Cornerstone Dba Ag Construction
- Based in
- San Anselmo
- On San Francisco permits
- May 2012 to Sep 2026
- Last 24 months
- 5 permits filed
107 permits since 2000: 87 completed, 3 in progress, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 107.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 3631 19th St | remove old siding at the back of the building facing west and east. install insulation, plywood, new wood siding in kind. use 1/2" struct ply, 10d @ 4" o.c. edge and field nailDetails
remove old siding at the back of the building facing west and east. install insulation, plywood, new wood siding in kind. use 1/2" struct ply, 10d @ 4" o.c. edge and field nail | $10,000 |
| Feb 24, 2026 | In progress issued May 2026 | 121 Dalewood Wy | convert part of garage into condition space to include (n) bedroom, bathroom, and laundry room. add a window in place of the garage door. curb cut reduction under dpw permit.Details
convert part of garage into condition space to include (n) bedroom, bathroom, and laundry room. add a window in place of the garage door. curb cut reduction under dpw permit. | $50,000 |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 2018 42nd Av | bathroom addition (no change to footprint) in e) garage areaDetails
bathroom addition (no change to footprint) in e) garage area | $20,000 |
| Dec 18, 2024 | In progress issued Jun 2025 | 5531 Diamond Heights Bl | remodel (e) single family home to include a (n) bathroom from garage space. update rear railings. no change to structural.Details
remodel (e) single family home to include a (n) bathroom from garage space. update rear railings. no change to structural. | $8,000 |
| Oct 8, 2024 | Completed final sign-off Aug 2025 | 2042 42nd Av | interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level.Details
interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level. | $80,000 |
| Sep 3, 2024 | Completed final sign-off Dec 2024 | 5531 Diamond Heights Bl | remodel kitchen and 2 bathrooms in kind. replace 7 windows- 2 in front of the ouse and 5 facing back yard. one patio door. same size, same locations, max u-factor 0.30.Details
remodel kitchen and 2 bathrooms in kind. replace 7 windows- 2 in front of the ouse and 5 facing back yard. one patio door. same size, same locations, max u-factor 0.30. | $20,000 |
| Jul 31, 2024 | Completed final sign-off Sep 2024 | 3631 19th St | replace wood siding in the light well, new insulation, plywood, cedar sidingDetails
replace wood siding in the light well, new insulation, plywood, cedar siding | $5,000 |
| Jun 10, 2024 | Completed final sign-off Sep 2024 | 733 Front St | revision to pa 202402025140 field condition rebuild 2 shower stalls to match previous conditions due to dryrot damage.Details
revision to pa 202402025140 field condition rebuild 2 shower stalls to match previous conditions due to dryrot damage. | |
| Feb 2, 2024 | Completed final sign-off Sep 2024 | 733 Front St | remodel (2) bathrooms, new plumbing, remove (2) shower stalls and add 2 non ada lavatories.Details
remodel (2) bathrooms, new plumbing, remove (2) shower stalls and add 2 non ada lavatories. | $20,000 |
| Jan 26, 2024 | Completed final sign-off Apr 2024 | 5 Eugenia Av | remodel kitchen in kind.Details
remodel kitchen in kind. | $15,000 |
| Mar 10, 2023 | Completed final sign-off Dec 2023 | 1932 Ortega St | interior remodel to provide interior stairs and relocate kitchen, remove existing exterior stair and extend deck.Details
interior remodel to provide interior stairs and relocate kitchen, remove existing exterior stair and extend deck. | $140,000 |
| Dec 21, 2022 | Completed final sign-off Feb 2023 | 65 Keystone Wy | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 3070 Market St | demo half bath, new full bath shower pan. replace kitchen cabinetsDetails
demo half bath, new full bath shower pan. replace kitchen cabinets | $10,000 |
| Jun 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1445 26th Av | replace (5) broken windows with marvin alum clad. front of the house.Details
replace (5) broken windows with marvin alum clad. front of the house. | $6,000 |
| Jun 1, 2022 | Never finaled issued Jun 2022, no final | 1431 17th St | install 1 wall sign. single faced. non-electric. "clayroom".Details
install 1 wall sign. single faced. non-electric. "clayroom". | $500 |
| Mar 14, 2022 | Completed final sign-off Jul 2022 | 2121 15th Av | rebuild of (e) yard masonary walls. voluntary seismic retrofit of crawl space & cripple walls.Details
rebuild of (e) yard masonary walls. voluntary seismic retrofit of crawl space & cripple walls. | $50,000 |
| Dec 23, 2021 | Completed final sign-off Feb 2022 | 375 09th St | voluntary strengthening of damaged failing mezzanine. beams, joists, guardrails and floor sheathing will be replaced in kind or with more capable framingDetails
voluntary strengthening of damaged failing mezzanine. beams, joists, guardrails and floor sheathing will be replaced in kind or with more capable framing | $22,000 |
| Apr 7, 2021 | Completed final sign-off Jun 2021 | 1363 07th Av | unit 5: replace kitchen cabinets. upgrade plumbing and electrical. add recessed lights. remodel bathroomDetails
unit 5: replace kitchen cabinets. upgrade plumbing and electrical. add recessed lights. remodel bathroom | $15,000 |
| Apr 5, 2021 | Completed final sign-off Oct 2021 | 175 Bluxome St | remodel 1 kitchen and 2 bathrooms, add recessed lights. no moving walls.Details
remodel 1 kitchen and 2 bathrooms, add recessed lights. no moving walls. | $20,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2023 | 2770 36th Av | to comply with nov 202024049/202037363/202056524: reconfig kitchen bathrooms, add one bathroom & relocated inerior stairs at 2/f. remodel bedroom &y bathroom, convert family room to bedroom, dd 1 bathroom, media room & wet bar, relocated washer/dryer at 1/f. amend to 201908290173 for additional wrkDetails
to comply with nov 202024049/202037363/202056524: reconfig kitchen bathrooms, add one bathroom & relocated inerior stairs at 2/f. remodel bedroom &y bathroom, convert family room to bedroom, dd 1 bathroom, media room & wet bar, relocated washer/dryer at 1/f. amend to 201908290173 for additional wrk | $90,000 |
| Oct 3, 2020 | Completed final sign-off Mar 2021 | 2130 Harrison St | rebuild (e) roof decks & walkways, guardrails, gate & lighting in-kind.Details
rebuild (e) roof decks & walkways, guardrails, gate & lighting in-kind. | $50,000 |
| Oct 2, 2020 | Completed final sign-off Jan 2021 | 247 El Camino Del Mar | replace (e) floating roof deck and railing with t-rex boards & railing.Details
replace (e) floating roof deck and railing with t-rex boards & railing. | $15,000 |
| Jun 19, 2020 | Completed final sign-off Sep 2020 | 1159 Green St | remodel bathroom in-kind, replace lightwell window not street facing, plumbing, elec, showerpanDetails
remodel bathroom in-kind, replace lightwell window not street facing, plumbing, elec, showerpan | $5,000 |
| Jun 18, 2020 | Expired or cancelled cancelled Jan 2026 | 247 El Camino Del Mar | demo and dispose old wood boards from the roofdeck. demo permit only.Details
demo and dispose old wood boards from the roofdeck. demo permit only. | $2,000 |
| Feb 21, 2020 | Completed final sign-off Mar 2020 | 6218 03rd St | to comply with n.o.v 202018441: remove/repair front dryrot/damage stucco . all work in kind.Details
to comply with n.o.v 202018441: remove/repair front dryrot/damage stucco . all work in kind. | $10,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 375 09th St | title 24 for permit 2019-1122-8005. should be an addition to original permitDetails
title 24 for permit 2019-1122-8005. should be an addition to original permit | |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 90 Joost Av | remodeling bathroom. upgrade electrica & plumbing new tub, wc, van9ity, cabinet.Details
remodeling bathroom. upgrade electrica & plumbing new tub, wc, van9ity, cabinet. | $8,500 |
| Nov 22, 2019 | Completed final sign-off Jun 2020 | 375 09th St | interior fill out of existing building into a pottery and wood turning studio. renovations include addition of an ada bathroom, additional lights/outlets, leveling floor, and additional sinksDetails
interior fill out of existing building into a pottery and wood turning studio. renovations include addition of an ada bathroom, additional lights/outlets, leveling floor, and additional sinks | $73,300 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 2406 Polk St | g/f -change of use, hvac & plumbing work. from stationary store /retail to nail salon/ service.Details
g/f -change of use, hvac & plumbing work. from stationary store /retail to nail salon/ service. | $5,000 |
| Nov 5, 2019 | Completed final sign-off Feb 2020 | 240 Lombard St | unit #434: kitchen and bathroom remodel. replace tub with shower pan, upgrade electrical, replace kitchen cabinets, upgrade electrical and plumbing, change lightsin the kitchen to led.Details
unit #434: kitchen and bathroom remodel. replace tub with shower pan, upgrade electrical, replace kitchen cabinets, upgrade electrical and plumbing, change lightsin the kitchen to led. | $20,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2021 | 2406 Polk St | accessible barrier removal including addition of bathroom and alteration to front entry to comply with abe program per ordinance 51-16.Details
accessible barrier removal including addition of bathroom and alteration to front entry to comply with abe program per ordinance 51-16. | $5,000 |
| Aug 27, 2019 | Completed final sign-off Nov 2019 | 1947 45th Av | replace wood siding at the back of the house with hardi cement siding, waterproof, not visible from the street, 600sf.Details
replace wood siding at the back of the house with hardi cement siding, waterproof, not visible from the street, 600sf. | $5,000 |
| Jul 17, 2019 | Completed final sign-off Sep 2019 | 1315 Sacramento St | remove old wood shingles at east light well. install cement siding on top of old redwood siding. replace 15 windows in light well and at the back yard. dry rot repairsDetails
remove old wood shingles at east light well. install cement siding on top of old redwood siding. replace 15 windows in light well and at the back yard. dry rot repairs | $10,000 |
| Feb 25, 2019 | Completed final sign-off Apr 2019 | 530 Waller St | replace cabinet + sinks kitchen, upgrade electrical and plumbing.Details
replace cabinet + sinks kitchen, upgrade electrical and plumbing. | $10,000 |
| Oct 5, 2018 | Never finaled issued Feb 2019, no final | 215 Baden St | add a full bath of first floor. the slab will be loweredDetails
add a full bath of first floor. the slab will be lowered | $60,000 |
| Oct 3, 2018 | Completed final sign-off Nov 2019 | 1947 45th Av | build deck and stairs at rear. replacing concrete slab at rear. replacing second story rear windows with sliding doors.Details
build deck and stairs at rear. replacing concrete slab at rear. replacing second story rear windows with sliding doors. | $20,000 |
| Sep 13, 2018 | Completed final sign-off Oct 2018 | 276 12th Av | repair replce 6 ft e dryrot studwall and siding at southwest corner front, reframing e front bay window supportDetails
repair replce 6 ft e dryrot studwall and siding at southwest corner front, reframing e front bay window support | $20,000 |
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 276 12th Av | repair dry rot at the building corner, in kind stucco repair at the front the front of the bldg. not removing any architectural features to match google photo 2017. siding at southern wall approx 200 sq ft each. replace in kind.Details
repair dry rot at the building corner, in kind stucco repair at the front the front of the bldg. not removing any architectural features to match google photo 2017. siding at southern wall approx 200 sq ft each. replace in kind. | $30,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 190 Castro St | unit 2: remodel 1 bathroom in-kind.Details
unit 2: remodel 1 bathroom in-kind. | $15,000 |
| Jul 2, 2018 | Completed final sign-off Sep 2018 | 190 Castro St | unit 3: remodel 1 bathroom & 1 kitchen in-kind.no walls moved. no change in (e) floor plan.Details
unit 3: remodel 1 bathroom & 1 kitchen in-kind.no walls moved. no change in (e) floor plan. | $40,000 |
| Jun 19, 2018 | Completed final sign-off Dec 2018 | 3191 Mission St | change of use from (e) framery (picture frame shop) to (n) body art (tattoo) shop. new accessible restroom. new lighting throughout.Details
change of use from (e) framery (picture frame shop) to (n) body art (tattoo) shop. new accessible restroom. new lighting throughout. | $40,000 |
| Jun 11, 2018 | Expired or cancelled withdrawn Aug 2018 | 1229 Vallejo St | unit a - remove (e) kitchen and convert (e) storage space into kitchenDetails
unit a - remove (e) kitchen and convert (e) storage space into kitchen | $20,000 |
| Apr 17, 2018 | Completed final sign-off Jul 2018 | 2912 Fillmore St | remodel bathroom in kind. no wall moving, no alteration of wall, window and door.Details
remodel bathroom in kind. no wall moving, no alteration of wall, window and door. | $12,000 |
| Mar 2, 2018 | Completed final sign-off Jun 2018 | 718 Joost Av | add 1/2 plywood inside the house all around exterior wall& install insulation inside the house. rebuilt (e) deck with staircase at rear of building (size approx 13'-0" x 5--0")Details
add 1/2 plywood inside the house all around exterior wall& install insulation inside the house. rebuilt (e) deck with staircase at rear of building (size approx 13'-0" x 5--0") | $20,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2018 | 1229 Vallejo St | ground floor horizontal fill in. remove 3 fire places on 2,3,4 floors, at family rooms. structural strengthening. (n) storage spaces in (e) garage.Details
ground floor horizontal fill in. remove 3 fire places on 2,3,4 floors, at family rooms. structural strengthening. (n) storage spaces in (e) garage. | $60,000 |
| Feb 1, 2018 | Completed final sign-off Feb 2018 | 718 Joost Av | rev to pa 201604225494 to comply with nov:201566534 items 8 & 9: replace (e) wood stairs at front with 60" wide stairs;Details
rev to pa 201604225494 to comply with nov:201566534 items 8 & 9: replace (e) wood stairs at front with 60" wide stairs; | $4,500 |
| Jan 29, 2018 | Completed final sign-off Feb 2018 | 718 Joost Av | reroofing.Details
reroofing. | $14,000 |
| Jan 24, 2018 | Completed final sign-off May 2018 | 1229 Vallejo St | replace stairs at the rear backyard in kind. trex hand rails.Details
replace stairs at the rear backyard in kind. trex hand rails. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Feb 2018 | 718 Joost Av | to replace three existing wood windows at the front facade (upper level) with new aluminum clad wood windows to match in size, location, and operation. og lugs to be replicated. complies w complaint 201567442, 201566534Details
to replace three existing wood windows at the front facade (upper level) with new aluminum clad wood windows to match in size, location, and operation. og lugs to be replicated. complies w complaint 201567442, 201566534 | $1,500 |
| Aug 16, 2017 | Completed final sign-off May 2019 | 2350 Market St | supplemental permit to pa#201602048876 to clarify the actual scope of work as described on plan. revision to pa #201602048876 for there is no need to install the sprinkler system throughout building as it is "not code required".Details
supplemental permit to pa#201602048876 to clarify the actual scope of work as described on plan. revision to pa #201602048876 for there is no need to install the sprinkler system throughout building as it is "not code required". | |
| Aug 9, 2017 | Completed final sign-off Oct 2017 | 3631 19th St | revision to pa #201707172038 - replace siding and 6 windows at rear west building elevation; same size same location, u=0.32 max. no other work.Details
revision to pa #201707172038 - replace siding and 6 windows at rear west building elevation; same size same location, u=0.32 max. no other work. | $30,000 |
| Aug 8, 2017 | Completed final sign-off May 2019 | 2350 Market St | revision to building permit # 201602048876. - previously proposed double hung wood windows on front facade to be single hung aluminum clad wood windows with ogee lugs. - previously proposed double hung wood windows to be aluminum casement and awning windows not visible from front streetDetails
revision to building permit # 201602048876. - previously proposed double hung wood windows on front facade to be single hung aluminum clad wood windows with ogee lugs. - previously proposed double hung wood windows to be aluminum casement and awning windows not visible from front street | |
| Jul 17, 2017 | Completed final sign-off Oct 2017 | 3631 19th St | replace siding at rear of building south elevation only. replace 24 windows at rear of building. not visible from street. min. u factor = 0.32. n/a maherDetails
replace siding at rear of building south elevation only. replace 24 windows at rear of building. not visible from street. min. u factor = 0.32. n/a maher | $10,000 |
| Jul 13, 2017 | Completed final sign-off Dec 2017 | 55 Exeter St | kitchen & bathroom remodel. add new stairs to garage.Details
kitchen & bathroom remodel. add new stairs to garage. | $50,000 |
| Jul 3, 2017 | Completed final sign-off Jul 2017 | 435 Vermont St | repair dry rotted wood on the deck. replace dry rotter joist and 2 beams. put trex 1 x 6 on top. rear of house. repair in kind.Details
repair dry rotted wood on the deck. replace dry rotter joist and 2 beams. put trex 1 x 6 on top. rear of house. repair in kind. | $5,000 |
| Jun 26, 2017 | Expired or cancelled cancelled Jul 2017 | 435 Vermont St | repair dryrotted wood on the deck. replace 2x6 floor with trex, upgrade reils @ rear of the house. repair in kind <50%.Details
repair dryrotted wood on the deck. replace 2x6 floor with trex, upgrade reils @ rear of the house. repair in kind <50%. | $5,000 |
| May 25, 2017 | Completed final sign-off Jun 2017 | 1631 Beach St | repair dry rot on the back stairs. no more than 10% repair. all repair work in-kind.Details
repair dry rot on the back stairs. no more than 10% repair. all repair work in-kind. | $3,000 |
| Apr 28, 2017 | Completed final sign-off Jun 2018 | 718 Joost Av | remodel interior 1 bath, kitchen, 1 bedroom, 1 dining rm & 1 living room. repair missing drywall. repair doors, windows if needed not visible from street. repair & update electrical & plumbing.Details
remodel interior 1 bath, kitchen, 1 bedroom, 1 dining rm & 1 living room. repair missing drywall. repair doors, windows if needed not visible from street. repair & update electrical & plumbing. | $40,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2018 | 718 Joost Av | replace siding on the front and side with hardie siding. replace 3 side windows in-kind with aluminum wood clad. comply with dbi complaint 201566534 item #4 and #9.Details
replace siding on the front and side with hardie siding. replace 3 side windows in-kind with aluminum wood clad. comply with dbi complaint 201566534 item #4 and #9. | $8,000 |
| Apr 11, 2017 | Completed final sign-off Oct 2017 | 300 03rd St | remodel kitchen & bathroom in-kind. n/a for maher.Details
remodel kitchen & bathroom in-kind. n/a for maher. | $30,000 |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 2188 15th St | remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093Details
remodel of extg bathroom and washer and dryer. extension of extg wall to property line in lightwell. addition of new plumbing fixtures and finishes. structural work. replace an overhead (dryrot) beam between (e) kitchen & dining room in kind. revision to pa#201609289093 | $20,000 |
| Nov 14, 2016 | Completed final sign-off Nov 2016 | 1629 Beach St | repair exterior stairs, remove trash shoot. stair is at the rear of the building, less than 50% repair. not visible from street.Details
repair exterior stairs, remove trash shoot. stair is at the rear of the building, less than 50% repair. not visible from street. | $5,000 |
| Oct 7, 2016 | Completed final sign-off Apr 2017 | 744 29th Av | improve ground floor area to include adding a bedroom, den and full bathroom.Details
improve ground floor area to include adding a bedroom, den and full bathroom. | $50,000 |
| Sep 21, 2016 | Completed final sign-off Aug 2017 | 1607 Howard St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story being performed on only residential building. there are two buildings on this lot. n/a maher ordinanceDetails
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story being performed on only residential building. there are two buildings on this lot. n/a maher ordinance | $60,000 |
| Aug 31, 2016 | Completed final sign-off Nov 2016 | 305 Los Palmos Dr | remodel kitchen in kind, upgrade electrical & plumbing, new cabinets, led lights for living & dining room. no walls to be alteredDetails
remodel kitchen in kind, upgrade electrical & plumbing, new cabinets, led lights for living & dining room. no walls to be altered | $10,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 1273 Mcallister St | remodel to (e) kitchen and bathroom. fixtures relocated in kitchen, new doors, new finishes, new outlets and kitchen task lighting. no structural work. all work located on second floor.Details
remodel to (e) kitchen and bathroom. fixtures relocated in kitchen, new doors, new finishes, new outlets and kitchen task lighting. no structural work. all work located on second floor. | $24,000 |
| Jul 8, 2016 | Completed final sign-off Aug 2016 | 19 Roscoe St | remove old vinyl siding at the back of the house. check for dry rot. new insulation, paper, cedar wood siding approx. 500 sq. ft.Details
remove old vinyl siding at the back of the house. check for dry rot. new insulation, paper, cedar wood siding approx. 500 sq. ft. | $5,000 |
| Jul 6, 2016 | Completed final sign-off May 2019 | 2350 Market St | remove drywall to explore structural framing for evaluation dispose.Details
remove drywall to explore structural framing for evaluation dispose. | $7,500 |
| Apr 28, 2016 | Completed final sign-off Aug 2016 | 97 Anderson St | replace cedar siding on the west and south sides of home. rebuild concrete planter boxes. new concrete driveway and walkway. less than 200 square feet. the new siding will be cedar shingle to match existing.Details
replace cedar siding on the west and south sides of home. rebuild concrete planter boxes. new concrete driveway and walkway. less than 200 square feet. the new siding will be cedar shingle to match existing. | $10,000 |
| Apr 22, 2016 | Completed final sign-off Jun 2018 | 718 Joost Av | this project is to replace existing stairs at front comply with complaint 201566534, ces 201567442Details
this project is to replace existing stairs at front comply with complaint 201566534, ces 201567442 | $800 |
| Feb 4, 2016 | Completed final sign-off Aug 2019 | 2350 Market St | extension of upper residential unit on the westside. updating commercial space & leveling storefront ceiling. updating kitchen & bathrooms.Details
extension of upper residential unit on the westside. updating commercial space & leveling storefront ceiling. updating kitchen & bathrooms. | $200,000 |
| Feb 4, 2016 | Completed final sign-off Jul 2016 | 1422 Thomas Av | proposed remodel existing kitchen in kind on 2nd floor. add a new office & a new 1/2 bathroom on the existing attic area. rebuild existing damaged stairs at rear deck, interior stair replace 8 (e) windowsDetails
proposed remodel existing kitchen in kind on 2nd floor. add a new office & a new 1/2 bathroom on the existing attic area. rebuild existing damaged stairs at rear deck, interior stair replace 8 (e) windows | $80,000 |
| Dec 30, 2015 | Completed final sign-off Jan 2016 | 743 Ellsworth St | remove illegal kitchen in garage; convert to storage; comply with nov 201567581Details
remove illegal kitchen in garage; convert to storage; comply with nov 201567581 | |
| Dec 18, 2015 | Never finaled issued Dec 2015, no final | 1466 Revere Av | remodel existing bathroom in kind.Details
remodel existing bathroom in kind. | $10,000 |
| Dec 8, 2015 | Completed final sign-off Jan 2016 | 637 Powell St | #201- to complete work and obtain finalinspection for work approved uner pa# 201312063513Details
#201- to complete work and obtain finalinspection for work approved uner pa# 201312063513 | $12,000 |
| Oct 30, 2015 | Completed final sign-off Apr 2019 | 200 12th St | nov 20140761 resolution. legalize unpermitted kitchen, legalize added shower. remove selected added partitions to restore unit as nuch as feasible to its previous permitted condition. n/a for maher ordinance 155-13.Details
nov 20140761 resolution. legalize unpermitted kitchen, legalize added shower. remove selected added partitions to restore unit as nuch as feasible to its previous permitted condition. n/a for maher ordinance 155-13. | $50,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 2642 40th Av | revision to 201503160993 to delete incorrect drawn window on groudn floor. convert ground floor bedroom - 4 to home office.Details
revision to 201503160993 to delete incorrect drawn window on groudn floor. convert ground floor bedroom - 4 to home office. | |
| Sep 22, 2015 | Completed final sign-off Jan 2016 | 743 Ellsworth St | bathroom remodel. replace tub with shower pan, upgrade electrical & plumbing. to comply with nov 2015 67581Details
bathroom remodel. replace tub with shower pan, upgrade electrical & plumbing. to comply with nov 2015 67581 | $9,000 |
| Sep 4, 2015 | Expired or cancelled cancelled Jan 2026 | 1466 Revere Av | remodel 2nd flr - add new joist to (e) 2x6 @ 32" oc with 2x10 @ 16" oc roof. proposed new bay window at rear/left side of (e) bld. enclose area under (e) room above to create exercise roomDetails
remodel 2nd flr - add new joist to (e) 2x6 @ 32" oc with 2x10 @ 16" oc roof. proposed new bay window at rear/left side of (e) bld. enclose area under (e) room above to create exercise room | $30,000 |
| Sep 3, 2015 | Completed final sign-off Jan 2016 | 743 Ellsworth St | replace kitchen cabinets, upgrade plumbing & electrical. new electrical panel. comply with nov# 201567581Details
replace kitchen cabinets, upgrade plumbing & electrical. new electrical panel. comply with nov# 201567581 | $6,000 |
| Jul 31, 2015 | Completed final sign-off Dec 2015 | 460 Ellis St | additional plans for title 24 for lighting for 201505196703. n/a maher ord. # 155-13Details
additional plans for title 24 for lighting for 201505196703. n/a maher ord. # 155-13 | $250 |
| Jun 15, 2015 | Expired or cancelled expired Jun 2021 | 2306 Castro St | revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchenDetails
revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchen | $70,000 |
| May 22, 2015 | Never finaled issued Jun 2015, no final | 47 Panorama Dr | reomdel existing bathroom in kind, (n) exhaust fan replacement. replace one damaged window on first floor in front to match existing aluminum window in kind, max. u-factor 0.32Details
reomdel existing bathroom in kind, (n) exhaust fan replacement. replace one damaged window on first floor in front to match existing aluminum window in kind, max. u-factor 0.32 | $9,000 |
| May 19, 2015 | Completed final sign-off Dec 2015 | 460 Ellis St | demo of ground floor office partitions and restroom construction of new walls and new accessible restroom. n/a for the maher.Details
demo of ground floor office partitions and restroom construction of new walls and new accessible restroom. n/a for the maher. | $40,000 |
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 2642 40th Av | prep for bpa#201503120611, exploratory work to investigate foundation & prepare for new footings, 18" max dp @ rear yard. demo of potions of concrete slab & prep for rebar installationDetails
prep for bpa#201503120611, exploratory work to investigate foundation & prepare for new footings, 18" max dp @ rear yard. demo of potions of concrete slab & prep for rebar installation | $3,000 |
| Mar 13, 2015 | Completed final sign-off Apr 2015 | 2 Shawnee Av | dry rot water damage repair at the corner of the house and around windowDetails
dry rot water damage repair at the corner of the house and around window | $6,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 2642 40th Av | demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades.Details
demo of ground floor walls + slab portions. construction of ground floor bedroom, full bath & rec. room, construction of 215 sq ft of new ground flr area under exist extension as a fam room. ground floor apppliance & fixture upgrades. | $90,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2015 | 733 Front St | removing closet, buuilding office/den; maher n/aDetails
removing closet, buuilding office/den; maher n/a | $7,000 |
| Dec 18, 2014 | Completed final sign-off Sep 2015 | 63 Topaz Wy | renovate kitchen, relocate bathroom, renovate full bath to full bath, new partition & door at family room.Details
renovate kitchen, relocate bathroom, renovate full bath to full bath, new partition & door at family room. | $40,000 |
| Sep 9, 2014 | Completed final sign-off Nov 2014 | 221 Lake St | bathroom remodel in same kind, remove finishes in bedroom, insulation, drywall, new lighting, new gas line.Details
bathroom remodel in same kind, remove finishes in bedroom, insulation, drywall, new lighting, new gas line. | $20,000 |
| Jul 22, 2014 | Completed final sign-off Aug 2014 | 116 Divisadero St | new permit to accompany/revision to 201407070549 for kitchen remodel. new beam at 10' long wall opening at kitchen.Details
new permit to accompany/revision to 201407070549 for kitchen remodel. new beam at 10' long wall opening at kitchen. | $1,500 |
| Jul 7, 2014 | Completed final sign-off Aug 2014 | 116 Divisadero St | remodel kitchen -for this unity only. plumbing & electrical upgrade, new electrical panel. no change on walls - no change to doors or windows.Details
remodel kitchen -for this unity only. plumbing & electrical upgrade, new electrical panel. no change on walls - no change to doors or windows. | $13,000 |
| Jul 3, 2014 | Never finaled issued Jul 2014, no final | 331 Collingwood St | plywood roofDetails
plywood roof | $8,500 |
| Jun 25, 2014 | Completed final sign-off Jul 2014 | 331 Collingwood St | reroofingDetails
reroofing | $8,500 |
| Apr 11, 2014 | Completed final sign-off Jun 2014 | 1826 45th Av | revision to 201404092822 additional dry rot, replace garage header, front entry header 2x8 balcony joist. no balcony. replace in kind.Details
revision to 201404092822 additional dry rot, replace garage header, front entry header 2x8 balcony joist. no balcony. replace in kind. | $3,400 |
| Apr 9, 2014 | Completed final sign-off Jun 2014 | 1826 45th Av | dry rot repair, replace 2 windows, new stucco at the front. milgard fiber glass windows. repair stucco in kind.window replacement in kind u factor shall not exceed .rDetails
dry rot repair, replace 2 windows, new stucco at the front. milgard fiber glass windows. repair stucco in kind.window replacement in kind u factor shall not exceed .r | $13,400 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 75 Glover St | revision to 201311262895, change of 1 shear wall for structural strengtheningDetails
revision to 201311262895, change of 1 shear wall for structural strengthening | |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 1145 Pine St | unit #43: kitchen and bathroom remodel, replace in kindDetails
unit #43: kitchen and bathroom remodel, replace in kind | $10,000 |
| Dec 6, 2013 | Expired or cancelled expired Jan 2016 | 637 Powell St | kitchen remodel, master bathroom remodel, new electrical wiring. lighting to comply with cec 150 (k)Details
kitchen remodel, master bathroom remodel, new electrical wiring. lighting to comply with cec 150 (k) | $20,000 |
| Nov 26, 2013 | Completed final sign-off Feb 2014 | 75 Glover St | work consists of voluntary seismic strenghtening of basement level of a 3 story 3 flats building. replacement of rotten post & footing.Details
work consists of voluntary seismic strenghtening of basement level of a 3 story 3 flats building. replacement of rotten post & footing. | $18,000 |