Dominic Shek-Ning Chu
- Listed as
- architect, designer, engineer
- Firm
- Consulting Struc. Engr.
- Based in
- San Mateo
- On San Francisco permits
- Aug 2006 to Oct 2026
45 permits since 2000 (engineer on 41 permits, architect on 3 permits, designer on 1 permit): 38 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 75 Santa Ana Av | Del Rio Stone Dba: Del Rio Stone Constr. | kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room.Details
kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. | $180,000 |
| Mar 11, 2026 | Completed final sign-off Jun 2026 | 245 South Hill Bl | Jean Design Build Inc | revision - 202511250460- voluntary seismic retrofit in accordance with chapter a3 per the engineered plan.Details
revision - 202511250460- voluntary seismic retrofit in accordance with chapter a3 per the engineered plan. | |
| Jan 22, 2026 | Completed final sign-off Apr 2026 | 3527 21st St | Peace Of Mind Structural Inc | voluntary strengthening by adding plywood, bolts, clips and hold-downs to upper and lower crawlspace levels. add a retaining wall to the front foundation at upper crawlspace.Details
voluntary strengthening by adding plywood, bolts, clips and hold-downs to upper and lower crawlspace levels. add a retaining wall to the front foundation at upper crawlspace. | $49,850 |
| Oct 31, 2025 | Completed final sign-off Sep 2026 | 11 Mars St | Umlaut Interiors Llc | revision to pa # 2024-1115-5113: at (e) 3rd fl door/window openings, remove and replace (e) structural posts & beams with new. replace (e) roof-supporting beam. replace (e) window headers. alter ceiling framing to accomodate new kitchen vent- see structural drawingsDetails
revision to pa # 2024-1115-5113: at (e) 3rd fl door/window openings, remove and replace (e) structural posts & beams with new. replace (e) roof-supporting beam. replace (e) window headers. alter ceiling framing to accomodate new kitchen vent- see structural drawings | $4,200 |
| Aug 19, 2025 | Completed final sign-off Apr 2026 | 1640 Florida St | Peace Of Mind Structural Inc | revision to permit 202401103736. foundation and voluntary strengthing per engineered plans.Details
revision to permit 202401103736. foundation and voluntary strengthing per engineered plans. | $60,000 |
| Jun 28, 2024 | Completed final sign-off Feb 2025 | 324 Holyoke St | Peace Of Mind Structural Inc | 1. replace the creacked portion of stem wall of footing with new cap for improvement. 2. add plywood clips, bolts & sill plate connector to rear wall of garage for voluntary seismic improvement.Details
1. replace the creacked portion of stem wall of footing with new cap for improvement. 2. add plywood clips, bolts & sill plate connector to rear wall of garage for voluntary seismic improvement. | $18,900 |
| Jul 3, 2023 | Completed final sign-off Sep 2025 | 11 Mars St | add plywood clips bolts & sill plate conncector to cripple wall @ crawl space for voluntary seismic improvement. add stong walls below bedroom & sun rm for voluntary seismic improvementDetails
add plywood clips bolts & sill plate conncector to cripple wall @ crawl space for voluntary seismic improvement. add stong walls below bedroom & sun rm for voluntary seismic improvement | $50,000 | |
| May 18, 2023 | Completed final sign-off Apr 2024 | 61 Divisadero St | Lewis M Merlo Inc | improvement to (e) retaining wallDetails
improvement to (e) retaining wall | $100,000 |
| Mar 1, 2023 | Completed final sign-off Mar 2023 | 238 Staples Av | Mountain Ridge Construction | revision 202302081647 installation of dowells in e concreteDetails
revision 202302081647 installation of dowells in e concrete | |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 40 Villa Tr | Gil Construction & Assoc Inc. | reinforce the (e) garden wall with new 8" concrete for voluntary improvement.Details
reinforce the (e) garden wall with new 8" concrete for voluntary improvement. | $7,000 |
| Sep 27, 2022 | Never finaled issued Oct 2022, no final | 1657 Mason St | interior non-bearing alterations to an existing 2-unit dwelling. work includes complete electrical, finishes, fixtures, hvac, proposed roof deck and safety railings at the roof. including structural improvements. no work to exterior, no additional units. no increase in height.Details
interior non-bearing alterations to an existing 2-unit dwelling. work includes complete electrical, finishes, fixtures, hvac, proposed roof deck and safety railings at the roof. including structural improvements. no work to exterior, no additional units. no increase in height. | $350,000 | |
| Mar 11, 2021 | Never finaled issued Mar 2023, no final | 110 Hernandez Av | Gilman Screens And Kitchens | remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program)Details
remodel master bath. reconfigure (e) 2-car garage & lower level to 1-car garage with in-law bedroom, kitchen & bathroom. window to become door/(n) window @ kitchen, add (n) window/change 2-car garage door to single (state adu program) | $300,000 |
| Nov 18, 2020 | Completed final sign-off Mar 2021 | 790 41st Av | Agape Construction | remove and replace garage door header. r/r (e) stucco to match existing in-kind.Details
remove and replace garage door header. r/r (e) stucco to match existing in-kind. | $14,000 |
| Oct 21, 2019 | Completed final sign-off Dec 2019 | 130 Yerba Buena Av | Connor Daly Corporation | voluntary seismic upgrade. remove partition wall in kitchen.Details
voluntary seismic upgrade. remove partition wall in kitchen. | $10,000 |
| Jan 8, 2019 | Completed final sign-off Oct 2019 | 599 Chenery St | Gilman Screens And Kitchens | remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchenDetails
remodel of kitchen, enlarge opening btwn kitchen & office. replace office & kitchen window for bay window, add 2 footings & 2 posts to reinforce structure, replace master bath vanity, refinish (e) hardwood floor, new flooring at kitchen | $150,000 |
| Nov 7, 2018 | Completed final sign-off Sep 2019 | 202 Clement St | K A Lau Construction | voluntary structural strengthening of (e) stair for proposed ti (ti under sep. permit #201810021998)Details
voluntary structural strengthening of (e) stair for proposed ti (ti under sep. permit #201810021998) | $5,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 2155 Union St | Blue Bay Painting Contractor | revision to 201809049021. drain 3rd fl balcony - outlet were moved due to dry rot. plumbing - install new drain box. improvement for rotten beam - reinforce with steel beam at top floor roof deck.Details
revision to 201809049021. drain 3rd fl balcony - outlet were moved due to dry rot. plumbing - install new drain box. improvement for rotten beam - reinforce with steel beam at top floor roof deck. | $30,000 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 750 11th Av | Agape Construction | voluntary strenthening upgrade - new plywoods and anchor boltsDetails
voluntary strenthening upgrade - new plywoods and anchor bolts | $12,000 |
| Apr 18, 2018 | Completed final sign-off Nov 2018 | 67 Delmar St | add simpson strong frame at kitchen for voluntary seismic strenghteningDetails
add simpson strong frame at kitchen for voluntary seismic strenghtening | $30,000 | |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 27 Pond St | Soil Engineering Construction | adding plywood to the walls at basement for voluntary improvementDetails
adding plywood to the walls at basement for voluntary improvement | $16,260 |
| Oct 19, 2017 | Completed final sign-off Nov 2017 | 575 Spruce St | Amarotico Construction Co | voluntary local improvement consisting approx 12' long wall in garage.Details
voluntary local improvement consisting approx 12' long wall in garage. | $7,000 |
| Sep 13, 2017 | Expired or cancelled expired May 2023 | 191 05th Av | Tec Construction Inc | commercial. soft story retrofit on ground floor for sfebc chaper 4d, 2016 cebc appendix a-4. no exterior work.Details
commercial. soft story retrofit on ground floor for sfebc chaper 4d, 2016 cebc appendix a-4. no exterior work. | $10,000 |
| Sep 13, 2017 | Expired or cancelled expired May 2023 | 191 05th Av | Tec Construction Inc | residential. soft story retrofit for sfebc chaper 4d, 2016 cebc appendix a-4. no exterior work.Details
residential. soft story retrofit for sfebc chaper 4d, 2016 cebc appendix a-4. no exterior work. | $30,000 |
| Aug 31, 2017 | Completed final sign-off Aug 2018 | 251 Lincoln Wy | soft story seismic retrofitDetails
soft story seismic retrofit | $10,000 | |
| Aug 11, 2017 | Completed final sign-off Jul 2020 | 191 05th Av | Tec Construction Inc | to comply with nov 201767822, fire damage repairs to unit #1 - kitchen, hallway & bathroom; unit 3 - kitchen; unit 5 - kitchen walls (two 5' walls) only and ceiling repairDetails
to comply with nov 201767822, fire damage repairs to unit #1 - kitchen, hallway & bathroom; unit 3 - kitchen; unit 5 - kitchen walls (two 5' walls) only and ceiling repair | $75,000 |
| Apr 20, 2017 | Completed final sign-off May 2019 | 1251 20th Av | Bai Construction | mandatory soft story retrofit per sfebc hcapter 4d, 2016 cebc appendix a-4.Details
mandatory soft story retrofit per sfebc hcapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Oct 6, 2016 | Expired or cancelled expired Dec 2023 | 63 Diamond St | Phoenix Construction | soft story retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4. | $30,000 |
| Oct 4, 2016 | Completed final sign-off Feb 2017 | 3110 Laguna St | Olive Construction Corp | soft story seismic retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story seismic retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4. | $28,000 |
| Sep 20, 2016 | Completed final sign-off Apr 2017 | 1380 48th Av | Sincere Construction Company Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $45,000 |
| Aug 22, 2016 | Completed final sign-off Feb 2017 | 1961 Clay St | Olive Construction Corp | revision to pa #201603031092 - clarification detail to existing condition.Details
revision to pa #201603031092 - clarification detail to existing condition. | |
| Jul 28, 2016 | Completed final sign-off Feb 2017 | 479 Fair Oaks St | Rodi Construction Inc | soft story seismic retrofit program per sfbc ch 34b using 212 iebc appendix a-4.Details
soft story seismic retrofit program per sfbc ch 34b using 212 iebc appendix a-4. | $65,000 |
| Jul 19, 2016 | Completed final sign-off Feb 2017 | 1961 Clay St | Olive Construction Corp | exterior alteration to front entry facade ref to permit #2016-0303-1092 for soft story seismic retrofitDetails
exterior alteration to front entry facade ref to permit #2016-0303-1092 for soft story seismic retrofit | $100 |
| Jul 14, 2016 | Completed final sign-off Aug 2017 | 1780 Mcallister St | Steelcore Builders Inc | mandatory soft story seismic ordinance 2012 iebc appendix a4. steel moment frames at ground level, plywood shear walls.Details
mandatory soft story seismic ordinance 2012 iebc appendix a4. steel moment frames at ground level, plywood shear walls. | $55,000 |
| Mar 16, 2016 | Completed final sign-off Sep 2016 | 69 Henry St | Agape Construction | soft story retrofit per sfbc chapter 34b engineering criteria to add 3 moment frames. 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria to add 3 moment frames. 2012 iebc appendix a-4 | $60,000 |
| Apr 30, 2015 | Completed final sign-off Oct 2015 | 1565 Green St | U A Construction | soft story wood frame seismic retrofit per sfbc chapter 34b - other rational design; app a4??Details
soft story wood frame seismic retrofit per sfbc chapter 34b - other rational design; app a4?? | $55,000 |
| Oct 14, 2014 | Completed final sign-off Jan 2015 | 101 Sutro Heights Av | Agape Construction | seismic retrofit for soft level. add straps, hold downs, sds screws, clips, plywood, gypsum board, blocking and anchor bolts.Details
seismic retrofit for soft level. add straps, hold downs, sds screws, clips, plywood, gypsum board, blocking and anchor bolts. | $45,000 |
| Aug 1, 2014 | Completed final sign-off Jun 2015 | 2023 46th Av | Amarotico Construction Co | convert extg ground floor room to bedroom suite with new full bathroom.Details
convert extg ground floor room to bedroom suite with new full bathroom. | $40,000 |
| Nov 6, 2013 | Completed final sign-off Feb 2014 | 321 Rutledge St | Strong Builders Construction Inc. | to comply with nov #200004201 - remove trtaining wall on site. create retqining wall & drainage for backyard.Details
to comply with nov #200004201 - remove trtaining wall on site. create retqining wall & drainage for backyard. | $24,000 |
| Oct 3, 2013 | Completed final sign-off Nov 2013 | 99 Brentwood Av | Behan Construction | add 4 piers on exterior of foundation wall, add 4 concrete pads under interior posts connecting all together with grade beam concrete. work to be done in garage to make storage room.Details
add 4 piers on exterior of foundation wall, add 4 concrete pads under interior posts connecting all together with grade beam concrete. work to be done in garage to make storage room. | $5,000 |
| Sep 20, 2013 | Completed final sign-off Nov 2013 | 224 Ordway St | Peace Of Mind Structural Inc | install simpson titen hd anchors, install plywood to cripple walls, install a new concrete footing in crawlspace. plywood strengthening under this permit.Details
install simpson titen hd anchors, install plywood to cripple walls, install a new concrete footing in crawlspace. plywood strengthening under this permit. | $8,820 |
| Jun 28, 2013 | Completed final sign-off Dec 2013 | 333 Dellbrook Av | G-Max Construction | kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensorDetails
kitchen & bathroom remodel, remove wall between kitchen & living, replace with ceiling beam, kitchen lighting to be high efficacy, bath lighting to be high efficacy or occupancy sensor | $135,000 |
| Apr 3, 2013 | Completed final sign-off Feb 2014 | 1409 Sutter St | provide mech, plumbing & electrical for t/i improvement per app #2013-0129-9034 and to modify occupancy code to read as a-2,b & r-1. fsds required to separate r1 and a2 occupancy in 5a construction. revisions required prior to final. details as per sffd ab 2.05.Details
provide mech, plumbing & electrical for t/i improvement per app #2013-0129-9034 and to modify occupancy code to read as a-2,b & r-1. fsds required to separate r1 and a2 occupancy in 5a construction. revisions required prior to final. details as per sffd ab 2.05. | $150,000 | |
| Oct 26, 2012 | Completed final sign-off Mar 2013 | 299 Douglass St | G-Max Construction | kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural).Details
kitchen & half bathroom remodel, new plumbing & electrical upgrades. widen door way between kitchen & dining room (structural). | $30,000 |
| Jul 12, 2011 | Completed final sign-off Apr 2012 | 4018 19th St | Iman Construction | to comply with nov #200861090 - removal of rotten stairs in rear of bldg and replace with new as per plansDetails
to comply with nov #200861090 - removal of rotten stairs in rear of bldg and replace with new as per plans | $20,000 |
| Aug 11, 2006 | Expired or cancelled expired Jun 2007 | 3636 Webster St | addition of steel moment frame to (e) garage for voluntary improvement in structural frame. no change in wall configuration, no arch work.Details
addition of steel moment frame to (e) garage for voluntary improvement in structural frame. no change in wall configuration, no arch work. | $22,500 |