Delsur Construction
- Based in
- South San Francisco
- On San Francisco permits
- Feb 2011 to Jul 2025
- Last 24 months
- 1 permit filed
46 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 8 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2025 | Completed final sign-off Dec 2025 | 1600 Stockton St | (e) storefront glass replacement: removal and replacemen t of 2 storefront glass panels (top panel 26"x60" 3/18" clear glass with round top) bottom panel 85 3/4" x 95 3/8", 1/4" clear tempered) rear exit door replacement patch and paint and replacement glass in kind. no electrical work.Details
(e) storefront glass replacement: removal and replacemen t of 2 storefront glass panels (top panel 26"x60" 3/18" clear glass with round top) bottom panel 85 3/4" x 95 3/8", 1/4" clear tempered) rear exit door replacement patch and paint and replacement glass in kind. no electrical work. | $7,400 |
| Jan 30, 2024 | In progress filed Jan 2024, not yet issued | 2870 16th St | revision to pa# 202009214648, revise ceiling condition in the 3/f units 2878 & 2878a to retain the (e) dropped ceiling and attic space above-upgrade pg&e electrical meters closet on basement lvl. revise the basement flr plan for western units 1 & 3 to accommodate (e) foundation encroachment from theDetails
revision to pa# 202009214648, revise ceiling condition in the 3/f units 2878 & 2878a to retain the (e) dropped ceiling and attic space above-upgrade pg&e electrical meters closet on basement lvl. revise the basement flr plan for western units 1 & 3 to accommodate (e) foundation encroachment from the | $30,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 4351 17th St | one bathroom remodel like for like. non structural.Details
one bathroom remodel like for like. non structural. | $14,000 |
| Aug 1, 2023 | Expired or cancelled expired May 2026 | 2874 16th St | shoring system for the retaining wall in sections for foundation system in approved pa202009214648.Details
shoring system for the retaining wall in sections for foundation system in approved pa202009214648. | $10,000 |
| Jul 14, 2023 | Completed final sign-off Apr 2024 | 170 Pacific Av | unit# 25: remodel 1-kitchen, 3-bathrooms, & 1-laundry within single family condo, replace flooring throughout. new & replaced electrical. structural headers. no exterior work.Details
unit# 25: remodel 1-kitchen, 3-bathrooms, & 1-laundry within single family condo, replace flooring throughout. new & replaced electrical. structural headers. no exterior work. | $100,000 |
| Jun 14, 2023 | Expired or cancelled cancelled Jan 2026 | 2870 16th St | revbision to bpa#202009214648, reduce number of fire dated windows, remove skylights in projectDetails
revbision to bpa#202009214648, reduce number of fire dated windows, remove skylights in project | |
| Dec 28, 2020 | Completed final sign-off Jan 2021 | 1120 Rhode Island St | replace dry-rot on exterior support like for like at back yardDetails
replace dry-rot on exterior support like for like at back yard | $5,000 |
| Sep 21, 2020 | Completed final sign-off May 2026 | 2874 16th St | repair building and remodel existing units.the (e) non-conforming basement level will be excavated to add four new adu's per ordinance 162-16.the (e) damaged egress staircase in the rear yard will be replaced & relocated.the (e) dry-rotted staircase at the front will be repaired in kind.Details
repair building and remodel existing units.the (e) non-conforming basement level will be excavated to add four new adu's per ordinance 162-16.the (e) damaged egress staircase in the rear yard will be replaced & relocated.the (e) dry-rotted staircase at the front will be repaired in kind. | $983,062 |
| Jun 2, 2020 | Expired or cancelled cancelled Jan 2026 | 2874 16th St | reroofingDetails
reroofing | $10,000 |
| May 21, 2020 | Expired or cancelled expired May 2026 | 2874 16th St | replace siding in all burnt areas. on the right side of building (east side). siding is visible from street.Details
replace siding in all burnt areas. on the right side of building (east side). siding is visible from street. | $40,000 |
| Mar 10, 2020 | Expired or cancelled expired May 2026 | 2874 16th St | remove plaster and lath in burned areas on all 3 floors(interior. no alterations in walls (approx 1200 sq ft) remove chimney. will reenforce non structural sound wood. reconstruction will be on another permit approx. 2-3 months.Details
remove plaster and lath in burned areas on all 3 floors(interior. no alterations in walls (approx 1200 sq ft) remove chimney. will reenforce non structural sound wood. reconstruction will be on another permit approx. 2-3 months. | $20,000 |
| Feb 20, 2020 | Completed final sign-off Mar 2020 | 68 Rosemont Pl | replace dry rot on landing and stair tread, work less then 50%, not visable by street.Details
replace dry rot on landing and stair tread, work less then 50%, not visable by street. | $4,000 |
| Feb 14, 2020 | Completed final sign-off Mar 2020 | 2874 16th St | to comply w/ n.o.v 201919821. remove trash and debris from premises and remove fire dagame debris. debris removal onlyDetails
to comply w/ n.o.v 201919821. remove trash and debris from premises and remove fire dagame debris. debris removal only | $18,000 |
| Jun 25, 2018 | Completed final sign-off Jul 2018 | 870 47th Av | revision to pa#201803194040. unit#1 kitchen remodel. replace kitchen cabinets.Details
revision to pa#201803194040. unit#1 kitchen remodel. replace kitchen cabinets. | $2,000 |
| Jun 25, 2018 | Completed final sign-off Jul 2018 | 874 47th Av | revision to pa#201803194045. unit#4 kitchen remodel. replace kitchen cabinets.Details
revision to pa#201803194045. unit#4 kitchen remodel. replace kitchen cabinets. | $2,000 |
| May 30, 2018 | Completed final sign-off Jul 2018 | 1050 North Point St | unit 507. kitchen remoel like for likeDetails
unit 507. kitchen remoel like for like | $12,000 |
| Apr 13, 2018 | Completed final sign-off Jul 2018 | 874 47th Av | unit 4: replace kitchen cabinets, replace electricalDetails
unit 4: replace kitchen cabinets, replace electrical | $5,000 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 870 47th Av | unit 1 and 4: remodel bathroom, install recessed lights, replace entry door, update supanel unit 1. size of bath 5x8Details
unit 1 and 4: remodel bathroom, install recessed lights, replace entry door, update supanel unit 1. size of bath 5x8 | $30,882 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 874 47th Av | unit 2,3, 4: remodel bathroom, install recessed lights, eplace entry doors, update subpanel in un its 3,4. size of bath 5x8Details
unit 2,3, 4: remodel bathroom, install recessed lights, eplace entry doors, update subpanel in un its 3,4. size of bath 5x8 | $44,823 |
| Oct 11, 2017 | Completed final sign-off Jul 2018 | 184 Marietta Dr | revision to pa #201511031627 to modify residential unit previously legalized per pa#201511031627 on the ground fl. add back storage, move laundry, furnace,water heater, add wastebins. 2 units in bldg, one to complete legalization per ordinance# 43-14. nook,bathroom & closet to remain the same place.Details
revision to pa #201511031627 to modify residential unit previously legalized per pa#201511031627 on the ground fl. add back storage, move laundry, furnace,water heater, add wastebins. 2 units in bldg, one to complete legalization per ordinance# 43-14. nook,bathroom & closet to remain the same place. | |
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 2821 Buchanan St | unit 3: kitchen remodel - replace cabinets, new appliances, 8 recessed lights, new outlets for couontertop (7). no change to walls, doors or openings.Details
unit 3: kitchen remodel - replace cabinets, new appliances, 8 recessed lights, new outlets for couontertop (7). no change to walls, doors or openings. | $14,000 |
| Sep 21, 2017 | Completed final sign-off Dec 2017 | 111 Chestnut St | add 2 partition walls to living room. extend dropped ceiling from foyer into new corridor and add recessed lights. replace e ceiling mounted light with recessed light. add wall mounted ledDetails
add 2 partition walls to living room. extend dropped ceiling from foyer into new corridor and add recessed lights. replace e ceiling mounted light with recessed light. add wall mounted led | $18,000 |
| Jul 28, 2017 | Completed final sign-off Sep 2017 | 520 Page St | remodel bath, replace fixtures like for like. remodel kitchen, cabinets, countertop, appliances, add recessed lights throughout all lights ledDetails
remodel bath, replace fixtures like for like. remodel kitchen, cabinets, countertop, appliances, add recessed lights throughout all lights led | $30,000 |
| Jun 30, 2017 | Completed final sign-off Sep 2017 | 1050 North Point St | kitchen remodel: replace cabinets, countertops and dishwasher.Details
kitchen remodel: replace cabinets, countertops and dishwasher. | $12,000 |
| Jun 30, 2017 | Completed final sign-off Sep 2017 | 516 Page St | remodel bathroom: replace all fixtures like for like. all lights led. remodel kitchen: replace cabinets, countertop and appliances. add 26 recessed lights through out. all lights led. no alteration of wall, window and door.Details
remodel bathroom: replace all fixtures like for like. all lights led. remodel kitchen: replace cabinets, countertop and appliances. add 26 recessed lights through out. all lights led. no alteration of wall, window and door. | $20,000 |
| May 10, 2017 | Completed final sign-off May 2017 | 4 Gerke Al | to comply with complaint #201775731, remove and replace to fix dryrot on deckDetails
to comply with complaint #201775731, remove and replace to fix dryrot on deck | $1,200 |
| Jul 13, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | unit#4006 kitchen and bathroom remodel, move laundry to hallway, add new fireplace accent to living room. add 42 recess led lights, replace subpanel for unit, shower pan.Details
unit#4006 kitchen and bathroom remodel, move laundry to hallway, add new fireplace accent to living room. add 42 recess led lights, replace subpanel for unit, shower pan. | $35,000 |
| Apr 27, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | remove patio tile, apply water proofing for leak at patio door and reinstall tile on patio on 40th floor. area 13' x 13'Details
remove patio tile, apply water proofing for leak at patio door and reinstall tile on patio on 40th floor. area 13' x 13' | $6,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2018 | 184 Marietta Dr | comply w/nov #201573182 -legalize (e) 2 bedrooms & bath @ ground floor. rewire elect, replace duct work, old insulation w/new, hardwood floors. repaint int./exterior sheetrock/toptile install. full kitchen remodel, replace (e) bathroom w/new vanities/tub. install 3 closets in rooms, window additn.Details
comply w/nov #201573182 -legalize (e) 2 bedrooms & bath @ ground floor. rewire elect, replace duct work, old insulation w/new, hardwood floors. repaint int./exterior sheetrock/toptile install. full kitchen remodel, replace (e) bathroom w/new vanities/tub. install 3 closets in rooms, window additn. | $90,000 |
| Jun 23, 2015 | Expired or cancelled cancelled Jan 2026 | 4145 20th St | replace fence and rear stair in kind at back yard.Details
replace fence and rear stair in kind at back yard. | $5,000 |
| Jan 27, 2015 | Never finaled issued Jan 2015, no final | 4145 20th St | upgrade main electric service to 100 amp unit #4145-4147 20th street. new subpanel in garage, remodel kitchen, bathroom, install new washer and dryer hookup in bathroom, convert bathtub to shower, update electrical for kitchen and bathroom. interior remodel in 4147 20th street(lower unit)Details
upgrade main electric service to 100 amp unit #4145-4147 20th street. new subpanel in garage, remodel kitchen, bathroom, install new washer and dryer hookup in bathroom, convert bathtub to shower, update electrical for kitchen and bathroom. interior remodel in 4147 20th street(lower unit) | $50,000 |
| Jan 31, 2014 | Completed final sign-off Mar 2014 | 1710 Quint St | revision to app#201401277170 legalizing a bathroom at ground floor. replace window.Details
revision to app#201401277170 legalizing a bathroom at ground floor. replace window. | |
| Jan 27, 2014 | Completed final sign-off Mar 2014 | 1710 Quint St | downstair bathroom remodel: move vanity to opposite wall, new circuit to bathroom, replace window 36x36, new tud, no new walls no structural workDetails
downstair bathroom remodel: move vanity to opposite wall, new circuit to bathroom, replace window 36x36, new tud, no new walls no structural work | $6,000 |
| Nov 13, 2013 | Completed final sign-off Mar 2014 | 1710 Quint St | remodel bathroom and kitchen like for like. add 5 circuits for the kitchen and bathroom fan, 10 new recess lighting in living room and dining room, kitchen min 50% of total wttage = high efficacy lighting; bathroom - lighting shall be high efficacy or controlled by manual sensorsDetails
remodel bathroom and kitchen like for like. add 5 circuits for the kitchen and bathroom fan, 10 new recess lighting in living room and dining room, kitchen min 50% of total wttage = high efficacy lighting; bathroom - lighting shall be high efficacy or controlled by manual sensors | $15,000 |
| Aug 20, 2013 | Completed final sign-off Oct 2013 | 300 03rd St | kitchen remodel and bathroom remodel. no structural.Details
kitchen remodel and bathroom remodel. no structural. | $12,000 |
| Jun 27, 2013 | Expired or cancelled cancelled Nov 2018 | 767 Cayuga Av | (n) ground floor master bedroom and bath, (n) stairs renovation of 2nd floor kitchen .partial excavation at rear of first floor with new foundation and framing.new retaining wall. new skylight.Details
(n) ground floor master bedroom and bath, (n) stairs renovation of 2nd floor kitchen .partial excavation at rear of first floor with new foundation and framing.new retaining wall. new skylight. | $80,000 |
| Apr 29, 2013 | Completed final sign-off Jun 2013 | 420 Mission Bay Blvd North Bl | repair sheetrock damage from water in unit above. replace sheetrock in living room and bathroom 2'x31' at bottom of wall.Details
repair sheetrock damage from water in unit above. replace sheetrock in living room and bathroom 2'x31' at bottom of wall. | $5,000 |
| Mar 1, 2013 | Completed final sign-off Nov 2013 | 3101 San Jose Av | revision to appl #2012.0913.9705 - add support beam to ceiling.Details
revision to appl #2012.0913.9705 - add support beam to ceiling. | $2,000 |
| Mar 1, 2013 | Completed final sign-off Nov 2013 | 3101 San Jose Av | revision to pa# 2012-1101-3268-replace roof & skiylights modificationDetails
revision to pa# 2012-1101-3268-replace roof & skiylights modification | $6,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 379 Winding Wy | kitchen and bath remodel, like for like, appliances and plumbing location.Details
kitchen and bath remodel, like for like, appliances and plumbing location. | $14,000 |
| Dec 6, 2012 | Completed final sign-off Jun 2013 | 745 Moultrie St | add bedroom and bathroom in garage storage area. replace 1 window on rear of house. replace furnace, water heater, remodel existing kitchen and bath, upgrade electrical panel to 100 amp service, rewire outlets and lightsDetails
add bedroom and bathroom in garage storage area. replace 1 window on rear of house. replace furnace, water heater, remodel existing kitchen and bath, upgrade electrical panel to 100 amp service, rewire outlets and lights | $60,000 |
| Nov 1, 2012 | Completed final sign-off Nov 2013 | 3101 San Jose Av | seal around skylights & edge to prevent leakage, repair roof & add drainage. ref pa #2012.0913.9705Details
seal around skylights & edge to prevent leakage, repair roof & add drainage. ref pa #2012.0913.9705 | $2,000 |
| Oct 18, 2012 | Completed final sign-off Mar 2013 | 92 Elsie St | replace bathtub with shower pan. new tile walls and floor. replace vanity and toilet. no change on wallsDetails
replace bathtub with shower pan. new tile walls and floor. replace vanity and toilet. no change on walls | $4,000 |
| May 8, 2012 | Completed final sign-off Jun 2012 | 369 Baltimore Wy | comply with nov 200711544: gr floor remove illegal kitchen, convert 2 bedrooms to storage, legalize full bath. 1st fl: kitchen and bath remodel, no wall changes. replace windows, visible from street.Details
comply with nov 200711544: gr floor remove illegal kitchen, convert 2 bedrooms to storage, legalize full bath. 1st fl: kitchen and bath remodel, no wall changes. replace windows, visible from street. | $22,000 |
| Apr 13, 2012 | Expired or cancelled cancelled Oct 2012 | 566 16th Av | 1 kitchen and 1 bathroom remodel, like for like. to comply with cec (150)kDetails
1 kitchen and 1 bathroom remodel, like for like. to comply with cec (150)k | $22,000 |
| Feb 16, 2011 | Completed final sign-off Sep 2012 | 1266 Washington St | changes to reinforcing and thickness of retaining wall due to new soil report. add to scope of work on grade stairs at front yard. revision to app#201008168883.Details
changes to reinforcing and thickness of retaining wall due to new soil report. add to scope of work on grade stairs at front yard. revision to app#201008168883. | $15,000 |