Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2024 | Completed final sign-off May 2025 | 126 Dorchester Wy | convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required.Details
convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required. | $248,000 |
| Jan 24, 2024 | Completed final sign-off Jun 2024 | 1977 16th Av | non-structural interior renovation of (e) bathroom and master closet on 2nd fl. no exterior work to be performed. in kind remodelDetails
non-structural interior renovation of (e) bathroom and master closet on 2nd fl. no exterior work to be performed. in kind remodel | $12,000 |
| Jul 25, 2023 | Completed final sign-off Jan 2024 | 528 Noriega St | remodel 2 bathrooms and replace in kind. replace vanity, toilet, tub, shower, tiles.Details
remodel 2 bathrooms and replace in kind. replace vanity, toilet, tub, shower, tiles. | $65,500 |
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 1535 Green St | remove/replace retaining wallDetails
remove/replace retaining wall | $70,000 |
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 1545 Green St | remove/replace 80 feet of retaining wallDetails
remove/replace 80 feet of retaining wall | $210,000 |
| Nov 28, 2022 | Completed final sign-off Apr 2023 | 8 Whitney St | remodel kitchen and bathroom inkind.Details
remodel kitchen and bathroom inkind. | $49,200 |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 2182 31st Av | one kitchen and one bathroom remodel, remove cabinets, etc and replace in kindDetails
one kitchen and one bathroom remodel, remove cabinets, etc and replace in kind | $42,500 |
| Oct 17, 2022 | Completed final sign-off Aug 2023 | 1900 Mission St | revision to approved addendum to site pa# 201507080963 and altered site permit #201912189840 per clouded changes. revise basement elevator mech, room to elevator control room. add elevator hoistway enting and smoke detector.Details
revision to approved addendum to site pa# 201507080963 and altered site permit #201912189840 per clouded changes. revise basement elevator mech, room to elevator control room. add elevator hoistway enting and smoke detector. | |
| Dec 7, 2021 | Completed final sign-off May 2022 | 454 Waller St | revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered.Details
revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered. | |
| Nov 1, 2021 | Completed final sign-off Nov 2023 | 1966 36th Av | add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied.Details
add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied. | $85,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 11 Miramar Av | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $40,300 |
| Oct 12, 2021 | Completed final sign-off Feb 2022 | 1465 Waller St | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $39,500 |
| Aug 25, 2021 | Completed final sign-off Apr 2022 | 1906 Mission St | underpinning & lagging at north property line of 1906 mission st to facilitate proposed excavation at 1900 mission st. ref pa# 201507080963, 201912189840, 202108257106.Details
underpinning & lagging at north property line of 1906 mission st to facilitate proposed excavation at 1900 mission st. ref pa# 201507080963, 201912189840, 202108257106. | $50,000 |
| Aug 25, 2021 | Completed final sign-off Apr 2022 | 1900 Mission St | temporary lagging wall & soldier piers. ref pa# 201507080963, 201912189840, 202108257108.Details
temporary lagging wall & soldier piers. ref pa# 201507080963, 201912189840, 202108257108. | $75,000 |
| Jun 24, 2021 | Completed final sign-off Jun 2021 | 20 Burnside Av | comply with nov 20275699 add sliding glass door on side of building. not visible from streetDetails
comply with nov 20275699 add sliding glass door on side of building. not visible from street | $3,200 |
| Jun 17, 2021 | Completed final sign-off Jun 2021 | 20 Burnside Av | replacing new toilet & vanity as well as new tile. 1/2 bath remodel.Details
replacing new toilet & vanity as well as new tile. 1/2 bath remodel. | $1,930 |
| Jun 8, 2021 | Completed final sign-off Dec 2021 | 578 26th Av | unit 12: remodel and replace 1 kitchen and 1 bath in kind.Details
unit 12: remodel and replace 1 kitchen and 1 bath in kind. | $46,200 |
| Jun 8, 2021 | Completed final sign-off Sep 2021 | 1380 La Playa | remove existing stucco at front of bldg, repair any dryrot, and replace everything in kind.Details
remove existing stucco at front of bldg, repair any dryrot, and replace everything in kind. | $29,350 |
| Jun 2, 2021 | Completed final sign-off Mar 2022 | 641 Chenery St | 2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work.Details
2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work. | $45,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 16 Whitney St | remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move.Details
remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move. | $49,500 |
| Apr 13, 2021 | Completed final sign-off Jul 2024 | 2275 40th Av | horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds.Details
horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds. | $365,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 1363 Hudson Av | basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roofDetails
basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roof | $165,000 |
| Mar 16, 2021 | Completed final sign-off Sep 2021 | 1457 10th Av | revision to application #202012090623. framing revisions in response to dbi correction notice dated 2/24/2021Details
revision to application #202012090623. framing revisions in response to dbi correction notice dated 2/24/2021 | |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 6124 Fulton St | remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout changeDetails
remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout change | $87,780 |
| Dec 9, 2020 | Completed final sign-off Sep 2021 | 1457 10th Av | basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrmDetails
basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrm | $280,000 |
| Nov 30, 2020 | Completed final sign-off Jul 2021 | 528 Noriega St | remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet.Details
remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet. | $35,000 |
| Nov 30, 2020 | Completed final sign-off May 2021 | 154 Park St | convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen areaDetails
convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen area | $85,000 |
| Jun 24, 2020 | Completed final sign-off Nov 2020 | 1236 Sutter St | t.i. new construction consists of non-structural wall, new millwork, nw light fixture & nw restrooms. no structural work included in scope. no increase in area. no change in occuapancy or use. fire sprinkler, fire alarm system, mechanical, electrical/plmg under seperate permit.Details
t.i. new construction consists of non-structural wall, new millwork, nw light fixture & nw restrooms. no structural work included in scope. no increase in area. no change in occuapancy or use. fire sprinkler, fire alarm system, mechanical, electrical/plmg under seperate permit. | $220,000 |
| Jan 31, 2020 | Never finaled filed Jan 2020, never issued | 2270 29th Av | referenced permit pa# 2019-0430-9317 s. new adu on 1st flr per ord# 95-17.Details
referenced permit pa# 2019-0430-9317 s. new adu on 1st flr per ord# 95-17. | $70,000 |
| Dec 18, 2019 | Completed final sign-off Jan 2024 | 1900 Mission St | alter site to bpa #201507080963. no change to exterior dimensions. convert to 2016 building code. convert 1st floor mezzanine to full second story,resulting in 7 story bldg. add the 12th dwelling.Details
alter site to bpa #201507080963. no change to exterior dimensions. convert to 2016 building code. convert 1st floor mezzanine to full second story,resulting in 7 story bldg. add the 12th dwelling. | $30,000 |
| Nov 5, 2019 | Completed final sign-off Jun 2020 | 440 Urbano Dr | lower level improvements: legalize (e) media room, reduce (e) garage/laundry area into (n) conditioned area and convert into (n) bedroom and family room, add new bathroom and new powder room, relocate laundry, add new windows & door at new bedroom, family room and laundry roomDetails
lower level improvements: legalize (e) media room, reduce (e) garage/laundry area into (n) conditioned area and convert into (n) bedroom and family room, add new bathroom and new powder room, relocate laundry, add new windows & door at new bedroom, family room and laundry room | $45,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 12 Whitney St | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen.Details
unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Aug 22, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | relocate new bathroom. reduce garage/storage into habitable space. create new office/study. replace furnace and water heater. replace two rear bedrooms windows at 2nd fl.Details
relocate new bathroom. reduce garage/storage into habitable space. create new office/study. replace furnace and water heater. replace two rear bedrooms windows at 2nd fl. | $30,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 641 08th Av | demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ftDetails
demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ft | $42,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2.Details
remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2. | $58,000 |
| Apr 30, 2019 | Never finaled filed Apr 2019, never issued | 2270 29th Av | construct (n) 3rd fl level above (e) 2-story bldg. build extension to rear of (3) ground fl & 2nd fl levels. convert rear of ground fl into 2-bedrm/1-bath accessory dwelling unit. extend (e) 1-car garage into 2-car garage & 2-bicyle spaces. remodel (e) 2nd flDetails
construct (n) 3rd fl level above (e) 2-story bldg. build extension to rear of (3) ground fl & 2nd fl levels. convert rear of ground fl into 2-bedrm/1-bath accessory dwelling unit. extend (e) 1-car garage into 2-car garage & 2-bicyle spaces. remodel (e) 2nd fl | $310,000 |
| Apr 30, 2019 | Completed final sign-off Jun 2019 | 4443 Irving St | remove existing wood shingles (falling off). off of west side of bldg. and replace in kind with wood shingles.Details
remove existing wood shingles (falling off). off of west side of bldg. and replace in kind with wood shingles. | $4,500 |
| Apr 11, 2019 | Completed final sign-off Oct 2019 | 830 Hyde St | new underpinning to accommodate excavation for permit 2018-0510-8747. underpinning consists of cantilever concrete piers & piers with temporary tiebacks. n/a for maher.Details
new underpinning to accommodate excavation for permit 2018-0510-8747. underpinning consists of cantilever concrete piers & piers with temporary tiebacks. n/a for maher. | $70,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 824 Hyde St | temporary earth shoring system to accommodate foundation construction for pa 2018-0510-8747. shoring consists of cantilevered soldier beams, & soldier beams with internal bracing. n/a for maher.Details
temporary earth shoring system to accommodate foundation construction for pa 2018-0510-8747. shoring consists of cantilevered soldier beams, & soldier beams with internal bracing. n/a for maher. | $80,000 |
| Apr 5, 2019 | Completed final sign-off Sep 2019 | 2086 23rd Av | remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls.Details
remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls. | $68,500 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 3516 Divisadero St | revision to ba 201509106555 s-1: revise ground floor unit interior layout. no exterior changes. revise foundation details at property line to reflect (e) condition.Details
revision to ba 201509106555 s-1: revise ground floor unit interior layout. no exterior changes. revise foundation details at property line to reflect (e) condition. | |
| May 10, 2018 | Completed final sign-off Nov 2020 | 824 Hyde St | to erect a 5 stories, 14 dwelling unit residential with commerical, 1 basement, type iiia/ia. comply w/ maher ord# 155-13.Details
to erect a 5 stories, 14 dwelling unit residential with commerical, 1 basement, type iiia/ia. comply w/ maher ord# 155-13. | $1,500,000 |
| Sep 12, 2017 | Completed final sign-off Jun 2018 | 1208 Stanyan St | to comply with nov #201702012Details
to comply with nov #201702012 | $25,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2017 | 1238 Sutter St | bracing and underpinning existing wall in a sectional sequence - along line a of foundation plan ref 201507161644Details
bracing and underpinning existing wall in a sectional sequence - along line a of foundation plan ref 201507161644 | $14,900 |
| Sep 25, 2015 | Completed final sign-off Sep 2016 | 245 Pixley St | revise pa 201404304546: add new roof hatch and roof deck redwood picket handrail, new interior stair to roof hatch that leads to new roof deck and other structural revision.Details
revise pa 201404304546: add new roof hatch and roof deck redwood picket handrail, new interior stair to roof hatch that leads to new roof deck and other structural revision. | $40,000 |
| Sep 15, 2015 | Completed final sign-off Sep 2015 | 236 Powell St | take off the old existing tile on the shop front exterior. remove (e) sign, 2'x3'Details
take off the old existing tile on the shop front exterior. remove (e) sign, 2'x3' | $5,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 238 Shipley St | exploratory permit for location of utility hook-ups approx 10 holes 4x4x2. holes to be backfilled afterwards.Details
exploratory permit for location of utility hook-ups approx 10 holes 4x4x2. holes to be backfilled afterwards. | $3,500 |
| Jul 16, 2015 | Completed final sign-off Jul 2018 | 1238 Sutter St | construct 9-story mixed-use w/ 2 commercial ground floor lease spaces and 8-story of residential w/ 37 units above.Details
construct 9-story mixed-use w/ 2 commercial ground floor lease spaces and 8-story of residential w/ 37 units above. | $6,500,000 |
| Jul 8, 2015 | Completed final sign-off Jan 2024 | 1900 Mission St | erect 6-story building, type iiia over type ia, 11 dwelling units and (1) retail, with 1 basement.Details
erect 6-story building, type iiia over type ia, 11 dwelling units and (1) retail, with 1 basement. | $2,772,350 |
| Jul 7, 2015 | Completed final sign-off Jul 2015 | 10 30th St | partial foundation replacement: replace 7 footings, replace 1st floor slab. replace 7 posts foundatoin to 2nd floor. (all work interior. not visible from street)Details
partial foundation replacement: replace 7 footings, replace 1st floor slab. replace 7 posts foundatoin to 2nd floor. (all work interior. not visible from street) | $8,500 |
| Jun 30, 2015 | Completed final sign-off Oct 2015 | 236 Powell St | remove the existing cracked tile at the front of first floor. install new smooth finish stucco, painted brick veneer, and stringcourse molding.Details
remove the existing cracked tile at the front of first floor. install new smooth finish stucco, painted brick veneer, and stringcourse molding. | $9,650 |
| Jun 15, 2015 | Completed final sign-off Jun 2015 | 245 Pixley St | remove lath and plaster interior from 1st floor and 2nd floor for engineer to conduct evaluation. temporary cover removed areas with 5/8 type x.Details
remove lath and plaster interior from 1st floor and 2nd floor for engineer to conduct evaluation. temporary cover removed areas with 5/8 type x. | $3,200 |
| Apr 20, 2015 | Never finaled issued Apr 2015, no final | 44 Avila St | remove and replace front exterior brick stairs in kind due to dryrot. water proof the new members and install new brick to match existing.Details
remove and replace front exterior brick stairs in kind due to dryrot. water proof the new members and install new brick to match existing. | $9,900 |
| Jan 20, 2015 | Completed final sign-off Oct 2015 | 44 Avila St | revision to appl #2013.0715.1859 - foundation revision. modify foundation design from full replacement to retrofit. n/a maher ordinanceDetails
revision to appl #2013.0715.1859 - foundation revision. modify foundation design from full replacement to retrofit. n/a maher ordinance | |
| Nov 26, 2014 | Completed final sign-off Feb 2015 | 44 Avila St | remove lath and plaster at 2nd floor/1st fl. rear of living area and 3 bedrooms to expose framing in order for engineer to conduct evacuation. apply 1/2" plywood to cover opened walll area.Details
remove lath and plaster at 2nd floor/1st fl. rear of living area and 3 bedrooms to expose framing in order for engineer to conduct evacuation. apply 1/2" plywood to cover opened walll area. | $3,000 |
| Nov 21, 2014 | Completed final sign-off Apr 2016 | 2270 29th Av | add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street.Details
add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street. | $75,000 |
| Nov 7, 2014 | Completed final sign-off Nov 2014 | 350 Douglass St | replace front stairs in kind and repair front stair landing framing.Details
replace front stairs in kind and repair front stair landing framing. | $6,500 |
| Oct 28, 2014 | Completed final sign-off Apr 2015 | 124 Inverness Dr | remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done.Details
remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done. | $112,750 |
| Oct 3, 2014 | Completed final sign-off Oct 2014 | 2055 18th Av | to take care of complaint no. 201485265 to put back planters where previous owner concreted over. both planters will be 5 ft x 3 ft.Details
to take care of complaint no. 201485265 to put back planters where previous owner concreted over. both planters will be 5 ft x 3 ft. | $500 |
| Jul 17, 2014 | Completed final sign-off Oct 2014 | 149 Gough St | addition of roll up door. ref app#201405276762Details
addition of roll up door. ref app#201405276762 | $4,800 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 2844 Greenwich St | kitchen remodelDetails
kitchen remodel | $27,500 |
| May 27, 2014 | Completed final sign-off Oct 2014 | 149 Gough St | new accessible restroom and staff room, cabinetry and interior finishesDetails
new accessible restroom and staff room, cabinetry and interior finishes | $40,000 |
| May 13, 2014 | Completed final sign-off Jun 2014 | 149 Gough St | interior demolition per ab-017. t.i. under separate permit. demo existing restroom.Details
interior demolition per ab-017. t.i. under separate permit. demo existing restroom. | $4,000 |
| Mar 27, 2014 | Completed final sign-off Jul 2014 | 2055 18th Av | ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy.Details
ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy. | $38,000 |
| Feb 5, 2014 | Completed final sign-off May 2014 | 2967 23rd Av | comply w/compliant #201449331 - addition of new family room & bathroom on lower level.Details
comply w/compliant #201449331 - addition of new family room & bathroom on lower level. | $40,000 |
| Jul 15, 2013 | Completed final sign-off Oct 2015 | 44 Avila St | add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r.Details
add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r. | $200,000 |
| Jul 1, 2013 | Completed final sign-off Oct 2013 | 2135 Greenwich St | remove 3rd floor bearing wall and revidse 3rd floor shear wal. structural work only. ref arch work 201306078984Details
remove 3rd floor bearing wall and revidse 3rd floor shear wal. structural work only. ref arch work 201306078984 | $1,000 |
| Jun 7, 2013 | Completed final sign-off Oct 2013 | 2135 Greenwich St | interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e).Details
interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e). | $125,000 |
| Sep 7, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | revise approved building permit app# 2011-0615-8173 replace existing foundation new 3rd floor deck of existing roof. delete special inspection #18 "bolts installed in existing concrete."Details
revise approved building permit app# 2011-0615-8173 replace existing foundation new 3rd floor deck of existing roof. delete special inspection #18 "bolts installed in existing concrete." | $30,000 |
| Jun 15, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement)Details
interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement) | $450,000 |
| Nov 8, 2010 | Completed final sign-off Feb 2011 | 793 36th Av | remove and replace existing kitchen cabinets & counter tops. strip walls in kitchen area (sheathing only). no wall relocation. min 50% of kitchen light watts to be high efficacy lightsDetails
remove and replace existing kitchen cabinets & counter tops. strip walls in kitchen area (sheathing only). no wall relocation. min 50% of kitchen light watts to be high efficacy lights | $25,500 |
| Nov 5, 2010 | Completed final sign-off Aug 2011 | 58 El Sereno Ct | demo (e) window at living room, install new sliding glass door. construct new wood deck at 2nd floor.Details
demo (e) window at living room, install new sliding glass door. construct new wood deck at 2nd floor. | $10,000 |
| Oct 5, 2010 | Completed final sign-off Dec 2010 | 854 34th Av | to install 1 4 ftx4ft skylight in bedroom on top floor. the skylight will be a minimum of 5 ft from property line.Details
to install 1 4 ftx4ft skylight in bedroom on top floor. the skylight will be a minimum of 5 ft from property line. | $2,500 |
| Jun 23, 2010 | Completed final sign-off Mar 2011 | 858 34th Av | by order of the board of appeals: appeal #10-019:(bpa: 200712039520-s) grants the appeal with adoption of conditions as agreed an listed in the general agreement w/special conditions to be approved by dcp and dbi.Details
by order of the board of appeals: appeal #10-019:(bpa: 200712039520-s) grants the appeal with adoption of conditions as agreed an listed in the general agreement w/special conditions to be approved by dcp and dbi. | |
| May 27, 2010 | Completed final sign-off Oct 2010 | 2917 24th Av | kitchen remodel. demo extg kitchen. replace new cabinets and counters. re use extg appliance,new lighting area aprox. 12'x10'Details
kitchen remodel. demo extg kitchen. replace new cabinets and counters. re use extg appliance,new lighting area aprox. 12'x10' | $25,000 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 1748 Filbert St | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on).Details
partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1750 Filbert St | modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560.Details
modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560. | $10,000 |
| May 27, 2009 | Completed final sign-off Jul 2009 | 1742 Filbert St | replace approximately 40ft linear ft of footing at west property line wallDetails
replace approximately 40ft linear ft of footing at west property line wall | $4,000 |
| Mar 10, 2009 | Completed final sign-off May 2009 | 521 Dewey Bl | remodel 2 existing bathrooms ground floor and second floor and 2 new shower pans.Details
remodel 2 existing bathrooms ground floor and second floor and 2 new shower pans. | $23,500 |
| Nov 14, 2008 | Completed final sign-off Jan 2009 | 58 El Sereno Ct | repair some dry rot on exterior stairs wall, also remove & replace some siding in the front of the house.Details
repair some dry rot on exterior stairs wall, also remove & replace some siding in the front of the house. | $3,000 |
| Oct 24, 2008 | Completed final sign-off Jan 2009 | 58 El Sereno Ct | remove old siding on west elevation of house. repair any dryrot. insulate walls. put on 1/2" plywood and then put on new hardy plank siding. non structural under this permit.Details
remove old siding on west elevation of house. repair any dryrot. insulate walls. put on 1/2" plywood and then put on new hardy plank siding. non structural under this permit. | $11,000 |
| May 12, 2008 | Completed final sign-off Jul 2008 | 639 08th Av | work @ unit# 639 only. remove old cabinets & lath & plaster. new electrical, new plumbing for sink. sheetrock, new cabinets & counter tops.Details
work @ unit# 639 only. remove old cabinets & lath & plaster. new electrical, new plumbing for sink. sheetrock, new cabinets & counter tops. | $10,000 |
| Dec 3, 2007 | Completed final sign-off Mar 2011 | 858 34th Av | alteration & 3rd floor addition including 3 bedrooms, 2 bathrooms & laundry.Details
alteration & 3rd floor addition including 3 bedrooms, 2 bathrooms & laundry. | $100,000 |
| Jun 4, 2007 | Completed final sign-off Dec 2007 | 1911 Mission St | add demising partition to (e) space to create 2 retail spaces. ad electrical outlets & lighting as required.Details
add demising partition to (e) space to create 2 retail spaces. ad electrical outlets & lighting as required. | $12,000 |
| Jun 4, 2007 | Never finaled issued Jun 2007, no final | 1909 Mission St | add demising partition to (e) space to create 2 retail spaces, add electrical outlets and lighting as required.Details
add demising partition to (e) space to create 2 retail spaces, add electrical outlets and lighting as required. | $12,000 |
| Apr 2, 2007 | Completed final sign-off Aug 2007 | 2435 25th Av | kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and locationDetails
kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and location | $25,500 |