Olcan Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Apr 2011 to Sep 2026
- Last 24 months
- 6 permits filed
63 permits since 2000: 60 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 473 Corbett Av | dry rot repair in basement appx 10sf voluntary bolting of mudsill to foundation, 5/8-inch dia. bolts with 3" less than 12" from ends and every 4 feet minimum 2 bolts per sill.Details
dry rot repair in basement appx 10sf voluntary bolting of mudsill to foundation, 5/8-inch dia. bolts with 3" less than 12" from ends and every 4 feet minimum 2 bolts per sill. | $19,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 326 Capp St | reframing of wall at front of house iwth new grade beam, new garaged doors to match existing new stucco patching.Details
reframing of wall at front of house iwth new grade beam, new garaged doors to match existing new stucco patching. | $90,000 |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 2111 Hyde St | interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal.Details
interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal. | $30,000 |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 357 Vallejo St | balcony deck boards, post and guard rail appx 4 ft long. all work in kind not visible from street. repair are to conform with sb326. all work is less than 50%Details
balcony deck boards, post and guard rail appx 4 ft long. all work in kind not visible from street. repair are to conform with sb326. all work is less than 50% | $11,108 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 4126 20th St | dry rot repair to siding on first fl. at rear of building aprox 160 sf. 2 new doors and repair to deck lss than 50% all work at rear of building not visible from streetDetails
dry rot repair to siding on first fl. at rear of building aprox 160 sf. 2 new doors and repair to deck lss than 50% all work at rear of building not visible from street | $10,000 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 3857 26th St | kitchen remodel: new cabinets, new sink, new tiles. no moving walls.Details
kitchen remodel: new cabinets, new sink, new tiles. no moving walls. | $15,000 |
| Sep 18, 2024 | Completed final sign-off Mar 2025 | 32 Hartford St | replacement of (e) 1 story volume at rear of the dwelling. (n) 1 hr. walls/roof over (e) foundations. replacing (e) rear/side facing windows. (e) stairs to rear yard to remain. interior finishes, plumbing, electrical. no increase in floor area or height. (n) laundry rmDetails
replacement of (e) 1 story volume at rear of the dwelling. (n) 1 hr. walls/roof over (e) foundations. replacing (e) rear/side facing windows. (e) stairs to rear yard to remain. interior finishes, plumbing, electrical. no increase in floor area or height. (n) laundry rm | $70,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2025 | 28 Sussex St | replace (13) windows and replace siding with trim facing front of building. horizontal v grove windows to be marvin either aluminum or fiberglass windows within openings u=.30maxDetails
replace (13) windows and replace siding with trim facing front of building. horizontal v grove windows to be marvin either aluminum or fiberglass windows within openings u=.30max | $25,000 |
| Nov 28, 2023 | Completed final sign-off Dec 2023 | 1065 Carolina St | replace in kind 12 rotton deck joist on rear decks. less than 50% repair in kind. not visible from street.Details
replace in kind 12 rotton deck joist on rear decks. less than 50% repair in kind. not visible from street. | $5,000 |
| May 4, 2023 | Completed final sign-off May 2023 | 1419 De Haro St | replace in kind siding on side of front stair wall approx 25ft due to rot. replace in kind 3 pieces of siding at rear of house approx 10ft (total 35ft) due to rot fix canopy at front door replace rot in kind.Details
replace in kind siding on side of front stair wall approx 25ft due to rot. replace in kind 3 pieces of siding at rear of house approx 10ft (total 35ft) due to rot fix canopy at front door replace rot in kind. | $12,000 |
| Mar 17, 2023 | Completed final sign-off Jul 2025 | 2111 Hyde St | unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural workDetails
unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural work | $400,000 |
| Feb 16, 2023 | Completed final sign-off Oct 2023 | 2111 Hyde St | remodel bathroom: new fixtures, new tile. no structural work, no wall removed.Details
remodel bathroom: new fixtures, new tile. no structural work, no wall removed. | $20,000 |
| Oct 7, 2022 | Completed final sign-off Sep 2025 | 25 Hartford St | rev 201508184644: to include 3/f roof deck and railing above the approved rear addition. associated includes new rear facing window and door in (e) opening. no additional area or height is proposed.Details
rev 201508184644: to include 3/f roof deck and railing above the approved rear addition. associated includes new rear facing window and door in (e) opening. no additional area or height is proposed. | $3,800 |
| Oct 6, 2022 | Completed final sign-off Oct 2023 | 2111 Hyde St | remodel bathroom: change tub to shower up date fiixtures and new tile. install new wood windows to replace in kind. existing windows street facing throughtout condo. all windows to be wood. u-factor less than 0.58Details
remodel bathroom: change tub to shower up date fiixtures and new tile. install new wood windows to replace in kind. existing windows street facing throughtout condo. all windows to be wood. u-factor less than 0.58 | $88,000 |
| Sep 13, 2022 | Never finaled issued Sep 2022, no final | 1460 Hudson Av | dry rot repair/termite repair to framing members on front of house. no window replacement, approx 50 sq ft. replace in kind.Details
dry rot repair/termite repair to framing members on front of house. no window replacement, approx 50 sq ft. replace in kind. | $12,000 |
| Aug 22, 2022 | Completed final sign-off Nov 2022 | 2110 Chestnut St | tenant improvement of existing m occupancy retail store. no modification to the structure, plumbing, mechanical system to remain. finished/wall coverings only.Details
tenant improvement of existing m occupancy retail store. no modification to the structure, plumbing, mechanical system to remain. finished/wall coverings only. | $8,322 |
| Jul 19, 2022 | Completed final sign-off Jul 2022 | 289 Magellan Av | replace in kind 3 windows with marvin at side of house. not visible from streetDetails
replace in kind 3 windows with marvin at side of house. not visible from street | $6,000 |
| Jun 3, 2022 | Completed final sign-off Mar 2023 | 351 California St | add new lights, new built in cabinets and benches new tv mounts. new flooring base and paint. no structural workDetails
add new lights, new built in cabinets and benches new tv mounts. new flooring base and paint. no structural work | $90,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 676 Noe St | interior alterations to intnerior wall openings, voluntary stregthening at garageDetails
interior alterations to intnerior wall openings, voluntary stregthening at garage | $10,000 |
| Sep 28, 2021 | Completed final sign-off Jul 2025 | 2111 Hyde St | bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changesDetails
bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changes | $100,000 |
| Aug 19, 2021 | Completed final sign-off Dec 2021 | 378 Capp St | replace in kind 4 windows at rear of building and painting. not street visible.Details
replace in kind 4 windows at rear of building and painting. not street visible. | $6,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 952 Capp St | fix dry rot siding at rear of garage. replace in kind approx 500 sqft paint to match existing.Details
fix dry rot siding at rear of garage. replace in kind approx 500 sqft paint to match existing. | $9,000 |
| Apr 2, 2021 | Completed final sign-off Sep 2025 | 2111 Hyde St | remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting.Details
remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting. | $385,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 84 Palm Av | new constuction of security gate between side alley.Details
new constuction of security gate between side alley. | $3,500 |
| Jan 28, 2021 | Completed final sign-off Jan 2022 | 56 Clarendon Av | dry rot & termite repair att rear of house. replace in-kind all work. not visiable from street. approx 70sf.Details
dry rot & termite repair att rear of house. replace in-kind all work. not visiable from street. approx 70sf. | $9,000 |
| Jan 28, 2021 | Completed final sign-off Oct 2021 | 1919 19th St | in revision to app# 201807023538 and 201807023517. new door at front facadeDetails
in revision to app# 201807023538 and 201807023517. new door at front facade | $8,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2021 | 3953 24th St | unit #6: remove 3 leaking windows + 1 door. remove approximately 160sf siding and replace. all work is going to replace in kind. not visible from street.Details
unit #6: remove 3 leaking windows + 1 door. remove approximately 160sf siding and replace. all work is going to replace in kind. not visible from street. | $20,000 |
| Nov 13, 2020 | Completed final sign-off Mar 2021 | 3857 26th St | install new washing machine and dryer in garage with new hook ups. no new walls and no new closetsDetails
install new washing machine and dryer in garage with new hook ups. no new walls and no new closets | $7,500 |
| Sep 16, 2020 | Completed final sign-off Nov 2020 | 4100 20th St | back out concrete in 2 car garage floors and pour new concrete in kindDetails
back out concrete in 2 car garage floors and pour new concrete in kind | $8,000 |
| Sep 10, 2020 | Completed final sign-off Jan 2021 | 1919 19th St | replace all shingle siding in-kind - wood ceder shingleDetails
replace all shingle siding in-kind - wood ceder shingle | $12,000 |
| May 28, 2020 | Completed final sign-off Sep 2020 | 741 Oak St | comply with the r-3 report of physical inspection cc-8417. light carpentry work light plumbing and light electrical work.Details
comply with the r-3 report of physical inspection cc-8417. light carpentry work light plumbing and light electrical work. | $18,000 |
| Feb 19, 2020 | Completed final sign-off Jan 2021 | 111 States St | repair in-kind dry rot at front corner of house approximately 40 sqDetails
repair in-kind dry rot at front corner of house approximately 40 sq | $3,000 |
| Dec 2, 2019 | Completed final sign-off Jan 2020 | 57 Thrift St | repair house due to water damage new floors, new cabinets, slight bathroom remodel (48 sf), removal of sheetrock & insulation and installation of new insulation & sheetrock.Details
repair house due to water damage new floors, new cabinets, slight bathroom remodel (48 sf), removal of sheetrock & insulation and installation of new insulation & sheetrock. | $72,673 |
| Nov 7, 2019 | Completed final sign-off Sep 2020 | 4308 21st St | remove tub and install shower pan. remove medicine cab and replace with new. approx 45 sf bathroom remodelDetails
remove tub and install shower pan. remove medicine cab and replace with new. approx 45 sf bathroom remodel | $28,000 |
| Aug 21, 2019 | Completed final sign-off Sep 2019 | 1101 Filbert St | unit #2: fix dry rot siding approx 20sf. replace sill plate & framing members affected by dry rot sheetrock & trim & paint. not visible from st. repair in kind. use 5/8 type x sheetrock.Details
unit #2: fix dry rot siding approx 20sf. replace sill plate & framing members affected by dry rot sheetrock & trim & paint. not visible from st. repair in kind. use 5/8 type x sheetrock. | $20,000 |
| Feb 15, 2019 | Completed final sign-off Mar 2019 | 1950 08th Av | remove sheetrock ceilings in kitchen and dining room (due to leak) replace sheetrock and paint no other workDetails
remove sheetrock ceilings in kitchen and dining room (due to leak) replace sheetrock and paint no other work | $9,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 2064 Great Hy | kitchen update, change counter top, sink, back splash, new outlets, range, kitchen size 90 sfDetails
kitchen update, change counter top, sink, back splash, new outlets, range, kitchen size 90 sf | $8,000 |
| Oct 11, 2018 | Completed final sign-off Aug 2020 | 39 Dashiell Hammett St | unit #301 - interior alterations to (e) condo residence including kithcne and bath reno. no change in occupancy/area/exit path or envelope.Details
unit #301 - interior alterations to (e) condo residence including kithcne and bath reno. no change in occupancy/area/exit path or envelope. | $150,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2018 | 850 Bay St | replace dryrot siding at rear of house and framing members at rear of house. partial rear elevation, not visible from street.Details
replace dryrot siding at rear of house and framing members at rear of house. partial rear elevation, not visible from street. | $9,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2021 | 1919 19th St | re-shingle existing front façade with wood to wood, windows at the front façade - steel to steel within the existing openings. reshingle & new windows at front facade.Details
re-shingle existing front façade with wood to wood, windows at the front façade - steel to steel within the existing openings. reshingle & new windows at front facade. | $20,000 |
| Jun 15, 2018 | Completed final sign-off Jul 2018 | 24 Sussex St | change front siding to 1x8 v grove hardi plank and change all front windows to marvin aluminum clad, paint siding. no change to window size and location. max u-factor 0.32 or better.Details
change front siding to 1x8 v grove hardi plank and change all front windows to marvin aluminum clad, paint siding. no change to window size and location. max u-factor 0.32 or better. | $30,000 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 1501 Beach St | unit#202 replace 5 existing aluminum windows with new marvin integrity wood-ultrex windows, same opening, same operation, same design. replace one patio door with new marvin integrity sliding door. no other work per this permit. n/a for maher.Details
unit#202 replace 5 existing aluminum windows with new marvin integrity wood-ultrex windows, same opening, same operation, same design. replace one patio door with new marvin integrity sliding door. no other work per this permit. n/a for maher. | $12,000 |
| Jan 17, 2018 | Completed final sign-off Apr 2018 | 30 Elsie St | repair water damaged and dry rot in front bedroom, 25 sq ftDetails
repair water damaged and dry rot in front bedroom, 25 sq ft | $9,000 |
| Jan 8, 2018 | Completed final sign-off May 2018 | 1501 Beach St | unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel.Details
unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel. | $49,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2018 | 3953 24th St | unit #c-2: revision to pa #201704264967, includes relocation of (e) corridor dr. and addition of a closet/storage space. no changes to egress path. see approved permit for accessibility compliance. no exterior work.Details
unit #c-2: revision to pa #201704264967, includes relocation of (e) corridor dr. and addition of a closet/storage space. no changes to egress path. see approved permit for accessibility compliance. no exterior work. | $1,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2017 | 989 Capp St | replace in-kind dry rot & termite damage @ rear deck, less than 50% of repair.Details
replace in-kind dry rot & termite damage @ rear deck, less than 50% of repair. | $15,000 |
| May 11, 2017 | Completed final sign-off May 2017 | 30 Elsie St | repair leak in siding at rear of house.Details
repair leak in siding at rear of house. | $10,000 |
| May 2, 2017 | Completed final sign-off Jun 2017 | 950 Capp St | rear building - remove rotten siding and replace with new, add new trim and investigate termite damageDetails
rear building - remove rotten siding and replace with new, add new trim and investigate termite damage | $15,000 |
| Apr 26, 2017 | Completed final sign-off Feb 2018 | 3953 24th St | unit c-2: interior alterations to extg commercial condo to include partitions hc restroom, electrical, and finishes. no change to egress path and no change occupancy.Details
unit c-2: interior alterations to extg commercial condo to include partitions hc restroom, electrical, and finishes. no change to egress path and no change occupancy. | $55,000 |
| Feb 24, 2017 | Completed final sign-off Jul 2017 | 343 Divisadero St | replace 7 windows like for like & door in the back. max u-factor .32, not visible from streetDetails
replace 7 windows like for like & door in the back. max u-factor .32, not visible from street | $7,420 |
| Feb 1, 2017 | Completed final sign-off May 2017 | 465 14th St | physical inspection report cc-8038.Details
physical inspection report cc-8038. | $25,000 |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 465 14th St | permit to comply with report of physical inspection #cc-8038. items 1, 2, 3, 4, 5, 6 of general bldg common areas.Details
permit to comply with report of physical inspection #cc-8038. items 1, 2, 3, 4, 5, 6 of general bldg common areas. | $25,000 |
| Jan 4, 2017 | Completed final sign-off Mar 2017 | 200 Randall St | replace insul & shtrck on 1st floor ceiling, add insulation & 2 layers of rock in garage ceiling. install new dehumidifier in garage w/new duct, replace two windows at rear of house, change two windows to patio door at rear of house. update electrical where applicable, add shear panel to patio door.Details
replace insul & shtrck on 1st floor ceiling, add insulation & 2 layers of rock in garage ceiling. install new dehumidifier in garage w/new duct, replace two windows at rear of house, change two windows to patio door at rear of house. update electrical where applicable, add shear panel to patio door. | $60,000 |
| Oct 7, 2016 | Completed final sign-off Oct 2016 | 3735 Moraga St | dry rot repair at the rear of house under back door a joist soffit and trim all work to be repaired in kind.Details
dry rot repair at the rear of house under back door a joist soffit and trim all work to be repaired in kind. | $1,500 |
| Aug 3, 2016 | Completed final sign-off Aug 2016 | 2766 39th Av | inkind repair of front siding under large upper floor window and associated wood sill repairDetails
inkind repair of front siding under large upper floor window and associated wood sill repair | $1,500 |
| Jun 13, 2016 | Completed final sign-off Jun 2016 | 2766 39th Av | take down brick facade that has pulled away from house at the garage door and reinstall brick and connect to buildingDetails
take down brick facade that has pulled away from house at the garage door and reinstall brick and connect to building | $2,500 |
| Apr 29, 2016 | Completed final sign-off Oct 2016 | 952 Capp St | earthquake brace and bolt to be performed in general conformance with the california existing building code, appendix chapter a3 (sfbc ab-108), and provide min 5/8" diameter bolt x 6" depth at 3ft oc.Details
earthquake brace and bolt to be performed in general conformance with the california existing building code, appendix chapter a3 (sfbc ab-108), and provide min 5/8" diameter bolt x 6" depth at 3ft oc. | $6,000 |
| Mar 14, 2016 | Completed final sign-off Mar 2016 | 937 Church St | repair dryrot on rear exterior stairs. 2 posts, stringer, rim joist, and stair treads, and add simpson hardwear. repair in kind. less than 50%. maintain egress at all times on provide a live fire watch.Details
repair dryrot on rear exterior stairs. 2 posts, stringer, rim joist, and stair treads, and add simpson hardwear. repair in kind. less than 50%. maintain egress at all times on provide a live fire watch. | $5,000 |
| Feb 16, 2016 | Completed final sign-off Mar 2016 | 1733 Greenwich St | repair stairs on exterior of house (back of house). dry rot repairs on back stairs common area stairs. repair area less than 50%Details
repair stairs on exterior of house (back of house). dry rot repairs on back stairs common area stairs. repair area less than 50% | $10,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2025 | 25 Hartford St | renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms &Details
renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms & | $405,044 |
| Mar 9, 2015 | Completed final sign-off Aug 2016 | 754 Post St | unit legalization, unit 101. interior alterations to legalize dwelling unit. fire sprinklers under seperate permit.Details
unit legalization, unit 101. interior alterations to legalize dwelling unit. fire sprinklers under seperate permit. | $6,790 |
| May 20, 2011 | Completed final sign-off Oct 2011 | 2810 Laguna St | repair & replace dry rot, sister stud to existing 4"x4" @16 in o.c. with taperoo 2x8, studs to straighten walls, repair mudsill in kitchen, dining room & office on main floor, raise foundation stem in 6 thk min. wall 12" on southern explosure, bolt 5/8" 24" o.c., reinforced with #5 rebar,Details
repair & replace dry rot, sister stud to existing 4"x4" @16 in o.c. with taperoo 2x8, studs to straighten walls, repair mudsill in kitchen, dining room & office on main floor, raise foundation stem in 6 thk min. wall 12" on southern explosure, bolt 5/8" 24" o.c., reinforced with #5 rebar, | $10,000 |
| Apr 19, 2011 | Completed final sign-off Oct 2011 | 2810 Laguna St | remodel 1-bathroom & closets. inspector to verify in field for accurate pricing to work stated.Details
remodel 1-bathroom & closets. inspector to verify in field for accurate pricing to work stated. | $4,200 |