Gorardo Ramirez
- Based in
- Discovery Bay
- On San Francisco permits
- Jun 2019 to Mar 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2020 | Expired or cancelled cancelled Jan 2026 | 155 Gardenside Dr | replace existing cantilever beam 6x12 psl w/ a new 6x12 pressure treated beam that extends 6' out for deck and goes 12' inside the building. repair is like for like. no changes are being made to the existing structure.Details
replace existing cantilever beam 6x12 psl w/ a new 6x12 pressure treated beam that extends 6' out for deck and goes 12' inside the building. repair is like for like. no changes are being made to the existing structure. | $18,900 |
| Jun 26, 2019 | Completed final sign-off Jan 2020 | 155 Gardenside Dr | unit 30:replace kitchen cabinet,new floor thru out the unit, relocate elec subpanel from closet to hallway,add can lights, add linen closet on 2nd fl, add washer & dryer on 2nd fl, upgrade kitchen plugs. new kitchen plumbing fixtures, remodel bathroom on 2nd fl, upgrade stair handrail/ballasters.Details
unit 30:replace kitchen cabinet,new floor thru out the unit, relocate elec subpanel from closet to hallway,add can lights, add linen closet on 2nd fl, add washer & dryer on 2nd fl, upgrade kitchen plugs. new kitchen plumbing fixtures, remodel bathroom on 2nd fl, upgrade stair handrail/ballasters. | $24,900 |