Daniel Simons
- Listed as
- architect
- Firm
- David Baker Architects
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Aug 2026
35 permits since 2000 (architect on 35 permits): 20 completed, 9 in progress, 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 1123 Sutter St | Nibbi Bros Assoc Inc. | generator fuel oil & piping for issued full permits: pa# 202411215452(market reate=201 units); pa# 202411215486(affordable=102 unnits)Details
generator fuel oil & piping for issued full permits: pa# 202411215452(market reate=201 units); pa# 202411215486(affordable=102 unnits) | |
| Mar 18, 2026 | In progress issued Mar 2026 | 850 Turk St | revision to arch & mep 20221208788-s4 and 202410072408-s4 for elevator smoke detection access hatch details & corresponding adjustments to elevator penthouse heightDetails
revision to arch & mep 20221208788-s4 and 202410072408-s4 for elevator smoke detection access hatch details & corresponding adjustments to elevator penthouse height | ||
| Feb 26, 2025 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes.Details
revision to pa#201909121446 addenda(s-2). revision to level-1 mpoe room walls of hv block 14. the work to be completed is the addition of two layers of gypsum board to mpoe room wall in order to increase fire rating to 2hr from 1hr using wall assembly wgs on a501. the mpoe room door also 90 minutes. | $4,148 |
| Jan 2, 2025 | In progress issued Oct 2025 | 1123 Sutter St | Nibbi Bros Assoc Inc. | this permit# 202411215452 is only for the 201 market rate housing units and for the mixed occupancies: r-2,a-3,m,e. 22 story over 1 basement, type 1a, fully sprinklered mixed use residential. the 102 affordable units and base, core, shell are under separate permit# 202411215486.Details
this permit# 202411215452 is only for the 201 market rate housing units and for the mixed occupancies: r-2,a-3,m,e. 22 story over 1 basement, type 1a, fully sprinklered mixed use residential. the 102 affordable units and base, core, shell are under separate permit# 202411215486. | $80,000,000 |
| Jan 2, 2025 | In progress issued Jun 2025 | 1123 Sutter St | Nibbi Bros Assoc Inc. | this permit #202411215486 is only for the building base, core shell and 102 affordable units.22 story over 1 basement, type 1a, fully sprinklered mixed use residential.(r-2 occupancy only approved at this stage).the 201 market rate units and commercial spaces are under separate permit #202411215452.Details
this permit #202411215486 is only for the building base, core shell and 102 affordable units.22 story over 1 basement, type 1a, fully sprinklered mixed use residential.(r-2 occupancy only approved at this stage).the 201 market rate units and commercial spaces are under separate permit #202411215452. | $40,000,000 |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | Nibbi Bros Assoc Inc. | revision to pa 202106031549 addendum 3 minor architectural & mechanical revisions to satisfy conditions of approval for addendum 6 fire alarm. scope includes adding smoke damper to ducting between janitor and laundry room at each residential level; adding smoke detector w/access panel, cage andDetails
revision to pa 202106031549 addendum 3 minor architectural & mechanical revisions to satisfy conditions of approval for addendum 6 fire alarm. scope includes adding smoke damper to ducting between janitor and laundry room at each residential level; adding smoke detector w/access panel, cage and | |
| Oct 15, 2024 | In progress issued Oct 2024 | 850 Turk St | Cahill Contractors Llc., Bobcomm Llc Dba Pacific Das Llc., Nibbi Bros Assoc Inc. | 100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884.Details
100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884. | |
| Oct 7, 2024 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | Nibbi Bros Assoc Inc. | the work covered by this application is minor architectural & mechanical revision to approved addendum 3,fa add 5(pa #202106031523) including 1) adding a smoke damper to ducting between the janitor & laundry room at each residential level. 2) adding a smoke detector with access panel, cage & louwerDetails
the work covered by this application is minor architectural & mechanical revision to approved addendum 3,fa add 5(pa #202106031523) including 1) adding a smoke damper to ducting between the janitor & laundry room at each residential level. 2) adding a smoke detector with access panel, cage & louwer | |
| Aug 30, 2024 | In progress issued Mar 2025 | 1151 Fairfax Av | Cahill Contractors Llc. | rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plansDetails
rev 201909121448 addenda 2- work to be completed is the addition of 2 layers of gypsum board to the mpoe room wall in order to increase the fire rating from 1 -2 hr. work to be done on lower level floor plan sheets and the wall type being constructed is detailed on plans | $4,148 |
| Mar 17, 2023 | Never finaled filed Mar 2023, never issued | 3485 Cesar Chavez St | priority process project: mayor dir 13-01 - erect a 7-story, 5 stories of type 3a construction over 2 stories of type 1a, the upper floors contains 126 residential units, ground floor host residential service and common spaces.Details
priority process project: mayor dir 13-01 - erect a 7-story, 5 stories of type 3a construction over 2 stories of type 1a, the upper floors contains 126 residential units, ground floor host residential service and common spaces. | $51,367,092 | |
| Dec 15, 2022 | Completed final sign-off May 2026 | 1633 Valencia St | Cahill Contractors Llc. | mayor directive 13-01: to erect 6 stories, type 1a ground flr residential service & common spaces, type 3a upper flr residential unitsDetails
mayor directive 13-01: to erect 6 stories, type 1a ground flr residential service & common spaces, type 3a upper flr residential units | $53,000,000 |
| Dec 8, 2022 | In progress issued Dec 2023 | 850 Turk St | Cahill Contractors Llc., Bobcomm Llc Dba Pacific Das Llc. | priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building.Details
priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building. | $39,000,000 |
| Nov 3, 2022 | Never finaled issued Dec 2022, no final | 1101 Sutter St | in kind replacement of existing windows - new wood windows to match existing conditions reference pa# 202112174636 s.Details
in kind replacement of existing windows - new wood windows to match existing conditions reference pa# 202112174636 s. | $200,000 | |
| Oct 19, 2022 | Completed final sign-off Oct 2023 | 555 Larkin St | Zone 4 Power Inc | 1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signageDetails
1/f: t.i. ground floor storefront. metal stud framing w/painted gyp bd, ceiling treatments, offices, break/copy room, & flex room. change of use to b-office. deferred submittal: signage | $925,000 |
| Sep 28, 2022 | Never finaled issued Sep 2022, no final | 53 Colton St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | assembly permit for sffd assembly stamps only. ref 201911127017-s3.Details
assembly permit for sffd assembly stamps only. ref 201911127017-s3. | |
| Sep 14, 2022 | Completed final sign-off Aug 2023 | 833 Bryant St | Cahill Contractors Llc. | affected units 201 226 228 301 326 328 401 426 428 501 526 528 601 626 628 relocated floor drain to tie onto (e) waste line, vent line and trap prime, no alterations to (e) structure are proposed, slope fillor to new drain location from exents of batroom (mac2% slope)Details
affected units 201 226 228 301 326 328 401 426 428 501 526 528 601 626 628 relocated floor drain to tie onto (e) waste line, vent line and trap prime, no alterations to (e) structure are proposed, slope fillor to new drain location from exents of batroom (mac2% slope) | $340,000 |
| Aug 15, 2022 | Completed final sign-off Oct 2022 | 500 Turk St | Rcm Fire Protection Inc. | fire underground service revision, pa# 201712156628 s3.Details
fire underground service revision, pa# 201712156628 s3. | |
| Jun 10, 2022 | Completed final sign-off May 2024 | 1950 Mission St | (n) metal stud wall, interior create a storage room with doors, cabinets, and furred wall at (e) cone wall to hang out.Details
(n) metal stud wall, interior create a storage room with doors, cabinets, and furred wall at (e) cone wall to hang out. | $25,000 | |
| May 20, 2022 | Completed final sign-off May 2024 | 150 04th Ti St | Webcor Construction Lp | parcel c2.4- production pile submission associated with new building under 201912169619.Details
parcel c2.4- production pile submission associated with new building under 201912169619. | $2,660,000 |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 588 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system.Details
repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system. | $350,000 |
| Dec 17, 2021 | In progress issued Nov 2025 | 1101 Sutter St | Nibbi Bros Assoc Inc. | priority processing per ab-004. ground floor of the existing concrete building will receive new infill storefront & garage door on sutter st. garage door on larkin st to be removed & infilled with concrete/window. interior improvements include new exit staris and new retail space.Details
priority processing per ab-004. ground floor of the existing concrete building will receive new infill storefront & garage door on sutter st. garage door on larkin st to be removed & infilled with concrete/window. interior improvements include new exit staris and new retail space. | $1,000,000 |
| Jun 3, 2021 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | Nibbi Bros Assoc Inc., Baines - Nibbi J V | sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units.Details
sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units. | $53,000,000 |
| Jun 3, 2021 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | Pacific States Environmental Contractors, Baines - Nibbi J V | sunnydale block 3b (lot 4) - mayor ed 13-01 & 17-02: priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use building with garage, retail, restaurants and 90 residetial units. one basement.Details
sunnydale block 3b (lot 4) - mayor ed 13-01 & 17-02: priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use building with garage, retail, restaurants and 90 residetial units. one basement. | $62,000,000 |
| Sep 14, 2020 | Never finaled issued Apr 2022, no final | 201 West Point Rd | Cahill-Nibbi Joint Venture | site grading for lot development & public road infrastructure. the john steward company in partnership with hope sf provides this grading permit submittal for the hunters view phase 3 public housing complex in the bayview hunters pt neighborhood. the site is located on the eastern side of middle ptDetails
site grading for lot development & public road infrastructure. the john steward company in partnership with hope sf provides this grading permit submittal for the hunters view phase 3 public housing complex in the bayview hunters pt neighborhood. the site is located on the eastern side of middle pt | $1,400,000 |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | Webcor Construction Lp | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 1101 Sutter St | Martin Building Co | demo of interior non-structural partitions onlyDetails
demo of interior non-structural partitions only | $7,000 |
| Dec 9, 2019 | Never finaled issued Dec 2021, no final | 1567 California St | to erect 9 stories, no basement. type i-a, 100 residential units with commercial, amenity & courtyard. (r-2,b,m,a-3,s-1) lot 15, 14 & 14a will be merged for this new development.Details
to erect 9 stories, no basement. type i-a, 100 residential units with commercial, amenity & courtyard. (r-2,b,m,a-3,s-1) lot 15, 14 & 14a will be merged for this new development. | $18,500,000 | |
| Nov 12, 2019 | Completed final sign-off Oct 2022 | 53 Colton St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | to erect 6 stories, 1 basement, type iii-a over i-a, 96 units residential with office, & assembly building. (r-2,b,a-3,s-2) (mayor exective dir# 13-01 & 17-02)Details
to erect 6 stories, 1 basement, type iii-a over i-a, 96 units residential with office, & assembly building. (r-2,b,a-3,s-2) (mayor exective dir# 13-01 & 17-02) | $25,000,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1151 Fairfax Av | Cahill - Nibbi Joint Ventures, Mc Millan Electric | mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023;Details
mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023; | $50,000,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1151 Fairfax Av | Cahill Contractors Llc., Cahill - Nibbi Joint Ventures, Cahill Contractors Inc | mayor dir# 17-02. 100% affordable housing. to erect 5 stories, no basement, type iii-a over type i-a, 76 units residential with mixed used buidling. (r-2,b,a-3) apn# 4624/033 (hunters view phase 3-block 17, lot 4)Details
mayor dir# 17-02. 100% affordable housing. to erect 5 stories, no basement, type iii-a over type i-a, 76 units residential with mixed used buidling. (r-2,b,a-3) apn# 4624/033 (hunters view phase 3-block 17, lot 4) | $50,000,000 |
| Jun 19, 2019 | Completed final sign-off May 2021 | 1950 Mission St | Swinerton Builders | revision to s2 of pa #2016-0921-8371 (arch/mep/landscape/civil); switchgear room was removed from the project & replaced with the youth/media room; landscaping.Details
revision to s2 of pa #2016-0921-8371 (arch/mep/landscape/civil); switchgear room was removed from the project & replaced with the youth/media room; landscaping. | |
| Jun 6, 2019 | Completed final sign-off Mar 2023 | 500 Turk St | James E Roberts-Obayashi Corporation | to demolish 1 story tire shop.Details
to demolish 1 story tire shop. | $80,000 |
| Feb 11, 2019 | Completed final sign-off Apr 2022 | 833 Bryant St | Cahill Contractors Llc. | 100% affortable to erect a type 3-a over 1-a, 6-story, 146 dwelling unit and retail with no basement.Details
100% affortable to erect a type 3-a over 1-a, 6-story, 146 dwelling unit and retail with no basement. | $26,145,272 |
| May 16, 2018 | Completed final sign-off Jul 2018 | 33 Gough St | Interstate Fence Co Inc | two chain link fence around parking lot. 10' max one gate access on mccoppin st. the property is under current application for development.Details
two chain link fence around parking lot. 10' max one gate access on mccoppin st. the property is under current application for development. | $20,000 |
| Dec 15, 2017 | Completed final sign-off Mar 2023 | 500 Turk St | James E Roberts-Obayashi Corporation, Sabah International Incorporated | to erect 8 stories, no basement, type i-a,108 units residential with commerical/retail mixed used (r-2,m)Details
to erect 8 stories, no basement, type i-a,108 units residential with commerical/retail mixed used (r-2,m) | $40,000,000 |