Adrian Collins
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Jun 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2021 | Completed final sign-off Jul 2021 | 319 Panorama Dr | remove rotten boards of rear top deck, replace in kind. less than 50% of deck. comply with nov#202178735Details
remove rotten boards of rear top deck, replace in kind. less than 50% of deck. comply with nov#202178735 | $4,500 |
| Apr 5, 2021 | Never finaled issued Apr 2021, no final | 1657 Mason St | remove internal finishes, no structural work. replace in kindDetails
remove internal finishes, no structural work. replace in kind | $1,000 |
| Mar 13, 2020 | Expired or cancelled cancelled Jan 2026 | 2100 Webster St | repair counters in kind, relocatee gang box, run cat 6 cable for media add patc anel power + data repair in kindDetails
repair counters in kind, relocatee gang box, run cat 6 cable for media add patc anel power + data repair in kind | $2,000 |
| Mar 13, 2019 | Completed final sign-off Feb 2020 | 147 Andover St | remove concrete floor because of water leak exploratory about 100 sq ft.Details
remove concrete floor because of water leak exploratory about 100 sq ft. | $1,000 |
| May 14, 2018 | Completed final sign-off Jun 2018 | 147 Andover St | to comply with nov201863301. place ipe on existing stairs & deck replacement in-kind 50% max.Details
to comply with nov201863301. place ipe on existing stairs & deck replacement in-kind 50% max. | $1,600 |
| Apr 29, 2010 | Completed final sign-off Aug 2010 | 3855 25th St | revision to application 2010-0311-8009. reframe existing wall with 4x6 according to drawing sk-01.Details
revision to application 2010-0311-8009. reframe existing wall with 4x6 according to drawing sk-01. | |
| Mar 11, 2010 | Completed final sign-off Aug 2010 | 3855 25th St | remodeling kitchen area in single family house including relocating powder rm., replacing windows and new skylights.Details
remodeling kitchen area in single family house including relocating powder rm., replacing windows and new skylights. | $35,000 |
| Apr 29, 2009 | Completed final sign-off Feb 2010 | 339 Cumberland St | remodel house: renovate two bathrms, add 1 bathrm, relocate laundry, add 3 ext. windows at north wall, add property line windows on west wall modifications to closets, roof replacement, roof hatch w/ alternating tread device.Details
remodel house: renovate two bathrms, add 1 bathrm, relocate laundry, add 3 ext. windows at north wall, add property line windows on west wall modifications to closets, roof replacement, roof hatch w/ alternating tread device. | $143,000 |