Phoenix Construction
- Based in
- Novato
- On San Francisco permits
- Apr 2011 to Jun 2022
- Last 24 months
- 0 permits filed
20 permits since 2000: 14 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2022 | Never finaled issued Jun 2022, no final | 1971 32nd Av | repair deck less than 50%. new 3 x 10 pt ledger at connection to building. new 3 x 14 pt stringers at stairs with new 3 x 6 pt treads. replace existing 2 x 6 decking boards with 5/4 x 6 trex. (rear of building). repair in kind, less than 50%.Details
repair deck less than 50%. new 3 x 10 pt ledger at connection to building. new 3 x 14 pt stringers at stairs with new 3 x 6 pt treads. replace existing 2 x 6 decking boards with 5/4 x 6 trex. (rear of building). repair in kind, less than 50%. | $8,400 |
| Sep 11, 2017 | Completed final sign-off Jul 2019 | 2700 Union St | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $70,000 |
| Jul 5, 2017 | Completed final sign-off Jun 2018 | 1940 Sacramento St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. retrofit includes plywood shear walls and simpson strong-tie frame system at the first story. some existing concrete foundations are modified at lateral force resisting system locations.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. retrofit includes plywood shear walls and simpson strong-tie frame system at the first story. some existing concrete foundations are modified at lateral force resisting system locations. | $92,950 |
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 1300 Page St | remodel (e) kitchen in-kind in apt#1. no changes to structure. layout of kitchen to remain the same. no sheetrock removed.Details
remodel (e) kitchen in-kind in apt#1. no changes to structure. layout of kitchen to remain the same. no sheetrock removed. | $10,000 |
| Feb 9, 2017 | Completed final sign-off Jun 2019 | 2411 Octavia St | replacement of damaged retaining wall & stairs at front of building in-kindDetails
replacement of damaged retaining wall & stairs at front of building in-kind | $40,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2017 | 2332 Steiner St | repair dry rot to exterior stairs on south side & north side of bldg., less than 50%, repair in kind. not visable from street.Details
repair dry rot to exterior stairs on south side & north side of bldg., less than 50%, repair in kind. not visable from street. | $12,000 |
| Oct 6, 2016 | Expired or cancelled expired Dec 2023 | 63 Diamond St | soft story retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4. | $30,000 |
| May 4, 2016 | Never finaled issued May 2016, no final | 2043 Ellis St | (8) windows to be replaced. all facing rear yard. same openings, not visible from street. u < 0.32Details
(8) windows to be replaced. all facing rear yard. same openings, not visible from street. u < 0.32 | $4,000 |
| Nov 25, 2015 | Completed final sign-off Dec 2016 | 2332 Steiner St | compliance with soft story retrofit program iebc sec a4 2012Details
compliance with soft story retrofit program iebc sec a4 2012 | $30,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2017 | 98 Cervantes Bl | compliance with mandatory seismic retrofit program 2013 sfbc sec 34b and 2012 iebc appx a-4. ** maher: compliance with ordinance no# 155-13 not required **Details
compliance with mandatory seismic retrofit program 2013 sfbc sec 34b and 2012 iebc appx a-4. ** maher: compliance with ordinance no# 155-13 not required ** | $35,000 |
| Nov 6, 2015 | Completed final sign-off Aug 2016 | 2429 Vallejo St | compliance with mandatory soft story retrofit program, iebc appendix a-4Details
compliance with mandatory soft story retrofit program, iebc appendix a-4 | $40,000 |
| Jul 3, 2015 | Completed final sign-off Aug 2015 | 63 Diamond St | replacing siding at back of building. approx 30ft x 25ft area.Details
replacing siding at back of building. approx 30ft x 25ft area. | $6,000 |
| Jun 26, 2015 | Expired or cancelled cancelled Jul 2015 | 62 Diamond St | replace siding to back of building, approx. 30'x25' area/Details
replace siding to back of building, approx. 30'x25' area/ | $6,000 |
| Feb 25, 2015 | Completed final sign-off Sep 2018 | 2401 Sacramento St | compliance with soft story seismic retrofit program 2013 sfbc sec. 34b and 2012 iebc app. a4Details
compliance with soft story seismic retrofit program 2013 sfbc sec. 34b and 2012 iebc app. a4 | $5,000 |
| Feb 5, 2014 | Completed final sign-off Jun 2014 | 1300 Page St | to obtain a final inspection for work already approved under pa# 201201232731, all work is complete.Details
to obtain a final inspection for work already approved under pa# 201201232731, all work is complete. | |
| Sep 3, 2013 | Completed final sign-off Apr 2014 | 2018 16th Av | 1st & 2nd floor: dry rott repair on front of building. only partial dry rott in front. to comply with markoff report #13635, item 1 only.Details
1st & 2nd floor: dry rott repair on front of building. only partial dry rott in front. to comply with markoff report #13635, item 1 only. | $12,000 |
| Apr 17, 2013 | Completed final sign-off May 2013 | 1959 45th Av | remove stucco as necessary at iradicated area. remove damage and reframe soffit with new material. provide ventilation and restucco area of repair to a reasonable match.Details
remove stucco as necessary at iradicated area. remove damage and reframe soffit with new material. provide ventilation and restucco area of repair to a reasonable match. | $4,800 |
| May 1, 2012 | Completed final sign-off Jun 2012 | 929 Monterey Bl | remove enough stucco to expose all damage, remvoe all damage & reframe, provide proper ventilation & refinish stucco.Details
remove enough stucco to expose all damage, remvoe all damage & reframe, provide proper ventilation & refinish stucco. | $5,200 |
| Jan 23, 2012 | Never finaled issued Feb 2012, no final | 1300 Page St | partial foundation redone, new concrete slab on grade, sheer walls. widen (e) garage door opening.Details
partial foundation redone, new concrete slab on grade, sheer walls. widen (e) garage door opening. | $25,000 |
| Apr 4, 2011 | Completed final sign-off May 2011 | 218 Lisbon St | foundation footings repair. no plywood strengthening work under this permit foundation strengthening work only under this permit.Details
foundation footings repair. no plywood strengthening work under this permit foundation strengthening work only under this permit. | $20,000 |