Sarah Leong
- Listed as
- architect, attorney, authorized agent-others, engineer
- Firm
- Sarah Leong Consulting Eng.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Jun 2023
63 permits since 2000 (engineer on 56 permits, architect on 4 permits, attorney on 2 permits, authorized agent-others on 1 permit): 54 completed, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2023 | Completed final sign-off Dec 2023 | 4006 22nd St | Fox Brothers Construction Inc | revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from streetDetails
revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from street | |
| Jul 29, 2022 | Expired or cancelled cancelled Jan 2026 | 843 Capp St | Bernhardt Remodeling | revision to permit #202011239549, with revised plans, no new stairs or side gate.Details
revision to permit #202011239549, with revised plans, no new stairs or side gate. | |
| Jun 3, 2022 | Completed final sign-off Feb 2023 | 15 Landers St | Ru Builders Inc | removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls.Details
removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls. | $150,000 |
| Feb 22, 2022 | Completed final sign-off Jun 2024 | 3035 23rd St | Competente Construction Inc | 1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs.Details
1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs. | $191,135 |
| Sep 3, 2021 | Completed final sign-off Jun 2022 | 321 Carl St | remodel (e) bathroom and add laundry room. removal of interior wall between study and bedroomDetails
remodel (e) bathroom and add laundry room. removal of interior wall between study and bedroom | $50,000 | |
| Feb 12, 2021 | Expired or cancelled withdrawn Jun 2021 | 3035 23rd St | replace existing 8' high fence at east property line. replace existing 10' fence at south property line.Details
replace existing 8' high fence at east property line. replace existing 10' fence at south property line. | $2,000 | |
| Nov 23, 2020 | Completed final sign-off Oct 2022 | 24 Santa Marina St | Competente Construction Inc | 1st fl: add new full bath & relocate kitchen to front of house. lower fl slab at rear of house to match (e) ceiling height at front. lower rear yard grade for new sunken patio. 2nd fl: 3 new windows in (e) openings.Details
1st fl: add new full bath & relocate kitchen to front of house. lower fl slab at rear of house to match (e) ceiling height at front. lower rear yard grade for new sunken patio. 2nd fl: 3 new windows in (e) openings. | $73,635 |
| Nov 23, 2020 | Expired or cancelled expired Apr 2026 | 843 Capp St | Bernhardt Remodeling | facade restoration (restore original cornice & some trimwork). new side yard gate, new guardrail at exterior stairs, replace exterior stairs in kind.Details
facade restoration (restore original cornice & some trimwork). new side yard gate, new guardrail at exterior stairs, replace exterior stairs in kind. | $27,700 |
| Sep 5, 2020 | Completed final sign-off Sep 2021 | 17 Greenview Ct | Cs Construction Co | 1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window.Details
1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window. | $88,941 |
| Dec 6, 2019 | Completed final sign-off Aug 2020 | 112 Chenery St | Gill Construction | enclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes.Details
enclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes. | $110,604 |
| Jul 2, 2019 | Completed final sign-off Dec 2019 | 46 Digby St | Mccormack Construction | woodrot repair existing 7'x39' rear deck at street/upper level. replace joists, ledger, railing, spaced boards on underside of deck. code required improvements: raise rail height, add deck ties <50%. no other work.same size same location. 42" max. partial repair only.Details
woodrot repair existing 7'x39' rear deck at street/upper level. replace joists, ledger, railing, spaced boards on underside of deck. code required improvements: raise rail height, add deck ties <50%. no other work.same size same location. 42" max. partial repair only. | $5,000 |
| Aug 16, 2018 | Never finaled issued Sep 2018, no final | 256 09th Av | Spryscapes Const Inc. | replacement of 13 windows with same size windows. replacement of 1 window with smaller window. all work not visible from the street. (none of these window face the street.)Details
replacement of 13 windows with same size windows. replacement of 1 window with smaller window. all work not visible from the street. (none of these window face the street.) | $20,000 |
| Dec 20, 2017 | Completed final sign-off Jul 2018 | 906 Chenery St | Evb General Contractor | shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected.Details
shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected. | $3,500 |
| Jul 13, 2017 | Completed final sign-off Dec 2018 | 486 Edinburgh St | add master bedroom and bath at lower garage level of existing single family house. remodel main floor interior space including kitchen, bath, new skylights, no change to existing exterior envelope of house. continue single family house. changes to exterior windows, front-aluminum to wood back woodDetails
add master bedroom and bath at lower garage level of existing single family house. remodel main floor interior space including kitchen, bath, new skylights, no change to existing exterior envelope of house. continue single family house. changes to exterior windows, front-aluminum to wood back wood | $250,000 | |
| Jul 10, 2017 | Completed final sign-off Mar 2018 | 766 03rd Av | Towey Construction Inc. | change solarium to home office install new bathrm, laundry and linen closet. frame wall across garage to create office file and storage area. fill in 3 exterior windows and 3 new windows build cabinets around gas and elec panel, water htr, furnaceDetails
change solarium to home office install new bathrm, laundry and linen closet. frame wall across garage to create office file and storage area. fill in 3 exterior windows and 3 new windows build cabinets around gas and elec panel, water htr, furnace | $92,000 |
| May 1, 2017 | Completed final sign-off Jan 2018 | 152 Collins St | Talcon Builders | voluntary upgrade of stucco & entry steps (replacement-in-kind) and garage door & front door.Details
voluntary upgrade of stucco & entry steps (replacement-in-kind) and garage door & front door. | $55,000 |
| Mar 31, 2017 | Never finaled issued Aug 2019, no final | 20 Whitney St | replace existing stair, extend/add deck spaceDetails
replace existing stair, extend/add deck space | $2,000 | |
| Mar 9, 2017 | Completed final sign-off Nov 2017 | 3140 Clay St | Burke Construction | unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor.Details
unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor. | $80,000 |
| Sep 23, 2016 | Completed final sign-off Jul 2017 | 225 Hartford St | to comply with nov#201390061, construction of new egress stair from upper apartment that had been illegally removed by previous owner. removal of non permitted space, restoration of original exterior wall at location of non permitted additions, new rear deck.Details
to comply with nov#201390061, construction of new egress stair from upper apartment that had been illegally removed by previous owner. removal of non permitted space, restoration of original exterior wall at location of non permitted additions, new rear deck. | $19,500 | |
| May 5, 2016 | Completed final sign-off Oct 2017 | 225 Hartford St | partial foundation replacement and 1st floor lateral strengthening. to comply with nov #201301271 dated 5/7/2013Details
partial foundation replacement and 1st floor lateral strengthening. to comply with nov #201301271 dated 5/7/2013 | $40,000 | |
| Mar 29, 2016 | Completed final sign-off Jan 2020 | 289 Chestnut St | Sgv Group Construction | soft story retrofit per sfbc chapter 34 b engineering criterioa iebc appendix a4. reinforce w gr level shear walls. add plywood, foundation anchors, holdowns, tiesDetails
soft story retrofit per sfbc chapter 34 b engineering criterioa iebc appendix a4. reinforce w gr level shear walls. add plywood, foundation anchors, holdowns, ties | $6,000 |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 2299 Sacramento St | Burke Construction | convert a half-bath into a full bathroom, install a new shower and high efficiency lighting and a new fan. n/a ordinance #155-13Details
convert a half-bath into a full bathroom, install a new shower and high efficiency lighting and a new fan. n/a ordinance #155-13 | $20,000 |
| Feb 10, 2016 | Completed final sign-off Oct 2022 | 250 Connecticut St | Sgv Group Construction | soft story retrofit per sfbc chapter 34b enginerring criteria: 2012 iebc appendix a4. soft story mitigation for sf wood-frane seismic retrofit program. add 2 new shear walls and footingsDetails
soft story retrofit per sfbc chapter 34b enginerring criteria: 2012 iebc appendix a4. soft story mitigation for sf wood-frane seismic retrofit program. add 2 new shear walls and footings | $10,000 |
| Feb 2, 2016 | Completed final sign-off Sep 2016 | 714 Castro St | Joe Bajuk General Const. | kitchen remodel, remove existing full bath and replace with 1/2 bath & pantry, enlarge opening from kitchen to dining room, enlarge opening from breakfast into tv room.Details
kitchen remodel, remove existing full bath and replace with 1/2 bath & pantry, enlarge opening from kitchen to dining room, enlarge opening from breakfast into tv room. | $96,000 |
| Jun 12, 2015 | Completed final sign-off Aug 2015 | 671 Madrid St | add plywood & bolting at portions of cripple walls. add three posts to support existing girders. this work is for work to be performed in general conformance with california existing bldg code; appendix, chapter a3 (sf.b.c. ab-108).Details
add plywood & bolting at portions of cripple walls. add three posts to support existing girders. this work is for work to be performed in general conformance with california existing bldg code; appendix, chapter a3 (sf.b.c. ab-108). | $2,000 | |
| May 14, 2015 | Never finaled issued Jul 2016, no final | 4226 22nd St | Kudos | revision to pa 2010 1123 5516s: delete deck & build bay window at front of bldg.Details
revision to pa 2010 1123 5516s: delete deck & build bay window at front of bldg. | |
| May 8, 2015 | Expired or cancelled expired Sep 2018 | 152 Collins St | Talcon Builders | remodel kitchen, 2 1/2 baths, shower, related electrical, mech, plumbing and structural. area of remodel approx 500 sfDetails
remodel kitchen, 2 1/2 baths, shower, related electrical, mech, plumbing and structural. area of remodel approx 500 sf | $95,000 |
| Feb 19, 2015 | Completed final sign-off Aug 2016 | 152 Collins St | Talcon Builders | build new deck at rear of buildingDetails
build new deck at rear of building | $18,000 |
| Feb 5, 2015 | Completed final sign-off Apr 2016 | 531 Sanchez St | H M W Development Inc | excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing.Details
excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing. | $133,000 |
| Dec 12, 2014 | Completed final sign-off Jan 2015 | 2200 Sacramento St | Burke Construction | reconvert extg one bedroom condo back to a 2 bedroom by constructing a new wall to split bedroom in half. n/a for the maherDetails
reconvert extg one bedroom condo back to a 2 bedroom by constructing a new wall to split bedroom in half. n/a for the maher | $5,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2014 | 2422 Mission St | Teutonic Construction Inc | wood rot repair 4 columnsDetails
wood rot repair 4 columns | $5,000 |
| Jul 16, 2014 | Completed final sign-off Aug 2014 | 225 Jersey St | replace 32 existing brick foundation with concrete and rebar steel per engineering plan providedDetails
replace 32 existing brick foundation with concrete and rebar steel per engineering plan provided | $4,500 | |
| Apr 17, 2014 | Completed final sign-off Aug 2014 | 1231 Guerrero St | Ray Tom Construction | unit a -kitchen & bathroom remodel, add study room.Details
unit a -kitchen & bathroom remodel, add study room. | $38,000 |
| Apr 11, 2014 | Completed final sign-off Jan 2015 | 4020 18th St | Waho Builders | kitchen remodel to replace cabinets, appliances & finishes, selective demolitoin, reconfigure rear facing window & door. documentation of (e) conditions of ground floor including bedroom, bathroom & living area.Details
kitchen remodel to replace cabinets, appliances & finishes, selective demolitoin, reconfigure rear facing window & door. documentation of (e) conditions of ground floor including bedroom, bathroom & living area. | $50,000 |
| Feb 21, 2014 | Completed final sign-off Aug 2014 | 1915 11th Av | K C Home Improvement Const Co | build new deck & stair at rear of house. replace single pnae windows (2) w/double pane sliders, insulate rear wall, new deck lighting.Details
build new deck & stair at rear of house. replace single pnae windows (2) w/double pane sliders, insulate rear wall, new deck lighting. | $20,000 |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 545 Laguna Honda Bl | Seastar Construction Co | remodel existing family room, powder roo, laundry area on 2nd floor, add new flush beam to replace existing drop beam per engineer's plans & calculation, no other structural improvements.Details
remodel existing family room, powder roo, laundry area on 2nd floor, add new flush beam to replace existing drop beam per engineer's plans & calculation, no other structural improvements. | $18,000 |
| Jul 15, 2013 | Completed final sign-off Nov 2013 | 555 Dewey Bl | Caruso Construction Inc. | rev. to pa#201305247845, remove 2 walls, 2 new headers, 3 new footings.Details
rev. to pa#201305247845, remove 2 walls, 2 new headers, 3 new footings. | $1,500 |
| Mar 28, 2013 | Completed final sign-off Jul 2013 | 763 Kansas St | Aileron Builders | rear cottage - remodel & enlargement of existing bathroom at 2nd floor. one window shall be replaced with new unit, voluntary wall strengthening included.Details
rear cottage - remodel & enlargement of existing bathroom at 2nd floor. one window shall be replaced with new unit, voluntary wall strengthening included. | $16,000 |
| Nov 21, 2012 | Completed final sign-off Dec 2012 | 33 Miguel St | correct violation 201130681/201274921 to add 2 new windows, 24" x48" at rear of buildingDetails
correct violation 201130681/201274921 to add 2 new windows, 24" x48" at rear of building | $3,500 | |
| Oct 12, 2012 | Completed final sign-off Jun 2013 | 513 Liberty St | Kudos | widen garage door opening. square out nw foundation corner up to first floor level. replace center front foundation wall to widen garage space. new garage door and floor.Details
widen garage door opening. square out nw foundation corner up to first floor level. replace center front foundation wall to widen garage space. new garage door and floor. | $20,000 |
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 110 Romain St | Waho Builders | revision to appl #2005.1202.9407 & #2012.0604.1751 - change of engineering specifications: change of "beam" (roof raftes) size, change hanger specification, guardrail changes.Details
revision to appl #2005.1202.9407 & #2012.0604.1751 - change of engineering specifications: change of "beam" (roof raftes) size, change hanger specification, guardrail changes. | $1,000 |
| Apr 20, 2012 | Completed final sign-off Dec 2012 | 34 Wawona St | Caruso Construction Inc. | work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the houseDetails
work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the house | $150,000 |
| Dec 15, 2011 | Completed final sign-off Jan 2013 | 25 Coleridge St | Bespoke Construction | widen & replace garage door & driveway. replace portion of perimeter foundation & add 199 sf of garage/basement space. repair & minor modifications to (e) front stair & walkway.Details
widen & replace garage door & driveway. replace portion of perimeter foundation & add 199 sf of garage/basement space. repair & minor modifications to (e) front stair & walkway. | $85,000 |
| May 13, 2011 | Completed final sign-off Jan 2012 | 1346 05th Av | Cy Lo Builder | remove 4 posts in garage,reframe with steel beams to create additional parking space. remove portion of bearing wall in garage, replace with wood beams.Details
remove 4 posts in garage,reframe with steel beams to create additional parking space. remove portion of bearing wall in garage, replace with wood beams. | $60,000 |
| Apr 18, 2011 | Completed final sign-off May 2013 | 226 Persia Av | A Man Around The House Inc | rear addition - 2 story rear addition. relocate kitchen. stairs from upper to lower level. lower level half-bath. new sheathing & siding at gable end.Details
rear addition - 2 story rear addition. relocate kitchen. stairs from upper to lower level. lower level half-bath. new sheathing & siding at gable end. | $100,000 |
| Jul 2, 2010 | Completed final sign-off Nov 2010 | 521 Laidley St | Urban Builder General Contracting Inc | 1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooringDetails
1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooring | $175,000 |
| Mar 10, 2010 | Completed final sign-off May 2010 | 267 Oak Park Dr | Intergrated Contractors | work to comply w/nov #200674331: 30' long debris catchment wall w/3' min of free-board located at rear of proeprty at base of slope.Details
work to comply w/nov #200674331: 30' long debris catchment wall w/3' min of free-board located at rear of proeprty at base of slope. | $8,500 |
| Dec 3, 2009 | Completed final sign-off Aug 2011 | 4345 25th St | Maginn Construction | horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support.Details
horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support. | $170,000 |
| Nov 17, 2009 | Completed final sign-off Dec 2009 | 672 Prentiss St | A Man Around The House Inc | replace existing 8' x 12' deck in back yard.Details
replace existing 8' x 12' deck in back yard. | $12,000 |
| Apr 29, 2009 | Completed final sign-off Feb 2010 | 339 Cumberland St | Adrian Collins | remodel house: renovate two bathrms, add 1 bathrm, relocate laundry, add 3 ext. windows at north wall, add property line windows on west wall modifications to closets, roof replacement, roof hatch w/ alternating tread device.Details
remodel house: renovate two bathrms, add 1 bathrm, relocate laundry, add 3 ext. windows at north wall, add property line windows on west wall modifications to closets, roof replacement, roof hatch w/ alternating tread device. | $143,000 |
| Jan 12, 2009 | Expired or cancelled expired May 2010 | 476 Diamond St | to complete work & obtain final inspection for work approved under pa#200801253306.Details
to complete work & obtain final inspection for work approved under pa#200801253306. | ||
| Jan 12, 2009 | Completed final sign-off May 2010 | 4222 22nd St | to complete work & obtain final inspection for work approved under pa#200505203010.Details
to complete work & obtain final inspection for work approved under pa#200505203010. | $50,000 | |
| Jan 12, 2009 | Expired or cancelled expired Jun 2010 | 476 Diamond St | to complete work & obtain final inspection for work approved under pa#200608230294.Details
to complete work & obtain final inspection for work approved under pa#200608230294. | $15,000 | |
| Jan 12, 2009 | Completed final sign-off May 2010 | 4222 22nd St | to complete work & obtain final inspection for work approved under pa#200705161404.Details
to complete work & obtain final inspection for work approved under pa#200705161404. | ||
| Nov 4, 2008 | Completed final sign-off Mar 2009 | 321 Crestmont Dr | Ward Construction Inc | revision to pa #200809040751, due to newly revealed site conditions, 3 retaining walls are re-designed.Details
revision to pa #200809040751, due to newly revealed site conditions, 3 retaining walls are re-designed. | |
| Oct 10, 2008 | Completed final sign-off Feb 2009 | 245 States St | replacement of 2 story rear deck in kindDetails
replacement of 2 story rear deck in kind | $12,000 | |
| Sep 23, 2008 | Completed final sign-off Dec 2008 | 3855 Jackson St | Ventana 76 | remove (e) top floor roof deck, roofing, sheathing. install 16" tji's to take load of new replacement roof deck. install new roof sheathing, roofing and tile decking over new tji's. replace (e) railingDetails
remove (e) top floor roof deck, roofing, sheathing. install 16" tji's to take load of new replacement roof deck. install new roof sheathing, roofing and tile decking over new tji's. replace (e) railing | $30,000 |
| Sep 4, 2008 | Completed final sign-off Mar 2009 | 321 Crestmont Dr | new retaining walls (5 total) below house to stabilize hill. voluntary structural improvementsDetails
new retaining walls (5 total) below house to stabilize hill. voluntary structural improvements | $70,000 | |
| May 7, 2008 | Completed final sign-off May 2008 | 182 Banks St | revision to 200703125982: substitute acrylic flooring for approved glass flooring. calculations and specs providedDetails
revision to 200703125982: substitute acrylic flooring for approved glass flooring. calculations and specs provided | ||
| May 2, 2007 | Completed final sign-off Oct 2007 | 1721 Noe St | extend laundry room at 1st fl, to line up w/ exterior wall of bedroom above, revision to pa #200511037295s1Details
extend laundry room at 1st fl, to line up w/ exterior wall of bedroom above, revision to pa #200511037295s1 | $10,000 | |
| Jun 12, 2006 | Completed final sign-off Oct 2006 | 2908 25th St | Elan Hahn | alteration of front facade indiciated by drawings. framing and trim work to complete a new bracketed overhanging roof sections.Details
alteration of front facade indiciated by drawings. framing and trim work to complete a new bracketed overhanging roof sections. | $7,500 |
| Sep 1, 2004 | Completed final sign-off May 2006 | 1658 Market St | revision to extg app #200302258271/delete portion of work - no 6x8 posts required below main levelDetails
revision to extg app #200302258271/delete portion of work - no 6x8 posts required below main level | ||
| Feb 25, 2003 | Completed final sign-off May 2006 | 1658 Market St | umb; stenghten, final phase, shearwalls below mezzanine shaar bolts.Details
umb; stenghten, final phase, shearwalls below mezzanine shaar bolts. | $2,000 |