Dustin Muhn
- Listed as
- engineer
- Firm
- Framework Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Sep 2026
103 permits since 2000 (engineer on 103 permits): 65 completed, 20 in progress, 7 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 320 San Leandro Wy | Perez Construction Co | converting (e) space at garage level to creat a new adu. new door and in-kind window replacement in front; new balcony and window in rear; new foundations, structural framing and shear design. project is subject to ab112 all-electric ordinance.Details
converting (e) space at garage level to creat a new adu. new door and in-kind window replacement in front; new balcony and window in rear; new foundations, structural framing and shear design. project is subject to ab112 all-electric ordinance. | $755,000 |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 65 Ramona Av | revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard....Details
revision to bpa 202207128248. replacement of hvac system for 67 ramona. addition of insulation over garage, pocket door b/w office and den, washer/dryer. in kind replacement of (e) window in garage. addition of light fixtures in garage and exit passageway. hose bib and recepticles in rear yard.... | ||
| Jul 31, 2026 | In progress filed Jul 2026, not yet issued | 919 Alvarado St | interior basement remodel and addition(rear side only). no work to be done to the front facade of the building.Details
interior basement remodel and addition(rear side only). no work to be done to the front facade of the building. | $1,000,000 | |
| Jul 17, 2026 | In progress issued Sep 2026 | 169 Brompton Av | Lindquist Custom Construction Inc | interior remodel within (e) building. no exterior scope. includes limited structural for voluntary strengthening upgrades.Details
interior remodel within (e) building. no exterior scope. includes limited structural for voluntary strengthening upgrades. | $200,000 |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 4071 20th St | Lemma Construction, Inc. | revision to 202507090474, minor encroachment permit for new exterior wood stairs, new 6'0 max high wood trash enclosure, new s.o.6 hardscapeDetails
revision to 202507090474, minor encroachment permit for new exterior wood stairs, new 6'0 max high wood trash enclosure, new s.o.6 hardscape | $15,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 28 Day St | Citidev Inc. | revision to permit 202502240915-s1 to remove basement. remove laundry in common area.Details
revision to permit 202502240915-s1 to remove basement. remove laundry in common area. | |
| Mar 18, 2026 | In progress issued Apr 2026 | 1193 Noe St | Ideal Builders | addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet..Details
addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet.. | $200,000 |
| Mar 9, 2026 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable.Details
revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable. | |
| Dec 22, 2025 | In progress issued Feb 2026 | 49 Hartford St | Reeb Design & Build Inc | revision to 202411124801. includes relocation of heat pump units from rear yard to a new rooftop mechanical platform. demo e slab at hall 002 to lower finish floor at garage. additional stepped landscape at rt wall to allow for grade change. add sink to kitchen island.Details
revision to 202411124801. includes relocation of heat pump units from rear yard to a new rooftop mechanical platform. demo e slab at hall 002 to lower finish floor at garage. additional stepped landscape at rt wall to allow for grade change. add sink to kitchen island. | $10,000 |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 998 Chenery St | addition of new bathroom and closet. renovation of existing bathroom and laundry closet.Details
addition of new bathroom and closet. renovation of existing bathroom and laundry closet. | $40,000 | |
| Dec 8, 2025 | In progress filed Dec 2025, not yet issued | 4633 19th St | Norwood Construction | renovation of (e) single family residence including rear addition.Details
renovation of (e) single family residence including rear addition. | $450,000 |
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 728 26th Av | Bay Remodels | revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam.Details
revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam. | $500 |
| Sep 2, 2025 | In progress issued Feb 2026 | 4071 20th St | Lemma Construction, Inc. | interior remodel including: (n) windows, (n) primary suite, (n) kitchen, (n) bathrooms, (n) cabinetry, (n) finishes. no changes to existing footprint. (e) courtyard deck to be structurally upgraded with new finishes.Details
interior remodel including: (n) windows, (n) primary suite, (n) kitchen, (n) bathrooms, (n) cabinetry, (n) finishes. no changes to existing footprint. (e) courtyard deck to be structurally upgraded with new finishes. | $900,000 |
| Aug 12, 2025 | Expired or cancelled withdrawn Mar 2026 | 3824 21st St | Deep Elm Construction Llc | revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change.Details
revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change. | $100 |
| Jul 17, 2025 | Completed final sign-off Jun 2026 | 3447 Clay St | The Toboni Group | revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f.Details
revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f. | $10,000 |
| Jun 23, 2025 | Completed final sign-off Feb 2026 | 81 Jersey St | S L M Development Inc. | revision to permit 202505065905. to replace existing footing discovered to be undersized and shallow.Details
revision to permit 202505065905. to replace existing footing discovered to be undersized and shallow. | $10,000 |
| May 6, 2025 | Completed final sign-off Feb 2026 | 81 Jersey St | S L M Development Inc. | convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof.Details
convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof. | $80,000 |
| Mar 6, 2025 | In progress issued Oct 2025 | 28 Day St | Citidev Inc. | alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units.Details
alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units. | $4,750,000 |
| Feb 28, 2025 | In progress issued Mar 2025 | 287 Mangels Av | Stonebridge Construction Inc | structural revision to 202104239265 replace deteriorated concrete slab at entry, new footing at front wall of house and added shear wall for voluntary seismic strengthening. ref pa 202408198999Details
structural revision to 202104239265 replace deteriorated concrete slab at entry, new footing at front wall of house and added shear wall for voluntary seismic strengthening. ref pa 202408198999 | $20,000 |
| Feb 6, 2025 | In progress issued Mar 2025 | 671 28th St | Phollies Inc | interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck.Details
interior remodel within (e) building includes limited structural work. 1st fl - addtion of entry vestibule with (n) floor elevations & enclosed space; 2nd fl - infill of (e) lightwells; (n) skylights and kitchen/bath remodel. demo and replace deck. | $400,000 |
| Feb 6, 2025 | In progress issued Feb 2025 | 728 26th Av | Bay Remodels | rev pa 202001313274: change beam from wood to steel. replace discovered undersized floor framing (one room only).Details
rev pa 202001313274: change beam from wood to steel. replace discovered undersized floor framing (one room only). | |
| Oct 23, 2024 | Completed final sign-off Feb 2025 | 229 Bonview St | Herling Construction | revision to permit 202206247014. modify guardrail detail.Details
revision to permit 202206247014. modify guardrail detail. | |
| Oct 1, 2024 | In progress issued Oct 2024 | 2533 Folsom St | Phollies Inc | interior remodel w/in (e) building including limited structural work at kitchen / dining only, no changes to exterior.Details
interior remodel w/in (e) building including limited structural work at kitchen / dining only, no changes to exterior. | $125,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 287 Mangels Av | Stonebridge Construction Inc | revision to permit 202104239265. shared foundation detail modification. adjust in footingDetails
revision to permit 202104239265. shared foundation detail modification. adjust in footing | |
| Sep 5, 2024 | In progress issued Sep 2024 | 291 Mangels Av | Stonebridge Construction Inc | revision to permit 202104239265 on 287 mangels av. shared foundation detail modification.Details
revision to permit 202104239265 on 287 mangels av. shared foundation detail modification. | |
| Sep 5, 2024 | In progress issued Sep 2024 | 283 Mangels Av | Stonebridge Construction Inc | revision to permit 202104239265 on 287 mangels av. shared foundation detail modification.Details
revision to permit 202104239265 on 287 mangels av. shared foundation detail modification. | |
| Aug 30, 2024 | Completed final sign-off Feb 2025 | 2819 Laguna St | revision to pa# 202402065305: remove portion of foundation replacement. updating shearwall. (ref pa# 202408148672)Details
revision to pa# 202402065305: remove portion of foundation replacement. updating shearwall. (ref pa# 202408148672) | ||
| Aug 20, 2024 | Expired or cancelled expired Jun 2026 | 1860 24th Av | Iy Development & Renovation Inc | revision to permit 202307111852. removal of a wall and installation of a new beam according to revised plan.Details
revision to permit 202307111852. removal of a wall and installation of a new beam according to revised plan. | $8,000 |
| Aug 14, 2024 | Completed final sign-off Feb 2025 | 2819 Laguna St | revision to applicaiton# 202402065305: moving steel i beams locations. adding few more feet of foundation replacement.Details
revision to applicaiton# 202402065305: moving steel i beams locations. adding few more feet of foundation replacement. | ||
| Aug 6, 2024 | Expired or cancelled expired Sep 2026 | 701 Myra Wy | Kalix Inc Dbalara Construction | revision to permit# 202405283031: underpinning foundation instead of replacing.Details
revision to permit# 202405283031: underpinning foundation instead of replacing. | |
| Aug 6, 2024 | Expired or cancelled expired Jun 2026 | 681 Myra Wy | Kalix Inc Dbalara Construction | revision to pa 2024 0528 3031 for 701 myra way underpinning foundation instead of replacingDetails
revision to pa 2024 0528 3031 for 701 myra way underpinning foundation instead of replacing | |
| Aug 6, 2024 | Expired or cancelled expired Jun 2026 | 705 Myra Wy | Kalix Inc Dbalara Construction | revision to pa 2024 0528 3031 for 701 myra way underpinning foundation instead of replacingDetails
revision to pa 2024 0528 3031 for 701 myra way underpinning foundation instead of replacing | |
| Jul 24, 2024 | Completed final sign-off May 2025 | 944 Capp St | Stonebridge Construction Inc, Synergy Enterprises Inc. | remodel (e) apartment uit including lower exist. slab. demo of (e) furnace and elimin. of all asbestos and (e) duct. install new mini split heat pump hvac system and elec wiring, new plumbing,insulation, kit cab,framing and furring as drawn. remove (e) chimney and non-load bearing walls.Details
remodel (e) apartment uit including lower exist. slab. demo of (e) furnace and elimin. of all asbestos and (e) duct. install new mini split heat pump hvac system and elec wiring, new plumbing,insulation, kit cab,framing and furring as drawn. remove (e) chimney and non-load bearing walls. | $368,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 673 04th Av | Daaron Builders | revision to permit 202307061565. revise garage beam to steel. modify footings.Details
revision to permit 202307061565. revise garage beam to steel. modify footings. | |
| Jun 7, 2024 | Completed final sign-off Jun 2026 | 2118 44th Av | Ideal Builders | remodel of e) residence w/ e) bldg vulume. 464 sf of n) conditioned floor area converted from e) garage. level 1: new bedroom, bathroom, office. replacement of 1 window & 1 door on level 1. 2 windows on level 2. new stucco at rear facade, associated structure, mech, plumbing, electrical workDetails
remodel of e) residence w/ e) bldg vulume. 464 sf of n) conditioned floor area converted from e) garage. level 1: new bedroom, bathroom, office. replacement of 1 window & 1 door on level 1. 2 windows on level 2. new stucco at rear facade, associated structure, mech, plumbing, electrical work | $45,000 |
| May 16, 2024 | Completed final sign-off Jul 2025 | 579 34th Av | Chang Chao Ming Constr | interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed.Details
interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed. | $220,000 |
| May 2, 2024 | Completed final sign-off Mar 2025 | 55 Grattan St | Kilrea Construction Inc. | revision to bpa# 202311090495: modify interior layout and remove skylights.Details
revision to bpa# 202311090495: modify interior layout and remove skylights. | |
| Apr 17, 2024 | Completed final sign-off May 2025 | 940 Capp St | Stonebridge Construction Inc | rear structure garage & attic. repair (e) dilapidated wood framing & siding. (n) 1x12 siding to match (e) siding. replace (e) sliding wood garage door with new math wood overhead motorized garage door; install new oh motorized door on courtyard in (e) opening; remove (e) 1 1/2" plywood wall andDetails
rear structure garage & attic. repair (e) dilapidated wood framing & siding. (n) 1x12 siding to match (e) siding. replace (e) sliding wood garage door with new math wood overhead motorized garage door; install new oh motorized door on courtyard in (e) opening; remove (e) 1 1/2" plywood wall and | $40,000 |
| Mar 15, 2024 | Completed final sign-off Feb 2025 | 168 16th Av | Deep Elm Construction Llc | interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow)Details
interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow) | $30,000 |
| Feb 13, 2024 | Completed final sign-off Mar 2025 | 1860 24th Av | Om's Remodeling, Iy Development & Renovation Inc | revision to pa# 202307111852, to comply with violation # 202418868, undermined footing. ties with pa# 202402135853Details
revision to pa# 202307111852, to comply with violation # 202418868, undermined footing. ties with pa# 202402135853 | $3,000 |
| Feb 13, 2024 | Completed final sign-off Mar 2025 | 1864 24th Av | Om's Remodeling | to comply with violation # 202418867, undermined footing. ties with pa# 202402135837Details
to comply with violation # 202418867, undermined footing. ties with pa# 202402135837 | |
| Jan 17, 2024 | Completed final sign-off Sep 2024 | 133 Henry St | Connor Daly Corporation | voluntary seismic retrofit on 1st floorDetails
voluntary seismic retrofit on 1st floor | $28,000 |
| Dec 19, 2023 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home.Details
renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home. | $200,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2025 | 55 Grattan St | Kilrea Construction Inc. | remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylightDetails
remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylight | $225,000 |
| Oct 26, 2023 | Completed final sign-off Sep 2025 | 473 Day St | Eco Logic Construction & Design Inc. | foundation replacement and interior remodel. no expansion of bldg envelop or work in prow. remodel 1/f include media room, new bathroom, storage space, conversion of tradesman hallway to 1-hr fire rated corridor. remodel 2/f kitchen. new electrical throughout. exterior scope include new windowsDetails
foundation replacement and interior remodel. no expansion of bldg envelop or work in prow. remodel 1/f include media room, new bathroom, storage space, conversion of tradesman hallway to 1-hr fire rated corridor. remodel 2/f kitchen. new electrical throughout. exterior scope include new windows | $400,000 |
| Oct 12, 2023 | Expired or cancelled expired Apr 2026 | 371 Prospect Av | Mosvaler Construction Inc | revision to 202209283359. new foundation to support existing structure due to unforseen conditions. additional revisions include: changes to the interior partition layout, changes to the sunroom floor elevation (no additional cost incurred)Details
revision to 202209283359. new foundation to support existing structure due to unforseen conditions. additional revisions include: changes to the interior partition layout, changes to the sunroom floor elevation (no additional cost incurred) | $8,900 |
| Jul 11, 2023 | Completed final sign-off Jun 2026 | 1860 24th Av | Om's Remodeling, Iy Development & Renovation Inc | remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless whDetails
remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless wh | $350,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2025 | 673 04th Av | conversion of (e) attic to habitable space, addition of 2 8x8ft dormers at roof, to include hallway, living room, closet, bedroom, bathroom, new stair and guareails for attic access. 1 new eero at new rear facing bedroom,(n) skylights at attices, (n) f/s at rear of attic additional only- defferedDetails
conversion of (e) attic to habitable space, addition of 2 8x8ft dormers at roof, to include hallway, living room, closet, bedroom, bathroom, new stair and guareails for attic access. 1 new eero at new rear facing bedroom,(n) skylights at attices, (n) f/s at rear of attic additional only- deffered | $200,000 | |
| May 19, 2023 | Completed final sign-off Feb 2026 | 4148 26th St | foundation replacement, seismic strengtheningDetails
foundation replacement, seismic strengthening | $100,000 | |
| Apr 28, 2023 | Completed final sign-off Mar 2025 | 393 Arlington St | Green Construction Builder Corp | replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair.Details
replacing & expanding existing main floor deck & new ground lvl flat work to integrate new deck. demo of (e) deck, replacement of (e) property line fire wall & n concrete footings. (n) larger deck will align to the (e) bi-fold door sill. (n) extisting metal spiral stair. | $80,000 |
| Mar 13, 2023 | Never finaled issued Jun 2023, no final | 137 Richland Av | partial foundation replacement, general interior remodel at 1st fl. add (1) full bath, (1) wet bar, (1) bedroom, remove wall at kitchen, remodel kitchenDetails
partial foundation replacement, general interior remodel at 1st fl. add (1) full bath, (1) wet bar, (1) bedroom, remove wall at kitchen, remodel kitchen | $250,000 | |
| Oct 28, 2022 | Completed final sign-off Aug 2026 | 4245 23rd St | Saturn Construction Co | interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck.Details
interior renovation of(e)garage level laundry room & storage room,1st level kitchen & living room,2nd level hall bath & bedrooms.exterior rear addition to add a bedroom on the garage level,enlarge the 2nd level.scope of work also includes(n)interior stair to(n)roof deck. | $1,200,000 |
| Sep 7, 2022 | Completed final sign-off May 2023 | 185 Evelyn Wy | Stonebridge Construction Inc | legalize and remodel 1st floor habitable space. convert part of (e) garage into a laundry room. replace (e) 1st floor concrete slab.Details
legalize and remodel 1st floor habitable space. convert part of (e) garage into a laundry room. replace (e) 1st floor concrete slab. | $154,000 |
| Jul 29, 2022 | Never finaled issued Jul 2023, no final | 225 Upper Tr | V J R Construction | construct a new roof top deck no modifications to (e) stair penthouseDetails
construct a new roof top deck no modifications to (e) stair penthouse | $20,000 |
| Jul 25, 2022 | Completed final sign-off Apr 2024 | 216 02nd Av | Stonebridge Construction Inc | 1st fl & 2nd fl only: voluntary seismic strengthening. 1st fl new concrete footing and shear wall. 2nd fl bathroom, kitchen and general remodel. remove & replace windows/doors.Details
1st fl & 2nd fl only: voluntary seismic strengthening. 1st fl new concrete footing and shear wall. 2nd fl bathroom, kitchen and general remodel. remove & replace windows/doors. | $175,000 |
| Jul 12, 2022 | In progress issued Feb 2024 | 65 Ramona Av | Peak General Contractors Inc | remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear.Details
remodel (e) storage space & add a bathroom @ the area of the remodel. horizontal addition @ rear. | $99,886 |
| Jul 11, 2022 | Never finaled issued Aug 2023, no final | 418 Union St | Xspace Builder | remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment.Details
remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment. | $365,000 |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 116 Park St | A L V Construction Inc | remove one (e) post and wood beam in garage and install new steel over two concrete footings.Details
remove one (e) post and wood beam in garage and install new steel over two concrete footings. | $20,000 |
| Jun 24, 2022 | Completed final sign-off Feb 2025 | 229 Bonview St | Herling Construction | convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rotDetails
convert 575 sf of garage to conditioned space & replace int stair. replace foundation. demolish existing deck stair to upper deck. replace windows & doors @ rear. 3 new skylilghts. replace in-kind less than 50% of rear deck due to rot. replace in-kind front window due to dry-rot | $150,000 |
| Jun 2, 2022 | Never finaled issued Aug 2022, no final | 24 Romain St | Macken Construction | new climatize room from existing storage area on first floor. add skylight on existing light well.Details
new climatize room from existing storage area on first floor. add skylight on existing light well. | $15,000 |
| Feb 7, 2022 | Completed final sign-off Sep 2022 | 1502 Golden Gate Av | Eon Builders Inc | revision t o pa 2021-1117-2639 clarify framing at recessed shower pan in structural drawingsDetails
revision t o pa 2021-1117-2639 clarify framing at recessed shower pan in structural drawings | $500 |
| Dec 23, 2021 | Completed final sign-off Feb 2022 | 375 09th St | Cornerstone Dba Ag Construction | voluntary strengthening of damaged failing mezzanine. beams, joists, guardrails and floor sheathing will be replaced in kind or with more capable framingDetails
voluntary strengthening of damaged failing mezzanine. beams, joists, guardrails and floor sheathing will be replaced in kind or with more capable framing | $22,000 |
| Nov 18, 2021 | Completed final sign-off Dec 2022 | 366 Franconia St | R & D Construction Co Inc | 50% repair: during construction revise bpa#202106293435 and 202109017569 to include in kind extg molding wooden deck with extg rotting firewall. repair in kind.Details
50% repair: during construction revise bpa#202106293435 and 202109017569 to include in kind extg molding wooden deck with extg rotting firewall. repair in kind. | $70,000 |
| Aug 30, 2021 | Completed final sign-off Jan 2023 | 57 Bessie St | Planart Construction Corp | revision to 202011189207 reduce excavation to 10 ft ceiling in media room, replace flat roof at rear due to dryrot and 3 stage shoring of neighboring foundations on both sidesDetails
revision to 202011189207 reduce excavation to 10 ft ceiling in media room, replace flat roof at rear due to dryrot and 3 stage shoring of neighboring foundations on both sides | |
| Aug 4, 2021 | Completed final sign-off Dec 2023 | 72 Rossi Av | North Bay Construction | new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property lineDetails
new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property line | $45,000 |
| Jul 28, 2021 | Completed final sign-off Jan 2023 | 3569 Washington St | The Toboni Group | revision to pa#202102265437; revised landscape walls in rear yard.Details
revision to pa#202102265437; revised landscape walls in rear yard. | $5,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2025 | 769 Cayuga Av | Perez Construction Llc. | remodel of exisitng kitchen, bathroom, & entry in second floor of main home, and conversion of existing lower floor garage/storage into one additional bedroom, bathroom & family room. 2 lightwell infills. widen garage door.Details
remodel of exisitng kitchen, bathroom, & entry in second floor of main home, and conversion of existing lower floor garage/storage into one additional bedroom, bathroom & family room. 2 lightwell infills. widen garage door. | $514,198 |
| Feb 26, 2021 | Completed final sign-off Jan 2023 | 3569 Washington St | The Toboni Group | interior remodel within existing footprint. lowering 1st level foundation 12". infill at rear 1st level and 2nd level under existing building footprint.Details
interior remodel within existing footprint. lowering 1st level foundation 12". infill at rear 1st level and 2nd level under existing building footprint. | $65,000 |
| Jan 28, 2021 | Completed final sign-off Jul 2025 | 128 Woodland Av | Ben Hardy & Company, Design Line Construction | interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work.Details
interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work. | $140,000 |
| Oct 17, 2020 | Completed final sign-off Oct 2022 | 156 Tiffany Av | Rozen Home Builders Inc | add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611).Details
add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611). | $110,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2022 | 1469 Kearny St | E F Mcginness And Sons | interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl.Details
interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl. | $15,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | North Bay Construction | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Jan 31, 2020 | Never finaled issued Feb 2022, no final | 728 26th Av | Bay Remodels | horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work.Details
horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work. | $225,000 |
| Jan 9, 2020 | Completed final sign-off Nov 2020 | 1382 Chestnut St | interior remodel: enlarge existing openings, remodel kitchen and bathDetails
interior remodel: enlarge existing openings, remodel kitchen and bath | $40,000 | |
| Dec 13, 2019 | Never finaled issued Jan 2020, no final | 727 De Haro St | partial door/window replacement @ rear if house, interior remodel of (e) street level bathroomDetails
partial door/window replacement @ rear if house, interior remodel of (e) street level bathroom | $250,000 | |
| Nov 19, 2019 | Completed final sign-off Aug 2020 | 1594 Geneva Av | M Bay Area Construction Inc | deck repair (2) nothing is getting altered only removing dryrot. repair in kind less than 50%.Details
deck repair (2) nothing is getting altered only removing dryrot. repair in kind less than 50%. | $28,000 |
| Sep 12, 2019 | Completed final sign-off May 2020 | 543 Chenery St | C K Construction | interior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelopeDetails
interior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelope | $50,000 |
| Sep 6, 2019 | Completed final sign-off Dec 2019 | 182 12th Av | Connor Daly Corporation | voluntary stregthening of garageDetails
voluntary stregthening of garage | $15,000 |
| Sep 6, 2019 | Completed final sign-off Feb 2020 | 1444 York St | Pacific Engineering & Construction Inc. | voluntary seismic improvement (not to a specific code requirement) of ground floor.Details
voluntary seismic improvement (not to a specific code requirement) of ground floor. | $15,000 |
| Aug 15, 2019 | Expired or cancelled cancelled Jan 2026 | 1735 Fulton St | replace slab on grade only.Details
replace slab on grade only. | $15,000 | |
| May 24, 2019 | Completed final sign-off Feb 2021 | 57 Potomac St | Marucheck Construction | voluntary strengthening at ground floor.Details
voluntary strengthening at ground floor. | $80,000 |
| May 24, 2019 | Completed final sign-off Mar 2020 | 1518 Castro St | Jim Patterson & Co. | voluntary strengthening at garage level only with partial foundation replacement.Details
voluntary strengthening at garage level only with partial foundation replacement. | $90,000 |
| May 21, 2019 | Completed final sign-off Jan 2021 | 3884 17th St | C & M Woodworking Inc Dba C & M General | foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only.Details
foundation replacement and voluntary strengthening of the garage. minor excavation to flatten rear patio and parking areas. work to be done on ground fl only. | $30,000 |
| Mar 14, 2019 | Never finaled filed Mar 2019, never issued | 1603 Treat Av | foundation replacement & strengthening of ground floor only.Details
foundation replacement & strengthening of ground floor only. | $150,000 | |
| Mar 4, 2019 | Completed final sign-off Jul 2019 | 995 Carolina St | renovating (e) roof deck with new code compliant guardrail.Details
renovating (e) roof deck with new code compliant guardrail. | $20,000 | |
| Feb 11, 2019 | Completed final sign-off Nov 2019 | 1353 Stevenson St | Edgewood Builders Inc | mandatory soft story retrofit per sfebc chp 4d. this permit for administrative purposes (and project cost adjustment) for documenting all soft story work completed under 201708316644. this permit cost for ss work only.Details
mandatory soft story retrofit per sfebc chp 4d. this permit for administrative purposes (and project cost adjustment) for documenting all soft story work completed under 201708316644. this permit cost for ss work only. | $100,000 |
| Jan 31, 2019 | Completed final sign-off Oct 2019 | 275 Santa Clara Av | N A V R O Inc Dba Proyecto | interior renovation of (e) kitchen & (e) baths & basement storage convertionos (e) 1st fl. office to bedroomDetails
interior renovation of (e) kitchen & (e) baths & basement storage convertionos (e) 1st fl. office to bedroom | $70,000 |
| Dec 28, 2018 | Expired or cancelled expired Sep 2024 | 51 Pixley St | horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade.Details
horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade. | $250,000 | |
| Oct 17, 2018 | Completed final sign-off Nov 2019 | 1501 Howard St | replace extg garage door. n/a for maherDetails
replace extg garage door. n/a for maher | $14,000 | |
| Sep 19, 2018 | Completed final sign-off Feb 2020 | 2446 20th Av | Dunros Construction | 2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper levelDetails
2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper level | $100,000 |
| Jul 11, 2018 | Completed final sign-off Jan 2019 | 522 Joost Av | Handyman Heroes Inc. | adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) windowDetails
adding new code compliant interior stair connecting the (e) grnd flr to (e) 2nd flr. demo 1 windoe and reducing size of 1 (e) window | $70,000 |
| Jun 11, 2018 | Completed final sign-off Jul 2021 | 1578 Shafter Av | Greenscape Construction Inc | revision to permit #201504244562. reduction in scope to reduce 3 story to 2 story structure at rear within required rear year. 2 bedroomds, 1 bathroom. 293 sf.Details
revision to permit #201504244562. reduction in scope to reduce 3 story to 2 story structure at rear within required rear year. 2 bedroomds, 1 bathroom. 293 sf. | |
| Feb 28, 2018 | Expired or cancelled expired Oct 2023 | 707 Rockdale Dr | Grant Ian Hetherington | revision #2 to pa 2017-01215-6667 - alteration of mat slab details for construct ability. replacing front stairs due to damageDetails
revision #2 to pa 2017-01215-6667 - alteration of mat slab details for construct ability. replacing front stairs due to damage | |
| Feb 20, 2018 | Completed final sign-off Oct 2020 | 807 42nd Av | structural improvements to foundation, structural upgrades to (e) framing. structural buildout of space inside (e) garage. ground fl - (n) bedrm & (n) bathrm. (n) sliding glass doors @ rear elevation. (n) stair <30" above grade @ rear, infill ligthwell only @ ground fl ceiling @ garage with skyligthDetails
structural improvements to foundation, structural upgrades to (e) framing. structural buildout of space inside (e) garage. ground fl - (n) bedrm & (n) bathrm. (n) sliding glass doors @ rear elevation. (n) stair <30" above grade @ rear, infill ligthwell only @ ground fl ceiling @ garage with skyligth | $40,000 | |
| Feb 20, 2018 | Completed final sign-off May 2018 | 2426 16th Av | Madden Construction | revision to app201710312810. (voluntary) assumed footing found to be non-existant, pouring new footing in its place. voluntaryDetails
revision to app201710312810. (voluntary) assumed footing found to be non-existant, pouring new footing in its place. voluntary | |
| Dec 15, 2017 | Expired or cancelled expired Oct 2023 | 707 Rockdale Dr | Grant Ian Hetherington | revision to pa #201610079839 s1. voluntary change of foundation systems from shallow continuous footings to match slab due to heavy presence of water on the site. monolithic pour.Details
revision to pa #201610079839 s1. voluntary change of foundation systems from shallow continuous footings to match slab due to heavy presence of water on the site. monolithic pour. | $10,000 |
| Oct 31, 2017 | Completed final sign-off May 2018 | 2426 16th Av | Madden Construction | voluntary strengthening at garage level, sheathing, holdowns, blocks and straps installed. no work performed upstairs,Details
voluntary strengthening at garage level, sheathing, holdowns, blocks and straps installed. no work performed upstairs, | $20,000 |
| Jul 28, 2017 | Expired or cancelled cancelled Jan 2026 | 1154 Clayton St | voluntary strengthening on garage level. adding structural sheating, anchor bolts and connectors. new moment frame across garage portal and footings/anchorage.Details
voluntary strengthening on garage level. adding structural sheating, anchor bolts and connectors. new moment frame across garage portal and footings/anchorage. | $35,000 | |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 209 Arkansas St | Rock And Rose Landscaping & Birkmyer | install 5' high max poured in place concrete retaining wall per engineers plan. install patio concrete with area drainDetails
install 5' high max poured in place concrete retaining wall per engineers plan. install patio concrete with area drain | $25,000 |
| Jun 30, 2017 | Completed final sign-off Jul 2018 | 102 Pierce St | Connor Daly Corporation | mandatory soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
mandatory soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $70,000 |