Soil Engineering Construction
- Based in
- Redwood City
- On San Francisco permits
- May 2002 to Aug 2022
- Last 24 months
- 0 permits filed
46 permits since 2000: 33 completed, 9 never finaled, 4 expired or cancelled.
Of the 9 never-finaled permits, 5 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2022 | Expired or cancelled withdrawn Jul 2024 | 224 Seacliff Av | to comply with nov# 202183822 & planning violation # 2022-001049enf. rockfall hazard mitigation, removal of all non structural elements observed beyond currently presumed property lines. mitigation of hazards presented by previously incorrectly scoped construction permits.Details
to comply with nov# 202183822 & planning violation # 2022-001049enf. rockfall hazard mitigation, removal of all non structural elements observed beyond currently presumed property lines. mitigation of hazards presented by previously incorrectly scoped construction permits. | $150,000 |
| Apr 15, 2022 | Completed final sign-off Oct 2025 | 2143 Wawona St | build retaining wall behind house.Details
build retaining wall behind house. | $80,000 |
| Mar 10, 2022 | Completed final sign-off Sep 2022 | 150 Hampshire St | to comply with nov 202183614, replace existing system and remove debris.Details
to comply with nov 202183614, replace existing system and remove debris. | $45,000 |
| May 26, 2020 | Completed final sign-off Mar 2021 | 1 San Antonio Pl | a rock fall slope netting system with rock anchors installed along the top, middle and bottom edges with 3mm composite cabled wire mesh. to comply with nov2020022932Details
a rock fall slope netting system with rock anchors installed along the top, middle and bottom edges with 3mm composite cabled wire mesh. to comply with nov2020022932 | $100,000 |
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 55 Music Concourse Dr | placement of skystar ferris wheel in golden gate park foundation and super structure includedDetails
placement of skystar ferris wheel in golden gate park foundation and super structure included | $42,000 |
| Jul 17, 2019 | Never finaled issued Oct 2019, no final | 828 Jones St | repair of rear yard retaining wall between 828 jones st. and 766 sutter st. ref pa 201810042324Details
repair of rear yard retaining wall between 828 jones st. and 766 sutter st. ref pa 201810042324 | |
| Oct 4, 2018 | Never finaled issued Oct 2019, no final | 766 Sutter St | repair of yard retaining wall between 828 jones st at 766 sutter st. maher n/aDetails
repair of yard retaining wall between 828 jones st at 766 sutter st. maher n/a | $20,000 |
| Mar 28, 2018 | Never finaled issued Jul 2018, no final | 130 Roosevelt Wy | new soldier pile retaining wallDetails
new soldier pile retaining wall | $75,000 |
| Feb 14, 2018 | Never finaled issued Apr 2018, no final | 250 Laguna Honda Bl | temp shorinf of (e) concrete posts and wood lagging of retaining wall behind (e) preschool. (e) retaining wall is leaning forward. shoring wall is being proposed until site is redeveloped for new afforable housing where na new retaining wall will be built maher naDetails
temp shorinf of (e) concrete posts and wood lagging of retaining wall behind (e) preschool. (e) retaining wall is leaning forward. shoring wall is being proposed until site is redeveloped for new afforable housing where na new retaining wall will be built maher na | $5,900 |
| Nov 10, 2017 | Completed final sign-off Mar 2019 | 239 Green St | to comply with nov 200990310 - rock slope stabilizationDetails
to comply with nov 200990310 - rock slope stabilization | $150,000 |
| Nov 10, 2017 | Completed final sign-off Feb 2019 | 231 Green St | to comply with nov 200990308 - rock slope stabilizationDetails
to comply with nov 200990308 - rock slope stabilization | $50,000 |
| Nov 10, 2017 | Completed final sign-off Mar 2019 | 235 Green St | to comply with nov 200990309 - rock slope stabilizationDetails
to comply with nov 200990309 - rock slope stabilization | $50,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 27 Pond St | adding plywood to the walls at basement for voluntary improvementDetails
adding plywood to the walls at basement for voluntary improvement | $16,260 |
| Jul 31, 2017 | Completed final sign-off Apr 2018 | 933 Girard St | r+r concrete slab. cnstruction of new low retaining walls. bolt home to reinforced foundation and install shearing. install drainage (rainwater-interior) install (4) new windows, at side and rear, not visbile from the st.Details
r+r concrete slab. cnstruction of new low retaining walls. bolt home to reinforced foundation and install shearing. install drainage (rainwater-interior) install (4) new windows, at side and rear, not visbile from the st. | $47,000 |
| Nov 29, 2016 | Completed final sign-off Jul 2017 | 1222 Clayton St | construction/slope stabilization in response to nov 201605701. slope stabiliazation includes scaling of loose rock installation of rock bolt anchors supporting steel mech catchment fence will be installed upslope of sidewalk, erosion control improvementsDetails
construction/slope stabilization in response to nov 201605701. slope stabiliazation includes scaling of loose rock installation of rock bolt anchors supporting steel mech catchment fence will be installed upslope of sidewalk, erosion control improvements | $130,000 |
| Nov 9, 2016 | Completed final sign-off Mar 2019 | 260 Chestnut St | rockslide mitigation will be constructed with shotcrete and tiebacks to protect (e) residence, existing spa and associated landscape.Details
rockslide mitigation will be constructed with shotcrete and tiebacks to protect (e) residence, existing spa and associated landscape. | $147,500 |
| Dec 4, 2015 | Completed final sign-off Aug 2016 | 30 Hodges Al | to coply with nov 201200501 structural site work to stabilize existing slopeDetails
to coply with nov 201200501 structural site work to stabilize existing slope | $30,000 |
| Dec 4, 2015 | Completed final sign-off Oct 2016 | 362 Vallejo St | to coply with nov 201205242 structural site work to stabilize existing slopeDetails
to coply with nov 201205242 structural site work to stabilize existing slope | $30,000 |
| Oct 1, 2015 | Completed final sign-off Sep 2016 | 4107 23rd St | replace failing retaining wall same sizeDetails
replace failing retaining wall same size | $47,000 |
| Jun 24, 2015 | Never finaled issued Jan 2016, no final | 100 Julian Av | repair and replace extg brick ret. wall with a new reinforced concrete retaining wall with brick veener. a handicap ramp will also be installed behind the majority of the new wall to lead up to the church courtyard grade.Details
repair and replace extg brick ret. wall with a new reinforced concrete retaining wall with brick veener. a handicap ramp will also be installed behind the majority of the new wall to lead up to the church courtyard grade. | $70,000 |
| May 28, 2015 | Completed final sign-off Oct 2016 | 26 Hodges Al | structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735Details
structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735 | $70,000 |
| Feb 26, 2015 | Expired or cancelled expired Nov 2017 | 4121 20th St | install new and reinforced concrete below existing foundation to create new basement area per boa decision 14-148Details
install new and reinforced concrete below existing foundation to create new basement area per boa decision 14-148 | $90,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2015 | 1709 Gough St | partial foundation underpinning.Details
partial foundation underpinning. | $10,000 |
| Jul 25, 2012 | Completed final sign-off Apr 2013 | 2086 12th Av | scale loose rock from slope. to comply with nov 2011145486. build 6 foot tall energy dissipation fence.response to nov 201114543.Details
scale loose rock from slope. to comply with nov 2011145486. build 6 foot tall energy dissipation fence.response to nov 201114543. | $10,000 |
| Jul 25, 2012 | Completed final sign-off Apr 2013 | 2090 12th Av | scale loose rock from slope. install 2 rock bolts. build 6 foot tall energy dissipation fence. response to nov 201114542Details
scale loose rock from slope. install 2 rock bolts. build 6 foot tall energy dissipation fence. response to nov 201114542 | $21,000 |
| Jul 18, 2012 | Completed final sign-off Jan 2014 | 1047 Montgomery St | rebuilt (e) retaining wall that have failed and replace (e) patio with new wood deckDetails
rebuilt (e) retaining wall that have failed and replace (e) patio with new wood deck | $55,000 |
| Jun 5, 2012 | Completed final sign-off Aug 2013 | 240 Lombard St | response to nov #201283596 - replace rockfall fence, (scale loose rock from slope as directed by soils engineer) rockbolts & netting under separate future permit.Details
response to nov #201283596 - replace rockfall fence, (scale loose rock from slope as directed by soils engineer) rockbolts & netting under separate future permit. | $140,000 |
| Mar 6, 2012 | Completed final sign-off Aug 2013 | 150 Hampshire St | to comply with nov 201109761. scale loose rock from rock face. off haul and dispose. intall rocks bolts. install rockfall protection mesh.Details
to comply with nov 201109761. scale loose rock from rock face. off haul and dispose. intall rocks bolts. install rockfall protection mesh. | $140,000 |
| Mar 6, 2012 | Completed final sign-off Sep 2012 | 145 Bonview St | replace two extg retaining walls with new soldier-pile retaining walls.Details
replace two extg retaining walls with new soldier-pile retaining walls. | $80,000 |
| Nov 23, 2011 | Completed final sign-off Mar 2012 | 11 High St | work to take place in common area only. install engineered retaining wallDetails
work to take place in common area only. install engineered retaining wall | $60,000 |
| Jul 2, 2010 | Completed final sign-off Jun 2011 | 2114 Baker St | remove & replace existing brick foundation. lower finish floor , restore cosmetics, remodel ktichen, add bedroom (non-load bearing) walls. replace window @ rear.Details
remove & replace existing brick foundation. lower finish floor , restore cosmetics, remodel ktichen, add bedroom (non-load bearing) walls. replace window @ rear. | $90,000 |
| Jun 23, 2009 | Completed final sign-off Jun 2012 | 999 Green St | demolish existing concrete retaining wall & build new replacement wall and drainage.Details
demolish existing concrete retaining wall & build new replacement wall and drainage. | $150,000 |
| Apr 3, 2009 | Completed final sign-off Sep 2009 | 609 Burnett Av | stabilize rear slope with tiebacks restrained shear pins capped with a 5' high grade beam/retaining wallDetails
stabilize rear slope with tiebacks restrained shear pins capped with a 5' high grade beam/retaining wall | $65,000 |
| Jun 16, 2006 | Completed final sign-off Jan 2007 | 240 Turk St | shoring and underpinning w/ cantilerved solder pills and underpinning pits dol to excavation of adjacent property (under separate permit).Details
shoring and underpinning w/ cantilerved solder pills and underpinning pits dol to excavation of adjacent property (under separate permit). | $60,000 |
| Jun 16, 2006 | Completed final sign-off Jan 2007 | 225 Jones St | sequential, non continous underpinning pits with wood lagging between pits, along west property line due to excavation of adjacent building (under separate permit.)Details
sequential, non continous underpinning pits with wood lagging between pits, along west property line due to excavation of adjacent building (under separate permit.) | $52,000 |
| Jun 16, 2006 | Completed final sign-off Jan 2007 | 218 Turk St | sequential non continous underpining pits with wood lagging between pits, along west and north property lines due to excavation of adjacent building (under separate permit).Details
sequential non continous underpining pits with wood lagging between pits, along west and north property lines due to excavation of adjacent building (under separate permit). | $32,000 |
| Jul 14, 2005 | Never finaled issued Dec 2005, no final | 2629 Diamond St | renovatin of basement. excavatin into crawl space to create new media room & 2 closets.Details
renovatin of basement. excavatin into crawl space to create new media room & 2 closets. | $120,000 |
| Jun 16, 2005 | Completed final sign-off May 2014 | 1135 Green St | construct new sub-terranean. 5-car garage under (e) 2-story townhouses - sprinkler under separate permit. no work to existing townhouses.Details
construct new sub-terranean. 5-car garage under (e) 2-story townhouses - sprinkler under separate permit. no work to existing townhouses. | $700,000 |
| Sep 29, 2004 | Completed final sign-off Feb 2005 | 90 Bronte St | compliance work for nov.#200338576 date 26/04/04work. includes demolition of (e) craked retainingDetails
compliance work for nov.#200338576 date 26/04/04work. includes demolition of (e) craked retaining | $23,000 |
| Jan 12, 2004 | Never finaled issued Jan 2004, no final | 7 Upper Tr | renew appl#220208264922Details
renew appl#220208264922 | $10,000 |
| Jan 12, 2004 | Never finaled issued Jan 2004, no final | 7 Upper Tr | renew appl#200212062952 for final inspectionDetails
renew appl#200212062952 for final inspection | |
| Oct 30, 2003 | Completed final sign-off Mar 2004 | 1650 Masonic Av | install partial retaining walls, which is 7 upper terrace retaining walls extend into 1650 masonic pDetails
install partial retaining walls, which is 7 upper terrace retaining walls extend into 1650 masonic p | $4,500 |
| Jul 22, 2003 | Completed final sign-off Oct 2003 | 2415 Larkin St | brace existing retaining/parapet wallDetails
brace existing retaining/parapet wall | $6,800 |
| Dec 6, 2002 | Expired or cancelled expired Feb 2004 | 7 Upper Tr | provide fndtn improvement incl underpinning,lateral supports (tie-backs),&small retaining wallDetails
provide fndtn improvement incl underpinning,lateral supports (tie-backs),&small retaining wall | $30,000 |
| Aug 26, 2002 | Expired or cancelled expired Feb 2004 | 7 Upper Tr | repair failing retaining wall, repair damaged foundation and deck supportsDetails
repair failing retaining wall, repair damaged foundation and deck supports | $40,000 |
| May 9, 2002 | Completed final sign-off Jun 2002 | 1637 Taylor St | renewal for final inspection 9001004Details
renewal for final inspection 9001004 | $10,000 |