Ward Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Jun 2006 to Sep 2014
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2014 | Completed final sign-off Oct 2014 | 336 Lathrop Av | subsurface drainage system to connect to sewer per plansDetails
subsurface drainage system to connect to sewer per plans | $14,000 |
| Oct 2, 2009 | Completed final sign-off Nov 2009 | 175 Ney St | partial foundation replacement along north/side of property @ prop. line.Details
partial foundation replacement along north/side of property @ prop. line. | $9,000 |
| Nov 4, 2008 | Completed final sign-off Mar 2009 | 321 Crestmont Dr | revision to pa #200809040751, due to newly revealed site conditions, 3 retaining walls are re-designed.Details
revision to pa #200809040751, due to newly revealed site conditions, 3 retaining walls are re-designed. | |
| Sep 24, 2008 | Completed final sign-off Jun 2009 | 666 Noe St | seismic work on lower level and infill wall shear under stairs.Details
seismic work on lower level and infill wall shear under stairs. | $23,000 |
| Feb 13, 2007 | Completed final sign-off May 2007 | 115 Stillings Av | drainage: subsurface drain, sewer lateral connection and if necessary sump pump and gfci. driveway: remove & replace. drain to city sewer.Details
drainage: subsurface drain, sewer lateral connection and if necessary sump pump and gfci. driveway: remove & replace. drain to city sewer. | $8,350 |
| Feb 13, 2007 | Never finaled issued Feb 2007, no final | 463 Hill St | drainage: driveway, channel drain, catch basin, sump pump, sewage drain connection, gfci installation. drain to city sewer.Details
drainage: driveway, channel drain, catch basin, sump pump, sewage drain connection, gfci installation. drain to city sewer. | $7,500 |
| Oct 30, 2006 | Completed final sign-off Aug 2007 | 34 Shore View Av | sub surface drainage systemDetails
sub surface drainage system | $16,000 |
| Jun 26, 2006 | Completed final sign-off Aug 2006 | 201 Westgate Dr | subsurface drainage system in crawl space, sump pump to discharge into sanitary sewerDetails
subsurface drainage system in crawl space, sump pump to discharge into sanitary sewer | $16,000 |