Burke Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2023
- Last 24 months
- 0 permits filed
118 permits since 2000: 105 completed, 10 never finaled, 3 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 118.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2023 | Completed final sign-off May 2024 | 554 Kansas St | revision to pa# 202212289281. to create a meter room for pg&e.Details
revision to pa# 202212289281. to create a meter room for pg&e. | $650 |
| Dec 30, 2022 | Never finaled issued Sep 2023, no final | 554 Kansas St | new roof deck with access stair & siding hatch over new roof for access; roof deck to include perimeter deck railing and windscreen.Details
new roof deck with access stair & siding hatch over new roof for access; roof deck to include perimeter deck railing and windscreen. | $75,000 |
| Dec 28, 2022 | Completed final sign-off May 2024 | 554 Kansas St | remodel gr fl 1st fl, adding 144 sq ft. remodel on main 2nd fl, with no new square footage. includes filling e interior stair for improved kitchen plan on 2nd fl, expand lower fl plan to include remodeled bath layout,new laundry rm, hall with closets gr flDetails
remodel gr fl 1st fl, adding 144 sq ft. remodel on main 2nd fl, with no new square footage. includes filling e interior stair for improved kitchen plan on 2nd fl, expand lower fl plan to include remodeled bath layout,new laundry rm, hall with closets gr fl | $75,000 |
| Dec 1, 2022 | Completed final sign-off May 2023 | 642 Carolina St | master bath remodel without plans; moisture sensor fan to vent outside. all lighting to be high efficiancy leds. no removal of wallsDetails
master bath remodel without plans; moisture sensor fan to vent outside. all lighting to be high efficiancy leds. no removal of walls | $50,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2023 | 662 46th Av | interior remodel to (e) bathroom. add new sink to (e) water closet. change (e) garage window to a door. enclose (e) covered entry. new interior stair. new lighting & electrical @ areas of (n) work only. legalize rooms at garage level to include family room with bar, laundry room and bathroomDetails
interior remodel to (e) bathroom. add new sink to (e) water closet. change (e) garage window to a door. enclose (e) covered entry. new interior stair. new lighting & electrical @ areas of (n) work only. legalize rooms at garage level to include family room with bar, laundry room and bathroom | $40,000 |
| May 25, 2022 | Completed final sign-off Dec 2022 | 14 Rossi Av | convert existing coat closet to new powder room.Details
convert existing coat closet to new powder room. | $10,000 |
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 2200 Sacramento St | unit #1207: a remodel without plans of the kitchen, 2 bathrooms, and 2 closets. all lighting to be high effecancy led lighting.Details
unit #1207: a remodel without plans of the kitchen, 2 bathrooms, and 2 closets. all lighting to be high effecancy led lighting. | $95,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2022 | 14 Rossi Av | a remodel without plans to the downstairs (1) bathroom. convert the tub/shower. all light to be high effacy. led lighting.Details
a remodel without plans to the downstairs (1) bathroom. convert the tub/shower. all light to be high effacy. led lighting. | $30,000 |
| Dec 13, 2021 | Completed final sign-off Mar 2024 | 548 Kansas St | 2/f: existing kitchen and bathroom remodel. add new skylights. add new habitable space on the ground floor. replace furnace and water heater. do voluntary strengthening.Details
2/f: existing kitchen and bathroom remodel. add new skylights. add new habitable space on the ground floor. replace furnace and water heater. do voluntary strengthening. | $125,000 |
| Nov 4, 2021 | Completed final sign-off Apr 2022 | 274 States St | a remodel of two bathrooms ( master bathroom and hallway bathroom) without plans. all lighting to be high efficency led lighting. vent fan to have built in moisture sensor.Details
a remodel of two bathrooms ( master bathroom and hallway bathroom) without plans. all lighting to be high efficency led lighting. vent fan to have built in moisture sensor. | $38,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2022 | 2200 Sacramento St | apt #1604: a remodel of the club room(#1604) without plans. this will include replacement of new vanity counters, code conpliant toilets replacement, new replacement cabinets in the kitchen and bar area, new hardwood flooring, new high efficiency led ighting and painting.Details
apt #1604: a remodel of the club room(#1604) without plans. this will include replacement of new vanity counters, code conpliant toilets replacement, new replacement cabinets in the kitchen and bar area, new hardwood flooring, new high efficiency led ighting and painting. | $100,000 |
| Sep 10, 2021 | Completed final sign-off Mar 2022 | 560 Kansas St | kitchen remodel without plans. no alteration to (e) layout. all lighting to be high efficacy.ledsDetails
kitchen remodel without plans. no alteration to (e) layout. all lighting to be high efficacy.leds | $18,000 |
| May 17, 2021 | Completed final sign-off Nov 2021 | 62 Manzanita Av | remodel one kitchen & 1 1/2 baths in kindDetails
remodel one kitchen & 1 1/2 baths in kind | $30,000 |
| Dec 21, 2020 | Never finaled issued Mar 2021, no final | 290 Beacon St | remodel (e) laundry room to provide for full bath. (n) work extends into bedroom. all interior work, no envelope expansion. updae plumbing and electrical as req'd per code. no structural work required.Details
remodel (e) laundry room to provide for full bath. (n) work extends into bedroom. all interior work, no envelope expansion. updae plumbing and electrical as req'd per code. no structural work required. | $50,000 |
| Nov 2, 2020 | Completed final sign-off Apr 2021 | 1535 Buchanan St | restore a three bedroom, two bath unit that was stripped down to the bare studs due to mold. no alteration to the (e) layout, no moving of any walls. install new insolation in ceiling & walls, fire rate sheetrock. kitchen has efficency led lighting.Details
restore a three bedroom, two bath unit that was stripped down to the bare studs due to mold. no alteration to the (e) layout, no moving of any walls. install new insolation in ceiling & walls, fire rate sheetrock. kitchen has efficency led lighting. | $70,000 |
| Oct 5, 2020 | Completed final sign-off Apr 2021 | 320 Magellan Av | remodel e bath. all lighting high eff led lighting. new vent to the outsiude. new tile, fixtures,no alteraton to e walls as layoutDetails
remodel e bath. all lighting high eff led lighting. new vent to the outsiude. new tile, fixtures,no alteraton to e walls as layout | $30,000 |
| Aug 7, 2020 | Completed final sign-off Jun 2021 | 290 Beacon St | kitchen (~180 sqft) remodel in kind. all cabinets, flooring and appliances (fridge, range, dishwasher, microwave) will be replaced. no change of layout.Details
kitchen (~180 sqft) remodel in kind. all cabinets, flooring and appliances (fridge, range, dishwasher, microwave) will be replaced. no change of layout. | $26,000 |
| Jun 30, 2020 | Expired or cancelled cancelled Jan 2026 | 30 Inca Ln | install new wall, doorway, closet in order to re-establish 3rd bedroom in the same location that was eliminated by previous owner. install new electrical per code requirement including new baseboard heater and high efficacy led lighting all work 1st flDetails
install new wall, doorway, closet in order to re-establish 3rd bedroom in the same location that was eliminated by previous owner. install new electrical per code requirement including new baseboard heater and high efficacy led lighting all work 1st fl | |
| Jun 29, 2020 | Never finaled issued Jun 2023, no final | 1314 Ocean Av | scope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i.Details
scope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i. | $18,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2020 | 687 Kansas St | kitchen & bath remodel w/out plans. bathroom install a new shower, new tile floor, & new high efficacy lighting with a fan. in kitchen replace (e) cabinets, install new floor, upgrade electrical to meet code. no walls or windows will be moved.Details
kitchen & bath remodel w/out plans. bathroom install a new shower, new tile floor, & new high efficacy lighting with a fan. in kitchen replace (e) cabinets, install new floor, upgrade electrical to meet code. no walls or windows will be moved. | $30,000 |
| Oct 2, 2019 | Completed final sign-off Feb 2020 | 99 Berkeley Wy | construct a new bathroom adjacent to the downstairs playroom. all lighting to be high effecacy led and the room will be vented with a new fan to the outside.Details
construct a new bathroom adjacent to the downstairs playroom. all lighting to be high effecacy led and the room will be vented with a new fan to the outside. | $37,500 |
| Jun 26, 2019 | Completed final sign-off Jan 2020 | 877 Carolina St | remodel without plans of two existing bathrooms. all lighting to be high efficacy led lighting and each bathroom will have a fan vented to the outside with a moisture sensor hallway bath 5' x 6' x 9' master bath 6' x 10'Details
remodel without plans of two existing bathrooms. all lighting to be high efficacy led lighting and each bathroom will have a fan vented to the outside with a moisture sensor hallway bath 5' x 6' x 9' master bath 6' x 10' | $60,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 4053 23rd St | bathroom remodel w/o plans. new recessed lighting in bathroom and all 3 upstairs bedrooms to be high efficacy led lighting. new bathroom fan to vent to the outside w/moisture sensor. bathroom approx 6'x9'.Details
bathroom remodel w/o plans. new recessed lighting in bathroom and all 3 upstairs bedrooms to be high efficacy led lighting. new bathroom fan to vent to the outside w/moisture sensor. bathroom approx 6'x9'. | $45,000 |
| Apr 29, 2019 | Completed final sign-off Feb 2020 | 99 Berkeley Wy | remodel of the existing master bath, hallway bath , and powder room. convert the shower in the hallway bath to a combination tub & shower. all lighting to be high-efficiency led. fans to vent to the exterior.Details
remodel of the existing master bath, hallway bath , and powder room. convert the shower in the hallway bath to a combination tub & shower. all lighting to be high-efficiency led. fans to vent to the exterior. | $41,000 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 320 Magellan Av | convert part of crawl space to basement, widen basement door & remodel existing bathroom. all lighting to be high efficacy & new bathroom fan to vent to the exterior.Details
convert part of crawl space to basement, widen basement door & remodel existing bathroom. all lighting to be high efficacy & new bathroom fan to vent to the exterior. | $40,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 30 Heather Av | bathroom remodel without plans add ceiling fan & vent through the roof, al llightin to be high effeciancey no walls moved removed added or infilled all (e) layouts to remain unchangedDetails
bathroom remodel without plans add ceiling fan & vent through the roof, al llightin to be high effeciancey no walls moved removed added or infilled all (e) layouts to remain unchanged | $19,500 |
| Oct 9, 2018 | Completed final sign-off Jul 2019 | 2 Dorantes Av | voluntary stregthening of garage/crawlspace level. add ply sheathing at cripple wall. bolt mudsill to foundation. add misc shear clips. maher naDetails
voluntary stregthening of garage/crawlspace level. add ply sheathing at cripple wall. bolt mudsill to foundation. add misc shear clips. maher na | $30,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 1530 O'farrell St | unit 2: install a 120 volt ventless all electric combination washer dryer.Details
unit 2: install a 120 volt ventless all electric combination washer dryer. | $2,500 |
| Sep 19, 2018 | Completed final sign-off Dec 2018 | 1530 O'farrell St | unit #2: remodel the kitchen without plans. all lighting to be high -efficacy led lighting. no change in walls and openings layout.Details
unit #2: remodel the kitchen without plans. all lighting to be high -efficacy led lighting. no change in walls and openings layout. | $21,500 |
| Apr 4, 2018 | Completed final sign-off Jul 2018 | 274 States St | kitchen remodel without plans. sink and range to say in same location. new cabinets and new hardwood floors. all lighting to b e high-efficary per cec 150.0(k). kitchen size is approximately 8'-x15'Details
kitchen remodel without plans. sink and range to say in same location. new cabinets and new hardwood floors. all lighting to b e high-efficary per cec 150.0(k). kitchen size is approximately 8'-x15' | $32,000 |
| Nov 6, 2017 | Completed final sign-off Sep 2018 | 320 Magellan Av | remodel kitchen, master bathroom and master closet. all lighting to be high efficency.Details
remodel kitchen, master bathroom and master closet. all lighting to be high efficency. | $105,000 |
| Jun 29, 2017 | Expired or cancelled cancelled Feb 2023 | 4741 19th St | conversion of garage / storage level to include a unit while maintaining parking. studio unit to include kitchen, bath & laundry.Details
conversion of garage / storage level to include a unit while maintaining parking. studio unit to include kitchen, bath & laundry. | $50,000 |
| Mar 24, 2017 | Completed final sign-off Jun 2017 | 1723 33rd Av | replace lower windows and reframe as per plans. replace extg upper aluminum windows with clad exterior/wood interior windows by marvin. replace siding and trim denim insulation.Details
replace lower windows and reframe as per plans. replace extg upper aluminum windows with clad exterior/wood interior windows by marvin. replace siding and trim denim insulation. | $35,000 |
| Mar 10, 2017 | Completed final sign-off Jun 2017 | 1701 Jackson St | bathroom remodel without plans. lighting to be high efficacy. convert tub and shower to tub only. new tile and vanity. no walls to be relocated.Details
bathroom remodel without plans. lighting to be high efficacy. convert tub and shower to tub only. new tile and vanity. no walls to be relocated. | $25,000 |
| Mar 9, 2017 | Completed final sign-off Nov 2017 | 3140 Clay St | unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor.Details
unit #9 - remodel of the kitchen, bath & one closet area. all lighting to be high efficacy, bathroom to be vented to the outside with a humidity sensor. | $80,000 |
| Dec 2, 2016 | Completed final sign-off Jun 2017 | 601 Van Ness Av | #605 -remodel 2 bathrooms , no alteration of locations of plumbing. install high efficency lightings.Details
#605 -remodel 2 bathrooms , no alteration of locations of plumbing. install high efficency lightings. | $40,000 |
| Oct 14, 2016 | Completed final sign-off Jan 2017 | 1701 Jackson St | bathroom remodel without plans. convert tub and shower to shower only. lighting to be high efficacyDetails
bathroom remodel without plans. convert tub and shower to shower only. lighting to be high efficacy | $25,000 |
| Oct 14, 2016 | Completed final sign-off Jan 2017 | 15 Galilee Ln | kitchen remodel without plans. replace cabinets and countertops. lighting to be high efficacyDetails
kitchen remodel without plans. replace cabinets and countertops. lighting to be high efficacy | $20,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2016 | 201 Joost Av | remodel part of lower storage/laundry area including new 3 small windows., jack up sagging portion of rear of house to make exit door operable, replace a rotted post on side exterior stairway.Details
remodel part of lower storage/laundry area including new 3 small windows., jack up sagging portion of rear of house to make exit door operable, replace a rotted post on side exterior stairway. | $16,500 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 3289 Folsom St | bathroom remodel without plans. convert tub to shower, vanity & toilet to remain in same location. all lighting to be high efficacy. no change on walls.Details
bathroom remodel without plans. convert tub to shower, vanity & toilet to remain in same location. all lighting to be high efficacy. no change on walls. | $20,000 |
| Jun 17, 2016 | Completed final sign-off Apr 2017 | 400 Spear St | 1st floor, unit #115: convert (e) closet into 1/2 bathroom and small closet. lighting to be high eff. 1/2 bath to be vented to outside. maher naDetails
1st floor, unit #115: convert (e) closet into 1/2 bathroom and small closet. lighting to be high eff. 1/2 bath to be vented to outside. maher na | $20,000 |
| May 20, 2016 | Completed final sign-off Aug 2019 | 663 Mangels Av | relocate entry door to align w/face of bldg; replace (e) new windows, bldg new entry porch w/bracketed roof, landing, steps, widen (e) garage door, (n) int double pocket door, restucco entire front, (n) ret.wall @ porch/driveway.Details
relocate entry door to align w/face of bldg; replace (e) new windows, bldg new entry porch w/bracketed roof, landing, steps, widen (e) garage door, (n) int double pocket door, restucco entire front, (n) ret.wall @ porch/driveway. | $75,000 |
| Apr 20, 2016 | Completed final sign-off Apr 2017 | 400 Spear St | unit 115: kitchen remodel without plans, appliances to stay in same location, add an island, new flooring, lighting to be high efficacy. compliance with maher ordinance no 155-13Details
unit 115: kitchen remodel without plans, appliances to stay in same location, add an island, new flooring, lighting to be high efficacy. compliance with maher ordinance no 155-13 | $40,000 |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 2299 Sacramento St | convert a half-bath into a full bathroom, install a new shower and high efficiency lighting and a new fan. n/a ordinance #155-13Details
convert a half-bath into a full bathroom, install a new shower and high efficiency lighting and a new fan. n/a ordinance #155-13 | $20,000 |
| Jan 22, 2016 | Completed final sign-off May 2016 | 1701 Jackson St | a kitchen remodel with new high efficacy lighting, cabinets, counters and backsplash. no alteration in location of appliancesDetails
a kitchen remodel with new high efficacy lighting, cabinets, counters and backsplash. no alteration in location of appliances | $24,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 79 Paradise Av | bathroom and laundry room remodel without plans. all lighting to be high efficacy.Details
bathroom and laundry room remodel without plans. all lighting to be high efficacy. | $16,000 |
| Oct 20, 2015 | Completed final sign-off Jun 2016 | 3140 Clay St | soft story ordinance mitigation installation of 2 steel moment frames and provide shear plywood and holddowns to various wallsDetails
soft story ordinance mitigation installation of 2 steel moment frames and provide shear plywood and holddowns to various walls | $40,000 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 560 Wisconsin St | kitchen remodel w/out plans. upgrade (e) circuit box, like-for-like. no change to walls or fixture locations.Details
kitchen remodel w/out plans. upgrade (e) circuit box, like-for-like. no change to walls or fixture locations. | $22,500 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 2170 Jackson St | 2/f - replace (e) tub and shower vlaves. tile tub/shower walls; install new shower doors.Details
2/f - replace (e) tub and shower vlaves. tile tub/shower walls; install new shower doors. | $6,000 |
| Jun 29, 2015 | Completed final sign-off Sep 2015 | 274 States St | apt 1: install new washer and dryer. install a new exterior tankless hot water heater. install a new circuit box.Details
apt 1: install new washer and dryer. install a new exterior tankless hot water heater. install a new circuit box. | $6,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 1168 Eddy St | bathroom remodel without plans. convert tub to shower. new toilet and tile floor. no electrical.Details
bathroom remodel without plans. convert tub to shower. new toilet and tile floor. no electrical. | $9,000 |
| Mar 13, 2015 | Completed final sign-off Jul 2015 | 65 Norfolk St | kitchen and bath remodel without plans. in kitchen replace cabinets and install new microwave. remodel bathroom with new shower, toilet, and vanity in same location. n/a for the maher.Details
kitchen and bath remodel without plans. in kitchen replace cabinets and install new microwave. remodel bathroom with new shower, toilet, and vanity in same location. n/a for the maher. | $20,000 |
| Dec 12, 2014 | Completed final sign-off Jan 2015 | 2200 Sacramento St | reconvert extg one bedroom condo back to a 2 bedroom by constructing a new wall to split bedroom in half. n/a for the maherDetails
reconvert extg one bedroom condo back to a 2 bedroom by constructing a new wall to split bedroom in half. n/a for the maher | $5,000 |
| Oct 31, 2014 | Never finaled issued Nov 2014, no final | 2200 Sacramento St | unit 1005: interior remodel of kitchen, bathroom & bedroom, no alteration to (e) load-bearing walls or chases. compliance with maher ordinance no 155-13 not required.Details
unit 1005: interior remodel of kitchen, bathroom & bedroom, no alteration to (e) load-bearing walls or chases. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Jul 10, 2014 | Completed final sign-off Nov 2014 | 201 Joost Av | replacement size for size of 7 windows in living room. new casement windows by pella with wood-clad frames: visible from street. u-factor 0.32 max.Details
replacement size for size of 7 windows in living room. new casement windows by pella with wood-clad frames: visible from street. u-factor 0.32 max. | $6,500 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 210 Chattanooga St | insytall a heated tile floor in the lower level bedroom and bathroomDetails
insytall a heated tile floor in the lower level bedroom and bathroom | $9,000 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 99 Berkeley Wy | replace 4 aluminum windows and one sliding glass door size for size with wood-clad.Details
replace 4 aluminum windows and one sliding glass door size for size with wood-clad. | $8,500 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 99 Berkeley Wy | kitchen remodel with plans. revove one non-loading bearing wall; new cabinets & applianceDetails
kitchen remodel with plans. revove one non-loading bearing wall; new cabinets & appliance | $40,000 |
| Apr 25, 2014 | Completed final sign-off Aug 2014 | 14 Rossi Av | bathroom remodel wihtout plans. new fixtures & tile. electrical update. no change on wallsDetails
bathroom remodel wihtout plans. new fixtures & tile. electrical update. no change on walls | $20,000 |
| Mar 28, 2014 | Completed final sign-off Apr 2014 | 206 Chattanooga St | to obtain final inspection for work approved under pa#200505172687. all work is complete. rot & stucco repair around garage door.Details
to obtain final inspection for work approved under pa#200505172687. all work is complete. rot & stucco repair around garage door. | |
| Dec 13, 2013 | Completed final sign-off May 2017 | 1344 Mcallister St | remove partition wall between existing kitchen and existing sun room @ 3rd flrDetails
remove partition wall between existing kitchen and existing sun room @ 3rd flr | $1,000 |
| Nov 26, 2013 | Completed final sign-off Dec 2014 | 526 43rd Av | interior remodel of main floor including remodeled kitchen and powder room. new raised bay window.Details
interior remodel of main floor including remodeled kitchen and powder room. new raised bay window. | $100,000 |
| Nov 1, 2013 | Completed final sign-off Apr 2014 | 248 02nd Av | bathroom remodel without plans. replacement in-kind. provide high-efficiency lighting unless lights are controlled by manual occupancy sensors.Details
bathroom remodel without plans. replacement in-kind. provide high-efficiency lighting unless lights are controlled by manual occupancy sensors. | $10,000 |
| Sep 12, 2013 | Completed final sign-off Sep 2014 | 86 Caire Tr | kitchen & bathroom remodel-new cabinets, bath tub, vanities. installed all electrical & plubming to be code complaint or brought up to current code. no change of wallsm, doors & windows.Details
kitchen & bathroom remodel-new cabinets, bath tub, vanities. installed all electrical & plubming to be code complaint or brought up to current code. no change of wallsm, doors & windows. | $30,000 |
| Aug 27, 2013 | Completed final sign-off Aug 2014 | 174 Brighton Av | to comply with complaint # 201317661, removal of an extg deck and stair construction of a new deck and stair.Details
to comply with complaint # 201317661, removal of an extg deck and stair construction of a new deck and stair. | $18,000 |
| Aug 27, 2013 | Never finaled issued Aug 2013, no final | 1957 Turk St | replace existing front windows with marvin "ultimate". replace windows, new windows to be exact copies of existing. 2 push out casements, 1 large picture window, 3 fixed units with grids across the top. 6 total.Details
replace existing front windows with marvin "ultimate". replace windows, new windows to be exact copies of existing. 2 push out casements, 1 large picture window, 3 fixed units with grids across the top. 6 total. | $7,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 30 Heather Av | bathroom remodel. new tub & shower valve, new tile on walls. convert two closets into a utility laundry room with washer/dryer. new plumbing & electric.Details
bathroom remodel. new tub & shower valve, new tile on walls. convert two closets into a utility laundry room with washer/dryer. new plumbing & electric. | $22,000 |
| Mar 8, 2013 | Completed final sign-off Jun 2013 | 3140 Clay St | kitchen & bath remodel. convert tub to shower only in bathroom, vanity & toilet in same place. new kitchen cabinets & appliances in existing layout. lighting to meet title 24 code.Details
kitchen & bath remodel. convert tub to shower only in bathroom, vanity & toilet in same place. new kitchen cabinets & appliances in existing layout. lighting to meet title 24 code. | $45,000 |
| Mar 4, 2013 | Completed final sign-off May 2013 | 28 Heather Av | remodel 1 bathroom, eliminate shower & convert to tub & shower. vanity & toilet to remain in (e) location. lighting to meet title 24 requirementsDetails
remodel 1 bathroom, eliminate shower & convert to tub & shower. vanity & toilet to remain in (e) location. lighting to meet title 24 requirements | $20,000 |
| Aug 29, 2012 | Completed final sign-off Nov 2012 | 274 States St | unit #2: two (2) bathroom remodel without plans. new tub/shower in one; new shower in second. bathrooms to be completed sequentially. lighting to comply with cec 150(k)Details
unit #2: two (2) bathroom remodel without plans. new tub/shower in one; new shower in second. bathrooms to be completed sequentially. lighting to comply with cec 150(k) | $28,500 |
| Jul 11, 2012 | Completed final sign-off Nov 2012 | 5150 Diamond Heights Bl | install new recessed lights in bedrooms, living room, kitchen and closet. install one-hour fire-rated enclosure in the ceiling for each recessed light. repair drywall as required 5/8 type "x".Details
install new recessed lights in bedrooms, living room, kitchen and closet. install one-hour fire-rated enclosure in the ceiling for each recessed light. repair drywall as required 5/8 type "x". | $12,500 |
| Jun 27, 2012 | Completed final sign-off Oct 2012 | 12 Macedonia St | two (2) new skylights @ kitchen and hallway. one (1) doorway widen between living room and kitchen. (ktchen & bath is currently being remodeled under pa# 201206061932). revision to pa# 201206061932.Details
two (2) new skylights @ kitchen and hallway. one (1) doorway widen between living room and kitchen. (ktchen & bath is currently being remodeled under pa# 201206061932). revision to pa# 201206061932. | $5,000 |
| Jun 6, 2012 | Completed final sign-off Oct 2012 | 12 Macedonia St | a remodel of the kitchen and 2 bathrooms, all being done without plans. the kitchen will have a similar layout with new cabinets, appliances, & flooring, bathrm will maintain the same layout with a new tub/shower, toilet, vanity & tile, bathrm 2 will maintain the same layout with a new shower,toiletDetails
a remodel of the kitchen and 2 bathrooms, all being done without plans. the kitchen will have a similar layout with new cabinets, appliances, & flooring, bathrm will maintain the same layout with a new tub/shower, toilet, vanity & tile, bathrm 2 will maintain the same layout with a new shower,toilet | $60,000 |
| Mar 22, 2012 | Completed final sign-off Sep 2012 | 370 Fair Oaks St | remodel of the master bedroom & master bathroom based on the drawings, dated 12/19/11. all work is on the 2nd floor.Details
remodel of the master bedroom & master bathroom based on the drawings, dated 12/19/11. all work is on the 2nd floor. | $95,000 |
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 6324 Geary Bl | repair & reinstall 2 leaking windows on the 4th floor & possibly on the 3rd floor. repair & paint stucco as required.Details
repair & reinstall 2 leaking windows on the 4th floor & possibly on the 3rd floor. repair & paint stucco as required. | $4,000 |
| Mar 13, 2012 | Completed final sign-off Apr 2012 | 3824 21st St | repair rotted front porch and replace in kind, replace any rotted frraming and install new t&g wood deck, to comply with notice of violation 201203141 (less than 50% repair) in kindDetails
repair rotted front porch and replace in kind, replace any rotted frraming and install new t&g wood deck, to comply with notice of violation 201203141 (less than 50% repair) in kind | $4,500 |
| Feb 16, 2012 | Completed final sign-off Oct 2012 | 786 Clayton St | revision to pa #201201202640. add 3 skylights.Details
revision to pa #201201202640. add 3 skylights. | $2,500 |
| Jan 20, 2012 | Completed final sign-off Oct 2012 | 786 Clayton St | project to comply with physical inspection report #cc5889. project cost for lower unit is 11,000.00. project cost for upper unit is 13,000.00. in addition the upper unit kitchen will be remodeled. no plans required. replacing cabinets, countertops, and floorng. remove old chimney for seismic safetyDetails
project to comply with physical inspection report #cc5889. project cost for lower unit is 11,000.00. project cost for upper unit is 13,000.00. in addition the upper unit kitchen will be remodeled. no plans required. replacing cabinets, countertops, and floorng. remove old chimney for seismic safety | $46,000 |
| Oct 12, 2011 | Completed final sign-off Jan 2012 | 1251 02nd Av | replace all toilets & angle stops (5). replace (e) fiberglass shower unit w/ new fiberglass shower unit. replace tub and vanity in second bathroom. tile around tub and on floor. install new faucets on vanity sinks. no work in kitchen. no electrical except to change bathroom light switch toDetails
replace all toilets & angle stops (5). replace (e) fiberglass shower unit w/ new fiberglass shower unit. replace tub and vanity in second bathroom. tile around tub and on floor. install new faucets on vanity sinks. no work in kitchen. no electrical except to change bathroom light switch to | $11,500 |
| Apr 12, 2011 | Completed final sign-off Feb 2012 | 281 Douglass St | add deck to rear of house, including fire wall at property line. add new window at dining room (to replace existing window and door). add lighting under deck for lighting requirement in master bedroom below.Details
add deck to rear of house, including fire wall at property line. add new window at dining room (to replace existing window and door). add lighting under deck for lighting requirement in master bedroom below. | $19,500 |
| Apr 12, 2011 | Completed final sign-off Feb 2012 | 281 Douglass St | revision to permit#2011.02.9824 to be as follows; replacement of windows (in-kind) @ rear of house. (n) french door @ rear of house. upgrade fixtures in upper floor bathroom.Details
revision to permit#2011.02.9824 to be as follows; replacement of windows (in-kind) @ rear of house. (n) french door @ rear of house. upgrade fixtures in upper floor bathroom. | $20,000 |
| Feb 8, 2011 | Completed final sign-off Feb 2012 | 281 Douglass St | replace (e) garage door in kind.Details
replace (e) garage door in kind. | $500 |
| Feb 8, 2011 | Completed final sign-off Feb 2012 | 281 Douglass St | move & remodel kitchen. remodel rear portion of house to create a great room. upgrade (e) master suite w/ new interior doors, flooring, bath fixtures. no exterior work.Details
move & remodel kitchen. remodel rear portion of house to create a great room. upgrade (e) master suite w/ new interior doors, flooring, bath fixtures. no exterior work. | $45,000 |
| Oct 21, 2010 | Completed final sign-off Dec 2010 | 130 Marston Av | kitchen remodel - install new cabinets using same layout, sink & appliances stay in same location. new sink, countertop and hardwood floor, upgrade electrical to meet new code, no alteration to windows or doors, no wall removal.Details
kitchen remodel - install new cabinets using same layout, sink & appliances stay in same location. new sink, countertop and hardwood floor, upgrade electrical to meet new code, no alteration to windows or doors, no wall removal. | $19,500 |
| Jun 14, 2010 | Completed final sign-off Nov 2010 | 161 Gilbert St | installation of interior non-bearing partitions to create enclosed storage room and a powder room powder room on main level of unit.Details
installation of interior non-bearing partitions to create enclosed storage room and a powder room powder room on main level of unit. | $12,000 |
| May 12, 2010 | Completed final sign-off Aug 2010 | 101 Harrison St | unit# 115. interior bathroom remodel. no exterior work. demo (e) bath rm, install new tile, fixtures, vanity and lighting.Details
unit# 115. interior bathroom remodel. no exterior work. demo (e) bath rm, install new tile, fixtures, vanity and lighting. | $30,000 |
| Mar 9, 2010 | Completed final sign-off Dec 2010 | 320 Magellan Av | install reccessed lights in din., liv., fam. rms. split single bedroom into 2-bedrooms &(n) electric. upstairs bathrm. remodel; reuse tub & toilet in (e) location. (n) tile, rock, paint. stucco & dry-rot repair on 1st. flr. of southeast corner of house. install replacement window & french drs. in liDetails
install reccessed lights in din., liv., fam. rms. split single bedroom into 2-bedrooms &(n) electric. upstairs bathrm. remodel; reuse tub & toilet in (e) location. (n) tile, rock, paint. stucco & dry-rot repair on 1st. flr. of southeast corner of house. install replacement window & french drs. in li | $35,000 |
| Jan 20, 2010 | Never finaled issued Jan 2010, no final | 201 Joost Av | street spaceDetails
street space | |
| Jan 20, 2010 | Completed final sign-off Feb 2010 | 201 Joost Av | sister foundation to existing foundation. new slab.Details
sister foundation to existing foundation. new slab. | $12,000 |
| Sep 28, 2009 | Completed final sign-off Jan 2010 | 679 Duncan St | replace both upper level front single pane windows in kind marvin fixed picture center windows,replace front door & sm window w/new 36 in door and 2 18 in sidelights, new ,6 ft 4x8(non bearing) header over door, remove brick facade and paint, replace front siding and insulate (r_13) front wall, repDetails
replace both upper level front single pane windows in kind marvin fixed picture center windows,replace front door & sm window w/new 36 in door and 2 18 in sidelights, new ,6 ft 4x8(non bearing) header over door, remove brick facade and paint, replace front siding and insulate (r_13) front wall, rep | $26,000 |
| Sep 23, 2009 | Completed final sign-off Jan 2010 | 115 Rutledge St | remove structural walls between kitchen and dining room. raise existing kitchen beam for flush ceiling. install new cabinets and fixtures.Details
remove structural walls between kitchen and dining room. raise existing kitchen beam for flush ceiling. install new cabinets and fixtures. | $25,000 |
| Apr 24, 2009 | Completed final sign-off Nov 2009 | 99 Miguel St | remodel existing bathroom, and kitchen w/ same footprint, removal of existing window in kitchen, addition of bay window in kitchen.Details
remodel existing bathroom, and kitchen w/ same footprint, removal of existing window in kitchen, addition of bay window in kitchen. | $25,000 |
| Mar 30, 2009 | Completed final sign-off May 2009 | 3629 19th St | bathroom remodel replace tub, sink & toilet in (e) lcoation. replace tile around tub and floor tile. no structural work. el;ectrical and plumbing under separate permit.Details
bathroom remodel replace tub, sink & toilet in (e) lcoation. replace tile around tub and floor tile. no structural work. el;ectrical and plumbing under separate permit. | $12,500 |
| Nov 12, 2008 | Completed final sign-off Feb 2009 | 679 Duncan St | remodel bathroom on main fl-remove all fixtures,floor tile,wall board.replace tub,sink,toilet,lights,door (internal) insulate per code.install exhaust fan &light.replace (e) skylight in kind.install recess light in living room.Details
remodel bathroom on main fl-remove all fixtures,floor tile,wall board.replace tub,sink,toilet,lights,door (internal) insulate per code.install exhaust fan &light.replace (e) skylight in kind.install recess light in living room. | $25,000 |
| Jun 25, 2008 | Completed final sign-off Aug 2008 | 135 Beaver St | 2nd floor bathroom remodel. retile floor and double shower, convert (e) door to pocket door (same location). new plumbing fixtures same locations. new lighting to meet new code requirment.Details
2nd floor bathroom remodel. retile floor and double shower, convert (e) door to pocket door (same location). new plumbing fixtures same locations. new lighting to meet new code requirment. | $14,000 |
| Jun 19, 2008 | Completed final sign-off Jan 2009 | 2235 42nd Av | add a 7 x 13 deck to the (e) 2nd floor at rear. (2) existing window units will be replaced with sliding glass doors to access the new deck.Details
add a 7 x 13 deck to the (e) 2nd floor at rear. (2) existing window units will be replaced with sliding glass doors to access the new deck. | $6,000 |
| Feb 25, 2008 | Completed final sign-off Jan 2009 | 206 Chattanooga St | bathroom remodel without plans. replace tub, toilet, and vanity sink. no alteratoin in location of tub, toilet or sink. new tile on floor and shower/tub stall. new sheetrock and file wainscoting on walls. elec replacement in existing locations. no structural work.Details
bathroom remodel without plans. replace tub, toilet, and vanity sink. no alteratoin in location of tub, toilet or sink. new tile on floor and shower/tub stall. new sheetrock and file wainscoting on walls. elec replacement in existing locations. no structural work. | $13,500 |
| Feb 12, 2008 | Completed final sign-off Apr 2008 | 61 Moss St | correct nov . repair kin kind of rot in base of rear exterior stair posts. cut on the rot & install new footings with a simpson post base at the bottom of each post. footings to be 2'x2' with 1/2" rebar. 18 inches below grade. less than 50% of structure of 3 each way.Details
correct nov . repair kin kind of rot in base of rear exterior stair posts. cut on the rot & install new footings with a simpson post base at the bottom of each post. footings to be 2'x2' with 1/2" rebar. 18 inches below grade. less than 50% of structure of 3 each way. | $3,800 |
| Jan 28, 2008 | Completed final sign-off Feb 2008 | 550 Pacheco St | obtain building inspection approval for a non permited kitchen and bath remodel in orders to complete a 3r-condo conversion report. in kitchen, new cabinets + floor, no alteration in location of appliances. in bathroom new tiling of floor + tub walls. no alteration of location of fixtures.Details
obtain building inspection approval for a non permited kitchen and bath remodel in orders to complete a 3r-condo conversion report. in kitchen, new cabinets + floor, no alteration in location of appliances. in bathroom new tiling of floor + tub walls. no alteration of location of fixtures. | $14,500 |
| Jan 28, 2008 | Completed final sign-off Jul 2008 | 554 Kansas St | 2nd floor bathroom remodel: replace tub with shower stall. replace one window, seal off one window, install new flat skylight, tile floor & stall, new vanity & toilet. all interior changes.Details
2nd floor bathroom remodel: replace tub with shower stall. replace one window, seal off one window, install new flat skylight, tile floor & stall, new vanity & toilet. all interior changes. | $16,000 |