Phollies Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 2 permits filed
178 permits since 2000: 149 completed, 3 in progress, 10 never finaled, 16 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Aug 2026 | 578 16th Av | new millgard windows throughout and remodel kitchen and bathroom in kind and like for like. u factor for windows is .25Details
new millgard windows throughout and remodel kitchen and bathroom in kind and like for like. u factor for windows is .25 | $150,000 |
| Feb 6, 2025 | In progress issued Mar 2025 | 671 28th St | interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck.Details
interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck. | $400,000 |
| Oct 1, 2024 | In progress issued Oct 2024 | 2533 Folsom St | interior remodel w/in (e) building including limited structural work at kitchen / dining only, no changes to exterior.Details
interior remodel w/in (e) building including limited structural work at kitchen / dining only, no changes to exterior. | $125,000 |
| Jul 11, 2024 | Completed final sign-off Aug 2024 | 318 12th Av | additional work to permit#202403228385 as follows: plywood three existing ground floor perimeter walls. 1/2 ply w/ 10d at 6" o.c. and 12" o.c. fieldDetails
additional work to permit#202403228385 as follows: plywood three existing ground floor perimeter walls. 1/2 ply w/ 10d at 6" o.c. and 12" o.c. field | $5,500 |
| Mar 22, 2024 | Completed final sign-off Aug 2024 | 318 12th Av | open walls to remove all knob and tube electrical upgrade main electrical to 200 amps (throughout house). remodel 2nd floor guest bath shower new insulation where neededDetails
open walls to remove all knob and tube electrical upgrade main electrical to 200 amps (throughout house). remodel 2nd floor guest bath shower new insulation where needed | $45,000 |
| Aug 24, 2023 | Never finaled issued Sep 2023, no final | 328 Highland Av | revision to 201909060920. remove requirement for fire sprinklerDetails
revision to 201909060920. remove requirement for fire sprinkler | |
| Dec 14, 2022 | Never finaled issued Dec 2022, no final | 2901 Pacific Av | convert e hotel room to sitting room, living room. remove toilet room, convert to storageDetails
convert e hotel room to sitting room, living room. remove toilet room, convert to storage | $75,000 |
| Sep 20, 2022 | Completed final sign-off May 2023 | 2742 Pierce St | remodel (1) existing kitchen: new cabinets, countertops, electrical and plumbing fixtures. no structural. all work to conform to title 24.Details
remodel (1) existing kitchen: new cabinets, countertops, electrical and plumbing fixtures. no structural. all work to conform to title 24. | $60,000 |
| May 19, 2022 | Completed final sign-off May 2022 | 560 Haight St | unit 208: revision to no-plan pa# 202105140396. reduce scope of work. original permit was for 2 bathrooms. reduce to only 1 bathroom. remove 2nd flr bathroom from scope.Details
unit 208: revision to no-plan pa# 202105140396. reduce scope of work. original permit was for 2 bathrooms. reduce to only 1 bathroom. remove 2nd flr bathroom from scope. | |
| Feb 7, 2022 | Completed final sign-off Dec 2022 | 310 Laurel St | remodel master and guest baths on 2nd floor. master bath to connect to existing walk-in closet. all new fixtures and tile all work to comply with title 24. no structural.Details
remodel master and guest baths on 2nd floor. master bath to connect to existing walk-in closet. all new fixtures and tile all work to comply with title 24. no structural. | $40,000 |
| Sep 22, 2021 | Completed final sign-off Jan 2022 | 181 28th Av | remodel of one (e) master bath. new tile, plumbing, fixtures, electrical. all work to comply with title 24. no structural. all work in kind.Details
remodel of one (e) master bath. new tile, plumbing, fixtures, electrical. all work to comply with title 24. no structural. all work in kind. | $35,000 |
| Sep 7, 2021 | Completed final sign-off Jan 2022 | 77 Carmelita St | replace insulation and drywall on north wall in entry stairwell, dining room and 3rd floor bedroom. reinstall dining room case work. new trim and paint to match existing.Details
replace insulation and drywall on north wall in entry stairwell, dining room and 3rd floor bedroom. reinstall dining room case work. new trim and paint to match existing. | $40,000 |
| Jun 24, 2021 | Completed final sign-off Oct 2021 | 661 Waller St | permit #202012020040 add $15,000 to job costDetails
permit #202012020040 add $15,000 to job cost | $10,000 |
| May 14, 2021 | Completed final sign-off May 2022 | 560 Haight St | 2 bathrooms remodel at first level and upper level in kind. no change to layout. no new wall and no existing all relocation. new lighting shall comply with cec 150.0 (k)5. total number of plumbing fixtures no change.Details
2 bathrooms remodel at first level and upper level in kind. no change to layout. no new wall and no existing all relocation. new lighting shall comply with cec 150.0 (k)5. total number of plumbing fixtures no change. | $15,000 |
| Mar 29, 2021 | Completed final sign-off Jan 2022 | 225 26th Av | remodel kitchen: new cibnets, appliances, flooring. all work to meet current codes & title 24. no structural.Details
remodel kitchen: new cibnets, appliances, flooring. all work to meet current codes & title 24. no structural. | $30,000 |
| Dec 2, 2020 | Completed final sign-off Oct 2021 | 661 Waller St | repair existing rear wood staircase and rear area of building damage due to fire. water damage repair, drywall, trims, paint, as necessary. response to nov # 202049781.Details
repair existing rear wood staircase and rear area of building damage due to fire. water damage repair, drywall, trims, paint, as necessary. response to nov # 202049781. | $10,000 |
| Dec 2, 2020 | Completed final sign-off Apr 2023 | 663 Waller St | repair existing wood staircase and rear wall of building damage due to fire. response to nov # 202049761.Details
repair existing wood staircase and rear wall of building damage due to fire. response to nov # 202049761. | $10,000 |
| Nov 25, 2020 | Completed final sign-off Oct 2021 | 99 Carmelita St | comply w/ nov 202049531. remove/replace in kind fire damaged interior drywall & siding (south side of bldg, not visible from st), remove/replace framing, electrical, drywall and trim.Details
comply w/ nov 202049531. remove/replace in kind fire damaged interior drywall & siding (south side of bldg, not visible from st), remove/replace framing, electrical, drywall and trim. | $10,000 |
| Jun 13, 2020 | Completed final sign-off Dec 2020 | 125 Steiner St | remodel existing kitchen & bath in-kind. new cabinets, plumbing fixtures, tiels. all new work to comply with t-24. no structual work. like for like.Details
remodel existing kitchen & bath in-kind. new cabinets, plumbing fixtures, tiels. all new work to comply with t-24. no structual work. like for like. | $60,000 |
| Feb 11, 2020 | Completed final sign-off Oct 2020 | 1999 Broadway | remodel extg kitchen. new cabinets, lighting and appliances.Details
remodel extg kitchen. new cabinets, lighting and appliances. | $40,000 |
| Dec 24, 2019 | Completed final sign-off Mar 2021 | 245 Ewing Tr | add new bathroom @ existing unconditioned space of rear of garage. relocate existing laundry. kitchen remodel. new skylightsDetails
add new bathroom @ existing unconditioned space of rear of garage. relocate existing laundry. kitchen remodel. new skylights | $85,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2022 | 1718 Diamond St | remodel existing ground floor bathroom, all work to comply with title 24. replace existing double swing doors to slding doors on existing 2x6 closet.Details
remodel existing ground floor bathroom, all work to comply with title 24. replace existing double swing doors to slding doors on existing 2x6 closet. | $30,000 |
| Sep 6, 2019 | Never finaled issued May 2023, no final | 328 Highland Av | vertical addition & horizontal addition at rear. renovation to existing single family home. addition of 3rd floor. bedroom & office on 3rd floor. separate fire sprinkler.Details
vertical addition & horizontal addition at rear. renovation to existing single family home. addition of 3rd floor. bedroom & office on 3rd floor. separate fire sprinkler. | $250,000 |
| Apr 1, 2019 | Completed final sign-off Aug 2019 | 181 28th Av | expand (e) basement bath. new showers and fixtures move door to laundry, all new work per t-24. no structural. no exterior work.Details
expand (e) basement bath. new showers and fixtures move door to laundry, all new work per t-24. no structural. no exterior work. | $35,000 |
| Aug 21, 2018 | Completed final sign-off Mar 2019 | 605 Waller St | remodel existing 3rd fl kitchen in existing locations, remodel existing 4th fl. bathroom. all new work to comply with new codes& title 24Details
remodel existing 3rd fl kitchen in existing locations, remodel existing 4th fl. bathroom. all new work to comply with new codes& title 24 | $40,000 |
| Mar 21, 2018 | Completed final sign-off Mar 2019 | 947 Green St | revision to 201711214644. move wall for new powder room. eliminate e bath, reconfigure master bath walls and closetDetails
revision to 201711214644. move wall for new powder room. eliminate e bath, reconfigure master bath walls and closet | |
| Feb 27, 2018 | Completed final sign-off Nov 2018 | 1250 Jones St | remodel existing kithcen and bath, reconfigure master bedroom closet and reconfigure closet to laundry room, new lighting appliances and fixtures, all new work to comply with all codes and title 24Details
remodel existing kithcen and bath, reconfigure master bedroom closet and reconfigure closet to laundry room, new lighting appliances and fixtures, all new work to comply with all codes and title 24 | $80,000 |
| Jan 2, 2018 | Completed final sign-off Mar 2019 | 605 Waller St | revision to 201609026787, changes to interior remodelDetails
revision to 201609026787, changes to interior remodel | |
| Nov 30, 2017 | Completed final sign-off Sep 2018 | 1337 Francisco St | all work at rear of house - replace exterior siding & some non structural framing, & replace some electrical as needed. work is due to fire. replace 2 sliding glass doors, hardwood floor paint.Details
all work at rear of house - replace exterior siding & some non structural framing, & replace some electrical as needed. work is due to fire. replace 2 sliding glass doors, hardwood floor paint. | $50,000 |
| Nov 21, 2017 | Completed final sign-off Mar 2019 | 947 Green St | remodel e kitchen and existing baths, new cabinets appliances, plumbing, fix. all new work to meet new codes, title 24. no struc no wall moved removed added or infilled. layout unchangedDetails
remodel e kitchen and existing baths, new cabinets appliances, plumbing, fix. all new work to meet new codes, title 24. no struc no wall moved removed added or infilled. layout unchanged | $80,000 |
| May 3, 2017 | Never finaled issued Oct 2021, no final | 78 Carmelita St | remodel & addition to lowest fl. replace (e) brick foundation, extend ground fl to footprint of (e) upper fl, add plumbing for future kitchenette. relocate structural walls/columns. interior partitions & plumbing & replace interior finishes, cabinetry & light fixtureDetails
remodel & addition to lowest fl. replace (e) brick foundation, extend ground fl to footprint of (e) upper fl, add plumbing for future kitchenette. relocate structural walls/columns. interior partitions & plumbing & replace interior finishes, cabinetry & light fixture | $60,000 |
| Feb 6, 2017 | Expired or cancelled withdrawn Feb 2017 | 2901 Pacific Av | title 24: electrical t.i. only: ref pa201608195579. replace and/or repair electrical throughout the building.Details
title 24: electrical t.i. only: ref pa201608195579. replace and/or repair electrical throughout the building. | $1,000 |
| Jan 13, 2017 | Completed final sign-off Jul 2017 | 2901 Pacific Av | structural only: revision to pa 2016-0819-5579 additional interior structural support due to field conditions. add structural support to roof framing for mechanical equipmentDetails
structural only: revision to pa 2016-0819-5579 additional interior structural support due to field conditions. add structural support to roof framing for mechanical equipment | $75,000 |
| Dec 30, 2016 | Completed final sign-off Jul 2017 | 2901 Pacific Av | revision to 201608195579 mechanical & electrical upgrade to coincide with ti. fire alram & sprinklers on sep permitDetails
revision to 201608195579 mechanical & electrical upgrade to coincide with ti. fire alram & sprinklers on sep permit | $125,000 |
| Sep 6, 2016 | Completed final sign-off Jan 2017 | 44 Southwood Dr | remodel existing kitchenDetails
remodel existing kitchen | $12,000 |
| Aug 29, 2016 | Never finaled issued Aug 2016, no final | 3332 Folsom St | street spaceDetails
street space | |
| Aug 19, 2016 | Completed final sign-off Jul 2017 | 2901 Pacific Av | project consists of interior upgrades to (e) guestrooms & common areas & upgrades to the (e) elevator. ada upgrades. no exterior work. fire sprinkler under a separate permit. mep under a separate permit.Details
project consists of interior upgrades to (e) guestrooms & common areas & upgrades to the (e) elevator. ada upgrades. no exterior work. fire sprinkler under a separate permit. mep under a separate permit. | $2,900,000 |
| Jun 29, 2016 | Completed final sign-off Dec 2019 | 848 35th Av | build out at rear of dwelling, 1st & 2nd floor at side yard both sides. 1st floor at rear yard under existing deck, add one bathroom laundry room, family roomDetails
build out at rear of dwelling, 1st & 2nd floor at side yard both sides. 1st floor at rear yard under existing deck, add one bathroom laundry room, family room | $400,000 |
| Feb 5, 2016 | Completed final sign-off Dec 2017 | 1189 De Haro St | remodel existing kitchen, bath and laundry room. all work to comply with all codes and title 24. no relocating partitions and doors.Details
remodel existing kitchen, bath and laundry room. all work to comply with all codes and title 24. no relocating partitions and doors. | $30,000 |
| Dec 28, 2015 | Completed final sign-off Feb 2017 | 1337 Francisco St | revision to app#201509156977. revision framing to match actual site conditions. delete footing work and repair special inspection change to sheet s3 only.Details
revision to app#201509156977. revision framing to match actual site conditions. delete footing work and repair special inspection change to sheet s3 only. | |
| Dec 28, 2015 | Completed final sign-off Sep 2018 | 1339 Francisco St | structural work on ground only. legalization and for structural infill under seperate permit per app#201512114904Details
structural work on ground only. legalization and for structural infill under seperate permit per app#201512114904 | $5,000 |
| Dec 11, 2015 | Completed final sign-off Oct 2018 | 1339 Francisco St | add unit on ground floor. fire sprinkler ground floor under separate permits.Details
add unit on ground floor. fire sprinkler ground floor under separate permits. | $50,000 |
| Oct 21, 2015 | Completed final sign-off Apr 2016 | 366 Nevada St | remodel (e) kitchen & bath, new cabinets, fixtures, appliances; all work to meet all codes & title 24. no walls moved/removed/infilled or added; all (e) layouts to remain unchanged.Details
remodel (e) kitchen & bath, new cabinets, fixtures, appliances; all work to meet all codes & title 24. no walls moved/removed/infilled or added; all (e) layouts to remain unchanged. | $60,000 |
| Sep 15, 2015 | Completed final sign-off Feb 2017 | 1337 Francisco St | 2nd floor unit - relocate (e) kitchen - remove (e) bathroom provide new bathroom at sunroom, provide new bedroom, replace windows side and rear -0.32 maxDetails
2nd floor unit - relocate (e) kitchen - remove (e) bathroom provide new bathroom at sunroom, provide new bedroom, replace windows side and rear -0.32 max | $20,000 |
| Jul 17, 2015 | Completed final sign-off Feb 2017 | 1339 Francisco St | interior remodel @ unit on 3rd floor, remove non-bearing walls between kitchen & dining, remodel (e)bath, provided new bath at sunroom.Details
interior remodel @ unit on 3rd floor, remove non-bearing walls between kitchen & dining, remodel (e)bath, provided new bath at sunroom. | $30,000 |
| Jul 8, 2015 | Completed final sign-off Jun 2016 | 1101 Green St | renovation of interior: new kitchen including casework and appliances. new entry ceilings. bathroom remodel with fixtures. new half bath. built in bookshelves and storage.Details
renovation of interior: new kitchen including casework and appliances. new entry ceilings. bathroom remodel with fixtures. new half bath. built in bookshelves and storage. | $100,000 |
| May 27, 2015 | Completed final sign-off Jul 2015 | 2259 Clay St | ground floor install new partition wall & add new door to common storage. no sturctural work.Details
ground floor install new partition wall & add new door to common storage. no sturctural work. | $1,500 |
| Feb 9, 2015 | Completed final sign-off May 2015 | 235 Precita Av | remodel one (1) bath in each unit. new plumbing, electrical, drywall, fixtures. no structural work. fnishes/fixtures, no walls to be moved.Details
remodel one (1) bath in each unit. new plumbing, electrical, drywall, fixtures. no structural work. fnishes/fixtures, no walls to be moved. | $60,000 |
| Feb 9, 2015 | Completed final sign-off May 2015 | 2392 Post St | remodel kitchen, dining room & laundry. new cabinets, appliances, lighting, plumbing fixtures. no walls removed; finishes/fixtures only; no structural.Details
remodel kitchen, dining room & laundry. new cabinets, appliances, lighting, plumbing fixtures. no walls removed; finishes/fixtures only; no structural. | $40,000 |
| Nov 24, 2014 | Completed final sign-off Apr 2016 | 360 Elizabeth St | voluntary structural upgrade and interior remodel of 360 a lower unit. replacement of 6 windows in kind per plan.Details
voluntary structural upgrade and interior remodel of 360 a lower unit. replacement of 6 windows in kind per plan. | $80,000 |
| Nov 4, 2014 | Completed final sign-off Nov 2018 | 3976 25th St | (n) front stair/entry; rear addition on 2nd & 3rd fls; remodel 3rd fl bedrooms & bathrooms; remove & raise roof & add 4th level occupancy; (n) sprinkler system throughout under deferred submittal.Details
(n) front stair/entry; rear addition on 2nd & 3rd fls; remodel 3rd fl bedrooms & bathrooms; remove & raise roof & add 4th level occupancy; (n) sprinkler system throughout under deferred submittal. | $100,000 |
| Sep 22, 2014 | Completed final sign-off Dec 2014 | 117 Castro St | remodel (e) 2/f bathroom; no structural ; all work to comply with current building codes and title 24; cec150(k)5Details
remodel (e) 2/f bathroom; no structural ; all work to comply with current building codes and title 24; cec150(k)5 | $20,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2014 | 2454 Bush St | to obtain final inspection for work approved under pa# 201009201221. all work is complete.Details
to obtain final inspection for work approved under pa# 201009201221. all work is complete. | |
| Sep 4, 2014 | Completed final sign-off Sep 2014 | 2454 Bush St | to obtain final inspection for work approved under pa# 201009201225. all work is complete.Details
to obtain final inspection for work approved under pa# 201009201225. all work is complete. | |
| Aug 15, 2014 | Completed final sign-off Apr 2015 | 1150 Lombard St | apt #9: remodel existing kitchen & powder room, all appliances to to stay in existing locations. new lighting in foyer, living room & dining room, all work to be as per code and title 24.Details
apt #9: remodel existing kitchen & powder room, all appliances to to stay in existing locations. new lighting in foyer, living room & dining room, all work to be as per code and title 24. | $30,000 |
| Jul 1, 2014 | Completed final sign-off Apr 2015 | 33 White St | revision appl. 2012.05.02.9619 to remove existing rear retaining wall and construct new rear retaining wall.Details
revision appl. 2012.05.02.9619 to remove existing rear retaining wall and construct new rear retaining wall. | $45,000 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 142 Arguello Bl | full remodel of (e) 2nd floor bath, new plumbing, electrical, tile, partial remodel of 2nd floor bath, new lighting, sink and faucet. all work to comply wiht all codes and title 24 regulations. no structuralDetails
full remodel of (e) 2nd floor bath, new plumbing, electrical, tile, partial remodel of 2nd floor bath, new lighting, sink and faucet. all work to comply wiht all codes and title 24 regulations. no structural | $30,000 |
| Apr 24, 2014 | Completed final sign-off Jun 2015 | 111 Chestnut St | unti #601:remodel extg kitchen and 2 full baths. all work to comply with all bldg, electrical, plumbing , and title 24 codes. all fixtures to remain in extg locations. no structural.Details
unti #601:remodel extg kitchen and 2 full baths. all work to comply with all bldg, electrical, plumbing , and title 24 codes. all fixtures to remain in extg locations. no structural. | $60,000 |
| Apr 24, 2014 | Expired or cancelled expired Sep 2017 | 586 Funston Av | remove and replace existing failing smooth stucco on front of building. re-roof existing bay windows and entry mudroom.Details
remove and replace existing failing smooth stucco on front of building. re-roof existing bay windows and entry mudroom. | $10,000 |
| Nov 1, 2013 | Completed final sign-off Jun 2018 | 3332 Folsom St | expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet.Details
expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet. | $85,000 |
| Oct 25, 2013 | Completed final sign-off Jan 2014 | 1845 Laguna St | remodel (e) kitchen. new cabinets, fixtures, & appliances. new plumbing & electrical to comply with current codes. kitchen on upper level. kitchen lighting shall have 50% wattage min. as high efficacy. no change to wall & openings.Details
remodel (e) kitchen. new cabinets, fixtures, & appliances. new plumbing & electrical to comply with current codes. kitchen on upper level. kitchen lighting shall have 50% wattage min. as high efficacy. no change to wall & openings. | $20,000 |
| Sep 9, 2013 | Completed final sign-off Feb 2014 | 409 Fair Oaks St | remodel extg kitchen create larger opening into living room. new plmg and electrical to comply with current codes.Details
remodel extg kitchen create larger opening into living room. new plmg and electrical to comply with current codes. | $30,000 |
| Jul 17, 2013 | Completed final sign-off Oct 2013 | 3466 21st St | remodel existing kitchen, remove walls & install new steel beams per plan, upgrade plumbing, electrical to current code, new cabinets & appliances.Details
remodel existing kitchen, remove walls & install new steel beams per plan, upgrade plumbing, electrical to current code, new cabinets & appliances. | $60,000 |
| May 29, 2013 | Completed final sign-off Sep 2014 | 2454 Bush St | replace existing wood fence - 7'8" along side, east lot line, max height, 54' in length. see plans for fence on west lot line last year.Details
replace existing wood fence - 7'8" along side, east lot line, max height, 54' in length. see plans for fence on west lot line last year. | $2,500 |
| Apr 8, 2013 | Completed final sign-off Jun 2013 | 405 Fair Oaks St | volintary structural upgrade: new posts & grade beams in center of basement.Details
volintary structural upgrade: new posts & grade beams in center of basement. | $5,300 |
| Mar 20, 2013 | Completed final sign-off Jun 2013 | 158 Lower Tr | install new beams and post to open kitchen walls.Details
install new beams and post to open kitchen walls. | $6,500 |
| Nov 28, 2012 | Completed final sign-off Jan 2013 | 2994 Folsom St | renew permit app # 200104277883 for a final, all work is completeDetails
renew permit app # 200104277883 for a final, all work is complete | |
| Nov 16, 2012 | Completed final sign-off Jul 2013 | 666 Post St | apt 203: remove non structural partition walls per plan. remodel kitchen and bath in existing location. new plumbing and electrical to meet existing codes and title 24Details
apt 203: remove non structural partition walls per plan. remodel kitchen and bath in existing location. new plumbing and electrical to meet existing codes and title 24 | $40,000 |
| Oct 24, 2012 | Completed final sign-off Feb 2014 | 531 Spruce St | structural work in garage. remove wall between kitchen and dining room and living room at second floor.remodel kitchen and bath. raise ceiling in kitchen, dining room and living room at 2nd floor.Details
structural work in garage. remove wall between kitchen and dining room and living room at second floor.remodel kitchen and bath. raise ceiling in kitchen, dining room and living room at 2nd floor. | $50,000 |
| Jun 22, 2012 | Completed final sign-off Mar 2013 | 49 Seward St | remove (e) kitchen cabinets and countertops. install new cabinets and countertops. all sinks, appliances and electrical to remain in (e) locations. no framing or structural work.Details
remove (e) kitchen cabinets and countertops. install new cabinets and countertops. all sinks, appliances and electrical to remain in (e) locations. no framing or structural work. | $3,000 |
| May 7, 2012 | Completed final sign-off Jul 2012 | 366 Nevada St | install 2 closets in (e) office, change (e) door to pocket doors. install new skylights in office, replace rear windows in kind, upgrade plugs & lights in office & bedrooms. install new hard wire smoke detectors in office & bedroomsDetails
install 2 closets in (e) office, change (e) door to pocket doors. install new skylights in office, replace rear windows in kind, upgrade plugs & lights in office & bedrooms. install new hard wire smoke detectors in office & bedrooms | $8,500 |
| May 3, 2012 | Completed final sign-off Nov 2012 | 3755 20th St | remodel existing kitchen, new cabinets, counter tops, flooring, electrical, plumbing, no structural.Details
remodel existing kitchen, new cabinets, counter tops, flooring, electrical, plumbing, no structural. | $20,000 |
| Feb 21, 2012 | Completed final sign-off Apr 2012 | 860 Elizabeth St | revision to 201201101996 per correction notice by joe duffy to replace front stairsin kindDetails
revision to 201201101996 per correction notice by joe duffy to replace front stairsin kind | $4,500 |
| Feb 14, 2012 | Completed final sign-off Sep 2014 | 2454 Bush St | breeze way corridor voluntary upgrade with new 1-hour rated walls & ceiling, new rated doors.Details
breeze way corridor voluntary upgrade with new 1-hour rated walls & ceiling, new rated doors. | $1,800 |
| Jan 26, 2012 | Expired or cancelled expired Dec 2015 | 857 Elizabeth St | remove existing double door & make new wall in front of existing for new pocket door. not visible from street. re-use existing doors. install new cabinets in 3 existing bedrooms, split closet between 2 bedrooms. new electrical outlets and cabinet lighting. no structural work. no new wall.Details
remove existing double door & make new wall in front of existing for new pocket door. not visible from street. re-use existing doors. install new cabinets in 3 existing bedrooms, split closet between 2 bedrooms. new electrical outlets and cabinet lighting. no structural work. no new wall. | $11,500 |
| Jan 10, 2012 | Completed final sign-off Apr 2012 | 860 Elizabeth St | dryrot repair of front stairs in kind. remove & replace existing stucco & framing in kind with new pressure treated 3x6 sills, new 2x6 framing, 3/4 sheathing & stucco to match existing. less than 50%. approx 150 square feet of stucco.Details
dryrot repair of front stairs in kind. remove & replace existing stucco & framing in kind with new pressure treated 3x6 sills, new 2x6 framing, 3/4 sheathing & stucco to match existing. less than 50%. approx 150 square feet of stucco. | $4,250 |
| Jan 3, 2012 | Completed final sign-off Jan 2012 | 1415 Eddy St | replace non ducted hood with new duct to roof above. re-use existing electrical. 5 ft away from any property line w/6" dcut.Details
replace non ducted hood with new duct to roof above. re-use existing electrical. 5 ft away from any property line w/6" dcut. | $300 |
| Dec 16, 2011 | Completed final sign-off Feb 2012 | 1120 Kearny St | to comply with physical inspection report #cc-6036Details
to comply with physical inspection report #cc-6036 | $3,500 |
| Oct 26, 2011 | Completed final sign-off Nov 2011 | 117 Castro St | see complaint #201166203- replace new drywall, upgrade existing plugs, lights & switching, install new tile floor for garden tools & equipment. replace 2 existing wood awning, windows with dual glaze windows to match. not visable from street, no structural work, u factor =0.40 max.Details
see complaint #201166203- replace new drywall, upgrade existing plugs, lights & switching, install new tile floor for garden tools & equipment. replace 2 existing wood awning, windows with dual glaze windows to match. not visable from street, no structural work, u factor =0.40 max. | $7,500 |
| Sep 22, 2011 | Completed final sign-off Nov 2011 | 77 Carmelita St | revision to appl #200911181542-s1: note the existance of existing footing.Details
revision to appl #200911181542-s1: note the existance of existing footing. | |
| Aug 2, 2011 | Completed final sign-off Oct 2011 | 72 Langton St | revision to pa# 2011-0126-9073-add cap railing to glass screen on roof deck. add new walking surface to extended deck area, per inspector's requestDetails
revision to pa# 2011-0126-9073-add cap railing to glass screen on roof deck. add new walking surface to extended deck area, per inspector's request | $2,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 2820 Union St | remove existing stucco on lower face of building. repair dryrot at windows & garage door, replace 3 front windows to match existing. replace stucco as needed to match existing. repair in kind.Details
remove existing stucco on lower face of building. repair dryrot at windows & garage door, replace 3 front windows to match existing. replace stucco as needed to match existing. repair in kind. | $20,000 |
| Apr 4, 2011 | Completed final sign-off Oct 2011 | 26 Piedmont St | the scope of work includes demolition of existing kitchen and half bath at lower level ( unit 26 piedmont st) to provide storage areas. the remodel intends to merge 26 piedmont st w/ 30 piedmont st.Details
the scope of work includes demolition of existing kitchen and half bath at lower level ( unit 26 piedmont st) to provide storage areas. the remodel intends to merge 26 piedmont st w/ 30 piedmont st. | $13,750 |
| Dec 23, 2010 | Completed final sign-off Jan 2013 | 3141 Folsom St | the scope of work at the second and third floors involves the creation of a horizontal extension into the rear yard to accomodale a new master bath and deck.Details
the scope of work at the second and third floors involves the creation of a horizontal extension into the rear yard to accomodale a new master bath and deck. | $47,900 |
| Jun 4, 2010 | Completed final sign-off Aug 2010 | 723 27th St | remodel (e)bathroom on 2nd fllor. no structural work. new plbg, elec, and tileDetails
remodel (e)bathroom on 2nd fllor. no structural work. new plbg, elec, and tile | $15,000 |
| Apr 13, 2010 | Completed final sign-off Oct 2010 | 416 Jersey St | revision to pa# 2009.12.16.3361. voluntary partial structural strengthing on all floorsDetails
revision to pa# 2009.12.16.3361. voluntary partial structural strengthing on all floors | $50,000 |
| Feb 5, 2010 | Completed final sign-off Jun 2010 | 1928 Fillmore St | tenant improvement includes new display units, new lighting, new wall finishes & floor finishes. there will be alterations to the windows at the front & side facages. there will be alterations to the second rear means of egress at the rear/side of property. exterior signage under separate permit.Details
tenant improvement includes new display units, new lighting, new wall finishes & floor finishes. there will be alterations to the windows at the front & side facages. there will be alterations to the second rear means of egress at the rear/side of property. exterior signage under separate permit. | $72,600 |
| Jan 25, 2010 | Completed final sign-off Apr 2010 | 1591 Jackson St | unit #1-bathroom remodel, replace (e) tub with shower, new tile surround., replace toilet in (e) location, replace vanity in (e) location. not adding or moving walls. high efficacy or occupancy sensor. exhaust connect to (e) duct.Details
unit #1-bathroom remodel, replace (e) tub with shower, new tile surround., replace toilet in (e) location, replace vanity in (e) location. not adding or moving walls. high efficacy or occupancy sensor. exhaust connect to (e) duct. | $7,500 |
| Dec 16, 2009 | Completed final sign-off Oct 2010 | 416 Jersey St | demo (e)stairway &construct a new stairway at new location, connecting 1st,2nd & 3rd floors.at 1st fl.(e) habitable space, remodel to create new study and full bath.at 2nd floor new half bath to be added and (e)kitchen and bath remodel.3rd floor. (e) master bath to be remodel.new hvac & windowsDetails
demo (e)stairway &construct a new stairway at new location, connecting 1st,2nd & 3rd floors.at 1st fl.(e) habitable space, remodel to create new study and full bath.at 2nd floor new half bath to be added and (e)kitchen and bath remodel.3rd floor. (e) master bath to be remodel.new hvac & windows | $200,000 |
| Nov 18, 2009 | Completed final sign-off Nov 2011 | 77 Carmelita St | modification of interior stairs, new bath on upper floor, remodel (e) kitchen, modification of roof @ rear half of (e) upper level for increased head room in (e) bedroom. new skylight on upper level.Details
modification of interior stairs, new bath on upper floor, remodel (e) kitchen, modification of roof @ rear half of (e) upper level for increased head room in (e) bedroom. new skylight on upper level. | $100,000 |
| Sep 17, 2009 | Completed final sign-off Nov 2009 | 355 28th St | to obtain final inspection for work approv under pa #200706204590. all work is complete.Details
to obtain final inspection for work approv under pa #200706204590. all work is complete. | |
| Sep 17, 2009 | Completed final sign-off Nov 2009 | 355 28th St | to obtain final inspection for work approv under pa #200811136473. all work is complete.Details
to obtain final inspection for work approv under pa #200811136473. all work is complete. | |
| Sep 17, 2009 | Completed final sign-off Nov 2009 | 355 28th St | to obtain final inspection for work approv under pa #200809171904. all work is complete.Details
to obtain final inspection for work approv under pa #200809171904. all work is complete. | |
| Jul 1, 2009 | Completed final sign-off May 2010 | 3141 Folsom St | foundation upgrade as per structural drawings dated 4/28/09 at north sie of bldg.Details
foundation upgrade as per structural drawings dated 4/28/09 at north sie of bldg. | $30,000 |
| Jul 1, 2009 | Completed final sign-off Nov 2009 | 360 Elizabeth St | remodel (e) kitchen & bathroom-new fixtures, cabinets, lighting as per title 24. kitchen: min 50% light watts in high efficacy lights. bathroom: high efficacy light or manaul on occupancy sensorDetails
remodel (e) kitchen & bathroom-new fixtures, cabinets, lighting as per title 24. kitchen: min 50% light watts in high efficacy lights. bathroom: high efficacy light or manaul on occupancy sensor | $30,000 |
| Jun 16, 2009 | Completed final sign-off Jun 2009 | 1768 Sanchez St | renew pa# 2006/12/22/0439 's' to obtain final inspection. all work has been completed.Details
renew pa# 2006/12/22/0439 's' to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 169 27th St | revised bldg pa as built: revise configuration of 2nd floor bathroom, relocated washer/dryer to pantry room (off kitchen). eliminate skylight in master bedroom. revision to pa# 2007-0306-5571.Details
revised bldg pa as built: revise configuration of 2nd floor bathroom, relocated washer/dryer to pantry room (off kitchen). eliminate skylight in master bedroom. revision to pa# 2007-0306-5571. | |
| Mar 12, 2009 | Completed final sign-off Nov 2009 | 1250 Jones St | demolish non bearing wall partitions&remove all finishes&fixtures at extg kchn,bathroom hallway&misc areas of liv rm&bedroom.the proposed plan incl a new kchn mstr bath&half bath.add'l work invol atler'n to closet at mstr bdrm&install built-in cabinetry at liv rm.exist elec&plumb wk shall be upgrde.Details
demolish non bearing wall partitions&remove all finishes&fixtures at extg kchn,bathroom hallway&misc areas of liv rm&bedroom.the proposed plan incl a new kchn mstr bath&half bath.add'l work invol atler'n to closet at mstr bdrm&install built-in cabinetry at liv rm.exist elec&plumb wk shall be upgrde. | $265,000 |
| Mar 3, 2009 | Completed final sign-off Jun 2009 | 926 Sanchez St | revision to application 200810164310, r1. 3 new footings and 14' of footing repair per drawing dated 2-17-09Details
revision to application 200810164310, r1. 3 new footings and 14' of footing repair per drawing dated 2-17-09 | $2,100 |
| Feb 12, 2009 | Completed final sign-off Mar 2009 | 138 11th Av | to finalize work approved under pa#200505091872. all work is complete.Details
to finalize work approved under pa#200505091872. all work is complete. |