Maginn Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2022
- Last 24 months
- 0 permits filed
42 permits since 2000: 39 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2022 | Completed final sign-off Feb 2024 | 175 Valley St | addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alterationDetails
addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alteration | $390,000 |
| Oct 9, 2019 | Completed final sign-off Jun 2021 | 1152 De Haro St | enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing addedDetails
enclose entry. removation to int including kitchen and bathrooms and replacement to int staircase. replacement windows, doors and siding at front and rear facade. struct beam and footing added | $225,000 |
| Feb 22, 2019 | Completed final sign-off Nov 2019 | 1539 18th Av | revision to 201811155936. replace in place of front windows. replacement of windows & siding at rear facade. demo of lower level fireplaceDetails
revision to 201811155936. replace in place of front windows. replacement of windows & siding at rear facade. demo of lower level fireplace | $10,000 |
| Feb 1, 2019 | Completed final sign-off May 2019 | 432 Ivy St | replace damaged wood siding in-kind to comply with complaint 201808171.Details
replace damaged wood siding in-kind to comply with complaint 201808171. | $25,000 |
| Nov 15, 2018 | Completed final sign-off Nov 2019 | 1539 18th Av | renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closetsDetails
renovation of interior at upper level, remodel kitchen in place, remodel 1 bathroom & closets into 1.5 bathrooms & closets | $70,000 |
| Nov 21, 2017 | Completed final sign-off Nov 2018 | 132 Vicksburg St | revision and additional work to 201612165146 replace dry rotted front staircase. add new wood gate at southside light wellDetails
revision and additional work to 201612165146 replace dry rotted front staircase. add new wood gate at southside light well | $16,500 |
| Sep 26, 2017 | Expired or cancelled cancelled Feb 2018 | 119 Vicksburg St | gut bathroom and replace in kind. shower vanity, toilet, medicine cabinetDetails
gut bathroom and replace in kind. shower vanity, toilet, medicine cabinet | $49,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2018 | 132 Vicksburg St | remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room.Details
remodel (e) living room, dining room, kitchen and bathroom at 2nd flr. new sliding glass doors to rear deck, lower floor framing at (e) family room, new gas fireplace at living room. | $142,000 |
| Jul 20, 2016 | Completed final sign-off Jun 2017 | 325 Clipper St | replace (e) decks on south facade in kind. ref pa 2015-0402-2624Details
replace (e) decks on south facade in kind. ref pa 2015-0402-2624 | $3,500 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 213 04th Av | existing 2 bathroom remodel at 3rd fl.Details
existing 2 bathroom remodel at 3rd fl. | $40,000 |
| Jan 19, 2016 | Completed final sign-off May 2016 | 1570 Hampshire St | replace in kind existing front stairway.Details
replace in kind existing front stairway. | $29,000 |
| Nov 19, 2015 | Completed final sign-off Jan 2017 | 4426 24th St | enclose portion of 2nd flr porch beneath the existing 3rd floor, repair dry rot at front stair and replace in kind and required for repair. new ceramic tile tread and risers at staircase and porch. non-habitable space at porch enclosed spaceDetails
enclose portion of 2nd flr porch beneath the existing 3rd floor, repair dry rot at front stair and replace in kind and required for repair. new ceramic tile tread and risers at staircase and porch. non-habitable space at porch enclosed space | $42,500 |
| Sep 8, 2015 | Completed final sign-off Feb 2016 | 261 Bradford St | renovation of interior at 1st flr. replacement of windows and siding at rear elevation (not visible from street)Details
renovation of interior at 1st flr. replacement of windows and siding at rear elevation (not visible from street) | $40,000 |
| Jul 22, 2014 | Completed final sign-off Aug 2015 | 432 Ivy St | replace 15 wood windows in kind; paint to match (e) windows.Details
replace 15 wood windows in kind; paint to match (e) windows. | $10,000 |
| Apr 22, 2014 | Completed final sign-off Oct 2015 | 432 Ivy St | alteration to interior layouts, install new windows at kitchen and dining room. new framing as needed at back. windows not visible from street.Details
alteration to interior layouts, install new windows at kitchen and dining room. new framing as needed at back. windows not visible from street. | $50,000 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 4426 24th St | revsion to app# 201212115971 to remodel existing bathroom at 3rd floor and master closet, no structural work.Details
revsion to app# 201212115971 to remodel existing bathroom at 3rd floor and master closet, no structural work. | $21,500 |
| Aug 8, 2013 | Completed final sign-off Apr 2014 | 132 Vicksburg St | remodel two bathrooms at 3rd floor - no strucutral work. new plumbing fixtures, cabinets, tile work, new hardwood flooring at 3rd floor. replace in kind bathrooms.Details
remodel two bathrooms at 3rd floor - no strucutral work. new plumbing fixtures, cabinets, tile work, new hardwood flooring at 3rd floor. replace in kind bathrooms. | $62,500 |
| Apr 19, 2013 | Completed final sign-off Oct 2013 | 2619 Laguna St | remodel (e) kitchen, breakfast area and powder room. no structural work. replace and or repair cabinets. new countertops, hardwood floors. install fire sprinklers at kitchen.Details
remodel (e) kitchen, breakfast area and powder room. no structural work. replace and or repair cabinets. new countertops, hardwood floors. install fire sprinklers at kitchen. | $32,000 |
| Dec 11, 2012 | Completed final sign-off Jul 2014 | 4426 24th St | enclose all (e) roof deck @ the 3rd fl rear elevation of the house.Details
enclose all (e) roof deck @ the 3rd fl rear elevation of the house. | $18,500 |
| Oct 17, 2012 | Completed final sign-off Feb 2013 | 2619 Laguna St | dry rot repair at decorative railing, post & balusters at garage roof. replace inkind, no structural work.Details
dry rot repair at decorative railing, post & balusters at garage roof. replace inkind, no structural work. | $8,200 |
| Sep 24, 2012 | Completed final sign-off Dec 2013 | 1967 28th Av | remodel existing bathroom and dressing room with new window. no structural. remove exisitng brick fire place at master bedroom. new direct vent fireplace. new windows and sliding glass door at mater bedroom at same openingDetails
remodel existing bathroom and dressing room with new window. no structural. remove exisitng brick fire place at master bedroom. new direct vent fireplace. new windows and sliding glass door at mater bedroom at same opening | $31,500 |
| Jul 10, 2012 | Completed final sign-off Dec 2012 | 2314 48th Av | remove existing front facade-shingles, balcony, install new bay window and window at kitchen, new stucco and veneer stone at front facadeDetails
remove existing front facade-shingles, balcony, install new bay window and window at kitchen, new stucco and veneer stone at front facade | $31,500 |
| May 22, 2012 | Completed final sign-off Aug 2012 | 2594 Great Hy | construction rev. to permit #201201192493 - to replace stucco siding at southwall and shingle siding at east wall with new stucco siding. install new wood/clad windows at (e) openings at southend east walls.Details
construction rev. to permit #201201192493 - to replace stucco siding at southwall and shingle siding at east wall with new stucco siding. install new wood/clad windows at (e) openings at southend east walls. | $16,800 |
| Jan 19, 2012 | Completed final sign-off Apr 2012 | 2594 Great Hy | remodel existing bathroom, no structural work, new plumbing fixtures. all (n) lighting must comply with cec 150(k)10.Details
remodel existing bathroom, no structural work, new plumbing fixtures. all (n) lighting must comply with cec 150(k)10. | $18,000 |
| Dec 19, 2011 | Completed final sign-off Aug 2012 | 2159 Bay St | new internal stair from 2nd floor to garageDetails
new internal stair from 2nd floor to garage | $3,000 |
| Sep 21, 2011 | Completed final sign-off Nov 2012 | 2159 Bay St | construction new wine cellar in first floor laundry & storage areaDetails
construction new wine cellar in first floor laundry & storage area | $3,500 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 1422 14th Av | bathroom upgrade, new tile, new fixtures. new lighting must comply with cec 150(k)10Details
bathroom upgrade, new tile, new fixtures. new lighting must comply with cec 150(k)10 | $9,000 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 6 Godeus St | bathroom upgrade, retile shower stall, floor, new fixtures. all new lighting must comply with cec 150(k)10Details
bathroom upgrade, retile shower stall, floor, new fixtures. all new lighting must comply with cec 150(k)10 | $8,000 |
| Mar 9, 2011 | Completed final sign-off Sep 2011 | 2581 21st Av | installation of new kitchen cabinets, light to comply with cec 105(k). no change to window, walls & doorsDetails
installation of new kitchen cabinets, light to comply with cec 105(k). no change to window, walls & doors | $17,000 |
| Jun 7, 2010 | Completed final sign-off Jul 2010 | 677 Sanchez St | new powder room/half bathroom on 2nd floorDetails
new powder room/half bathroom on 2nd floor | $12,500 |
| Dec 3, 2009 | Completed final sign-off Aug 2011 | 4345 25th St | horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support.Details
horizontal addition - new deck @ garden level, 1st & 2nd floor addition, new dormer, kitchen remodel, powder room addiiton, add basement door at street level, upgrade basement structural support. | $170,000 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 2581 21st Av | replace 1200 sq ft of siding approx, south side & back of buildingDetails
replace 1200 sq ft of siding approx, south side & back of building | $6,000 |
| Sep 23, 2008 | Completed final sign-off Apr 2009 | 1471 Mcallister St | remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath.Details
remove kitchen cabinest and install new cabinets, plumbing fixtures, wood floring, storage area to be 2nd bath room, install lighting fixtures at kitchen & 2nd bath. | $75,000 |
| Jun 17, 2008 | Completed final sign-off Sep 2008 | 52 Valparaiso St | replace back staircase in-kind, less than 50% dry rot replacement, not visible from the streetDetails
replace back staircase in-kind, less than 50% dry rot replacement, not visible from the street | $8,800 |
| Aug 31, 2007 | Completed final sign-off Dec 2007 | 381 Noe St | 1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinetsDetails
1st floor-interior kitchen /bath remodel at rear of house, add bathtub,remove two walls, new fixtures,partition walls cabinets | $60,000 |
| Dec 8, 2006 | Completed final sign-off Mar 2007 | 56 Roscoe St | work to comply with condo conversion 3r-4609.Details
work to comply with condo conversion 3r-4609. | $10,000 |
| Jul 14, 2006 | Expired or cancelled expired Jun 2010 | 1627 Jackson St | revision for appl# 200606023099. replacement 400 sq ft siding at rear of building. no strucutral work.Details
revision for appl# 200606023099. replacement 400 sq ft siding at rear of building. no strucutral work. | $5,000 |
| Jul 5, 2006 | Completed final sign-off Sep 2006 | 717 Castro St | to comply with physical inspection applicate no 3r-4512.Details
to comply with physical inspection applicate no 3r-4512. | $16,300 |
| Jun 2, 2006 | Completed final sign-off Aug 2006 | 1627 Jackson St | replacement of rear stairs in kindDetails
replacement of rear stairs in kind | $35,000 |
| Apr 20, 2006 | Completed final sign-off Mar 2007 | 2454 18th Av | repair of dryrot in 12' section of south roof pararet with 18" upper 18" non combustibal surface.Details
repair of dryrot in 12' section of south roof pararet with 18" upper 18" non combustibal surface. | $5,000 |
| Feb 16, 2006 | Completed final sign-off Mar 2006 | 4431 23rd St | replacement of stringers treads (6) and risers at front of bldng less than 50 percent in kind repair & replacement - dry rot repairDetails
replacement of stringers treads (6) and risers at front of bldng less than 50 percent in kind repair & replacement - dry rot repair | $2,000 |
| Sep 28, 2004 | Completed final sign-off Oct 2004 | 610 Rivera St | replace 2 windows at front of houseDetails
replace 2 windows at front of house | $1,000 |