Strong Builders Construction Inc.
- Based in
- Belmont
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 26 permits filed
179 permits since 2000: 112 completed, 18 in progress, 30 never finaled, 19 expired or cancelled.
Of the 30 never-finaled permits, 4 are 3 to 5 years old, 16 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 179.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 280 Fell St | revision to pa 202606163326 revised location of new laundry closet @ unit 205Details
revision to pa 202606163326 revised location of new laundry closet @ unit 205 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 830 Cortland Av | repair of roofing because of dry rot. ref#202609248597Details
repair of roofing because of dry rot. ref#202609248597 | $4,000 |
| Sep 24, 2026 | In progress issued Sep 2026 | 830 Cortland Av | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $4,000 |
| Sep 24, 2026 | In progress issued Sep 2026 | 280 Fell St | revision to pa 202606163328 revised location of new laundry closet @ unit 305Details
revision to pa 202606163328 revised location of new laundry closet @ unit 305 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 830 Cortland Av | re-roofing with hot works. revision to app#202609248597Details
re-roofing with hot works. revision to app#202609248597 | |
| Aug 7, 2026 | In progress issued Aug 2026 | 830 Cortland Av | modification of existing windows. revision to approved set # 202510026606.Details
modification of existing windows. revision to approved set # 202510026606. | |
| Jun 17, 2026 | In progress issued Jul 2026 | 830 Cortland Av | revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes.Details
revision to 202510026606. scope includes additional foundtaion grade beam at rear of building. requested voluntarily by client. replacement of wood frames floor with a concrete slab in addition on the west side. replace (e) door at north side entrance. add (n) window facing street and mep changes. | |
| Jun 16, 2026 | Completed final sign-off Sep 2026 | 280 Fell St | interior renovation only at (e) unit# 403 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 403 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | interior renovation only at (e) unit# 404 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 404 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | interior renovation only at (e) unit# 305 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 305 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | interior renovation only at (e) unit# 205 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 205 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 712 Sansome St | to obtain final inspection for work approved under pa# 202502281344. all work is complete.Details
to obtain final inspection for work approved under pa# 202502281344. all work is complete. | |
| Apr 21, 2026 | Completed final sign-off Apr 2026 | 1100 Gough St | apt#13d: fixed the tile in the bathroom, small repairDetails
apt#13d: fixed the tile in the bathroom, small repair | $1,200 |
| Mar 24, 2026 | In progress issued Mar 2026 | 7555 Geary Bl | unit 104- interior repair of unit. remove and replace damaged drywall around (e) windows and inside closet in kind. patch and paint to match (e). no window replacement no change to opening or wall removal or structural work.Details
unit 104- interior repair of unit. remove and replace damaged drywall around (e) windows and inside closet in kind. patch and paint to match (e). no window replacement no change to opening or wall removal or structural work. | $1,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 349 Mississippi St | interior renovation of 2 bathrooms + 1 kitchen. work includes demo of existing plumbing fixtures, finishes, lighting & adjustment of non structural walls. new fixtures, finishes, lighting, interior walls, & kitchen island to be installed.Details
interior renovation of 2 bathrooms + 1 kitchen. work includes demo of existing plumbing fixtures, finishes, lighting & adjustment of non structural walls. new fixtures, finishes, lighting, interior walls, & kitchen island to be installed. | $60,000 |
| Dec 19, 2025 | In progress issued Aug 2026 | 828 Cortland Av | improvement to existing garage and cover patio area. demo fo existing non structural int. partitions, existing wood raised floor and roof, exisiting and deck. construction of new stairs and landing, new garage roll up doors. replace existing finishes.Details
improvement to existing garage and cover patio area. demo fo existing non structural int. partitions, existing wood raised floor and roof, exisiting and deck. construction of new stairs and landing, new garage roll up doors. replace existing finishes. | $65,000 |
| Nov 7, 2025 | In progress issued Nov 2025 | 280 Fell St | revision to pa 202509306390 interior renovations at unit 304 remove bathtub and add new shower. existing 2 bathrooms have shower pans. 1st permit remdoels both bathtubs into shower pans, this permit only one whower into bathrubDetails
revision to pa 202509306390 interior renovations at unit 304 remove bathtub and add new shower. existing 2 bathrooms have shower pans. 1st permit remdoels both bathtubs into shower pans, this permit only one whower into bathrub | $2,500 |
| Oct 20, 2025 | In progress issued May 2026 | 830 Cortland Av | ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout.Details
ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout. | $180,000 |
| Oct 15, 2025 | In progress issued May 2026 | 323 Staples Av | legalization of adu. 2-story horizontal addition. remodel of both 1st & 2nd floors including removal of unauthorized storage at rear of building.Details
legalization of adu. 2-story horizontal addition. remodel of both 1st & 2nd floors including removal of unauthorized storage at rear of building. | $150,000 |
| Sep 30, 2025 | In progress issued Sep 2025 | 280 Fell St | interior renovation at unit 304. scope consist of converting an existing closet into a laundry closet with stacked washer/dryer applicances, including utility connections, venting, and code compliant installation. 2 bathroom remodel, conisting of new tile flooring, new bathtub, vanity, and lightDetails
interior renovation at unit 304. scope consist of converting an existing closet into a laundry closet with stacked washer/dryer applicances, including utility connections, venting, and code compliant installation. 2 bathroom remodel, conisting of new tile flooring, new bathtub, vanity, and light | $40,000 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 1212 Hampshire St | revision to pa #202505075982 to perform specifically in unit a as per inspector's request.Details
revision to pa #202505075982 to perform specifically in unit a as per inspector's request. | |
| Aug 7, 2025 | In progress issued Aug 2025 | 1740 Broadway | unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural.Details
unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural. | $100,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 1155 Leavenworth St | unit 2: in-kind kitchen remodelDetails
unit 2: in-kind kitchen remodel | $15,000 |
| Feb 28, 2025 | Expired or cancelled expired Jul 2026 | 712 Sansome St | non-structural interior demo, no structural, no new construction, no occupancy-vacant bldg, no change to exteriors.Details
non-structural interior demo, no structural, no new construction, no occupancy-vacant bldg, no change to exteriors. | $10,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 7555 Geary Bl | repair windows leak from outside, caulking etc. 4 total windows. reflashing.Details
repair windows leak from outside, caulking etc. 4 total windows. reflashing. | $3,300 |
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 447 Orizaba Av | living room: add 2 plugs and change light fixture. new flooring, paint, replace old heater same location in kind. patch and replace sheetrock as needed for electrical work and heater replacement. use 5/8" type x sheetrock where fire separation is required.Details
living room: add 2 plugs and change light fixture. new flooring, paint, replace old heater same location in kind. patch and replace sheetrock as needed for electrical work and heater replacement. use 5/8" type x sheetrock where fire separation is required. | $6,000 |
| Aug 20, 2024 | Completed final sign-off Sep 2024 | 18 Clyde St | replace (e) siding, make new weaterpoof and install new siding, and painting. rear elevation, not visible from street, repair in kind.Details
replace (e) siding, make new weaterpoof and install new siding, and painting. rear elevation, not visible from street, repair in kind. | $3,100 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 1740 Broadway | unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exteriorDetails
unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exterior | $50,000 |
| Mar 27, 2024 | Completed final sign-off Oct 2024 | 7555 Geary Bl | unit #201 kitchen and bathroom remodel in kind. new floors for kitchen. painting the apt and new base boardDetails
unit #201 kitchen and bathroom remodel in kind. new floors for kitchen. painting the apt and new base board | $62,000 |
| Mar 25, 2024 | Completed final sign-off Jun 2024 | 1310 Fillmore St | bathroom remodel in kind no change of location of fixtures change tub to shower. (no moving walls)Details
bathroom remodel in kind no change of location of fixtures change tub to shower. (no moving walls) | $15,000 |
| Jan 19, 2024 | Completed final sign-off Aug 2024 | 412 Lansdale Av | revision to approved 202203281034 for final inspection. remove reayr yard steps to grade, remove door between bedrooms on second floor, remove rear yard trellisDetails
revision to approved 202203281034 for final inspection. remove reayr yard steps to grade, remove door between bedrooms on second floor, remove rear yard trellis | |
| Dec 21, 2023 | Completed final sign-off Jul 2024 | 1189 Potrero Av | restore existing foam cover at front column to match in kindDetails
restore existing foam cover at front column to match in kind | $1,957 |
| Nov 2, 2023 | Completed final sign-off Feb 2024 | 280 Fell St | units 309, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installationDetails
units 309, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installation | $5,000 |
| Nov 2, 2023 | Completed final sign-off Sep 2024 | 280 Fell St | units 409, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installationDetails
units 409, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installation | $5,000 |
| Oct 30, 2023 | Completed final sign-off Jan 2024 | 1498 Underwood Av | fix drain for boiler; install electrical plugs; replace door and sheetrock; per complaint #202306894,202313187. repair in kind.Details
fix drain for boiler; install electrical plugs; replace door and sheetrock; per complaint #202306894,202313187. repair in kind. | $10,000 |
| Sep 18, 2023 | Never finaled issued Sep 2023, no final | 90 Aquavista Wy | excavate and install french drain (pipe).Details
excavate and install french drain (pipe). | $58,000 |
| Sep 8, 2023 | Completed final sign-off Feb 2024 | 7555 Geary Bl | unit 105: bathroom and kitchen remodeling. kitchen : 135 sf. bath: 70 sf.Details
unit 105: bathroom and kitchen remodeling. kitchen : 135 sf. bath: 70 sf. | $18,500 |
| Aug 11, 2023 | Completed final sign-off Sep 2023 | 1498 Underwood Av | in-kind window replacement, facing the rear. not visible from street.Details
in-kind window replacement, facing the rear. not visible from street. | $2,000 |
| Jun 13, 2023 | Never finaled issued Jun 2023, no final | 917 Hampshire St | partial roof repair. french drain installation.Details
partial roof repair. french drain installation. | $15,000 |
| Jun 9, 2023 | Completed final sign-off Oct 2023 | 3535 California St | fire damage and repair extereeior wall. replace damaged siding drywall exterior wall. framing and electrical wiring like for likeDetails
fire damage and repair extereeior wall. replace damaged siding drywall exterior wall. framing and electrical wiring like for like | $20,000 |
| Apr 10, 2023 | Completed final sign-off Nov 2023 | 1740 Broadway | 7/flr- unit #602: interior renovations, renovate kitchen & bath, add new bath, mep no change to fixtures,structurl areas.Details
7/flr- unit #602: interior renovations, renovate kitchen & bath, add new bath, mep no change to fixtures,structurl areas. | $75,000 |
| Mar 28, 2023 | Completed final sign-off May 2023 | 7555 Geary Bl | two bathrooms renovations, bath tubs replacement, electrical and pluming fixtures replacment. paint the wall, floor, renovation. emergency valve repair. ref # 20305247Details
two bathrooms renovations, bath tubs replacement, electrical and pluming fixtures replacment. paint the wall, floor, renovation. emergency valve repair. ref # 20305247 | $15,000 |
| Mar 16, 2023 | Completed final sign-off Feb 2024 | 280 Fell St | units 209, new laundry installation in the closet for each apartment unit. install new electrical, plumbing outlets for new laundry installationDetails
units 209, new laundry installation in the closet for each apartment unit. install new electrical, plumbing outlets for new laundry installation | $15,000 |
| Feb 14, 2023 | Completed final sign-off Feb 2024 | 412 Lansdale Av | back of the house stucco repairing/replacing.Details
back of the house stucco repairing/replacing. | $10,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2024 | 1740 Broadway | 6/f unit 601: interior renovations, non-structural. add one new bathroom, renovate bath, kitchen. replace (5) interior windows, mechanical, electrical, and plumbing. no change to street facing exteriors.Details
6/f unit 601: interior renovations, non-structural. add one new bathroom, renovate bath, kitchen. replace (5) interior windows, mechanical, electrical, and plumbing. no change to street facing exteriors. | $25,000 |
| Oct 17, 2022 | Completed final sign-off Oct 2023 | 293 Connecticut St | replace all street facing windows in kind (wood-framed, double-hung, with integral ogee lugs) made of wood and two not street facing with vinyl windows. 23 windows total. must maintain eero.Details
replace all street facing windows in kind (wood-framed, double-hung, with integral ogee lugs) made of wood and two not street facing with vinyl windows. 23 windows total. must maintain eero. | $5,000 |
| Sep 22, 2022 | Completed final sign-off Oct 2022 | 1348 Sacramento St | revision to permit 201908280141. enlargement of closet in unit 1. flip plubing to opposite wall. pg&e enclosure detail. update size of window in bedroom in elevation.Details
revision to permit 201908280141. enlargement of closet in unit 1. flip plubing to opposite wall. pg&e enclosure detail. update size of window in bedroom in elevation. | $3,500 |
| Aug 19, 2022 | Completed final sign-off Nov 2023 | 293 Connecticut St | revision to application # 202202107751: to correct address in description from 1426 18th street to correct address 1424 18th streetDetails
revision to application # 202202107751: to correct address in description from 1426 18th street to correct address 1424 18th street | |
| Aug 11, 2022 | Never finaled issued Aug 2022, no final | 7555 Geary Bl | unit #4:bathroom renovation in kind.no layout changes.45 sfDetails
unit #4:bathroom renovation in kind.no layout changes.45 sf | $2,000 |
| Jun 15, 2022 | Completed final sign-off Mar 2023 | 686 28th Av | remove existing siding at rear and make exterior wall in stucco backyard (from wood to stucco) approx 350sfDetails
remove existing siding at rear and make exterior wall in stucco backyard (from wood to stucco) approx 350sf | $3,000 |
| Jun 15, 2022 | Completed final sign-off Feb 2024 | 412 Lansdale Av | ground floor bathroom remodeling in kind. no layout changes, no dimensions changes. in kind renovation only.Details
ground floor bathroom remodeling in kind. no layout changes, no dimensions changes. in kind renovation only. | $2,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 686 28th Av | refresh front facade in kind, stucco repair (approx 150sf) replace 4 windows and change one garage door all work in kind. (windows to be made out wood or alluminum clad)Details
refresh front facade in kind, stucco repair (approx 150sf) replace 4 windows and change one garage door all work in kind. (windows to be made out wood or alluminum clad) | $500 |
| May 10, 2022 | Completed final sign-off May 2023 | 686 28th Av | structural revision to approved renovation permit 202109168591. new foundations, upgrade seismic systems upsize beamDetails
structural revision to approved renovation permit 202109168591. new foundations, upgrade seismic systems upsize beam | |
| Mar 28, 2022 | Completed final sign-off Aug 2024 | 412 Lansdale Av | interior renovations: renovate kitchen, renovate 2 baths. new rear deck guardrails and trolis. window replacements.Details
interior renovations: renovate kitchen, renovate 2 baths. new rear deck guardrails and trolis. window replacements. | $100,000 |
| Feb 10, 2022 | Completed final sign-off Nov 2023 | 293 Connecticut St | the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior.Details
the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior. | $50,000 |
| Nov 22, 2021 | Completed final sign-off Jul 2022 | 1740 Broadway | apt 201: interior renovations on 2/f. renovate kitchen and bathroom. new heating. new windows at interior lightwell. no structural, no change to areas. no change to facade.Details
apt 201: interior renovations on 2/f. renovate kitchen and bathroom. new heating. new windows at interior lightwell. no structural, no change to areas. no change to facade. | $30,000 |
| Oct 20, 2021 | Completed final sign-off Sep 2022 | 1649 La Salle Av | to comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work.Details
to comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work. | $25,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 2219 Chestnut St | to comply with nov# 202183304 to repair damage caused by vehicle into bldg. repair store front post, street facing. no change to exterior/repair in kind. maintain any and all accesibility features at entrance.Details
to comply with nov# 202183304 to repair damage caused by vehicle into bldg. repair store front post, street facing. no change to exterior/repair in kind. maintain any and all accesibility features at entrance. | $2,500 |
| Sep 16, 2021 | Completed final sign-off May 2023 | 686 28th Av | interior renovation and rear openings. 2 new bathrooms, renovate kitchen, new bedrooms. structural and mep.Details
interior renovation and rear openings. 2 new bathrooms, renovate kitchen, new bedrooms. structural and mep. | $100,000 |
| Feb 16, 2021 | Completed final sign-off Nov 2021 | 1426 18th St | to comply with accessible business entrance program per ord 51-16. add door hardware - door bell, handrail auto door opener, stair strip.Details
to comply with accessible business entrance program per ord 51-16. add door hardware - door bell, handrail auto door opener, stair strip. | $10,000 |
| Dec 24, 2020 | Never finaled issued Aug 2021, no final | 1740 Broadway | #505: interior renovation for new bedrooms & new bathrooms. kitchen renovation. new interior windows. no exterior. no structural.Details
#505: interior renovation for new bedrooms & new bathrooms. kitchen renovation. new interior windows. no exterior. no structural. | $25,000 |
| Oct 24, 2020 | Completed final sign-off Apr 2022 | 1740 Broadway | unit #405: interior renovations. new kitchen and baths. no new area. no structural. no change to street facing elevations. convert studio to 1-bedroom apt.Details
unit #405: interior renovations. new kitchen and baths. no new area. no structural. no change to street facing elevations. convert studio to 1-bedroom apt. | $25,000 |
| Oct 5, 2020 | Completed final sign-off Sep 2021 | 10 Sussex St | roofing, adding new roof on top of existing no plywood nor sheeting. removing planks.Details
roofing, adding new roof on top of existing no plywood nor sheeting. removing planks. | $5,000 |
| Oct 3, 2020 | Never finaled issued Feb 2021, no final | 1740 Broadway | 6 unit renovations in 204/502/503/504/604/703: new bedrooms, kitchen & bathrooms. no structural work. no exterior, no new floor area. maher n/a.Details
6 unit renovations in 204/502/503/504/604/703: new bedrooms, kitchen & bathrooms. no structural work. no exterior, no new floor area. maher n/a. | $300,000 |
| Jul 6, 2020 | Never finaled issued Aug 2020, no final | 1740 Broadway | interior renovations only at 3 extg units: 207,506, & 704. new bathrooms, kitchens, and bathrooms.Details
interior renovations only at 3 extg units: 207,506, & 704. new bathrooms, kitchens, and bathrooms. | $100,000 |
| Jun 9, 2020 | Never finaled filed Jun 2020, never issued | 7555 Geary Bl | add 2 adu's per ord# 162-16 at (e) basement level. soft story completed under separate permit# 2016-1117-3005.Details
add 2 adu's per ord# 162-16 at (e) basement level. soft story completed under separate permit# 2016-1117-3005. | $150,000 |
| Mar 10, 2020 | Completed final sign-off Mar 2020 | 3325 Steiner St | to obtain final inspection for work approved under pa #2017-0629-0720 & 2016-0916-8002. all work is complete.Details
to obtain final inspection for work approved under pa #2017-0629-0720 & 2016-0916-8002. all work is complete. | |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1740 Broadway | unit 602: run new duct pipe for unit #602 thru unit 603. kitchen vent & bathroom vent & laundry vent, & booster fan & install flu pipe for future tankless water heater. duct work and piping work only. verify in final by field inspectorDetails
unit 602: run new duct pipe for unit #602 thru unit 603. kitchen vent & bathroom vent & laundry vent, & booster fan & install flu pipe for future tankless water heater. duct work and piping work only. verify in final by field inspector | $1,200 |
| Sep 6, 2019 | Completed final sign-off Aug 2020 | 1740 Broadway | interior renovations as unit 603. add bedroom & bathroomDetails
interior renovations as unit 603. add bedroom & bathroom | $50,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2022 | 1348 Sacramento St | construct (2) new adu's per ordinance no. 162-16. no change to occupancy or egress. remove non structural walls. new kitchen & bath. excavate less than 50 cubic yards of soil.Details
construct (2) new adu's per ordinance no. 162-16. no change to occupancy or egress. remove non structural walls. new kitchen & bath. excavate less than 50 cubic yards of soil. | $120,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 7555 Geary Bl | unit 304 comply with nov 201978131. kitchen remodel, bathroom remodel, painting. no interior walls demolished.Details
unit 304 comply with nov 201978131. kitchen remodel, bathroom remodel, painting. no interior walls demolished. | $25,000 |
| Jul 24, 2019 | Completed final sign-off Jun 2020 | 720 Jones St | unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural workDetails
unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural work | $65,000 |
| Jul 3, 2019 | Completed final sign-off Jul 2022 | 1348 Sacramento St | seismic retrofit per san francisco ordinance no. 66-13 seismic strengthening of soft-story, wood frame building. no change to building footprint or exterior appearanceDetails
seismic retrofit per san francisco ordinance no. 66-13 seismic strengthening of soft-story, wood frame building. no change to building footprint or exterior appearance | $1,348 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 208 Tocoloma Av | dry rot repair at 13 windows. replace stucco around windows in kind.Details
dry rot repair at 13 windows. replace stucco around windows in kind. | $14,000 |
| Jun 11, 2019 | Completed final sign-off Feb 2020 | 1740 Broadway | interior renovation at one extg unit on 3rd floor. remodel kitchen and bath. new bath. no change to exterior or structure. n/a for maherDetails
interior renovation at one extg unit on 3rd floor. remodel kitchen and bath. new bath. no change to exterior or structure. n/a for maher | $50,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2019 | 71 Bernard St | in-kind siding repair at edge of garage due to auto accident. n/a for maher.Details
in-kind siding repair at edge of garage due to auto accident. n/a for maher. | $9,500 |
| Apr 1, 2019 | Completed final sign-off Jul 2020 | 3440 California St | comply with accessible building entrance program.Details
comply with accessible building entrance program. | $5,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2020 | 720 Jones St | renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixturesDetails
renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixtures | $45,000 |
| Jan 30, 2019 | Never finaled issued Oct 2019, no final | 1408 California St | renovation of units 305, 308, on 3rd level, 409 4th level, 505 on 5th level, 4 total units. unit 305 is conversion from 2 to 3 bedroom, conversion from studio to 1 bedroom at units 308,409. 1 bdrm to 2 at 504.n kitchen cabinets, n plumbing fixt, new lighting, @ e j boxes, n dshwshDetails
renovation of units 305, 308, on 3rd level, 409 4th level, 505 on 5th level, 4 total units. unit 305 is conversion from 2 to 3 bedroom, conversion from studio to 1 bedroom at units 308,409. 1 bdrm to 2 at 504.n kitchen cabinets, n plumbing fixt, new lighting, @ e j boxes, n dshwsh | $170,000 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 1740 Broadway | interior renovations at (4) existing units #206, 302, 304, 306. new kitchens & baths. no change to street facing exteriors. no structural work. no change to areas.Details
interior renovations at (4) existing units #206, 302, 304, 306. new kitchens & baths. no change to street facing exteriors. no structural work. no change to areas. | $50,000 |
| Oct 5, 2018 | Never finaled issued Nov 2018, no final | 1740 Broadway | interior removation for 4 existing units. revision reference permit # 2018-0710-4086 units # 402,403,404,& 501Details
interior removation for 4 existing units. revision reference permit # 2018-0710-4086 units # 402,403,404,& 501 | $50,000 |
| Sep 28, 2018 | Expired or cancelled cancelled Jan 2026 | 1127 Wisconsin St | rev to pa# 201606291230; type x drywall-premium edge attache w/scres to be over adhisive to buck side of sheating fire caulking edgeDetails
rev to pa# 201606291230; type x drywall-premium edge attache w/scres to be over adhisive to buck side of sheating fire caulking edge | |
| Aug 16, 2018 | Completed final sign-off Dec 2018 | 1348 Sacramento St | kitchen remodel, bathroom remodel, electrical upgrade.Details
kitchen remodel, bathroom remodel, electrical upgrade. | $23,000 |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 1740 Broadway | interior renovations to (4) units - new kitchen & bathrooms. new interior windows - mech, electrical, plumbing. no change to exterior, structural, use, common areas. no new areaDetails
interior renovations to (4) units - new kitchen & bathrooms. new interior windows - mech, electrical, plumbing. no change to exterior, structural, use, common areas. no new area | $150,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 1740 Broadway | open drywall to ses structural demo drywall survey 20 location 2 x 2 feetDetails
open drywall to ses structural demo drywall survey 20 location 2 x 2 feet | $1,600 |
| Jul 6, 2018 | Expired or cancelled cancelled Dec 2018 | 1348 Sacramento St | apt. #3 remodel. bathroom and kitchen remodel. electrical and plumbing upgrade. drywall and painting.Details
apt. #3 remodel. bathroom and kitchen remodel. electrical and plumbing upgrade. drywall and painting. | $18,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 1740 Broadway | unit 403: exploratory of (e) kitchen, bathroom & closets: 150sf.Details
unit 403: exploratory of (e) kitchen, bathroom & closets: 150sf. | $3,000 |
| Feb 28, 2018 | Completed final sign-off Apr 2018 | 1071 Gilman Av | bathroom remodel in kind, no plumbing, wall relocation.Details
bathroom remodel in kind, no plumbing, wall relocation. | $11,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 2656 Van Ness Av | renovation of unit #2 on teh 2nd flr, including new bedroom, new bathroom, new laundry. renovated kitchen & bath, new lighting, new heating, no exterior changes maher naDetails
renovation of unit #2 on teh 2nd flr, including new bedroom, new bathroom, new laundry. renovated kitchen & bath, new lighting, new heating, no exterior changes maher na | $35,000 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 720 Jones St | apt 30: no exterior changes or moving of walls: bathroom remodel inkind (1): new tile, bathroom fan , light fixturs.Details
apt 30: no exterior changes or moving of walls: bathroom remodel inkind (1): new tile, bathroom fan , light fixturs. | $9,000 |
| Jan 24, 2018 | Completed final sign-off May 2018 | 1408 California St | apt 309: remodel ktichen in-kind, electrical upgrade, bathroom light fixtures replace and add bathroom fan only.Details
apt 309: remodel ktichen in-kind, electrical upgrade, bathroom light fixtures replace and add bathroom fan only. | $16,000 |
| Jan 10, 2018 | Expired or cancelled expired Oct 2025 | 2656 Van Ness Av | renovation of apt #10 on the 2nd fl, including (1) new bedroom, new laundry, renovate kichen & bath, new lighting, no exterior changes. maher naDetails
renovation of apt #10 on the 2nd fl, including (1) new bedroom, new laundry, renovate kichen & bath, new lighting, no exterior changes. maher na | $40,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher naDetails
renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher na | $50,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 720 Jones St | unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/aDetails
unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/a | $12,000 |
| Nov 13, 2017 | Completed final sign-off Jan 2020 | 1129 Wisconsin St | revision to bpa#201606291230, not to build roof deckDetails
revision to bpa#201606291230, not to build roof deck | |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changesDetails
renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changes | $45,000 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 22 Flora St | siding repair right side non visible from street 12 feet. add 3 outlets and 3 switches on ground floorDetails
siding repair right side non visible from street 12 feet. add 3 outlets and 3 switches on ground floor | $500 |
| Sep 20, 2017 | Completed final sign-off May 2018 | 22 Flora St | basement floor remodel - change plumbing, change lighting, build new walls, add sink and add (n) bathroom on basement floor, walls and sink. no exterior work visible from street.Details
basement floor remodel - change plumbing, change lighting, build new walls, add sink and add (n) bathroom on basement floor, walls and sink. no exterior work visible from street. | $70,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2018 | 158 Shrader St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $30,000 |
| Aug 21, 2017 | Never finaled issued Aug 2017, no final | 21 Williar Av | rev to pa#201508275399: new wall for relocated laundry and office closet. change bathroom door form swing to pocket door. open space next to back officeDetails
rev to pa#201508275399: new wall for relocated laundry and office closet. change bathroom door form swing to pocket door. open space next to back office |