Clonduff Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2025
- Last 24 months
- 7 permits filed
53 permits since 2000: 41 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2025 | In progress filed Jun 2025, not yet issued | 4200 23rd St | revision 202201196239- (e) window number 10 at sunroom to be replaced in kind (was previously permitted as a (n) 45 min rated window unit). facing frontDetails
revision 202201196239- (e) window number 10 at sunroom to be replaced in kind (was previously permitted as a (n) 45 min rated window unit). facing front | |
| May 20, 2025 | In progress issued May 2025 | 4200 23rd St | temporary shoring wall for 202201196239Details
temporary shoring wall for 202201196239 | $2,000 |
| Apr 28, 2025 | Completed final sign-off Jan 2026 | 130 Madrone Av | remove and replace all existing windows in kind. new windows to be installed in existing window openings. work to be done due to water damage. 7 visible from the street. same size, same location/opening, same operation. no structural work. u factor 0.30 max. maintain eero per cbc 1031 as required.Details
remove and replace all existing windows in kind. new windows to be installed in existing window openings. work to be done due to water damage. 7 visible from the street. same size, same location/opening, same operation. no structural work. u factor 0.30 max. maintain eero per cbc 1031 as required. | $30,000 |
| Apr 21, 2025 | In progress issued Apr 2025 | 4200 23rd St | revision to 202201196239. changes at rear retaining walls.Details
revision to 202201196239. changes at rear retaining walls. | |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 130 Madrone Av | window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansionDetails
window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansion | $650,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2026 | 130 Madrone Av | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $125,000 |
| Oct 9, 2024 | In progress issued Oct 2025 | 881 Foerster St | rev 202304175823- remove (e) balcony. revise layout of bathroom remodelDetails
rev 202304175823- remove (e) balcony. revise layout of bathroom remodel | |
| Apr 24, 2024 | In progress issued Apr 2024 | 24 Presidio Tr | remove and replace in kind shingles on the top floor. no structural work all cosmetic. (siding)Details
remove and replace in kind shingles on the top floor. no structural work all cosmetic. (siding) | $20,000 |
| Apr 17, 2023 | Never finaled issued Aug 2023, no final | 881 Foerster St | interior remodel and renovation of exterior windows and doors, enlarge e windo2ws in select locations, partial foundation replacment and seismic upgrade, no floor area, building expansion or site work0Details
interior remodel and renovation of exterior windows and doors, enlarge e windo2ws in select locations, partial foundation replacment and seismic upgrade, no floor area, building expansion or site work0 | $190,000 |
| Jan 24, 2023 | Completed final sign-off Sep 2023 | 267 Roosevelt Wy | reduction in scope to pa #202205164299. eliminate flat ceiling @ roof level & changes of skylights.Details
reduction in scope to pa #202205164299. eliminate flat ceiling @ roof level & changes of skylights. | |
| Oct 5, 2022 | Completed final sign-off Apr 2023 | 2780 Diamond St | permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom.Details
permit revision to pa# 201912270778. revision to deck railing. revision to first story bathroom. | |
| Sep 23, 2022 | Expired or cancelled withdrawn Oct 2022 | 267 Roosevelt Wy | rev to pa# 2022-0516-4299: keep light well, keep (e) rear bay volume, bath and kichem remodel, new windows at rear & east, new skylights, limeted structural workDetails
rev to pa# 2022-0516-4299: keep light well, keep (e) rear bay volume, bath and kichem remodel, new windows at rear & east, new skylights, limeted structural work | |
| May 16, 2022 | Completed final sign-off Sep 2023 | 267 Roosevelt Wy | lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural.Details
lightwell infill (1-story). bath & kitchen remodel. rebuild interior stair. new windows and doors at rear. new skylights at roof. limited structural. | $125,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 2782 Diamond St | horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear.Details
horizontal addition of (e) 3-story, 2-unit residence to comply w/ current zoning. interior remodel. no significant grading. unit 1: (2) bedrooms & (2.5) bath. unit 2: (2) bedrooms & (1.5) bath. new deck at rear. | $300,000 |
| Jul 19, 2019 | Completed final sign-off Nov 2021 | 2609 Scott St | revision to pa 2017-1024-2116 (s1) shift occupiable roof deck to the west and leave existing mansard roof to the eastDetails
revision to pa 2017-1024-2116 (s1) shift occupiable roof deck to the west and leave existing mansard roof to the east | |
| Apr 29, 2019 | Completed final sign-off Nov 2021 | 2609 Scott St | kitchen & bathroom remodel. all cosmetic changes. no structural work to be done. no walls, framing modification.Details
kitchen & bathroom remodel. all cosmetic changes. no structural work to be done. no walls, framing modification. | $90,000 |
| Dec 5, 2018 | Completed final sign-off Oct 2020 | 2506 Washington St | interior remodel and associated structural work of existing first and second floors. on first floor, remodel of kitchen, living room, dining room, powder room, and family room. on second floor remodel of master bedroom, batrhoom and remodel of bedrooms and shared bathroom.Details
interior remodel and associated structural work of existing first and second floors. on first floor, remodel of kitchen, living room, dining room, powder room, and family room. on second floor remodel of master bedroom, batrhoom and remodel of bedrooms and shared bathroom. | $300,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2020 | 2506 Washington St | temporary shoring for excavation for gr fl expansion on separate permitDetails
temporary shoring for excavation for gr fl expansion on separate permit | $30,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2020 | 2506 Washington St | expansion of e basement level including associated structural work to include bedroom, mediaroom, mudroom, full bathDetails
expansion of e basement level including associated structural work to include bedroom, mediaroom, mudroom, full bath | $200,000 |
| Jul 13, 2018 | Completed final sign-off Nov 2019 | 912 Wisconsin St | repair and replace portion of the existing deck in the rear yard.Details
repair and replace portion of the existing deck in the rear yard. | $6,000 |
| May 17, 2018 | Completed final sign-off Feb 2022 | 86 Waller St | horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard.Details
horizontal & vertical addition. reconfigure interior spaces. second dwelling unit added 1st floor. new deck and stairs to rear yard. | $98,000 |
| Oct 24, 2017 | Completed final sign-off Nov 2021 | 2609 Scott St | construct a rear horizontal addition at 1st, 2nd and 3rd floors, at an existing single family three story over basement residential building. new windows and bay window at front facade. interior alterationsDetails
construct a rear horizontal addition at 1st, 2nd and 3rd floors, at an existing single family three story over basement residential building. new windows and bay window at front facade. interior alterations | $800,000 |
| Aug 2, 2017 | Completed final sign-off Jan 2020 | 24 Presidio Tr | 2nd floor: bathroom remodel all cosmetic no structural. no change in wall & opening layoutDetails
2nd floor: bathroom remodel all cosmetic no structural. no change in wall & opening layout | $15,000 |
| Jul 28, 2017 | Completed final sign-off Jul 2020 | 466 Clipper St | horizontal addition to rear, basement; dditional living space underneath deck, expend garage for two cars, main level; reorganizing kitchen, dinning, laundry & living foom, enclose front porch. third level, divide existing bhrm, extend existing dormer, ad new dormer, adequate headrm & ext masterbedDetails
horizontal addition to rear, basement; dditional living space underneath deck, expend garage for two cars, main level; reorganizing kitchen, dinning, laundry & living foom, enclose front porch. third level, divide existing bhrm, extend existing dormer, ad new dormer, adequate headrm & ext masterbed | $340,000 |
| May 23, 2017 | Completed final sign-off Nov 2019 | 48 Clifford Tr | new roof top deck & access stair @ (e) roof.Details
new roof top deck & access stair @ (e) roof. | $50,000 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 24 Presidio Tr | basement remodel within existing building footprint. window replacement in kind. new door at rear facade. includes structural work. no exterior work visible from the street.Details
basement remodel within existing building footprint. window replacement in kind. new door at rear facade. includes structural work. no exterior work visible from the street. | $100,000 |
| Feb 17, 2017 | Completed final sign-off Sep 2017 | 24 Presidio Tr | revision to pa #201609016538 - overhang design & add new firepit at terrace.Details
revision to pa #201609016538 - overhang design & add new firepit at terrace. | |
| Sep 1, 2016 | Completed final sign-off Sep 2017 | 24 Presidio Tr | interior remodel within (e) bld. window replacement exterior terrance remodel. minor structural associated. kitchen remodelDetails
interior remodel within (e) bld. window replacement exterior terrance remodel. minor structural associated. kitchen remodel | $100,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2017 | 24 Presidio Tr | kitchen and bathroom remodel. replace in kind. all cosmetic- no structural work.Details
kitchen and bathroom remodel. replace in kind. all cosmetic- no structural work. | $135,000 |
| Mar 8, 2016 | Completed final sign-off Nov 2016 | 24 Presidio Tr | remodel 3rd fl bathroom, install new tile fixts. no structural work. remove & replace in-kind 4 windows same size not visible from the street.Details
remodel 3rd fl bathroom, install new tile fixts. no structural work. remove & replace in-kind 4 windows same size not visible from the street. | $15,000 |
| Nov 13, 2015 | Completed final sign-off Apr 2018 | 829 Clayton St | remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths.Details
remodel (e) home & rear yard addition & raise portion of roof in rear. existing 3 bed, 2 baths will become 5 bedrooms and 3.5 baths. | $415,000 |
| Nov 9, 2015 | Never finaled issued Nov 2015, no final | 1764 Dolores St | street spaceDetails
street space | |
| Oct 29, 2015 | Never finaled issued Nov 2015, no final | 1764 Dolores St | selective demolition limited to interior walls, cabinetry, and finishes only.all work to be non-structural only. preserve protection (fire rating) & comply with section; table 16c-d for lateral resistance @ crosswalls for material finishes.Details
selective demolition limited to interior walls, cabinetry, and finishes only.all work to be non-structural only. preserve protection (fire rating) & comply with section; table 16c-d for lateral resistance @ crosswalls for material finishes. | $3,000 |
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 1011 Kearny St | remove & replace the floor tiles in kind in the lobby to kearny. cosmetic upgrade in the bathrooms floor area. all fixtures 4replace in (e) location. no structural work to be done. ref. pa#201501095394Details
remove & replace the floor tiles in kind in the lobby to kearny. cosmetic upgrade in the bathrooms floor area. all fixtures 4replace in (e) location. no structural work to be done. ref. pa#201501095394 | $8,000 |
| Aug 11, 2015 | Completed final sign-off Sep 2015 | 1011 Kearny St | mech & elec work for ti approved under pa 2015-0109-5954. fire protection under separate permitDetails
mech & elec work for ti approved under pa 2015-0109-5954. fire protection under separate permit | $30,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 24 Presidio Tr | all interior work - remove and replace flooring on the entry level; patch sheetrock in the ceiling in living room; for new lighting. no structuralDetails
all interior work - remove and replace flooring on the entry level; patch sheetrock in the ceiling in living room; for new lighting. no structural | $22,000 |
| Jul 30, 2015 | Completed final sign-off Oct 2015 | 667 Mangels Av | to comply with complaint #201560361, remove & replace (e) siding due to extensive water damage & dry rot at rear of property and north side.Details
to comply with complaint #201560361, remove & replace (e) siding due to extensive water damage & dry rot at rear of property and north side. | $10,000 |
| Jul 20, 2015 | Completed final sign-off Jul 2015 | 830 Balboa St | to obtain final inspection for work approved under pa #200806245222. all work is complete.Details
to obtain final inspection for work approved under pa #200806245222. all work is complete. | |
| Jun 19, 2015 | Completed final sign-off Sep 2015 | 1011 Kearny St | revision to 201501095394 at district inspectors request to provide a new ada approved restroom. change use under sep permit 201501095394Details
revision to 201501095394 at district inspectors request to provide a new ada approved restroom. change use under sep permit 201501095394 | $15,000 |
| May 27, 2015 | Completed final sign-off May 2016 | 222 El Camino Del Mar | new deck at rear yard. new gas firepit, outdoor kitchen, hottubDetails
new deck at rear yard. new gas firepit, outdoor kitchen, hottub | $9,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 1764 Dolores St | 362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition.Details
362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition. | $189,000 |
| Mar 9, 2015 | Never finaled issued Feb 2016, no final | 55 Buena Vista Tr | propose remodel & addition at 2nd flr master bath & bedroom. extent of work include 9'-7" (247 sf) horizontal addition to exterior rear wall at 2nd flr only. roof at proposed work to be remodeled. no work to remaining (e) areas of the house or site. n/a for maher ordinance.Details
propose remodel & addition at 2nd flr master bath & bedroom. extent of work include 9'-7" (247 sf) horizontal addition to exterior rear wall at 2nd flr only. roof at proposed work to be remodeled. no work to remaining (e) areas of the house or site. n/a for maher ordinance. | $150,000 |
| Jan 9, 2015 | Completed final sign-off Sep 2015 | 1011 Kearny St | change of use from "b" occupancy office to m occupancy less than 49 occupants. retail wine sales and tasting per crfc sec. 113789.c.5; installation of display shelving, retail counter and 3 compartment and hand wash sinks. no structural and electrical under separate permit.Details
change of use from "b" occupancy office to m occupancy less than 49 occupants. retail wine sales and tasting per crfc sec. 113789.c.5; installation of display shelving, retail counter and 3 compartment and hand wash sinks. no structural and electrical under separate permit. | $15,000 |
| Sep 12, 2013 | Completed final sign-off Jan 2014 | 55 Buena Vista Tr | demo (e) bathroom finishes and fixtures for new wet bar area; all cosmetic no structural install new gas fireplaceDetails
demo (e) bathroom finishes and fixtures for new wet bar area; all cosmetic no structural install new gas fireplace | $45,000 |
| May 10, 2013 | Completed final sign-off Sep 2013 | 4 Pacheco St | remodel (e) kitchen and and bath. convert (e) closet to 2nd bath. replace 3 sideyard windows with new to match (e). non structural demolition.Details
remodel (e) kitchen and and bath. convert (e) closet to 2nd bath. replace 3 sideyard windows with new to match (e). non structural demolition. | $75,000 |
| Oct 22, 2012 | Completed final sign-off Feb 2013 | 1055 Lombard St | unit #c - kitchen & bathroom remodel - new cabinets, counter tops, new sink, new toilet, tiles, patching wood floor.Details
unit #c - kitchen & bathroom remodel - new cabinets, counter tops, new sink, new toilet, tiles, patching wood floor. | $35,000 |
| Oct 20, 2011 | Completed final sign-off Mar 2012 | 75 Santa Rita Av | remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen.Details
remodel of extg kitchen/nook, relocation of stair to basement level and new powder room, enlarge rear deck/balcony adjacent to kitchen. | $98,000 |
| Jul 27, 2011 | Completed final sign-off Aug 2011 | 655 Castro St | to comply with physical inspection report #cc6003Details
to comply with physical inspection report #cc6003 | $8,000 |
| Jun 23, 2011 | Completed final sign-off Aug 2011 | 823 30th Av | remove 4 existing windows in front of building and replace in kind with marvin wood windows.Details
remove 4 existing windows in front of building and replace in kind with marvin wood windows. | $3,000 |
| Jun 8, 2011 | Completed final sign-off Jun 2011 | 308 Spruce St | comply with physical inspection cc-5950; remove illegal bathroom in storage areaDetails
comply with physical inspection cc-5950; remove illegal bathroom in storage area | $4,000 |
| Apr 28, 2011 | Completed final sign-off May 2011 | 69 26th Av | install flourescent light at garage and washer dryer and sink moving sheetrock in garage only, all interior no structural no rooms at rear, no chaneg to walls and windowDetails
install flourescent light at garage and washer dryer and sink moving sheetrock in garage only, all interior no structural no rooms at rear, no chaneg to walls and window | $6,000 |
| Sep 28, 2010 | Completed final sign-off Dec 2010 | 1049 Treat Av | replace in-kind per cbc code req'd (e) ext. side egress stairs. -no added sq footage; -no int. work; -no change to bldg envelope or front facadeDetails
replace in-kind per cbc code req'd (e) ext. side egress stairs. -no added sq footage; -no int. work; -no change to bldg envelope or front facade | $10,000 |
| Jun 19, 2009 | Completed final sign-off Dec 2009 | 2690 19th Av | cut and repair inspection holes in stucco for inspection of dry rot no structural work involvedDetails
cut and repair inspection holes in stucco for inspection of dry rot no structural work involved | $300 |