Ru Builders Inc
- Based in
- San Bruno
- On San Francisco permits
- May 2022 to May 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 11 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Jun 2026 | 254 Ritch St | convert (e) 1 bedroom unit into 2 bedrooms by adding 1 wall and 1 door in the corner of a living room. new wall will have 1 light switch and 1 receptacle. non-load bearing.Details
convert (e) 1 bedroom unit into 2 bedrooms by adding 1 wall and 1 door in the corner of a living room. new wall will have 1 light switch and 1 receptacle. non-load bearing. | $1,275 |
| Mar 24, 2026 | In progress issued Apr 2026 | 11 Clarendon Av | (e) roof terrace renovation to include new door to terrace, railing, pavers and hot tub.Details
(e) roof terrace renovation to include new door to terrace, railing, pavers and hot tub. | $43,000 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 252 Ritch St | convert 1 bedroom unit into a 2 bedroom units, build new non loading wall, new doorsDetails
convert 1 bedroom unit into a 2 bedroom units, build new non loading wall, new doors | $2,500 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 3826 18th St | to comply w/ nov# 202544671, items #4 & #5, remove (e) fix windows and replace with a operable window. not visible from street.Details
to comply w/ nov# 202544671, items #4 & #5, remove (e) fix windows and replace with a operable window. not visible from street. | $1,600 |
| May 23, 2025 | In progress issued May 2025 | 79 Molimo Dr | 2nd floor bathroom remodel like for likeDetails
2nd floor bathroom remodel like for like | $32,000 |
| Feb 24, 2025 | Completed final sign-off Mar 2025 | 149 San Felipe Av | to obtain final inspection for work approved under pa#: 202205315233 and 202207128239 all work are complete.Details
to obtain final inspection for work approved under pa#: 202205315233 and 202207128239 all work are complete. | |
| Sep 30, 2024 | Completed final sign-off May 2025 | 79 Molimo Dr | upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprintDetails
upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprint | $150,000 |
| Sep 17, 2024 | Completed final sign-off Mar 2025 | 506 Bella Vista Wy | 147sf horizontal extention at 2nd floor located at rear of propertyDetails
147sf horizontal extention at 2nd floor located at rear of property | $80,000 |
| Jul 17, 2024 | Completed final sign-off Apr 2025 | 59 Molimo Dr | revision to permit 202406144508. 1/f: relocate bathroom and add laundry closet. 2/f: add (2) solar tubes over kitchen.Details
revision to permit 202406144508. 1/f: relocate bathroom and add laundry closet. 2/f: add (2) solar tubes over kitchen. | $10,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 59 Molimo Dr | kitchen renovation at 2nd fl; bathroom remodel at 1st and 2nd fl; all in-kind. no new wall and no existiong wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. number of plumbing fixture count remain same.Details
kitchen renovation at 2nd fl; bathroom remodel at 1st and 2nd fl; all in-kind. no new wall and no existiong wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. number of plumbing fixture count remain same. | $94,500 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 15 Landers St | amend to pa202206035569: due to field conditions, add new perimeter foundation to replace (e) perimeter foundation fould to be in very poor condition.Details
amend to pa202206035569: due to field conditions, add new perimeter foundation to replace (e) perimeter foundation fould to be in very poor condition. | $30,000 |
| Jul 12, 2022 | Expired or cancelled expired Mar 2025 | 149 San Felipe Av | structrual revision to 202205315233. reduction of scope of work to lateral strengthening in lieu of seismic upgrade of garage level. remove proposed plywood sw between garage doors. reduce sectional foundation installation to 2 phases. remove urfp @ rear retaining wall due to (e) anchors.Details
structrual revision to 202205315233. reduction of scope of work to lateral strengthening in lieu of seismic upgrade of garage level. remove proposed plywood sw between garage doors. reduce sectional foundation installation to 2 phases. remove urfp @ rear retaining wall due to (e) anchors. | |
| Jun 3, 2022 | Completed final sign-off Feb 2023 | 15 Landers St | removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls.Details
removal of 17 sq ft of building, then interior remodel including new kitchen and 2 new bathrooms, new heating system, 3 new skylights, lateral strengthening with 2 new footing and associated shear walls. | $150,000 |
| May 31, 2022 | Expired or cancelled expired Mar 2025 | 149 San Felipe Av | strengthen (e) garage level foundations with new doweled concrete wall & footings at north/south perimeter reaining walls. upgrade ground water draininage system. seismic upgrade of garage level with plywood shearwalls/hold downs.Details
strengthen (e) garage level foundations with new doweled concrete wall & footings at north/south perimeter reaining walls. upgrade ground water draininage system. seismic upgrade of garage level with plywood shearwalls/hold downs. | $63,000 |
| May 24, 2022 | Completed final sign-off Dec 2022 | 149 San Felipe Av | bathroom renovation (in kind) (2 bathrooms)Details
bathroom renovation (in kind) (2 bathrooms) | $48,200 |