final sign-off Aug 2026 | 609 Moultrie St | Rico's General Construction | to erect a three story type v-b single family dwelling w/ one basement.Details
to erect a three story type v-b single family dwelling w/ one basement. | $250,000 |
| Mar 8, 2017 | Never finaled issued Mar 2017, no final | 528 Washington St | Associated Trucking Inc | interior non structural demolition of existing fixtures, finishes, fittings, misc partitions throughout. new work will be submitted under sep permit. n/a maher ord. 155-13Details
interior non structural demolition of existing fixtures, finishes, fittings, misc partitions throughout. new work will be submitted under sep permit. n/a maher ord. 155-13 | $11,600 |
| Jul 12, 2016 | Completed final sign-off Jan 2019 | 225 Shipley St | Associated Trucking Inc | per emergency order 108168-e & 108169-e, demolish two story single family house, building is in two lot 098 & 099.Details
per emergency order 108168-e & 108169-e, demolish two story single family house, building is in two lot 098 & 099. | $20,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 43 Everson St | Associated Trucking Inc, Hymac Construction Inc | shoring permitDetails
shoring permit | $45,000 |
| Jan 26, 2016 | Completed final sign-off Apr 2017 | 26 Bernard St | Bartley Construction, Associated Trucking Inc | revision to 2015 0716 1739, detail 7/35 west wall enlarge footing & wallDetails
revision to 2015 0716 1739, detail 7/35 west wall enlarge footing & wall | |
| Nov 20, 2015 | Expired or cancelled expired Sep 2023 | 2939 Vallejo St | J M K Construction Inc, Associated Trucking Inc | new passenger elevator to replace exisitng dumbwaiter in same location. relocation of exisitng powder rm at same level. replace existing window w/new door at basement level.Details
new passenger elevator to replace exisitng dumbwaiter in same location. relocation of exisitng powder rm at same level. replace existing window w/new door at basement level. | $150,000 |
| Jul 31, 2015 | Never finaled issued Aug 2015, no final | 484 Day St | Associated Trucking Inc | foundation cribbing in section per plan. (foundation replacement under separate permit)Details
foundation cribbing in section per plan. (foundation replacement under separate permit) | $5,000 |
| Jun 24, 2015 | Completed final sign-off May 2016 | 484 Day St | Associated Trucking Inc | new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mseDetails
new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mse | $140,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 1764 Dolores St | Clonduff Construction Inc., Associated Trucking Inc, Farallon General Contractors Inc. | 362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition.Details
362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition. | $189,000 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 34 Mountain Spring Av | Associated Trucking Inc | excavate approx. 25' trench 30-inch wide, 3' to 6' deep along front property line to access (e) foundation. apply waterproff membrane to exposed concrete foundation. backfill and compact soil.Details
excavate approx. 25' trench 30-inch wide, 3' to 6' deep along front property line to access (e) foundation. apply waterproff membrane to exposed concrete foundation. backfill and compact soil. | $6,000 |
| Feb 24, 2015 | Completed final sign-off Jun 2016 | 2109 Broadway | Associated Trucking Inc, Kirk G Construction | replace approx. 20 lenear feet of retaining wall along west property line at rear.Details
replace approx. 20 lenear feet of retaining wall along west property line at rear. | $40,000 |
| Dec 12, 2014 | Completed final sign-off Oct 2017 | 379 Elizabeth St | Associated Trucking Inc | (front building) enclose existing porch, integrate with living space. see reference permit app#201409186744.Details
(front building) enclose existing porch, integrate with living space. see reference permit app#201409186744. | $25,000 |
| Nov 26, 2014 | Never finaled issued Aug 2015, no final | 46 Manchester St | Associated Trucking Inc, Cronin Construction & Development Inc. | rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding.Details
rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding. | $108,000 |
| Nov 18, 2014 | Completed final sign-off Nov 2015 | 576 15th Av | Associated Trucking Inc | replace extg unsound footingDetails
replace extg unsound footing | $6,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2016 | 542 Laidley St | Loughran Construction Inc., Associated Trucking Inc | revision to approved permit 201309056039; revision to front facade & garageDetails
revision to approved permit 201309056039; revision to front facade & garage | $20,000 |
| Jul 15, 2014 | Completed final sign-off Oct 2015 | 439 Clipper St | Associated Trucking Inc, Custom 6 Builders | provdie temporary shoring to faciliate excavation & construction of the ;porposed garage addition per approved permit application 201105166108-s1Details
provdie temporary shoring to faciliate excavation & construction of the ;porposed garage addition per approved permit application 201105166108-s1 | $25,000 |
| Apr 9, 2014 | Never finaled issued Mar 2015, no final | 153 Clipper St | Hcg Associates Inc, Associated Trucking Inc | convert (e) underfloor basement into living space, parking garage & bathroom.Details
convert (e) underfloor basement into living space, parking garage & bathroom. | $75,000 |
| Nov 27, 2013 | Completed final sign-off Jan 2015 | 2759 Broderick St | Associated Trucking Inc, Dijeau Poage Construction Inc. | excavate at garage level crawl space to add new laundry, water closet, 3 storp elevator, replace sitting rm windows with french doors, rework enlarge openings in dinng room walls, demolish master bedroom fireplace and add new window, remodel existing baths and laundry rm. remodel kitchenDetails
excavate at garage level crawl space to add new laundry, water closet, 3 storp elevator, replace sitting rm windows with french doors, rework enlarge openings in dinng room walls, demolish master bedroom fireplace and add new window, remodel existing baths and laundry rm. remodel kitchen | $325,000 |
| Nov 20, 2013 | Completed final sign-off May 2016 | 3112 Washington St | Cardea Bldg Dba Dimension Design Group, Associated Trucking Inc | crawl space excavation of single family home. scope includes new sub grade space with new stairs to main floor project also includes voluntary structural upgrades. new bedroom and family room on garage level. sub contractor (assoc. trucking inc.) will do excavation.Details
crawl space excavation of single family home. scope includes new sub grade space with new stairs to main floor project also includes voluntary structural upgrades. new bedroom and family room on garage level. sub contractor (assoc. trucking inc.) will do excavation. | $350,000 |
| Nov 1, 2013 | Completed final sign-off Jun 2018 | 3332 Folsom St | Phollies Inc, Associated Trucking Inc | expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet.Details
expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet. | $85,000 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 1241 Green St | Associated Trucking Inc | exploratory demo only for hvac inspection and installation.Details
exploratory demo only for hvac inspection and installation. | $3,500 |
| Sep 10, 2013 | Completed final sign-off Jul 2014 | 17 Costa St | Loughran Construction Inc., Associated Trucking Inc | remove extg retaining wall and extg deck. install new retaining wall and new concrete slab deck.Details
remove extg retaining wall and extg deck. install new retaining wall and new concrete slab deck. | $20,000 |
| Apr 12, 2013 | Completed final sign-off May 2015 | 4207 26th St | Aidan Mc Cracken Const Inc., Associated Trucking Inc | back yard renovation:create lower patio space by retaining walls. install pavers and deck on extg upper yard. new fences.Details
back yard renovation:create lower patio space by retaining walls. install pavers and deck on extg upper yard. new fences. | $75,000 |
| Oct 24, 2012 | Completed final sign-off Dec 2012 | 1948 Pacific Av | Associated Trucking Inc | remove deteriorated rear decks not visible from street.Details
remove deteriorated rear decks not visible from street. | $6,000 |
| May 8, 2012 | Completed final sign-off May 2013 | 1560 Haight St | Associated Trucking Inc | revision to appl #2010.09.03.0211 - add conc slab on grade at front of 1st floor. add existing 2nd floor framing to plans. revise steel frame correction. all work interior, not visible from street. new m occupancy added 2 hour rated ceiling required.Details
revision to appl #2010.09.03.0211 - add conc slab on grade at front of 1st floor. add existing 2nd floor framing to plans. revise steel frame correction. all work interior, not visible from street. new m occupancy added 2 hour rated ceiling required. | $1,000 |
| Apr 11, 2012 | Completed final sign-off Oct 2012 | 1856 Franklin St | Associated Trucking Inc | unit 8: remodel kitchen and bath in kind. lighting change to comply with t24Details
unit 8: remodel kitchen and bath in kind. lighting change to comply with t24 | $35,000 |
| Mar 30, 2012 | Completed final sign-off Apr 2012 | 1856 Franklin St | Associated Trucking Inc | renew pa #200506235916 for final inspection. all work is complete.Details
renew pa #200506235916 for final inspection. all work is complete. | |
| Mar 30, 2012 | Completed final sign-off Dec 2012 | 3282 Mission St | Associated Trucking Inc | soft demo; remove old cooler, remove some shelving strip tile floor, no drywall demo, no electrical, remove old stand alone coolerDetails
soft demo; remove old cooler, remove some shelving strip tile floor, no drywall demo, no electrical, remove old stand alone cooler | $2,200 |
| Feb 23, 2012 | Completed final sign-off Oct 2012 | 4529 25th St | Associated Trucking Inc | new garden concrete retaining wall /structural specifications for new garden hardscape wallsDetails
new garden concrete retaining wall /structural specifications for new garden hardscape walls | $2,000 |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 4057 19th St | Keegan Contruction Inc., Associated Trucking Inc | replace brick foundation with concrete, excavate rear (storage) portion of garage to provide 7'-6" clearence, & waterproofing & drainage. all modification within existing footprint.Details
replace brick foundation with concrete, excavate rear (storage) portion of garage to provide 7'-6" clearence, & waterproofing & drainage. all modification within existing footprint. | $120,000 |
| Jan 24, 2012 | Completed final sign-off Nov 2012 | 1421 Shrader St | San Francisco Design & Constr., Associated Trucking Inc | infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widenDetails
infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widen | $91,000 |
| Jan 20, 2012 | Completed final sign-off Aug 2012 | 251 Hartford St | Saturn Construction Co, Associated Trucking Inc | minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard.Details
minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard. | $150,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 3812 21st St | Associated Trucking Inc | revision to 201004130198 (comply with nov 200679636) change design of replacement of 12 feet long of rear yard retaining wall at left side west property lineDetails
revision to 201004130198 (comply with nov 200679636) change design of replacement of 12 feet long of rear yard retaining wall at left side west property line | |
| Jan 4, 2012 | Completed final sign-off Jan 2013 | 5319 California St | Artcore Construction, Associated Trucking Inc | excavate and create storage area behind garage at basement.Details
excavate and create storage area behind garage at basement. | $75,000 |
| Dec 28, 2011 | Completed final sign-off Dec 2012 | 97 Andover St | Associated Trucking Inc | revision to pa# 2009-0107-9755-install 3 underpinning piers, install 4 shoring piers & install 30 ft length of shoringDetails
revision to pa# 2009-0107-9755-install 3 underpinning piers, install 4 shoring piers & install 30 ft length of shoring | $20,000 |
| Nov 17, 2011 | Completed final sign-off Sep 2012 | 292 14th St | Associated Trucking Inc | comply w/complaints# 200455972 & 200735370-structural work/upgrades to (e) vacant bar, remove posts & lower basement storage area. new partition walls for storage at basement. ada & t.i. to be on sepertate permits. flue pipe repairsDetails
comply w/complaints# 200455972 & 200735370-structural work/upgrades to (e) vacant bar, remove posts & lower basement storage area. new partition walls for storage at basement. ada & t.i. to be on sepertate permits. flue pipe repairs | $100,000 |
| Oct 7, 2011 | Never finaled issued Oct 2011, no final | 856 Divisadero St | Associated Trucking Inc | remove (e) non-structural partitions walls on ground floor & storage rooms on mezzanine for future grocery expansion per ab-017. tenant improvement under separate permit.Details
remove (e) non-structural partitions walls on ground floor & storage rooms on mezzanine for future grocery expansion per ab-017. tenant improvement under separate permit. | $5,000 |
| Jun 15, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | Patrick Coakley Construction, Associated Trucking Inc | interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement)Details
interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement) | $450,000 |
| Apr 29, 2011 | Completed final sign-off Apr 2013 | 143 Collingwood St | Associated Trucking Inc, North South Construction Inc | interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl.Details
interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl. | $85,000 |
| Nov 4, 2010 | Expired or cancelled expired Mar 2013 | 1650 Davidson Av | Associated Trucking Inc | reconstruct existing driveway rampDetails
reconstruct existing driveway ramp | $4,000 |
| Sep 21, 2010 | Expired or cancelled cancelled Mar 2011 | 520 Jersey St | Associated Trucking Inc | construct an accessory building at rear yard with underground storage/wine cellar.Details
construct an accessory building at rear yard with underground storage/wine cellar. | $10,000 |
| Aug 27, 2010 | Completed final sign-off Jun 2011 | 819 Grove St | Associated Trucking Inc | shoring plan for application # 2009.12.04.2614Details
shoring plan for application # 2009.12.04.2614 | $165,000 |
| Jun 22, 2010 | Completed final sign-off Oct 2011 | 584 Pacific Av | Associated Trucking Inc | interior demolition to expose framing for engineer inspection of structural members. remove non-bearing partition walls (strip interior finishes), per ab-017.Details
interior demolition to expose framing for engineer inspection of structural members. remove non-bearing partition walls (strip interior finishes), per ab-017. | $9,500 |
| Apr 14, 2010 | Completed final sign-off Apr 2023 | 25 Rutledge St | Associated Trucking Inc | replace existing foundation at ground level. new posts and verification of rooms at ground floor under separate permitDetails
replace existing foundation at ground level. new posts and verification of rooms at ground floor under separate permit | $30,000 |
| Mar 30, 2010 | Completed final sign-off Sep 2010 | 2057 15th St | Associated Trucking Inc | foundation repair per plans along prop. line cap foundation approx. 6" max. @ basement area.Details
foundation repair per plans along prop. line cap foundation approx. 6" max. @ basement area. | $5,000 |
| Nov 20, 2009 | Completed final sign-off Sep 2010 | 2057 15th St | Associated Trucking Inc | replace elss than 45' of foundation.Details
replace elss than 45' of foundation. | $12,000 |
| Oct 23, 2009 | Expired or cancelled withdrawn Mar 2010 | 483 Broadway | Associated Trucking Inc | relocate existing name. (projecting double faced).Details
relocate existing name. (projecting double faced). | $500 |
| Oct 23, 2009 | Expired or cancelled withdrawn Mar 2010 | 483 Broadway | Associated Trucking Inc | replace existing name. (projecting single faced).Details
replace existing name. (projecting single faced). | $250 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | unit #2057a: remodel kitchen, 2 bathrooms in kind, no structural work. provide h.e. lights per title 24 mandartory measuresDetails
unit #2057a: remodel kitchen, 2 bathrooms in kind, no structural work. provide h.e. lights per title 24 mandartory measures | $23,000 |
| Sep 10, 2009 | Completed final sign-off Jan 2010 | 774 Haight St | Associated Trucking Inc | revise app 200907213114: replacing windows in unit (0.67), insulating, sheetrock entire unit, repair dryrot as required, modify kitchen layout. convert dining room to bedroom. replace e furnace in kind. replace water heater.Details
revise app 200907213114: replacing windows in unit (0.67), insulating, sheetrock entire unit, repair dryrot as required, modify kitchen layout. convert dining room to bedroom. replace e furnace in kind. replace water heater. | |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | work @ unit#2057d. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057d. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $15,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2079 15th St | Associated Trucking Inc | work @ unit#2057e. remodel kitchen and two bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057e. remodel kitchen and two bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $25,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | work @ unit#2057c. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057c. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $15,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | work @ unit#2057f. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057f. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $25,000 |
| Aug 31, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | work @ #2057b 15th street. remodel kitchen and two baths. in kind. no removal of walls. kitchen: replace cabinets & counters. bath: replace plumbing fixtures retile walls & floor. no structural work and relocation of walls. replace lighting.Details
work @ #2057b 15th street. remodel kitchen and two baths. in kind. no removal of walls. kitchen: replace cabinets & counters. bath: replace plumbing fixtures retile walls & floor. no structural work and relocation of walls. replace lighting. | $23,000 |
| Aug 31, 2009 | Completed final sign-off Dec 2010 | 2057 15th St | Associated Trucking Inc | remove & replace dry rotted siding in kind at rear of building. total are 1800 sqft. no structural framing replacement.Details
remove & replace dry rotted siding in kind at rear of building. total are 1800 sqft. no structural framing replacement. | $15,000 |
| May 1, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | Associated Trucking Inc | work @ unit# 2079f only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths.Details
work @ unit# 2079f only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths. | $23,000 |
| May 1, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | Associated Trucking Inc | work @ unit# 2079b only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks & fixtures. replace tile & fixtures in baths.Details
work @ unit# 2079b only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks & fixtures. replace tile & fixtures in baths. | $23,000 |
| May 1, 2009 | Completed final sign-off Jan 2010 | 2079 15th St | Associated Trucking Inc | work @ unit# 2079d only. remodel kitchen & baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths.Details
work @ unit# 2079d only. remodel kitchen & baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths. | $18,000 |
| Mar 18, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | Associated Trucking Inc | work @ unit# 2079c. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079c. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |
| Mar 18, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | Associated Trucking Inc | work @ unit# 2079a. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079a. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |
| Mar 18, 2009 | Completed final sign-off Sep 2010 | 2057 15th St | Associated Trucking Inc | work @ unit# 2079e. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079e. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |
| May 15, 2008 | Completed final sign-off Jan 2011 | 1701 Oak St | Cas Construction, Associated Trucking Inc | garage conversion of (e) storage at basement level. sprinkler under separate permit.Details
garage conversion of (e) storage at basement level. sprinkler under separate permit. | $150,000 |
| Sep 14, 2007 | Completed final sign-off Apr 2008 | 2700 California St | Rees Construction, Associated Trucking Inc | excavation a portion of lowest floor to allow for a (n) garage.provide (n) driveway and curb cut on portion of sidewalk.Details
excavation a portion of lowest floor to allow for a (n) garage.provide (n) driveway and curb cut on portion of sidewalk. | $75,000 |
| Feb 7, 2007 | Completed final sign-off Oct 2012 | 4529 25th St | Design Line Construction, Associated Trucking Inc | remove 2 upper levels of existing house, horizontal addition @ front, rear and sides and vertical addtiion to make new 2 unit residence.Details
remove 2 upper levels of existing house, horizontal addition @ front, rear and sides and vertical addtiion to make new 2 unit residence. | $380,000 |
| Dec 22, 2006 | Never finaled issued Oct 2007, no final | 3344 Market St | Associated Trucking Inc | demolish 1 story garage.Details
demolish 1 story garage. | |
| Dec 22, 2006 | Never finaled issued Oct 2007, no final | 3340 Market St | Associated Trucking Inc | demolish 1 story garage building.Details
demolish 1 story garage building. |