Mrcc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Aug 2026
- Last 24 months
- 13 permits filed
103 permits since 2000: 73 completed, 7 in progress, 15 never finaled, 8 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress | 990 Monterey Bl | removal of tiles at front porch and stairs, new tiles and new waterproofing, less than 50% repairs, street facing stairs and porch. | $40,000 |
| Jun 30, 2026 | Completed | 4118 20th St | patch sheetrock from electrical upgrade. new vanity and medicine cabinet on the 3rd floor bath | $15,000 |
| Jun 4, 2026 | Completed | 2077 Greenwich St | remove ceiling lath and plaster, install new insulation, construt new 2 hour rated sheetrock ceiling throughout entire unit (~2000 ish sq. ft.). for floor - ceiling unit separation | $20,000 |
| May 19, 2026 | In progress | 2949 Octavia St | interior remodel of 2nd & 3rd flrs duplex in area of kitchen. new tankless water heaters to be located in garage. no changes visible from street. | $80,000 |
| May 8, 2026 | In progress | 1311 South Van Ness Av | rear stairs to be replaced in kind. | $15,000 |
| Mar 6, 2026 | Completed | 56 Hartford St | to obtain final inspection for work approved under 200503298604 and 200608179715. all work is complete | |
| Oct 27, 2025 | Completed | 323 Church St | scope of work at (e) third fl level (323 church). new interior wall system to create new home office nook, new built in desk and cabinetry, (e) bedroom 03 to remain. | $7,500 |
| Oct 24, 2025 | Completed | 1952 21st Av | one bathroom remodel remove all finishes (tile, vanity, lighting fixtures, plumbing fixtures) replace with new | $50,000 |
| Sep 22, 2025 | In progress | 54 Sussex St | new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovations | $750,000 |
| Mar 20, 2025 | Completed | 301 Mission St | replace (e) kitchen cabinets & appliances, (n) countertop & overhead lights, electrical upgrades for appliances; remove and replace flooring, shower and tub, new vanity counter, new overhead lights, 2 new plugs for medicine cabinets. no wall demolition or construction, no change to ceiling framing. | $250,000 |
| Feb 26, 2025 | Completed | 166 Hartford St | new skylight @ main level existing parlor. replace kitchen windows, replace exterior door, new kitchen exhauset hood, (n) washer & dryer.not visible from street | $75,000 |
| Nov 8, 2024 | In progress | 1410 Monterey Bl | remodel of (e) bathroom, replacement of plumbing fixtures. enlarged shower, removal of (e) bathtub. new vanity, new electrical & plumbing, all new tile. | $37,500 |
| Nov 6, 2024 | In progress | 3262 25th St | upgrade foundations. selective demo of rear rear additions and interior partitions. partition a portion of garage to create vestibule and add new stair to upper level. new rear windows at rear elevations. fill in existing property line windows wih rated construction. reframe rear area of house. | $310,500 |
| Jul 16, 2024 | Completed | 743 Filbert St | remodel existing kitchen and bathroom. add new bathroom - new plumbing req'd and electrical. no exterior work. | $80,000 |
| Feb 21, 2024 | Completed | 410 30th St | remodel of (e) kitchen, new window and door, new electrical. remodel (2) bathrooms with new electrical and plumbing. | $110,000 |
| Feb 5, 2024 | In progress | 2509 Pacific Av | to obtain final inspection for work approved under pa#2019-1212-9393 all work is complete | |
| Aug 3, 2023 | Completed | 366 31st Av | revision to 202306614845: reflecting an increase in cost to the existing permit- the aditional cost of 35,000 is due to the extent of dryrot discovered in the walls. | $35,000 |
| Jun 29, 2023 | Completed | 73 Dellbrook Av | 1st fl. remodel garage to include additon of bedroom and bathroom, replace sliding door 2nd fl. remodel (e) kitchen and bathrooms new elce ad plumbing in area of remodels structural upgrades as required for remodel | $250,000 |
| May 1, 2023 | Completed | 51 Farnum St | remodel 1 (e) bathroom, new plumbing fixtures, new finishes, one new lavatory sink. replace 1 (e) skylight on flat roof. no changes. u-factor = 0.30. new electrical and plumbing in area of work. in kind replacement of light fixtures. | $22,000 |
| Apr 13, 2023 | Never finaled | 121 Randall St | revision to pa 2022-1228-9224 to voluntarily add shearwall on line a6 and d at garage level; change rear stair foundation detail | $200 |
| Mar 31, 2023 | Completed | 366 31st Av | remove and replace dryrot at south side of building. aprox 150 approx. 150sqft is experiencing dry rott issues. remove and replace three exteriors windows in kind at the same dryrott locations. note this unit is in the backyard and not visible to the street. | $15,000 |
| Mar 17, 2023 | Completed | 56 Hartford St | (n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level). | $125,000 |
| Feb 24, 2023 | Completed | 999 Green St | #1704: new kitchen cabinets at kitchen/breakfast area. partially demolish existing non-load bearing interior partition at kitchen, reconfigure closets at primary suite (non-load bearing partition walls), new range ventilation at kitchen (recirc.). | $75,000 |
| Feb 13, 2023 | Completed | 236 Baden St | revision to pa#202211106344 at front facade remove extg t1-11 siding and replace with stucco to match extg stucco at 1st level. | |
| Nov 10, 2022 | Completed | 236 Baden St | front facade replace in kind (2) existing vinyl windows w/new marvin wood clad, max u-factor 0.30. remove (e) vinyl siding at upper level front facade and patch and repair new paint. no change to openings. remove (e) aspesto siding on south wall & replace w/ new hadi siding | $25,000 |
| Sep 15, 2022 | Completed | 475 Gates St | dry rot removal at exterior. front soffit overhung. work includes stucco removal and relacement, framig, new soffit vent and paint. | $10,000 |
| Sep 15, 2022 | Completed | 426 Eureka St | kitchen remodel: new electrical, relocated plumbing, new insulation & sheetrock, new cabinets and tile. one nnew window replaced in wood on an interval staircase. remodel upstairs bar area- relocate ar sink, new lower cabinets, 1 new window relacement on interval stair area. no removal of walls | $40,000 |
| Jul 15, 2022 | Never finaled | 2509 Pacific Av | recommencement and completion of work approved under pa# 201805169267 & 201806141933. | |
| Feb 24, 2022 | Completed | 112 Montcalm St | repair + replacement of (e) stairs, handrails, guardrail, 8 landing footing replacement in (e) location. | $1,500 |
| Apr 8, 2021 | Completed | 2010 Eddy St | apt b(2nd flr) - kitchen & bthroom remodel. all (n) plumbing & (n) appliance at (e) location, no change to interior walls, (n) high efficiency lighting. | $45,000 |
| Apr 6, 2021 | Completed | 164 Hartford St | kitchen renovation. remove non structural wall. replace fixtures and finishes. | $50,000 |
| Mar 10, 2021 | Never finaled | 755 Corbett Av | (n) exterior door system @ (n) first floor deck area. (n) exterior deck (infill) within req'd rear yard setback (reference to 2020-005528var variance). (n) exterior deck guardrails & handrails to replace (e) (1/f & 1/f stair to grade only) | $20,000 |
| Feb 20, 2021 | Completed | 2511 Pacific Av | reference bpa 201805169267 for 2509 pacific ave, 2509/2511 pacific easement agreement at basement & first floor levels only. new re-roofing as necessary at garageroof. | |
| Oct 8, 2020 | Completed | 112 Montcalm St | revision to pa 201908300285. reconfiguration of master bath, office and master closet on 1st flr window shift along 2nd flr. | $25,000 |
| Sep 30, 2020 | Never finaled | 333 Lansdale Av | remove stucco at front corner of house for dry rot repair. reframe + stucco as needed. remove + replace 4 dbl hung wood windows with new marvin wood windows to match. remove approx 100 sqft of interior sheetorck + replace. | $25,000 |
| Sep 15, 2020 | Completed | 266 Bemis St | dryrot repair to garage door header, change vinyl siding to stucco siding, guardrail change to 42" high rail of same kind, no changes to door/window | $120,000 |
| Aug 22, 2020 | Completed | 2519 Pacific Av | renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation). | $75,000 |
| Jul 6, 2020 | Completed | 2040 Laguna St | (n) bathroom remodel (to the studs). kitchen remodel, plumbing fixture locations to remain. (n) sheetrock, insulation, cabinets, tile, counter tops, paint | $45,000 |
| Jul 6, 2020 | Completed | 426 Eureka St | upper level bathroom remodel. plumbing fixture locations to remain. (n) electrical, sheetrack, tile, fixtures, insulation, paint | $20,000 |
| Jan 9, 2020 | Completed | 426 Eureka St | 2/f: remodel (e) bathroom. fixture locations reamin in the same location. new vanity, new medicine cabinet, rough-in of eletrical & plumbing, new sheetrock & new tile. 1 bathroom remodel in-kind. | $20,000 |
| Dec 12, 2019 | Never finaled | 2509 Pacific Av | soil shoring @ west property line. ref pa# 2018/05/16/9267. | $40,000 |
| Nov 18, 2019 | Completed | 236 Baden St | interrior remodel with new plumbing & elec, new doors and windows at rear of house new skylights (2) new sun turnnel (1) new wood deck at rear | $200,000 |
| Oct 18, 2019 | Completed | 517 17th Av | rev to pa# 201709269586; adding 2 additional footings | |
| Sep 24, 2019 | Completed | 2509 Pacific Av | revision to 201805169267. scope revised to include all work is to occur within property boundaries only, specifically revised at west property boundry within e proposed garage area. | $8,000 |
| Aug 30, 2019 | Completed | 112 Montcalm St | interior remodel, no changes to bld footprint. replace front windows with double pane wood windows. new windows and doors and skylight throughout. add two-bike parking | $25,000 |
| Aug 19, 2019 | Completed | 517 17th Av | administrative no plan permit. revision to app#201709269586 (s1) to remove sprinklers from scope of work. | |
| May 6, 2019 | Completed | 2214 Pine St | replace kitchen cabinets/finishes; demo/replace bath #1 and finishes; demo/replace bath #2 and finises/ add laundry where closet is currently. no structural work, no framing/modification. | $100,000 |
| Apr 26, 2019 | Completed | 1220 18th St | unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr. | $45,000 |
| Apr 18, 2019 | Completed | 136 Randall St | kitchen remodel. relocate (e) half bath. remodel of (e) shed to sunroom with new door & windows. sunroom is uncondititioned space. | $36,837 |
| Mar 19, 2019 | Completed | 569 03rd Av | new rear yard deck & stairs to grade off upper unit. new deck doors within existing window opening. no work on int of unit, lower unit, front facade. no expansion of ext envelope or added sq footage. | $10,000 |
| Jan 18, 2019 | Completed | 2040 Laguna St | kitchen and bathroom remodel. bathroom-new cabinets, countertops, appliances, 6'x5'. bathroom-demo to the studs, new tiles, fixtures, electrical., 5'x5'. misc: new flooring and paint. maher n/a | $50,000 |
| Aug 9, 2018 | Completed | 60 Hartford St | bathroom remodel: existing 6'x10' bath demoed down to the studs. new electrical wiring, plumbing fixtures remain in the same spot. (toilet,tub, sink) | $20,000 |
| Jul 20, 2018 | Completed | 523 17th Av | new 3rd fl master bath/closet. new exterior window at front, wood double hung, no added square footage, no increase to exterior envelope | $50,000 |
| Jun 14, 2018 | Expired or cancelled | 2509 Pacific Av | new elevator to extend from existing basement to existing 3rd floor; new roof dormer to accomodate new elevator. | $100,000 |
| May 16, 2018 | Expired or cancelled | 2509 Pacific Av | (n) horizontal addition @ rear yard under (e) deck @ garage (no change in perceived building envelope), interior renovations throughout. no cfc shall be issued until easement is approved, notarized & recorded. | $300,000 |
| Mar 6, 2018 | Completed | 2212 Pine St | lighting per cenc 150.0(k) unit demolished to the studs. there are 2 bedrooms, one kitchen, one bath. all finishes to be replace in kind. lower unit, behind entrance stairs. all (e) walls to remain | $225,000 |
| Nov 9, 2017 | Completed | 2032 14th Av | remodel (e) garage: addition of new office in existing envelope. relocate furnace & laundry. | $35,000 |
| Oct 17, 2017 | Completed | 666 10th Av | remodel (e) bathroom, new plumbing, electrical, insulation, sheetrock, tile, cabinet, paint. | $25,000 |
| Sep 27, 2017 | Completed | 999 Green St | new kitchen cabinetry, appliances, & lighting, new unit entry door, replacement of extg windows in kind, new plmg fixtures(no change in location/quantity). new interior finishes. new windows 136 sq. ft. | $60,000 |
| Sep 26, 2017 | Completed | 517 17th Av | add a (n) dwelling unit at the rear portion of the ground floor (studio unit) | $40,000 |
| Jul 31, 2017 | Completed | 40 Collingwood St | replace (e) windows and (1) exterior door at the rear of the property. replace in kind windows/door. | $3,500 |
| Jun 14, 2017 | Completed | 40 Collingwood St | interior remodel of kitchen and bath with new powder room. new electrical and plumbing in remodeled area. removal of extg brick flue and raising extg beam up into attic space. new awning window at back of house. replace in kind exterior door at rear. maher ord 155-13 na | $85,000 |
| Aug 30, 2016 | Completed | 837 25th Av | laundry room remodel: partial sheetrock removal & replacement, update electrical, plumbing for sink, washer & dryer, new cabinets and paint. | $10,000 |
| Aug 15, 2016 | Completed | 51 Farnum St | revision to pa #201510200287s, reduced scope of work, construct 1 story addition at rear of property at 2nd level 100 sq ft, new interior partitions & finishes as indicated on plans, new 7x4 deck & catwalk, 3 new skylights, remove 2 (e) skylights. | |
| Jul 18, 2016 | Expired or cancelled | 65 Hartford St | to complete work approved under pa#2000-0725-6072 | $10,000 |
| May 3, 2016 | Expired or cancelled | 65 Hartford St | to obtain final inspection for work approved under pa # 200007256072. all work is complete. | $45,000 |
| May 3, 2016 | Completed | 2032 14th Av | residential remodel: replace fixtures and finishes in powder room and bathrooms. upgrade main electricla panel. | $45,000 |
| Feb 10, 2016 | Never finaled | 1220 18th St | new window systems throughout (all wood), new exterior doors (all wood & wood with glass), new natural stone exterior landing & treads/risers at main exterior entry, new painted steel partial height (6-0 max) decorative fence at front facade (75/open min) | $30,000 |
| Jan 14, 2016 | Completed | 704 Junipero Serra Bl | new residential elevator @ side (south) yard. approximately 5'-8" x 6'-0" x 28'-6" tall. (5'-8" x 11'-1" @ ground floor level) | $60,000 |
| Oct 20, 2015 | Never finaled | 51 Farnum St | horizontal addition two story 400 sq ft addition at rear, new interior partitions & finishes as on plan. new rear deck & catwalk to backyard, provide three new skylights, remove two existing skylights. | $175,000 |
| Oct 16, 2015 | Completed | 1069 Pennsylvania Av | revised second floor layout, revision to previously approved pa# 201508043322. mep to be submitted under sep permit. n/a ordinance #155-13 | |
| Sep 1, 2015 | Completed | 1069 Pennsylvania Av | scope of work: to include new hvac systems. kitchen hood exhaust and make up air systems. plumbing and electrical for renovations. n/a for maher. | $180,000 |
| Aug 4, 2015 | Completed | 1069 Pennsylvania Av | interior t.i. of extg warehouse space into a commercial kitchen: new kitchen and equipment layout, 2 new stairs to replace extg, new ada lift and new accessible restrooms. mep referred under seperate permit. n/a for maher. | $230,000 |
| May 27, 2015 | Completed | 4271 26th St | revision 201306280785-s1, revise laundry room, mud room to bedroom | |
| Mar 9, 2015 | Completed | 4268 26th St | revision to approved permit # 2013 0321 2723 - convert 1st flr bathroom into living space. convert closet to bathroom. replace in kind windows (3) at rear facade. remove approved dormers from scope of work from approved permit | $24,433 |
| Feb 18, 2015 | Completed | 64 Hartford St | to comply with nov 201527831, fire damage repair, minor framing, siding, trim, 2 doors, 1 window, no structural work, all work at front elevation, soft demo, fire damaged. | $30,000 |
| Aug 8, 2014 | Completed | 936 Chenery St | bathroom remodel 6' x 6' - plumbing fixtures locations to remain, new electrical fixtures installed, insulation, sheetrocks. to comply with cec 150.0(k)5 | $30,000 |
| Apr 14, 2014 | Completed | 33 Hartford St | small 5'x6' barthroom window. demolished to the stud. new insulation, sheetrock, tile, replacement of plumbing and electrical fixtures and one window. | $15,000 |
| Jan 23, 2014 | Completed | 359 San Benito Wy | remodel to kitchen & two bathrooms, no expansion of (e) envelope. several windows to be replaced at sides & rear of house in-kind wood windows. new heating system to be installed & some new electrical updates. general dryrot repair. | $135,000 |
| Nov 27, 2013 | Completed | 4408 17th St | lower unit - to remove cabinets (partial), remove (e) sheetrocks in kitchen / dining room; install insulation and acoustica sheetrock with rc channels; re-instate fire rated ceiling; to comply with cec150(k) 8 | $10,000 |
| Nov 22, 2013 | Never finaled | 164 Hartford St | revision to appl #2012.0615.2659: replace concrete foundation at two exterior walls at rear of house. | $3,000 |
| Jun 28, 2013 | Completed | 4271 26th St | lower floor addition including bedroom & bathroom & new interior stair. legalize (e) family room @ 2nd floor (garden room). | $75,000 |
| Jun 4, 2013 | Completed | 2047 10th Av | replace in kind exterior finish systems at 2nd floor exterior entry foyer. replace in kind exterior finish systems at front exterior stair. replace in kind structural framing members at front exterior stair and foyer area as required for dry rot repair | $9,000 |
| Mar 29, 2013 | Never finaled | 2744 Fulton St | revision to pa# 201301299054, replacement of existing wood beam with new steel beam | $2,000 |
| Mar 21, 2013 | Never finaled | 4268 26th St | convert closet and attic space to bathroom | $25,000 |
| Jan 29, 2013 | Never finaled | 2744 Fulton St | interior renovation: extg ground level renovation to legalize laundry, bath, family. extg 2nd level renovated bath. | $50,000 |
| Nov 8, 2012 | Completed | 52 07th Av | kitchen remodel, remodel of (2) bathrooms, relocate laundry, minor electrical (interior work only). | $70,000 |
| Oct 30, 2012 | Completed | 2047 10th Av | partial excavation at first floor to create new laundry room. new interior renovations throughout existing first floor level including new bathroom & new bedroom, new exterior window systems & new exterior door at first floor level. | $45,000 |
| Jun 15, 2012 | Never finaled | 164 Hartford St | replacement of (e) bonus room including new electrical work & plumbing to accomodate new structure. | $75,000 |
| Jun 11, 2012 | Completed | 164 Hartford St | adding 6 can lights & plugs to code, replacing 2 existing windows in kind, adding sheetrock to walls & ceilings. | $9,000 |
| Apr 27, 2012 | Completed | 36 Hartford St | replace half of the kitchen cabinetry in kind. adding 2 under cabinet lights and electrical to future warning drawer | $12,000 |
| Sep 8, 2010 | Never finaled | 60 Hartford St | remodel 1st floor bedroom & bathroom.remove art studio at 1st floor.add garage @ 1st floor. | $50,000 |
| Jul 30, 2010 | Completed | 1315 Diamond St | add full bathroom and legalize bedroom at existing first/garage floor | $24,000 |
| Jun 18, 2010 | Completed | 52 Hartford St | replace and extend existing rear deck and stair to rear yard. incl new footings and foundation | $20,000 |
| Jan 26, 2010 | Completed | 2445 Ulloa St | downstairs (e) bathroom remodel, upstairs (e) kitchen remodel. no added sqft. no increase to bldg enevelope. window replacement under separate permit | $40,000 |
| Sep 16, 2008 | Expired or cancelled | 936 Chenery St | repair in kind partial exterior siding, finish treads and risers. (e) porch finish flooring, new windows wood clad double hung windows at front facade. u factor 0.67 or better. | $20,000 |
| Sep 21, 2007 | Never finaled | 426 Eureka St | revision to app# 2007 07 02 5742. shotcrete to be used at exterior walls as shown on revised plans. | |
| Jul 2, 2007 | Completed | 426 Eureka St | new rear deck & patio (less than 3' above), remodel (e) basement laundry, no increase to building envelope, no alteration to building st facade, new retaining walls for new patio (rear yard). | $60,000 |
| Aug 17, 2006 | Expired or cancelled | 56 Hartford St | revision to 200503298604, new glass block property line window at e office, in lieu of existing window to remain | $500 |
| Jul 11, 2005 | Completed | 4419 19th St | complete interior remodel of (e)single family residence. new curb cut & garage (+ramp/encorachment) @ (e) basement. new 4th story vertical addition. new rear yard addition. new front facade to return to original victorian detailing. | $500,000 |