John Lum
- Listed as
- architect, authorized agent-others, engineer
- Firm
- John Lum Arch.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2004 to Sep 2026
126 permits since 2000 (architect on 122 permits, authorized agent-others on 2 permits, engineer on 2 permits): 78 completed, 10 in progress, 21 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 126.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 867 Hampshire St | demoliton of (e) wood framed entry stair, brick retaining walls, planters + concrete driveway at front yard. (n) wood framed entry stair, concrete retaining walls, planters + concrete driveway at front yard. replace sidewalk under separate permit. (n) street tree + sidewalk landscaping under...Details
demoliton of (e) wood framed entry stair, brick retaining walls, planters + concrete driveway at front yard. (n) wood framed entry stair, concrete retaining walls, planters + concrete driveway at front yard. replace sidewalk under separate permit. (n) street tree + sidewalk landscaping under... | $40,000 | |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 4555 19th St | revision to pa# 202605191549 & 201311222689: reconfiguration of the floor plan at all levels, elimination of windows, modification of window configurations. all work is nonstructural. fire sprinkler 13r throughoutDetails
revision to pa# 202605191549 & 201311222689: reconfiguration of the floor plan at all levels, elimination of windows, modification of window configurations. all work is nonstructural. fire sprinkler 13r throughout | ||
| May 27, 2026 | In progress issued Jun 2026 | 1868 Greenwich St | Iy Development & Renovation Inc | all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof...Details
all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof... | |
| Dec 19, 2025 | Expired or cancelled cancelled Jan 2026 | 665 Pacheco St | detached rear yard 1-story adu, type 5b, 313 sqftDetails
detached rear yard 1-story adu, type 5b, 313 sqft | ||
| Nov 18, 2025 | In progress issued Jan 2026 | 116 Delmar St | Amador General Construction Inc | revision to pa # 2025-0825-3833. reconfiguration of approved 3rd fl bathroom. addition of an indoor sauna space and a storage/equipment room. no plumbing fixture increase.Details
revision to pa # 2025-0825-3833. reconfiguration of approved 3rd fl bathroom. addition of an indoor sauna space and a storage/equipment room. no plumbing fixture increase. | $15,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 3074 Pacific Av | Terence Mcmahon Construction | remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of wayDetails
remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of way | $25,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 3500 21st St | Bryce C B Construction Inc | 1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing.Details
1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing. | $257,293 |
| May 9, 2024 | Completed final sign-off Jan 2025 | 395 Collingwood St | Lyons Building & Associates Inc. | revision to permit 202111162548. remove (e) post and beam, replace with new built up beam at 3/f. add a beam at the roof. add support posts tracked down to foundation.Details
revision to permit 202111162548. remove (e) post and beam, replace with new built up beam at 3/f. add a beam at the roof. add support posts tracked down to foundation. | $100 |
| Mar 15, 2024 | In progress issued Jun 2024 | 4567 19th St | Upcycle Builders Inc. | revision to pa# 202002043484: addition of concrete shear wall on gridline 2, updates to the foundation along gridline. to be supported on hand dug piers, updates to the 3rd fl deck framing, updates to low roof framingDetails
revision to pa# 202002043484: addition of concrete shear wall on gridline 2, updates to the foundation along gridline. to be supported on hand dug piers, updates to the 3rd fl deck framing, updates to low roof framing | $20,000 |
| Aug 23, 2023 | Completed final sign-off Jan 2025 | 395 Collingwood St | Lyons Building & Associates Inc. | revision to 202111162548 & 202207067796: demo & replace areas of dryrot in siding & front porch/stairs. replace fireplace chimney, replace remaining windows in (e) opening. add additional rigid insulation in rafter bays & new batt insulation to all uninsulated exterior walls. replace (e) interirDetails
revision to 202111162548 & 202207067796: demo & replace areas of dryrot in siding & front porch/stairs. replace fireplace chimney, replace remaining windows in (e) opening. add additional rigid insulation in rafter bays & new batt insulation to all uninsulated exterior walls. replace (e) interir | $20,000 |
| Jun 14, 2023 | Expired or cancelled cancelled Jan 2026 | 2870 16th St | Delsur Construction | revbision to bpa#202009214648, reduce number of fire dated windows, remove skylights in projectDetails
revbision to bpa#202009214648, reduce number of fire dated windows, remove skylights in project | |
| May 17, 2023 | Completed final sign-off Mar 2024 | 565 Ortega St | Floyd Construction Inc | (n) 1-hr fire-rated assemblies to walls and ceiling of breezeway. (n) nfpa 13-d sprinklers throughout breezeway under separate permit. install handrail at existing stairDetails
(n) 1-hr fire-rated assemblies to walls and ceiling of breezeway. (n) nfpa 13-d sprinklers throughout breezeway under separate permit. install handrail at existing stair | $43,930 |
| Mar 9, 2023 | Completed final sign-off Jul 2023 | 2121 Market St | to comply with abe ord 51-16 abe 202002212165. no work is proposed under this permit. permit to document technical infeasibility & casp report for accessible building entrance programDetails
to comply with abe ord 51-16 abe 202002212165. no work is proposed under this permit. permit to document technical infeasibility & casp report for accessible building entrance program | ||
| Feb 16, 2023 | In progress issued Jul 2024 | 109 Grand View Av | Casement Construction | remodel & addition to (e) single-family dwelling. add (n) 2nd dwelling unit. add (n) basement & 3rd floor addition. (n) horizontal addition at rear. (n) nfpa-d fire sprinklers throughout - under separate permit.Details
remodel & addition to (e) single-family dwelling. add (n) 2nd dwelling unit. add (n) basement & 3rd floor addition. (n) horizontal addition at rear. (n) nfpa-d fire sprinklers throughout - under separate permit. | $1,195,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Aug 2025 | 729 Bush St | preserve (e) history resource per dcp. remodel & addition to (e) 1-story type-3 building with a (n) 6-story o/ basement 3-a/1a buiding.(n) asc no more than 3 patients incble of self preservation.(n) medical office,4 (n) residential units.(n) elevators & f/a f/s life safety under sep permits.Details
preserve (e) history resource per dcp. remodel & addition to (e) 1-story type-3 building with a (n) 6-story o/ basement 3-a/1a buiding.(n) asc no more than 3 patients incble of self preservation.(n) medical office,4 (n) residential units.(n) elevators & f/a f/s life safety under sep permits. | $2,213,400 | |
| Dec 20, 2022 | Never finaled filed Dec 2022, never issued | 847 Duncan St | erect a 4-story (3-story over 1-basement), type vb, residential duplex per sb-9. unit 1 islocated on lower floor. unit 2 is located on upper 3 floors. no lot split.Details
erect a 4-story (3-story over 1-basement), type vb, residential duplex per sb-9. unit 1 islocated on lower floor. unit 2 is located on upper 3 floors. no lot split. | $1,750,000 | |
| Dec 20, 2022 | Never finaled filed Dec 2022, never issued | 847 Duncan St | demolition of 2-story (1-story over basement), type vb, single family dwelling.Details
demolition of 2-story (1-story over basement), type vb, single family dwelling. | $10,650 | |
| Dec 20, 2022 | Never finaled filed Dec 2022, never issued | 847 Duncan St | 202212208811Details
202212208811 | $2,750 | |
| Dec 16, 2022 | Expired or cancelled withdrawn Apr 2024 | 395 Collingwood St | Lyons Building & Associates Inc. | expansion of roof volume within (e) atrium footprint, ref approved site pa# 201810304503-sr1. replace (e) glazed atrium @ 3rd floor with new sloped roof & glazing in (e) footprint. remopve (e) atrium slope & gable roof & replace with new sloped roof.Details
expansion of roof volume within (e) atrium footprint, ref approved site pa# 201810304503-sr1. replace (e) glazed atrium @ 3rd floor with new sloped roof & glazing in (e) footprint. remopve (e) atrium slope & gable roof & replace with new sloped roof. | $25,000 |
| Oct 6, 2022 | In progress issued Jul 2024 | 2164 15th St | convert non-conforming ground fl unit to an adu (unit #2164a) per sf planning code #207(c)(4).info sht fs-12 dated may 5, 2023 will not apply. subject building occupancy will change from r-3(2 units) to r-2(3 units). horizontal addition at all floors and renovations. voluntary seismic upgrade,Details
convert non-conforming ground fl unit to an adu (unit #2164a) per sf planning code #207(c)(4).info sht fs-12 dated may 5, 2023 will not apply. subject building occupancy will change from r-3(2 units) to r-2(3 units). horizontal addition at all floors and renovations. voluntary seismic upgrade, | $270,000 | |
| Aug 30, 2022 | Completed final sign-off Jun 2023 | 3452 Sacramento St | rev to pa 2018 1196282 replace proposed metal roofing and siding finishes.Details
rev to pa 2018 1196282 replace proposed metal roofing and siding finishes. | ||
| Aug 15, 2022 | Never finaled issued Dec 2022, no final | 1423 Jackson St | Winder Construction Inc. | remove and replace (e) building foundation for voluntary structural upgrades. exploratory demolition of interior 1st fl wood sheathing where applicable. investigate 1st fl framing for damage (dry rot).Details
remove and replace (e) building foundation for voluntary structural upgrades. exploratory demolition of interior 1st fl wood sheathing where applicable. investigate 1st fl framing for damage (dry rot). | $50,000 |
| Jul 6, 2022 | Completed final sign-off Jan 2025 | 395 Collingwood St | Lyons Building & Associates Inc. | revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroomDetails
revision to approved pa 20211162548 as follows. on first floor install (n) wood floors and replace (e) garage door in kind. on 2nd floor, kitchen remodel (fixtures, appliances and casework. update fixtures and cabs in (e) bathroom. replace entry gate and entry door. on 3rd floor, replace bathroom | $37,870 |
| Jun 2, 2022 | Completed final sign-off Dec 2023 | 417 Mississippi St | Current Construction | revision to pa 2016-0714-2376 (n) over hang above previously approved deck doors @ 4th floorDetails
revision to pa 2016-0714-2376 (n) over hang above previously approved deck doors @ 4th floor | $5,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2023 | 2121 Market St | R-Quad Construction | property line wall remediarion: remove (e) plumbing & electrical & mech equip on west property line wall to comply w/ nov 201949801, 201960701 & 202017001. frame-in windows and vent currently located in the wall, re-routing duct and providing mech fan for crawl space. invisible from streetDetails
property line wall remediarion: remove (e) plumbing & electrical & mech equip on west property line wall to comply w/ nov 201949801, 201960701 & 202017001. frame-in windows and vent currently located in the wall, re-routing duct and providing mech fan for crawl space. invisible from street | $17,500 |
| Mar 30, 2022 | Completed final sign-off Jul 2022 | 1901 Union St | Slick Construction | renovation of (e) toilet rooms in (e) bar to create 2 accessible toilet rooms w(n) fixtures and finishes; install (n) powered door operator @ entry door. (e) skylight to be removed.Details
renovation of (e) toilet rooms in (e) bar to create 2 accessible toilet rooms w(n) fixtures and finishes; install (n) powered door operator @ entry door. (e) skylight to be removed. | $124,000 |
| Mar 24, 2022 | Completed final sign-off Jul 2025 | 115 Belgrave Av | Art Of Construction Inc | revision to bpa #2017/1004/0424(site)to include the following: adjustments to interior floor plans & window placement,revision to rear deck,revised landscape design & grading.Details
revision to bpa #2017/1004/0424(site)to include the following: adjustments to interior floor plans & window placement,revision to rear deck,revised landscape design & grading. | |
| Feb 10, 2022 | Completed final sign-off Dec 2022 | 708 Castro St | Stingray Builders Inc. | rev pa202106233059 & 202006259150: relocate n washer/dryer to (n) closet. relocate (n) toilet w/in (n) bath & closets w/in (n) bedroom. replace (n) stairs to rear yard w/ (n) emergency escape/rescue ladder. (n) 2-burner range,mw,sinks,fridge,wetbar at (e) family room.Details
rev pa202106233059 & 202006259150: relocate n washer/dryer to (n) closet. relocate (n) toilet w/in (n) bath & closets w/in (n) bedroom. replace (n) stairs to rear yard w/ (n) emergency escape/rescue ladder. (n) 2-burner range,mw,sinks,fridge,wetbar at (e) family room. | |
| Feb 1, 2022 | Completed final sign-off May 2024 | 565 Ortega St | Floyd Construction Inc | permit to vest approved variance to legalize(e)detached structure in rear yard.rear yard variance for detached structure received in 2019,variance decision (2017-002602var). work to include installation of new kitchenette with two burner cooktop range,sink, & refrigerator,(e) bath to be 49a2aDetails
permit to vest approved variance to legalize(e)detached structure in rear yard.rear yard variance for detached structure received in 2019,variance decision (2017-002602var). work to include installation of new kitchenette with two burner cooktop range,sink, & refrigerator,(e) bath to be 49a2a | $35,000 |
| Dec 27, 2021 | Completed final sign-off Apr 2022 | 182 Andover St | Hunter Dale Builders Inc. | replace wood siding in-kind at front & rear facade. all nail size & pattern & spacing to match existing.Details
replace wood siding in-kind at front & rear facade. all nail size & pattern & spacing to match existing. | $5,000 |
| Nov 18, 2021 | Completed final sign-off Mar 2022 | 740 Francisco St | Christopher Gate Construction Inc | rev to pa #202011209419 and 202106031592; address correction notice #202011209419 dated 9/17/21. remove rotted wood. framing & replace per struct design. replace (e) stucco @ front facade rot abatement. replace gyp board int finish @ rot abatement. struct design for (n) guardrailDetails
rev to pa #202011209419 and 202106031592; address correction notice #202011209419 dated 9/17/21. remove rotted wood. framing & replace per struct design. replace (e) stucco @ front facade rot abatement. replace gyp board int finish @ rot abatement. struct design for (n) guardrail | $5,000 |
| Nov 16, 2021 | Completed final sign-off Jan 2025 | 395 Collingwood St | Lyons Building & Associates Inc. | 2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes.Details
2nd/f: kitchen cosmetic remodel of replacing appliances. fixtures and finishes. reconfiguration of (e) bathroom layout and updating fixture and finishes, new closet/caseworok at (e) bath. 3rd/f: new closet recofifurarion/casework @ primary bedroom, replacing (e) bathroom fixtures and finishes. | $65,238 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | Cook Construction, Upcycle Builders Inc. | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Jun 11, 2021 | Expired or cancelled expired Apr 2026 | 182 Andover St | Hunter Dale Builders Inc. | revision to pa #202011239556. new opening in media room facing east. four new fire rated glass fire wall along north property line. replacement of non-compliant front stairs and landing primarily in kind.Details
revision to pa #202011239556. new opening in media room facing east. four new fire rated glass fire wall along north property line. replacement of non-compliant front stairs and landing primarily in kind. | $15,000 |
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 740 Francisco St | Christopher Gate Construction Inc | rev pa202011209419 to include replacement of pair of damanged framed wood doors at front porch to match (e) in materia, design, profile and finish. replace (broken door, built wwop, w/in door approx matching the original in (e) opening.Details
rev pa202011209419 to include replacement of pair of damanged framed wood doors at front porch to match (e) in materia, design, profile and finish. replace (broken door, built wwop, w/in door approx matching the original in (e) opening. | $1,000 |
| Feb 5, 2021 | Expired or cancelled withdrawn Mar 2021 | 395 Collingwood St | replace 2 windows & add new windows as noted. reorginize 2/f layout, remove bay at kitchen and relocate (e) stair to 3/f. reorginize 3/f owners suite to include a closet and study.replace rear roof structure & deck. add 2 new dormers onthe rear facade.Details
replace 2 windows & add new windows as noted. reorginize 2/f layout, remove bay at kitchen and relocate (e) stair to 3/f. reorginize 3/f owners suite to include a closet and study.replace rear roof structure & deck. add 2 new dormers onthe rear facade. | $400,000 | |
| Nov 23, 2020 | Completed final sign-off Dec 2021 | 485 Colon Av | Winder Construction Inc. | interior remodeling including kitchen & bathroom, addition of 2-1/2 bathrooms and new interior stair. conversoin of unfinished g/f into new living space. new windows and exterior doors to be added.Details
interior remodeling including kitchen & bathroom, addition of 2-1/2 bathrooms and new interior stair. conversoin of unfinished g/f into new living space. new windows and exterior doors to be added. | $318,450 |
| Nov 23, 2020 | Expired or cancelled expired Apr 2026 | 182 Andover St | Hunter Dale Builders Inc. | convert portion of (e) garage to habitable space: new office, media room, relocated bathroom, new doors and interior stairs.Details
convert portion of (e) garage to habitable space: new office, media room, relocated bathroom, new doors and interior stairs. | $74,306 |
| Nov 20, 2020 | Completed final sign-off Mar 2022 | 740 Francisco St | Christopher Gate Construction Inc | to comply with planning enf case# 2020-004524enf. restore (e) garage door to match historic design. rehabilitate front deck guardrail to be compatible with historic design. restore front entry gate to match historic. legalize removal of illegally constructed additions at rear.Details
to comply with planning enf case# 2020-004524enf. restore (e) garage door to match historic design. rehabilitate front deck guardrail to be compatible with historic design. restore front entry gate to match historic. legalize removal of illegally constructed additions at rear. | $15,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2022 | 33 Capra Wy | Alex Construction & Electric Inc | rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f.Details
rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f. | $25,000 |
| Nov 5, 2020 | Never finaled issued May 2021, no final | 3452 Sacramento St | Ace Drilling & Excavation | rear building. to demolish 1 story, detach garage. ** maher: n/a **Details
rear building. to demolish 1 story, detach garage. ** maher: n/a ** | $6,500 |
| Oct 21, 2020 | Completed final sign-off Nov 2022 | 182 Andover St | Hunter Dale Builders Inc., Bryce C B Construction Inc | replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard.Details
replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard. | $56,500 |
| Oct 21, 2020 | Expired or cancelled withdrawn May 2021 | 708 Castro St | convert (e) crawl space to (n) habitable space, convert (e) garage to (n) habitable space, add 2 (n) bedrooms, (n) bathrooms, (n) laundry to (e) 1/f & remdoel interior. (n) doors & windows on 1/f.Details
convert (e) crawl space to (n) habitable space, convert (e) garage to (n) habitable space, add 2 (n) bedrooms, (n) bathrooms, (n) laundry to (e) 1/f & remdoel interior. (n) doors & windows on 1/f. | $57,560 | |
| Oct 13, 2020 | Never finaled filed Oct 2020, never issued | 1258 Lombard St | conversion of existing non-habitable storage area into new adu per ordinance 162-16, including new kitchen, bedroom, bathroom, living room, laundry/mechanical room. new windows will be added to the facade. all work to be contained within the existing building envelope.Details
conversion of existing non-habitable storage area into new adu per ordinance 162-16, including new kitchen, bedroom, bathroom, living room, laundry/mechanical room. new windows will be added to the facade. all work to be contained within the existing building envelope. | $166,600 | |
| Sep 29, 2020 | Completed final sign-off Jun 2024 | 324 Locust St | Richard Avelar &Assoc Reconstr/Dba Recon | enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes.Details
enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes. | $28,000 |
| Sep 21, 2020 | Completed final sign-off May 2026 | 2874 16th St | Delsur Construction | repair building and remodel existing units.the (e) non-conforming basement level will be excavated to add four new adu's per ordinance 162-16.the (e) damaged egress staircase in the rear yard will be replaced & relocated.the (e) dry-rotted staircase at the front will be repaired in kind.Details
repair building and remodel existing units.the (e) non-conforming basement level will be excavated to add four new adu's per ordinance 162-16.the (e) damaged egress staircase in the rear yard will be replaced & relocated.the (e) dry-rotted staircase at the front will be repaired in kind. | $983,062 |
| Sep 4, 2020 | Never finaled issued Apr 2023, no final | 5915 California St | construct (n) 4 story, type 5b, 3 condominium units including: 3 car common garage, (1) three bedroom three bath condo unit w/ mudroom, kitchen, dining room, living room, laundry closet & study. (2) two bedroom, two bath condo units w/ kitchen, dining room, living room, & laundry closet. no basementDetails
construct (n) 4 story, type 5b, 3 condominium units including: 3 car common garage, (1) three bedroom three bath condo unit w/ mudroom, kitchen, dining room, living room, laundry closet & study. (2) two bedroom, two bath condo units w/ kitchen, dining room, living room, & laundry closet. no basement | $850,000 | |
| Sep 4, 2020 | Never finaled issued Apr 2023, no final | 5915 California St | to demolish a 2-story, type 5, single family residence.Details
to demolish a 2-story, type 5, single family residence. | $10,000 | |
| Aug 20, 2020 | Completed final sign-off Sep 2023 | 4315 21st St | Urbnbuild Inc | remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.Details
remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows. | $255,000 |
| Jul 14, 2020 | Completed final sign-off Apr 2021 | 4120 24th St | upgrade & replace bldg foundation. excavate (e) crawl space to increase ceiling height in unconditioned storage area, horizontal addition - fill in area under 2nd fl habitable space on north & east side of bldg. relocate (e) storage units for apartments & new exterior door for storage access.Details
upgrade & replace bldg foundation. excavate (e) crawl space to increase ceiling height in unconditioned storage area, horizontal addition - fill in area under 2nd fl habitable space on north & east side of bldg. relocate (e) storage units for apartments & new exterior door for storage access. | $101,559 | |
| Jun 25, 2020 | Completed final sign-off Dec 2022 | 708 Castro St | Stingray Builders Inc. | remodel existing single family dwelling. convert crawl space and portion of garage to habiable space (rooms down). remove brick foundation, install new concrete foundation & slab.Details
remodel existing single family dwelling. convert crawl space and portion of garage to habiable space (rooms down). remove brick foundation, install new concrete foundation & slab. | $40,000 |
| Feb 4, 2020 | Completed final sign-off Aug 2020 | 672 Bay St | Hawke Construction | revision to pa 2019-1204-8699 - removal of wall between kitchen & dining roomDetails
revision to pa 2019-1204-8699 - removal of wall between kitchen & dining room | $800 |
| Feb 4, 2020 | Never finaled issued Nov 2021, no final | 4567 19th St | Upcycle Builders Inc. | remodel of (e) two story sf with vertical & horizontal expansion,(n)entry,bedroom, bath on 1st fl,2nd fl relocate master suite w/(n) bath/closet,reconfigure two(e) bedrooms w/bath ensuite.new office,playroom & laundry, relocate kitchen & living room to (n)3rd fl w/ access to rear deck & yardDetails
remodel of (e) two story sf with vertical & horizontal expansion,(n)entry,bedroom, bath on 1st fl,2nd fl relocate master suite w/(n) bath/closet,reconfigure two(e) bedrooms w/bath ensuite.new office,playroom & laundry, relocate kitchen & living room to (n)3rd fl w/ access to rear deck & yard | $454,036 |
| Dec 31, 2019 | In progress issued Nov 2023 | 740 Francisco St | remodel & addition to (e) single family dwelling. add 2nd unit to (n) lower fls,(n) horizontal addition to rear & (n) split-level vertical addition,excavate for 2(n) fls below(e) 1st floor. (n) nfa 13-d fire sprinklers throghout, under separate permit.**maher applicable**Details
remodel & addition to (e) single family dwelling. add 2nd unit to (n) lower fls,(n) horizontal addition to rear & (n) split-level vertical addition,excavate for 2(n) fls below(e) 1st floor. (n) nfa 13-d fire sprinklers throghout, under separate permit.**maher applicable** | $737,270 | |
| Dec 10, 2019 | Completed final sign-off Sep 2020 | 322 Chattanooga St | Bryce C B Construction Inc | minor interior remodel @ exiting 1st floor bedroom. replace (e) entry door w/ new solid door. add new laundry room within 2nd flr. interior remodel @ (e) 3rd flr bedroom, bathroom, and powder room. replace (e) door &sidelight @ 3rd flr bedroom w/ new fixed windowDetails
minor interior remodel @ exiting 1st floor bedroom. replace (e) entry door w/ new solid door. add new laundry room within 2nd flr. interior remodel @ (e) 3rd flr bedroom, bathroom, and powder room. replace (e) door &sidelight @ 3rd flr bedroom w/ new fixed window | $71,261 |
| Dec 4, 2019 | Completed final sign-off Aug 2020 | 672 Bay St | Hawke Construction | renovation of condo unit bldg to include renovation of kitchen and bathroom, lighting, electrical and 2 (n) windows and exterior doorsDetails
renovation of condo unit bldg to include renovation of kitchen and bathroom, lighting, electrical and 2 (n) windows and exterior doors | $55,193 |
| Nov 25, 2019 | Never finaled issued Sep 2021, no final | 337 Pacheco St | construct new 2 story over 1 basement, single family dwelling including all new structure fixtures, fittings and finishes. new curb cut. building to be equipped with new nfpa 13-r fire sprinklers under separate permit.Details
construct new 2 story over 1 basement, single family dwelling including all new structure fixtures, fittings and finishes. new curb cut. building to be equipped with new nfpa 13-r fire sprinklers under separate permit. | $514,446 | |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 566 29th Av | First Restaurant Builders | revision to pa #201308235160 & 201805108750. move wall between garage & lower unit. retain (e) bay window on front facade. adjust interior layout of lower unit.Details
revision to pa #201308235160 & 201805108750. move wall between garage & lower unit. retain (e) bay window on front facade. adjust interior layout of lower unit. | |
| Sep 12, 2019 | Completed final sign-off Dec 2025 | 211 03rd Av | Bryce C B Construction Inc | new 3rd fl addition to an existing two story single family house, to include a master bedroom suite and a study/home officeDetails
new 3rd fl addition to an existing two story single family house, to include a master bedroom suite and a study/home office | $88,303 |
| Aug 28, 2019 | Expired or cancelled cancelled Jan 2026 | 889 Carolina St | Barker-O'donoghue Master Bldrs | revision bldg pa 2014-0211-8267 lower finish grading @ rear of property and change configuration of rear site retaining wall. no change to bldgDetails
revision bldg pa 2014-0211-8267 lower finish grading @ rear of property and change configuration of rear site retaining wall. no change to bldg | |
| Aug 6, 2019 | Never finaled issued Mar 2021, no final | 15 Park Hill Av | North Bay Construction | remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit.Details
remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit. | $709,962 |
| Jul 8, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | Centric Construction Inc | as per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200.Details
as per planning confirmation of demo calculations only for 2018015629enf & 2019012759enf. revision to 201107079682, 201711073406, 201803093281, 201901241098, 201905312200. | |
| Jul 3, 2019 | Completed final sign-off Oct 2020 | 565 Ortega St | Floyd Construction Inc | revision to pa #201704043128. removal of (e) canopy @ rear yard & replace with (n) canopy, not visible from st; extend screening @ front facade to enclose garbage recycling areaDetails
revision to pa #201704043128. removal of (e) canopy @ rear yard & replace with (n) canopy, not visible from st; extend screening @ front facade to enclose garbage recycling area | $9,500 |
| Jun 26, 2019 | Completed final sign-off Jan 2020 | 155 Gardenside Dr | Gorardo Ramirez | unit 30:replace kitchen cabinet,new floor thru out the unit, relocate elec subpanel from closet to hallway,add can lights, add linen closet on 2nd fl, add washer & dryer on 2nd fl, upgrade kitchen plugs. new kitchen plumbing fixtures, remodel bathroom on 2nd fl, upgrade stair handrail/ballasters.Details
unit 30:replace kitchen cabinet,new floor thru out the unit, relocate elec subpanel from closet to hallway,add can lights, add linen closet on 2nd fl, add washer & dryer on 2nd fl, upgrade kitchen plugs. new kitchen plumbing fixtures, remodel bathroom on 2nd fl, upgrade stair handrail/ballasters. | $24,900 |
| May 31, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | Centric Building Inc. | revision to pa# 2019-0124-1098. remove and replace gable roof and supporting fron wall structures due to dry rot. remove skylightrs and do not replace in new roof. to comply with nov 201954721.Details
revision to pa# 2019-0124-1098. remove and replace gable roof and supporting fron wall structures due to dry rot. remove skylightrs and do not replace in new roof. to comply with nov 201954721. | $10,000 |
| Mar 28, 2019 | Never finaled issued Apr 2019, no final | 269 Waller St | Christopher Gate Construction Inc | revision to 201712186738 & 201809079400 & 201902203332; remove defficient (e) wall & roof framing in areas shown on plans. reframe per structural dwgs revised under 201902203332. no increase in height or outline of bld under this permitDetails
revision to 201712186738 & 201809079400 & 201902203332; remove defficient (e) wall & roof framing in areas shown on plans. reframe per structural dwgs revised under 201902203332. no increase in height or outline of bld under this permit | $35,000 |
| Feb 20, 2019 | Completed final sign-off Feb 2021 | 269 Waller St | Christopher Gate Construction Inc | revision to permit #201712186738 & #201809079400. remove deficent (e) wall & floor framing in areas shown on plans. reframe per revised structural drawings.Details
revision to permit #201712186738 & #201809079400. remove deficent (e) wall & floor framing in areas shown on plans. reframe per revised structural drawings. | $5,000 |
| Feb 7, 2019 | Completed final sign-off Apr 2021 | 2609 Fillmore St | Lee & Georgiou Inc. Dba Georgiou Const. | revision to pa #201804055656. remove & replace (e) damage non-conforming front stair w/(n) wood stair, guardrail and newel post akin to (e). remove (e) concrete work in front setback. (n) permeable & planted area in front setback. (n) slopped concrete walkway & security gate at side yard.Details
revision to pa #201804055656. remove & replace (e) damage non-conforming front stair w/(n) wood stair, guardrail and newel post akin to (e). remove (e) concrete work in front setback. (n) permeable & planted area in front setback. (n) slopped concrete walkway & security gate at side yard. | |
| Nov 28, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | Lee & Georgiou Inc. Dba Georgiou Const. | revision to pa 201804055656. expansion of media rm & (n) structural beam at basement level. (n) windows & exterior door, replacement of skylight at dining rm at 1st floor. reconfiguration of master bathroom & reduction of size of (n) skylight at 3rd flr.Details
revision to pa 201804055656. expansion of media rm & (n) structural beam at basement level. (n) windows & exterior door, replacement of skylight at dining rm at 1st floor. reconfiguration of master bathroom & reduction of size of (n) skylight at 3rd flr. | |
| Nov 19, 2018 | Completed final sign-off Jun 2023 | 3454 Sacramento St | Amber - Tru Construction Inc. | add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permitDetails
add 1 story & 3 units, remodel & add to (e) mixed use bldg. horizontal addition @ rear & side thorough interior remodel including (n) elevator, interior stairs, kitchens & baths. new nfpa 13-r sprinklers throughout under separate permit | $1,554,324 |
| Nov 8, 2018 | Completed final sign-off Feb 2021 | 269 Waller St | Christopher Gate Construction Inc | rear horizontal expansion of sfd @ 1st fl, interior remodel with (n) master bed & (n) master closets. new expand deck above master bedroom. extend nfpa 13-r fire sprinkler coverage to (n) area-under separate permitDetails
rear horizontal expansion of sfd @ 1st fl, interior remodel with (n) master bed & (n) master closets. new expand deck above master bedroom. extend nfpa 13-r fire sprinkler coverage to (n) area-under separate permit | $27,500 |
| Oct 30, 2018 | Expired or cancelled cancelled Oct 2023 | 411 Douglass St | renovation & vertical addition to sfd, addition of (n) powder room in basement, remodel of (e) kitchen, add (n) interior stair to (n) 3rd fl, add (n) 3rd fl with (n) master suite & rear roof deck.Details
renovation & vertical addition to sfd, addition of (n) powder room in basement, remodel of (e) kitchen, add (n) interior stair to (n) 3rd fl, add (n) 3rd fl with (n) master suite & rear roof deck. | $146,111 | |
| Oct 30, 2018 | Expired or cancelled cancelled Nov 2023 | 395 Collingwood St | remodel & add to existing sfd. excavate (n) basement level, create (n) foyer & mudroom, relocate main entry to 1st fl. add (n) elevator & staircase. create 2 (n) bedrs on 2nd fl & relocate living rm, dining rm & kitchen to 3rd fl toward rear yard & raise ceilingDetails
remodel & add to existing sfd. excavate (n) basement level, create (n) foyer & mudroom, relocate main entry to 1st fl. add (n) elevator & staircase. create 2 (n) bedrs on 2nd fl & relocate living rm, dining rm & kitchen to 3rd fl toward rear yard & raise ceiling | $563,898 | |
| Jun 6, 2018 | Completed final sign-off Dec 2019 | 836 Bay St | Caruso Construction Inc. | new elevator w/new fire rated shaft. infill expansion of garage and front entry. removal of 1 powder room & kitchen remodelDetails
new elevator w/new fire rated shaft. infill expansion of garage and front entry. removal of 1 powder room & kitchen remodel | $94,550 |
| Jun 1, 2018 | Completed final sign-off Apr 2022 | 33 Capra Wy | Alex Construction & Electric Inc | remodel & addition to convert (e) sfd to (n) 3 unit residence. horizontal addition @ rear yard. vertical addition of (n) 3rd & 4th flrs.new interior stairs. new nfpa 13-r fire sprinklers throughout,under separate permit.**maher n/a**Details
remodel & addition to convert (e) sfd to (n) 3 unit residence. horizontal addition @ rear yard. vertical addition of (n) 3rd & 4th flrs.new interior stairs. new nfpa 13-r fire sprinklers throughout,under separate permit.**maher n/a** | $881,437 |
| May 16, 2018 | Completed final sign-off Jan 2019 | 2090 Vallejo St | Upcycle Builders Inc. | interior renovation at all floors and minor reconfigurations for new owner move-in. maher naDetails
interior renovation at all floors and minor reconfigurations for new owner move-in. maher na | $124,841 |
| May 10, 2018 | Never finaled issued Aug 2018, no final | 566 29th Av | First Restaurant Builders | comply with boa appeal no# 17-193. remove the 4th floor from project scope under pa# 2013/0823/5160 s.Details
comply with boa appeal no# 17-193. remove the 4th floor from project scope under pa# 2013/0823/5160 s. | |
| May 10, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | Hammerhouse Construction | revision to pa #201801259579, radiant heating changed to forced air unit located in attic soffits and chase provided for ducting. cathedral ceiling in living room changed to flat ceiling, windows 201 & 205 to remainDetails
revision to pa #201801259579, radiant heating changed to forced air unit located in attic soffits and chase provided for ducting. cathedral ceiling in living room changed to flat ceiling, windows 201 & 205 to remain | |
| Apr 5, 2018 | Completed final sign-off Apr 2021 | 2609 Fillmore St | Lee & Georgiou Inc. Dba Georgiou Const. | renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl.Details
renovation of single fam res. remodel of basement to include (n) media rm & installation of (n) int. stairs. remodel of bedrooms & bath at 2nd & 3rd fl. replacement of (e) windows at front facade at 1st fl in kind. install (n) windows at rear & (n) skylight at roof. remodel kitchen at 1st fl. | $536,500 |
| Jan 25, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | Hammerhouse Construction | remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace.Details
remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace. | $174,731 |
| Dec 15, 2017 | Expired or cancelled cancelled Mar 2018 | 3932 26th St | Hing Wah Construction Inc | replace 110' foundationDetails
replace 110' foundation | $65,000 |
| Oct 24, 2017 | Never finaled issued Jan 2021, no final | 3074 Pacific Av | remodel and addition to (e)single fam dwelling. vertical addition of (n)3rd flr at front of bldg w/(n) roof deck above(n)playroom,bathroom,bedroom,storage and interior stairs on(n)3rd flr. remodel (e)kitchen on 1st floor. new nfpa-13r fire sprinklers throught, under separate permit. **maher n/a**Details
remodel and addition to (e)single fam dwelling. vertical addition of (n)3rd flr at front of bldg w/(n) roof deck above(n)playroom,bathroom,bedroom,storage and interior stairs on(n)3rd flr. remodel (e)kitchen on 1st floor. new nfpa-13r fire sprinklers throught, under separate permit. **maher n/a** | $265,786 | |
| Sep 7, 2017 | Never finaled issued Jun 2019, no final | 595 Noe St | K O D Construction | revision to 2017-0125-7870, remove property line windows, remove ab009 requirement, remove fire sprinkler requirement, revise title 24 for altered sprinklersDetails
revision to 2017-0125-7870, remove property line windows, remove ab009 requirement, remove fire sprinkler requirement, revise title 24 for altered sprinklers | |
| Aug 30, 2017 | Never finaled issued Oct 2017, no final | 140 Greenwood Av | Velic Construction | revision to pa 2017-0124-7740 - replace (e) forced air unit with (n) forced air unit; replace (e) water heater with (n) on demand water heaterDetails
revision to pa 2017-0124-7740 - replace (e) forced air unit with (n) forced air unit; replace (e) water heater with (n) on demand water heater | $3,000 |
| Aug 2, 2017 | Completed final sign-off Aug 2018 | 260 Townsend St | Skyline Construction | 6th fl: build out shell space to add two office suites industry private offices, conference rooms & breakrooms. 7th fl: upgrade restroom & fixtures & finishes. mep and life safety under spereate permit. maher naDetails
6th fl: build out shell space to add two office suites industry private offices, conference rooms & breakrooms. 7th fl: upgrade restroom & fixtures & finishes. mep and life safety under spereate permit. maher na | $650,000 |
| May 26, 2017 | Never finaled filed May 2017, never issued | 1253 Masonic Av | add unit per ordinance no. 162-16. infill (e) lightwell at north & south property line at basement level only.infill (e) "niche' at south property line & addition of (n) elevator from basement to 3rd floor apartment (unit#1253). conversion of non habitable basement storage area & crawl space intoDetails
add unit per ordinance no. 162-16. infill (e) lightwell at north & south property line at basement level only.infill (e) "niche' at south property line & addition of (n) elevator from basement to 3rd floor apartment (unit#1253). conversion of non habitable basement storage area & crawl space into | $246,136 | |
| Apr 4, 2017 | Completed final sign-off Nov 2020 | 565 Ortega St | Floyd Construction Inc | interior renovation of single family residence to include kitchen 2 1/2 baths, 4 bedrooms, and new bar. new or replaced windows at side & rear elevations. new sliding door at side elevationDetails
interior renovation of single family residence to include kitchen 2 1/2 baths, 4 bedrooms, and new bar. new or replaced windows at side & rear elevations. new sliding door at side elevation | $417,000 |
| Feb 21, 2017 | Completed final sign-off Dec 2017 | 126 18th Av | The Toboni Group | revision to 201307091398 - renovate of (e) sfd - revise 1st flr: layout to include (n) medica room, revise 3rd flr: layout to eliminate 1(n) bath & add 1 (n) laundrt - revise 4th flr layout to include (n) wet bar; (n) nfpa13r sprinkler throughout (under separate permit).Details
revision to 201307091398 - renovate of (e) sfd - revise 1st flr: layout to include (n) medica room, revise 3rd flr: layout to eliminate 1(n) bath & add 1 (n) laundrt - revise 4th flr layout to include (n) wet bar; (n) nfpa13r sprinkler throughout (under separate permit). | |
| Jan 25, 2017 | Completed final sign-off Jul 2019 | 595 Noe St | renovation of a single residence in a 3 unit bldg. remodel and relocation of 1 bedroom, living room, parlor, laundry, kitchen and bathroom. addition of 2 new bedrooms, 2 new bathrooms, property line windows per ab-009.Details
renovation of a single residence in a 3 unit bldg. remodel and relocation of 1 bedroom, living room, parlor, laundry, kitchen and bathroom. addition of 2 new bedrooms, 2 new bathrooms, property line windows per ab-009. | $154,066 | |
| Oct 20, 2016 | Completed final sign-off Jun 2017 | 133 09th Av | Thomas Chen Construction | interior expansion & remodel of unit in 2-unit residential: increase habtable space at 1st floor by removing non-load bearing interior wall. (n) servies, fixtures & finish. (n) windowDetails
interior expansion & remodel of unit in 2-unit residential: increase habtable space at 1st floor by removing non-load bearing interior wall. (n) servies, fixtures & finish. (n) window | $9,545 |
| Jul 14, 2016 | Completed final sign-off Jan 2018 | 69 Henry St | conversion of (e) garage into a (n) accessory dwelling unit at rear yard. (n) windows, doors, plumbing & electrical work, (n) bicycle parking.Details
conversion of (e) garage into a (n) accessory dwelling unit at rear yard. (n) windows, doors, plumbing & electrical work, (n) bicycle parking. | $63,850 | |
| Jun 15, 2016 | Completed final sign-off May 2017 | 3974 Washington St | Ventana 76 | renovation of a single family residence. remodel of 2nd flr kitchen & dining room. remove (e) secondary interior stair. remodel of 3rd flr (2) baths & (2) bedrooms. remove (1) (e)bedroom on 3rd flr, replace with sitting area.Details
renovation of a single family residence. remodel of 2nd flr kitchen & dining room. remove (e) secondary interior stair. remodel of 3rd flr (2) baths & (2) bedrooms. remove (1) (e)bedroom on 3rd flr, replace with sitting area. | $185,190 |
| Jun 15, 2016 | Completed final sign-off Oct 2017 | 2025 Lake St | Floyd Construction Inc | basement - legalize (e) rec room, modify (e) trash closet & laundroom to create a workshop. expand (e) rear deck with access to rear yard from the 1st floor. (n) door to rear yard @ basementDetails
basement - legalize (e) rec room, modify (e) trash closet & laundroom to create a workshop. expand (e) rear deck with access to rear yard from the 1st floor. (n) door to rear yard @ basement | $40,000 |
| Apr 19, 2016 | Expired or cancelled withdrawn Feb 2019 | 1251 37th Av | remove (e) terrazzo on (e) front stair & replace with (n) stone tile; (n) planters on (e) front stair; (n) exterior lighting at frontDetails
remove (e) terrazzo on (e) front stair & replace with (n) stone tile; (n) planters on (e) front stair; (n) exterior lighting at front | $1,000 | |
| Mar 18, 2016 | Expired or cancelled expired Sep 2026 | 3932 26th St | Lei's Construction Company, Hing Wah Construction Inc, Blue Birds Construction Inc | renovation & horizontal addition to (e)2 unit bldg. remove(e) slab, foundations, struct & partitions as shown. remove(e)exterior doors, windows & structure as shown excavate & expand()garage level to relocate one unit. renovate & expand (e)2nd & 3rd levels toward rear yard.sprinklers separte permit.Details
renovation & horizontal addition to (e)2 unit bldg. remove(e) slab, foundations, struct & partitions as shown. remove(e)exterior doors, windows & structure as shown excavate & expand()garage level to relocate one unit. renovate & expand (e)2nd & 3rd levels toward rear yard.sprinklers separte permit. | $617,121 |
| Mar 14, 2016 | Completed final sign-off Jan 2017 | 4352 26th St | revision to 201208086891. infill previously permitted light court, add 2 new skylights, modify location and size of previously permitted skylights, modify front elevation glazing configuration and finishesDetails
revision to 201208086891. infill previously permitted light court, add 2 new skylights, modify location and size of previously permitted skylights, modify front elevation glazing configuration and finishes | $1,000 | |
| Mar 8, 2016 | Completed final sign-off Jul 2016 | 961 14th St | Hawke Construction | revision to permit 201601056397, remove & replace wood lap siding at rear & sides of rear portion of bldg, (e)stair and guardrail to be reconstructed as per sfbc 3404.1.1.1,remove (e) window & replace with smaller window frame.Details
revision to permit 201601056397, remove & replace wood lap siding at rear & sides of rear portion of bldg, (e)stair and guardrail to be reconstructed as per sfbc 3404.1.1.1,remove (e) window & replace with smaller window frame. | $31,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2017 | 439 04th Av | remodel of (e) single family dwelling: remodel of 1st, 2nd and 3rd floors, conversion of main part of 1st floor to habitable space, addition of (n) bathroom & (n) powder room. addition of (n) staircase, addition of (n) rear deack at 2nd floor, remodel (e) kitchen and bathrooms.Details
remodel of (e) single family dwelling: remodel of 1st, 2nd and 3rd floors, conversion of main part of 1st floor to habitable space, addition of (n) bathroom & (n) powder room. addition of (n) staircase, addition of (n) rear deack at 2nd floor, remodel (e) kitchen and bathrooms. | $309,143 | |
| Aug 18, 2015 | Completed final sign-off Sep 2025 | 25 Hartford St | Fulcrum Point Construction, Olcan Construction Inc | renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms &Details
renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms & | $405,044 |
| Aug 7, 2015 | Expired or cancelled withdrawn Dec 2015 | 918 Haight St | correct the record to show legal occupancy of existing 4th flr, no new work under this permit.Details
correct the record to show legal occupancy of existing 4th flr, no new work under this permit. |