Mc Millan Electric
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 12 permits filed
262 permits since 2000: 157 completed, 9 in progress, 41 never finaled, 55 expired or cancelled.
Of the 41 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 37 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 262.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2026 | In progress issued Mar 2026 | 120 Kearny St | 32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroomDetails
32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroom | $8,500 |
| Jan 13, 2026 | In progress issued Jan 2026 | 221 Main St | to erect projecting double face electrical signDetails
to erect projecting double face electrical sign | $10,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 3 Embarcadero Center | suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369Details
suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369 | $80,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 350 California St | 14th floor. installation if new lighting and controls on the 14th floor in suite 1400.Details
14th floor. installation if new lighting and controls on the 14th floor in suite 1400. | $68,000 |
| Jul 2, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049.Details
22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049. | $110,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2 Embarcadero Center | electrical work for new security operations center on level lobby. deferred electrical submittal ref#: 202405242925Details
electrical work for new security operations center on level lobby. deferred electrical submittal ref#: 202405242925 | $56,450 |
| May 5, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433Details
22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433 | $400,000 |
| May 1, 2025 | Completed final sign-off May 2026 | 1 Sansome St | 17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177Details
17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177 | $375,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039Details
14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039 | $150,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989Details
22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989 | $150,000 |
| Feb 25, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857Details
15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857 | $28,000 |
| Dec 16, 2024 | Completed final sign-off Mar 2025 | 71 Stevenson St | 10/fl- ti 202410183227- install (n) fire alarm notification appliances to accomadate to the tiDetails
10/fl- ti 202410183227- install (n) fire alarm notification appliances to accomadate to the ti | $17,298 |
| Sep 27, 2024 | In progress issued Sep 2024 | 1 Sansome St | 19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit.Details
19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit. | $81,000 |
| Aug 20, 2024 | In progress issued Sep 2024 | 71 Stevenson St | ti 202408138572- fire alarm project involving the one for one replacement of notification appliances as well as additional applicanceDetails
ti 202408138572- fire alarm project involving the one for one replacement of notification appliances as well as additional applicance | $9,726 |
| Mar 4, 2024 | Completed final sign-off May 2024 | 71 Stevenson St | install 12 (n) fire alarm appliances & 2 new fire alarm initiating devices to accomodate ste 1450 t.i. 202401254666Details
install 12 (n) fire alarm appliances & 2 new fire alarm initiating devices to accomodate ste 1450 t.i. 202401254666 | $9,650 |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | 31/f-suite 3110: tenant improvement power & lighting. ti reference pa 202307273089Details
31/f-suite 3110: tenant improvement power & lighting. ti reference pa 202307273089 | $200,000 |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | 32/f- suite 3210: tenant improvement power & lighting. ti reference pa 202307273090Details
32/f- suite 3210: tenant improvement power & lighting. ti reference pa 202307273090 | $200,000 |
| Dec 12, 2023 | In progress issued Dec 2023 | 1 Sansome St | 31/f-suite 3150: tenant improvement power & lighting. ti reference pa 202307273129.Details
31/f-suite 3150: tenant improvement power & lighting. ti reference pa 202307273129. | $200,000 |
| May 5, 2023 | Never finaled filed May 2023, never issued | 2340 San Jose Av | as-builts for pa# 2018-0703-3677: upsize (2) circuit breakers in retail meter/mains, from 50 amps to (1) 125a & (1) 100a upsize panel rt to 250 a & panel rxz to 225aDetails
as-builts for pa# 2018-0703-3677: upsize (2) circuit breakers in retail meter/mains, from 50 amps to (1) 125a & (1) 100a upsize panel rt to 250 a & panel rxz to 225a | $5,000 |
| Mar 21, 2023 | Completed final sign-off Dec 2025 | 55 New Montgomery St | to provide an emergency response radio coverage system (errcs) including backbone that meets state and local codes and requirements.Details
to provide an emergency response radio coverage system (errcs) including backbone that meets state and local codes and requirements. | $100,000 |
| Jul 15, 2022 | Expired or cancelled cancelled Feb 2025 | 274 Brannan St | basement and gr floors, structural reinforcement for 2 openings at basement level, gr level. structural reiforcemnt at existing slab for future conduit runsDetails
basement and gr floors, structural reinforcement for 2 openings at basement level, gr level. structural reiforcemnt at existing slab for future conduit runs | $20,000 |
| Jan 7, 2020 | Completed final sign-off Jul 2020 | 71 Stevenson St | 6/f & 7/f: title 24 compliance to ti.i pa201910094036 & pa201907166033Details
6/f & 7/f: title 24 compliance to ti.i pa201910094036 & pa201907166033 | $75,000 |
| Nov 12, 2019 | Never finaled issued Jan 2020, no final | 150 Spear St | provide and install new light fixtures and power recepticles per tenant improvement project ref pa #2019-0823-9655.Details
provide and install new light fixtures and power recepticles per tenant improvement project ref pa #2019-0823-9655. | $80,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2020 | 150 Spear St | 10/f: title 24 electrical installation under ew201907162189. ref t.i. pa201906254320. maher n/a.Details
10/f: title 24 electrical installation under ew201907162189. ref t.i. pa201906254320. maher n/a. | $80,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1151 Fairfax Av | mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023;Details
mayor dir# 13-01. 100% affordable housing. to erect 6 stories, 1 basement, type iii-a over type i-a, 42 units residential mixed used. (r-2,b,a-3,s-2) apn# 4624-033 (hunters view phase 3-block 14, lot 3); received addendum 7 (tie down), suggest concurrent review, dmj 12/27/2023; | $50,000,000 |
| Aug 28, 2019 | Completed final sign-off Nov 2019 | 595 Market St | ref# 2019-0624-4181: electrical work for 23rd floor. partial-scope office tenant retrofit: lighting, power and signal, wiring, lighting and contols.Details
ref# 2019-0624-4181: electrical work for 23rd floor. partial-scope office tenant retrofit: lighting, power and signal, wiring, lighting and contols. | $200,000 |
| May 16, 2019 | Expired or cancelled cancelled Jan 2026 | 1 Montgomery St | electrical title 24 for 11th and 12th flDetails
electrical title 24 for 11th and 12th fl | $350,000 |
| May 16, 2019 | Completed final sign-off Jul 2019 | 120 Kearny St | electrical work title 24. no arch drawing.Details
electrical work title 24. no arch drawing. | $350,000 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 301 Battery St | lighting scoope, revised lighting layout, revise power layout, title 24 calculations. reference pa. #2018 921 1070, #2018 0921 1072 (6th and 7th floors)Details
lighting scoope, revised lighting layout, revise power layout, title 24 calculations. reference pa. #2018 921 1070, #2018 0921 1072 (6th and 7th floors) | $80,000 |
| Feb 11, 2019 | Completed final sign-off Aug 2019 | 1 Market St | lighting scope, revised lighting layout, revise power layout, title 24 calculations. reference p.a.#2018 0831 8852 r1Details
lighting scope, revised lighting layout, revise power layout, title 24 calculations. reference p.a.#2018 0831 8852 r1 | $100,000 |
| Oct 25, 2018 | Completed final sign-off Feb 2020 | 425 Market St | roof: replacement of (e) sand filter - replace 3 (e) sand filters with (3) new sand filters. maher n/a.Details
roof: replacement of (e) sand filter - replace 3 (e) sand filters with (3) new sand filters. maher n/a. | $150,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 600 Stockton St | revision to 201705267760: hvac to at&t hexoend changing from chilled water to split systemDetails
revision to 201705267760: hvac to at&t hexoend changing from chilled water to split system | $15,000 |
| Jun 21, 2018 | Completed final sign-off Jan 2019 | 300 California St | electrical pemrit work only. ref 201805229737 maher not reqDetails
electrical pemrit work only. ref 201805229737 maher not req | $350,000 |
| May 26, 2017 | Completed final sign-off Oct 2018 | 600 Stockton St | installation of equipment racks inside existing storage room, includes battery rack with less than 50 gallons of electrolytes. installation of one air conditioning unit. maher ord 155-13 na.Details
installation of equipment racks inside existing storage room, includes battery rack with less than 50 gallons of electrolytes. installation of one air conditioning unit. maher ord 155-13 na. | $20,000 |
| Apr 26, 2017 | Expired or cancelled cancelled Jan 2026 | 71 Stevenson St | on 15, 16, 17, 21, 22, and 23 floor- electrical lighting & power revisions upgrades t-24. ref pa #201704043091, 201704043090, 201704043089, 201704043088, 201704043086.Details
on 15, 16, 17, 21, 22, and 23 floor- electrical lighting & power revisions upgrades t-24. ref pa #201704043091, 201704043090, 201704043089, 201704043088, 201704043086. | $450,000 |
| Mar 22, 2017 | Expired or cancelled cancelled Jan 2026 | 50 Fremont St | replace out, like for like, a electric-driven fire pump controller. new controller is a listed firetrol model fta1000 fire pump controllerDetails
replace out, like for like, a electric-driven fire pump controller. new controller is a listed firetrol model fta1000 fire pump controller | $12,000 |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 1 Embarcadero Center | lobby & 2nd flr: tenant improvements with small office space electric panel upgrade, ref. 201603141932; maher n/aDetails
lobby & 2nd flr: tenant improvements with small office space electric panel upgrade, ref. 201603141932; maher n/a | $110,000 |
| May 19, 2016 | Never finaled issued Sep 2016, no final | 1001 Potrero Av | verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher.Details
verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher. | $10,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 401 Harrison St | installation of telecom equipment inside existing room at basementDetails
installation of telecom equipment inside existing room at basement | $50,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 731 Market St | work is based off of the electrically engineered drawings ref pa 2016-0217-9764. partial scope office tenant retrofit lighting, power and signal, wiring, lighting & receptacle controls.Details
work is based off of the electrically engineered drawings ref pa 2016-0217-9764. partial scope office tenant retrofit lighting, power and signal, wiring, lighting & receptacle controls. | $195,000 |
| Jun 25, 2015 | Never finaled issued Jun 2015, no final | 455 The Embarcadero | 1/f: electrical- furnish and install new lighting and power, relocate existing panel boards make safe demo prior to job start; reference pa#201406309966Details
1/f: electrical- furnish and install new lighting and power, relocate existing panel boards make safe demo prior to job start; reference pa#201406309966 | $350,000 |
| Sep 19, 2014 | Completed final sign-off Aug 2015 | 345 California St | suite #170: electrical devices added, lights, switches, and plugs.n/a for the maher ordinance #155-13 refer to building permit #2014 0729 2432Details
suite #170: electrical devices added, lights, switches, and plugs.n/a for the maher ordinance #155-13 refer to building permit #2014 0729 2432 | $10,000 |
| Mar 1, 2013 | Completed final sign-off Mar 2013 | 100 Pine St | fire alarm t.i., 16th and 17th floors install 26 strobes, relocate 13 speakers, re-locate 2 smoke detectorsDetails
fire alarm t.i., 16th and 17th floors install 26 strobes, relocate 13 speakers, re-locate 2 smoke detectors | $22,000 |
| Feb 4, 2013 | Completed final sign-off May 2013 | 100 Pine St | revision to appl #2012.1211.5944 (16th & 17th floor)- installation of card reader security doors for low voltage security access.Details
revision to appl #2012.1211.5944 (16th & 17th floor)- installation of card reader security doors for low voltage security access. | $15,000 |
| Oct 24, 2012 | Completed final sign-off Oct 2012 | 150 California St | fire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobesDetails
fire alarm t.i. - relocate 6 strobes, 4 speakers. 1 new smoke detector, 2 new strobes | $7,200 |
| Jun 1, 2012 | Completed final sign-off Feb 2013 | 370 03rd St | 2nd floor:t. i. ups battery room. install a new battery ups system.Details
2nd floor:t. i. ups battery room. install a new battery ups system. | $100,000 |
| May 29, 2012 | Completed final sign-off Jul 2012 | 370 03rd St | tenant improvement - ref to pa# 201203055349. energy title 24 - tenant improvement for 2nd & 3rd floor. separate permit for title 24.Details
tenant improvement - ref to pa# 201203055349. energy title 24 - tenant improvement for 2nd & 3rd floor. separate permit for title 24. | $5,000,000 |
| Dec 1, 2011 | Completed final sign-off Nov 2012 | 1525 Mission St | re-inforce existing mezzanineDetails
re-inforce existing mezzanine | $15,000 |
| Nov 16, 2011 | Never finaled issued Nov 2011, no final | 1390 Market St | provide power for co detection devices and controller relays. provide boxes and conduits infracstructure for 24 v co vendor wiring. provide conduits to fa system for interface for monitoring.Details
provide power for co detection devices and controller relays. provide boxes and conduits infracstructure for 24 v co vendor wiring. provide conduits to fa system for interface for monitoring. | $22,000 |
| Jul 20, 2011 | Completed final sign-off Aug 2011 | 110 Sutter St | to obtain final inspection for work approved under pa# 200601242912. all work is complete.Details
to obtain final inspection for work approved under pa# 200601242912. all work is complete. | |
| May 10, 2011 | Completed final sign-off Jul 2011 | 405 Howard St | 6th floor-install 1 control relay, 1 door holder, 1 interposing relay, 10 speaker strobes, 4 ceiling mount speakersDetails
6th floor-install 1 control relay, 1 door holder, 1 interposing relay, 10 speaker strobes, 4 ceiling mount speakers | $7,500 |
| May 10, 2011 | Completed final sign-off May 2011 | 201 Mission St | 27th floor-install 8 speaker strobe sets, 1 strobe set & 19 speakersDetails
27th floor-install 8 speaker strobe sets, 1 strobe set & 19 speakers | $5,000 |
| Mar 7, 2011 | Completed final sign-off Nov 2012 | 1525 Mission St | complete work and obtain final inspection for 200811035693Details
complete work and obtain final inspection for 200811035693 | $10,000 |
| Jan 27, 2011 | Expired or cancelled cancelled Oct 2011 | 71 Stevenson St | 14th floor-install furniture workstations in empty suite. modify electrical outlets, relocate (e) light fixturesDetails
14th floor-install furniture workstations in empty suite. modify electrical outlets, relocate (e) light fixtures | $8,500 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 601 Montgomery St | replace 9 each 2x4 light fixturesDetails
replace 9 each 2x4 light fixtures | $3,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 150 California St | suite 650: install 2-ceiling speakers, 4-strobes.Details
suite 650: install 2-ceiling speakers, 4-strobes. | $4,500 |
| Nov 23, 2010 | Completed final sign-off Feb 2011 | 625 03rd St | roof: @ 2nd floor mech rooms remove 4-life safety device (duct smoke detectors) & install 1-on roof.Details
roof: @ 2nd floor mech rooms remove 4-life safety device (duct smoke detectors) & install 1-on roof. | $2,800 |
| Oct 27, 2010 | Never finaled issued Oct 2010, no final | 100 California St | suite 1300. install 1 ceiling mount speaker.Details
suite 1300. install 1 ceiling mount speaker. | $1,500 |
| Oct 27, 2010 | Never finaled issued Oct 2010, no final | 150 California St | 1st floor: install 1 module relayDetails
1st floor: install 1 module relay | $3,500 |
| Aug 19, 2010 | Completed final sign-off Sep 2010 | 201 Mission St | 23rd floor-install 1 smoke detectors, 2 speaker/strobe set, 3 speaker (ceiling mount).Details
23rd floor-install 1 smoke detectors, 2 speaker/strobe set, 3 speaker (ceiling mount). | $3,200 |
| Aug 19, 2010 | Completed final sign-off Apr 2011 | 405 Howard St | 5th floor-install 2 power supply, install 3 speaker/strobe setsDetails
5th floor-install 2 power supply, install 3 speaker/strobe sets | $3,500 |
| Jun 22, 2010 | Completed final sign-off Aug 2010 | 150 California St | 10th floor, ste #1000 fire alarm - relocate of existing notification devices which are powered by existing fcps -24f booster power supply.Details
10th floor, ste #1000 fire alarm - relocate of existing notification devices which are powered by existing fcps -24f booster power supply. | $2,500 |
| Jun 7, 2010 | Never finaled issued Jun 2010, no final | 301 Mission St | install 2 smoke detectors and 2 smoke dampersDetails
install 2 smoke detectors and 2 smoke dampers | $5,000 |
| May 20, 2010 | Completed final sign-off Oct 2010 | 301 Mission St | 1st floor install (1) speaker/strobe.Details
1st floor install (1) speaker/strobe. | $500 |
| Apr 27, 2010 | Completed final sign-off Jun 2010 | 150 California St | fire alarm system on 6th fl. relocate 7 strobes and 6 ceiling speakers.Details
fire alarm system on 6th fl. relocate 7 strobes and 6 ceiling speakers. | $1,000 |
| Apr 13, 2010 | Completed final sign-off Apr 2010 | 1390 Market St | floor 11, suite 1118 - install (1) strobe set & (5) speakers.Details
floor 11, suite 1118 - install (1) strobe set & (5) speakers. | $4,200 |
| Apr 1, 2010 | Completed final sign-off Jun 2010 | 116 California St | floor 13th suite:1320: (2) smoke detectors, (2) strobe set, (2) ceiling mount speaker, (2) door holder. work on 100 california st.Details
floor 13th suite:1320: (2) smoke detectors, (2) strobe set, (2) ceiling mount speaker, (2) door holder. work on 100 california st. | $7,500 |
| Mar 11, 2010 | Never finaled issued Mar 2010, no final | 201 Mission St | 22nd floor ste 2200 -install 1 speaker, 5 speakers ceiling mounted for fire alarm system.Details
22nd floor ste 2200 -install 1 speaker, 5 speakers ceiling mounted for fire alarm system. | $6,000 |
| Mar 11, 2010 | Expired or cancelled expired Nov 2013 | 201 Mission St | 20th floor ste #2030 -install 2 speakers ceiling mountedDetails
20th floor ste #2030 -install 2 speakers ceiling mounted | $2,100 |
| Mar 4, 2010 | Completed final sign-off Jun 2010 | 405 Howard St | 1st floor/bldg #2-install 2 single input module, 1 control relay, 3 booster power supply, & 3 speaker/strobe setsDetails
1st floor/bldg #2-install 2 single input module, 1 control relay, 3 booster power supply, & 3 speaker/strobe sets | $7,500 |
| Feb 25, 2010 | Never finaled issued Feb 2010, no final | 1390 Market St | temporary fire alarm work-suite 1202: install 7-strobe & 3 horns. on existing system- will be changed to speaker strobes under application 2009/10/08/8555Details
temporary fire alarm work-suite 1202: install 7-strobe & 3 horns. on existing system- will be changed to speaker strobes under application 2009/10/08/8555 | $5,000 |
| Feb 3, 2010 | Completed final sign-off May 2010 | 555 California St | 49th floor. revision to pa# 2009.10.13.8802 to add new strobes, speaker, smoke detector and relay.Details
49th floor. revision to pa# 2009.10.13.8802 to add new strobes, speaker, smoke detector and relay. | $2,000 |
| Jan 22, 2010 | Completed final sign-off May 2010 | 55 Francisco St | relocate (1) existing horn strobe on first floor.Details
relocate (1) existing horn strobe on first floor. | $3,000 |
| Dec 1, 2009 | Completed final sign-off Dec 2009 | 1390 Market St | 4th floor-install 1 speaker, install 1 ceiling speaker strobe, install 1 horn/ceilingDetails
4th floor-install 1 speaker, install 1 ceiling speaker strobe, install 1 horn/ceiling | $3,200 |
| Nov 17, 2009 | Completed final sign-off Jan 2010 | 505 Montgomery St | 6th floor fire alarm system - (5) strobe sets, (2) speakers, (2) relays.Details
6th floor fire alarm system - (5) strobe sets, (2) speakers, (2) relays. | $4,000 |
| Nov 2, 2009 | Completed final sign-off Dec 2009 | 150 California St | relocate existing life safety devices.Details
relocate existing life safety devices. | $4,000 |
| Oct 29, 2009 | Completed final sign-off Apr 2010 | 45 Fremont St | floors 4,5,6,15: fire alarm 111 strobes, 8 speakers, 20 smoke detectors, 35 duct detectors, 16 door holders, 11 control modules, 4 booster power suppliesDetails
floors 4,5,6,15: fire alarm 111 strobes, 8 speakers, 20 smoke detectors, 35 duct detectors, 16 door holders, 11 control modules, 4 booster power supplies | $28,000 |
| Oct 29, 2009 | Completed final sign-off Dec 2009 | 201 Mission St | suite 1825 and 1850: install 9 strobe setsDetails
suite 1825 and 1850: install 9 strobe sets | $38,000 |
| Oct 13, 2009 | Completed final sign-off May 2010 | 555 California St | 49th floor. fire alarm system. install 27 strocbe, 29 ceiling mounted speakers, 1 smoke detector, 1 detector base with relay.Details
49th floor. fire alarm system. install 27 strocbe, 29 ceiling mounted speakers, 1 smoke detector, 1 detector base with relay. | $12,000 |
| Aug 18, 2009 | Completed final sign-off May 2010 | 555 California St | life safety: 21st. floor. tenant improvement, adding new strobes, speakers to be connected to the existing building fire alarm system.Details
life safety: 21st. floor. tenant improvement, adding new strobes, speakers to be connected to the existing building fire alarm system. | $5,000 |
| Jul 17, 2009 | Completed final sign-off Jul 2009 | 45 Fremont St | 13th. floor revise matrix; fire alarm sequenccy of operation. rev. permit #2009/0506/7807.Details
13th. floor revise matrix; fire alarm sequenccy of operation. rev. permit #2009/0506/7807. | |
| Jun 17, 2009 | Completed final sign-off Jul 2009 | 100 California St | 11th floor-suite #1100-13 strobes, suite #1125-20 ceiling mount speakersDetails
11th floor-suite #1100-13 strobes, suite #1125-20 ceiling mount speakers | $5,000 |
| May 29, 2009 | Completed final sign-off Oct 2009 | 1 Sansome St | renew pa# 2007/10/30/6783 to obtain final inspection. all work has been completed.Details
renew pa# 2007/10/30/6783 to obtain final inspection. all work has been completed. | |
| May 18, 2009 | Never finaled issued May 2009, no final | 111 Sutter St | to obtain final inspection for work approved under app #200708078971. all work is complete.Details
to obtain final inspection for work approved under app #200708078971. all work is complete. | |
| May 7, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | renew pa# 2007/07/27/7929 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/27/7929 to obtain final inspection. all work has been completed. | |
| May 7, 2009 | Completed final sign-off Nov 2009 | 601 Montgomery St | renew pa# 2006/06/27/5085 to obtain final inspection. all work has been completed.Details
renew pa# 2006/06/27/5085 to obtain final inspection. all work has been completed. | |
| May 6, 2009 | Completed final sign-off Sep 2009 | 1 California St | 10th floor - for fire alarm system - install (2) speakers, (13) strobes, (2) ceiling strobes, (4) smoke detector, (4) tubes, (4) relays, (1) module, (1) strobe booster, (2) batteries.Details
10th floor - for fire alarm system - install (2) speakers, (13) strobes, (2) ceiling strobes, (4) smoke detector, (4) tubes, (4) relays, (1) module, (1) strobe booster, (2) batteries. | $16,000 |
| May 6, 2009 | Completed final sign-off Jul 2009 | 45 Fremont St | 13th floor - fire alarm system - install (1) smoke detector, (1) control relay, (2) relay.Details
13th floor - fire alarm system - install (1) smoke detector, (1) control relay, (2) relay. | $6,000 |
| May 6, 2009 | Completed final sign-off Jun 2009 | 555 Front St | ground floor - electrical work; install occupancy sensors & occupancy dual level throughout the bldg.Details
ground floor - electrical work; install occupancy sensors & occupancy dual level throughout the bldg. | $60,000 |
| Apr 9, 2009 | Never finaled issued Apr 2009, no final | 450 10th St | renew pa# 2007/07/24/7559 to obtain final inspection. all work has been completed.Details
renew pa# 2007/07/24/7559 to obtain final inspection. all work has been completed. | |
| Apr 6, 2009 | Completed final sign-off Apr 2009 | 1 California St | add 1 speaker & 2 strobes.Details
add 1 speaker & 2 strobes. | $5,000 |
| Feb 20, 2009 | Completed final sign-off May 2009 | 555 California St | 49th floor-install 2 interface module: 6 smoke detectors, 6 detector base, 8 photo elective smoke detectors, 8 smoke detectors, 8 duct detectors, 8 tube for ducts, 12 strobes, 12 speakers & 2 control modulesDetails
49th floor-install 2 interface module: 6 smoke detectors, 6 detector base, 8 photo elective smoke detectors, 8 smoke detectors, 8 duct detectors, 8 tube for ducts, 12 strobes, 12 speakers & 2 control modules | $12,000 |
| Jan 22, 2009 | Never finaled issued Jan 2009, no final | 45 Fremont St | work @ penthouse.addition of 1 control module for elevator alternate recall.Details
work @ penthouse.addition of 1 control module for elevator alternate recall. | $4,600 |
| Jan 13, 2009 | Completed final sign-off Apr 2009 | 45 Fremont St | install 32 strobe lights.32 speakers,2 control modules, 1 strobe power booster, 3 pilot relays, 2 door release, 3 manual pull strobe. 16th floorDetails
install 32 strobe lights.32 speakers,2 control modules, 1 strobe power booster, 3 pilot relays, 2 door release, 3 manual pull strobe. 16th floor | $23,000 |
| Dec 31, 2008 | Expired or cancelled expired May 2011 | 100 California St | 11th floor-install 13 strobe sets & 18 ceiling mount speakersDetails
11th floor-install 13 strobe sets & 18 ceiling mount speakers | $8,500 |
| Nov 5, 2008 | Never finaled issued Nov 2008, no final | 101 02nd St | phone room modification, provide one duct detector, program detector. verify operation.Details
phone room modification, provide one duct detector, program detector. verify operation. | $1,000 |
| Nov 4, 2008 | Never finaled issued Nov 2008, no final | 2001 37th Av | install new lighting in the orradre courtyard-16 lights, 4 switchesDetails
install new lighting in the orradre courtyard-16 lights, 4 switches | $8,500 |
| Nov 4, 2008 | Expired or cancelled cancelled Jan 2026 | 555 California St | 49th floor-install 12 speakers, 11 strobes and 14 detectorsDetails
49th floor-install 12 speakers, 11 strobes and 14 detectors | $8,500 |
| Nov 4, 2008 | Never finaled issued Nov 2008, no final | 690 Market St | 24th floor; unit#2404-install 4 smoke detectors, 2 detectors, 2 relays, 2 single input module, 4 audible base.Details
24th floor; unit#2404-install 4 smoke detectors, 2 detectors, 2 relays, 2 single input module, 4 audible base. | $7,500 |
| Oct 29, 2008 | Completed final sign-off Dec 2008 | 1280 Laguna St | to complete work and obtain final inspection for work 200506175389.Details
to complete work and obtain final inspection for work 200506175389. | $500 |