Agape Construction
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2011 to Nov 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2020 | Completed final sign-off Mar 2021 | 790 41st Av | remove and replace garage door header. r/r (e) stucco to match existing in-kind.Details
remove and replace garage door header. r/r (e) stucco to match existing in-kind. | $14,000 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 750 11th Av | voluntary strenthening upgrade - new plywoods and anchor boltsDetails
voluntary strenthening upgrade - new plywoods and anchor bolts | $12,000 |
| Jul 6, 2017 | Completed final sign-off May 2018 | 231 Frederick St | soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4 | $70,000 |
| Mar 16, 2016 | Completed final sign-off Sep 2016 | 69 Henry St | soft story retrofit per sfbc chapter 34b engineering criteria to add 3 moment frames. 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria to add 3 moment frames. 2012 iebc appendix a-4 | $60,000 |
| Oct 24, 2014 | Completed final sign-off Sep 2015 | 1371 Jackson St | seismic upgrade for soft story as per san francisco building code, chapter 34b, 2012 i e b c appendix 4a design method.Details
seismic upgrade for soft story as per san francisco building code, chapter 34b, 2012 i e b c appendix 4a design method. | $55,000 |
| Oct 15, 2014 | Completed final sign-off Sep 2015 | 1290 Jackson St | seismic upgrade for soft story as per san francisco building code, chapter 34b, appendix a-4 design method.Details
seismic upgrade for soft story as per san francisco building code, chapter 34b, appendix a-4 design method. | $50,000 |
| Oct 14, 2014 | Completed final sign-off Jan 2015 | 101 Sutro Heights Av | seismic retrofit for soft level. add straps, hold downs, sds screws, clips, plywood, gypsum board, blocking and anchor bolts.Details
seismic retrofit for soft level. add straps, hold downs, sds screws, clips, plywood, gypsum board, blocking and anchor bolts. | $45,000 |
| Oct 27, 2011 | Completed final sign-off Nov 2011 | 111 Day St | to comply w/complaint #201075809 structural repair - add steel channel, cut /modify terrel cornice, add flashing.Details
to comply w/complaint #201075809 structural repair - add steel channel, cut /modify terrel cornice, add flashing. | $1,500 |